CN103615102A - Construction working platform - Google Patents

Construction working platform Download PDF

Info

Publication number
CN103615102A
CN103615102A CN201310580512.5A CN201310580512A CN103615102A CN 103615102 A CN103615102 A CN 103615102A CN 201310580512 A CN201310580512 A CN 201310580512A CN 103615102 A CN103615102 A CN 103615102A
Authority
CN
China
Prior art keywords
working platform
construction working
snap close
bindiny mechanism
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310580512.5A
Other languages
Chinese (zh)
Other versions
CN103615102B (en
Inventor
高志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHU JOINT ENGINEERING MATERIALS CO., LTD.
Original Assignee
CHANGSHU ANCIENT TOWN BAIMAO CONSTRUCTION DEFORMATION JOINT LINKAGE DEVICE FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHU ANCIENT TOWN BAIMAO CONSTRUCTION DEFORMATION JOINT LINKAGE DEVICE FACTORY filed Critical CHANGSHU ANCIENT TOWN BAIMAO CONSTRUCTION DEFORMATION JOINT LINKAGE DEVICE FACTORY
Priority to CN201310580512.5A priority Critical patent/CN103615102B/en
Publication of CN103615102A publication Critical patent/CN103615102A/en
Application granted granted Critical
Publication of CN103615102B publication Critical patent/CN103615102B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention discloses a construction working platform which comprises an operating platform, a connecting mechanism, a supporting seat and a motor. The operating platform is connected with the connecting mechanism; the connecting mechanism is connected with the supporting seat; sliding gears are arranged on the operating platform; the motor is connected with the sliding gears; racks are mounted on the connecting mechanism; limiting fixing devices are arranged on the operating platform. Owing to the mode, the construction working platform has the advantages that the construction working platform is good in stability and convenient to mount, the quantity of units of the construction working platform can be increased or decreased according to actual requirements of construction sites, and accordingly construction requirements can be met.

Description

Construction working platform
Technical field
The present invention relates to building field, particularly relate to a kind of construction working platform.
Background technology
At the realm of building construction, widely used all kinds scaffold, generally exist and use the problems such as material is many, the time of setting up is long, operating platform height is not easy to constructing operation, construction material is not easy to transmit, safe construction hidden danger is many, especially in high level, Super High engineering, problem is more outstanding, and construction operation platform has well solved this problem.But traditional construction operation platform conventionally size is fixing; under different scope of operation width requirements, can not well adapt to actual needs; often can be because construction operation platform be excessive or too smallly make troubles and affect operating efficiency to construction; as manufactured construction operation platform according to building-site situation, complicated operation, lose time and do not meet economic benefit.
Summary of the invention
The technical problem that the present invention mainly solves is to provide a kind of construction working platform, and this construction working platform steadiness is good, and easy for installation, can expand and delete unit according to the actual needs in building site, to meet construction requirement.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: a kind of construction working platform, comprising: operating desk, bindiny mechanism, supporting seat and motor, and described operating desk is connected with described bindiny mechanism;
Described bindiny mechanism is connected with described supporting seat;
Described operating desk is provided with balladeur train;
Described motor is connected with described balladeur train;
Gear bar is installed in described bindiny mechanism;
Described operating desk is provided with limiting and fixing device.
In a preferred embodiment of the present invention, described bindiny mechanism comprises: steel pipe, cross fixator and distortion snap close.
In a preferred embodiment of the present invention, described cross fixator is connected with described steel pipe.
In a preferred embodiment of the present invention, described steel pipe is provided with buckle slot, and described buckle slot is provided with circular hole, and described circular hole is connected with described distortion snap close.
In a preferred embodiment of the present invention, in the middle of described cross fixator, be provided with a bonnet lock hole, described cross fixator surface is provided with snap close post, on described cross fixator, is also provided with reference column and locating hole, and described reference column and described locating hole cooperatively interact.
In a preferred embodiment of the present invention, described latch plate is provided with the hole that is locked.
In a preferred embodiment of the present invention, described distortion snap close two ends are provided with latch plate.
In a preferred embodiment of the present invention, described in be locked hole and described snap close post cooperatively interact.
The invention has the beneficial effects as follows: construction working platform steadiness of the present invention is good, and easy for installation, can expand and delete unit according to the actual needs in building site, to meet construction requirement.
Accompanying drawing explanation
Fig. 1 is the structural representation of construction working platform of the present invention;
Fig. 2 is the structural representation of construction working platform of the present invention bindiny mechanism;
Fig. 3 is the structural representation of construction working Platform pipe of the present invention;
Fig. 4 is the top view of construction working platform cross fixator of the present invention;
Fig. 5 is the front view of construction working platform cross fixator of the present invention;
Fig. 6 is the structural representation of construction working platform distortion snap close of the present invention;
Fig. 7 is the expansion schematic diagram of construction working platform distortion snap close of the present invention;
In accompanying drawing, the mark of each parts is as follows: 1, operating desk; 2, bindiny mechanism; 3, supporting seat; 4, motor; 5, balladeur train; 6, gear bar; 7, limiting and fixing device; 8, steel pipe; 9, cross fixator; 10, distortion snap close; 11, buckle slot; 12, circular hole; 13, bonnet lock hole; 14, snap close post; 15, latch plate; 16, reference column; 17, locating hole; 18, the hole that is locked.
The specific embodiment
Below in conjunction with accompanying drawing, preferred embodiment of the present invention is described in detail, thereby so that advantages and features of the invention can be easier to be it will be appreciated by those skilled in the art that, protection scope of the present invention is made to more explicit defining.
Refer to Fig. 1 to Fig. 7, the embodiment of the present invention comprises: a kind of construction working platform, comprise: operating desk 1, bindiny mechanism 2, supporting seat 3 and motor 4, described operating desk 1 is connected with described bindiny mechanism 2, described bindiny mechanism 2 comprises: steel pipe 8, cross fixator 9 and distortion snap close 10, described bindiny mechanism 2 can expand this working platform fast, makes it meet the needs of different situations.
Described bindiny mechanism 2 is connected with described supporting seat 3, and described supporting seat 3 plays the effect of a stable center of gravity.
Described operating desk 1 is provided with balladeur train 5, in described bindiny mechanism 2, gear bar 6 is installed, and described balladeur train 5 coordinates with described gear bar 6, and described operating desk can be moved up and down.
Described motor 4 is connected with described balladeur train 5, and described motor 4 plays the effect that a transmitting gear slides.
Described operating desk 1 is provided with limiting and fixing device 7, and when being elevated to a certain height work, described limiting and fixing device 7 will make described operating desk 1 fixing, while avoiding work, because weight too heavily causes described operating desk to glide, causes injures and deaths.
Described cross fixator 9 is connected with described steel pipe 8, and described cross fixator 9 has played and strengthened fixing effect described steel pipe 8.
Described steel pipe 8 is provided with buckle slot 11, and described buckle slot 11 is provided with circular hole 12, and described circular hole 12 is connected with described distortion snap close 10, and described circular hole 12 is conducive to described distortion snap close 10 and passes.
In the middle of described cross fixator 9, be provided with a bonnet lock hole 13, described bonnet lock hole 13 is conducive to described distortion snap close 10 and passes.
Described cross fixator 9 surfaces are provided with snap close post 14, described distortion snap close 10 two ends are provided with latch plate 15, described latch plate 15 is provided with the hole 18 that is locked, described in be locked hole 18 cooperatively interact with described snap close post 14, be conducive to described distortion snap close 10 by described steel pipe 8 fixations.
Described cross fixator 9 is provided with reference column 16 and locating hole 17, and described reference column 16 and described locating hole 17 cooperatively interact, and makes so described cross fixator 9 two described steel pipes 8 of having good positioning can be fixed.
Below the operating principle of construction working platform of the present invention is described in detail.
Bindiny mechanism 2 is connected with supporting seat 3, can need to increase the quantity of bindiny mechanism 2 according to self, then gear bar 6 is vertically mounted in bindiny mechanism 2, motor 4 is connected with balladeur train 5 and is arranged on operating desk 1, balladeur train 5 is connected with gear bar 6, operating desk 1 is fixed in bindiny mechanism 2, finally at balladeur train 5 places, the lower end of operating desk 1, installs limiting and fixing device 7.
When assembled this bindiny mechanism 2 of people, by two steel pipe 8 right-angled intersections, make 11 relative and insertions of buckle slot, then cross fixator 9 is arranged on to the infall of two steel pipes 8, make reference column 16 insert locating hole 17 interior fixing, will be out of shape snap close 10 through circular hole 12 and bonnet lock hole 13, open the latch plate 15 at distortion snap close 10 two ends, the hole 18 that is locked on latch plate 15 is inserted on the snap close post 14 on cross fixator 9 surfaces, has completed splicing.
Compared with prior art, construction working platform steadiness of the present invention is good, and easy for installation, can expand and delete unit according to the actual needs in building site, to meet construction requirement.
The foregoing is only embodiments of the invention; not thereby limit the scope of the claims of the present invention; every equivalent structure or conversion of equivalent flow process that utilizes manual of the present invention and accompanying drawing content to do; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.

Claims (8)

1. a construction working platform, is characterized in that, comprising: operating desk, bindiny mechanism, supporting seat and motor, and described operating desk is connected with described bindiny mechanism;
Described bindiny mechanism is connected with described supporting seat;
Described operating desk is provided with balladeur train;
Described motor is connected with described balladeur train;
Gear bar is installed in described bindiny mechanism;
Described operating desk is provided with limiting and fixing device.
2. construction working platform according to claim 1, is characterized in that, described bindiny mechanism comprises: steel pipe, cross fixator and distortion snap close.
3. construction working platform according to claim 1, is characterized in that, described cross fixator is connected with described steel pipe.
4. construction working platform according to claim 1, is characterized in that, described steel pipe is provided with buckle slot, and described buckle slot is provided with circular hole, and described circular hole is connected with described distortion snap close.
5. construction working platform according to claim 1, it is characterized in that: in the middle of described cross fixator, be provided with a bonnet lock hole, described cross fixator surface is provided with snap close post, on described cross fixator, is also provided with reference column and locating hole, and described reference column and described locating hole cooperatively interact.
6. construction working platform according to claim 1, is characterized in that: described latch plate is provided with the hole that is locked.
7. construction working platform according to claim 1, is characterized in that: described distortion snap close two ends are provided with latch plate.
8. construction working platform according to claim 1, is characterized in that: described in be locked hole and described snap close post cooperatively interact.
CN201310580512.5A 2013-11-19 2013-11-19 Construction working platform Expired - Fee Related CN103615102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310580512.5A CN103615102B (en) 2013-11-19 2013-11-19 Construction working platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310580512.5A CN103615102B (en) 2013-11-19 2013-11-19 Construction working platform

Publications (2)

Publication Number Publication Date
CN103615102A true CN103615102A (en) 2014-03-05
CN103615102B CN103615102B (en) 2015-12-30

Family

ID=50165817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310580512.5A Expired - Fee Related CN103615102B (en) 2013-11-19 2013-11-19 Construction working platform

Country Status (1)

Country Link
CN (1) CN103615102B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358407A (en) * 2014-10-30 2015-02-18 无锡市安捷脚手架有限公司 Scaffold capable of being mounted fast
CN104358408A (en) * 2014-10-30 2015-02-18 无锡市安捷脚手架有限公司 Square disk scaffold
CN106351431A (en) * 2016-09-29 2017-01-25 四川大学 Movable working platform capable of performing continuous construction and used for rail transit tunnel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2804266Y (en) * 2005-05-10 2006-08-09 白虹 Fastening for fast detaching steel pipe scaffold
CN201011122Y (en) * 2007-03-23 2008-01-23 翁振华 Locating disk of direct plugged self-locking type scaffold
JP2008057253A (en) * 2006-08-31 2008-03-13 Hoshin:Kk Combinational material of scaffold/shoring
CN101761223A (en) * 2008-11-17 2010-06-30 无锡速捷脚手架工程有限公司 Method for installation of scaffold component
CN201883671U (en) * 2010-12-19 2011-06-29 曾凡荣 Scaffold for engineering building construction
CN202181716U (en) * 2011-08-11 2012-04-04 北京建筑工程学院 Automatic lifting type scaffold for building construction
CN202658869U (en) * 2012-06-19 2013-01-09 张玉家 Bushed rail type electric inserted lift scaffold

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2804266Y (en) * 2005-05-10 2006-08-09 白虹 Fastening for fast detaching steel pipe scaffold
JP2008057253A (en) * 2006-08-31 2008-03-13 Hoshin:Kk Combinational material of scaffold/shoring
CN201011122Y (en) * 2007-03-23 2008-01-23 翁振华 Locating disk of direct plugged self-locking type scaffold
CN101761223A (en) * 2008-11-17 2010-06-30 无锡速捷脚手架工程有限公司 Method for installation of scaffold component
CN201883671U (en) * 2010-12-19 2011-06-29 曾凡荣 Scaffold for engineering building construction
CN202181716U (en) * 2011-08-11 2012-04-04 北京建筑工程学院 Automatic lifting type scaffold for building construction
CN202658869U (en) * 2012-06-19 2013-01-09 张玉家 Bushed rail type electric inserted lift scaffold

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358407A (en) * 2014-10-30 2015-02-18 无锡市安捷脚手架有限公司 Scaffold capable of being mounted fast
CN104358408A (en) * 2014-10-30 2015-02-18 无锡市安捷脚手架有限公司 Square disk scaffold
CN104358407B (en) * 2014-10-30 2016-09-07 江苏江北船业有限公司 A kind of can the scaffold of Fast Installation
CN106351431A (en) * 2016-09-29 2017-01-25 四川大学 Movable working platform capable of performing continuous construction and used for rail transit tunnel

Also Published As

Publication number Publication date
CN103615102B (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN203285078U (en) Supporting frame with adjustable height
CN103615102B (en) Construction working platform
CN203424568U (en) Multifunctional design drawing table
CN204299286U (en) A kind of novel easy-to-dismount rail bar
CN201850679U (en) Removable stone curtain wall hanging assembly
CN203452454U (en) Guardrail connecting element
CN205830224U (en) A kind of tool-free fast-assembling blind plate assembly for IT rack
CN203403528U (en) Connecting piece for steel-structure corbel
CN203589461U (en) U upright bracket of switch cabinet
CN202988476U (en) Elevator guide rail bracket
CN203067450U (en) Pipe cap connection part
CN204940550U (en) One turns to drawstring connector
CN204152856U (en) A kind of guide pump assembling set
CN211324124U (en) Architectural design show shelf
CN212802702U (en) Strutting arrangement for building engineering
CN203403535U (en) Improved connecting structure for beam columns
CN203956516U (en) The rail structure that equipment is used
CN204316923U (en) A kind of drawing-type stereoscopic support
CN207998441U (en) A kind of aerial work platform of single-beam crane
CN213319808U (en) A positioner for broken wall machine equipment production usefulness
CN204778154U (en) Public rail brackets of elevator
CN221352351U (en) Adjustable signboard for building engineering management
CN202932341U (en) Assembled tea table
CN203375102U (en) Support of liquid crystal screen
CN201635337U (en) Movable-floor bearing bracket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20151111

Address after: Changshou City ancient town Baimao purple Fu Village in Suzhou City, Jiangsu province 215500

Applicant after: CHANGSHU JOINT ENGINEERING MATERIALS CO., LTD.

Address before: The red road Suzhou city Jiangsu province 215500 Baimao Industrial Park of Changshou City ancient town No. 8

Applicant before: Changshu Ancient Town Baimao Construction Deformation Joint Linkage Device Factory

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230