CN103615102B - Construction working platform - Google Patents

Construction working platform Download PDF

Info

Publication number
CN103615102B
CN103615102B CN201310580512.5A CN201310580512A CN103615102B CN 103615102 B CN103615102 B CN 103615102B CN 201310580512 A CN201310580512 A CN 201310580512A CN 103615102 B CN103615102 B CN 103615102B
Authority
CN
China
Prior art keywords
bindiny mechanism
operating desk
snap close
hole
working platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310580512.5A
Other languages
Chinese (zh)
Other versions
CN103615102A (en
Inventor
高志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHANGSHU JOINT ENGINEERING MATERIALS CO., LTD.
Original Assignee
CHANGSHU JOINT ENGINEERING MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGSHU JOINT ENGINEERING MATERIALS Co Ltd filed Critical CHANGSHU JOINT ENGINEERING MATERIALS Co Ltd
Priority to CN201310580512.5A priority Critical patent/CN103615102B/en
Publication of CN103615102A publication Critical patent/CN103615102A/en
Application granted granted Critical
Publication of CN103615102B publication Critical patent/CN103615102B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mutual Connection Of Rods And Tubes (AREA)

Abstract

The invention discloses a kind of construction working platform, comprising: operating desk, bindiny mechanism, supporting seat and motor, described operating desk is connected with described bindiny mechanism; Described bindiny mechanism is connected with described supporting seat; Described operating desk is provided with balladeur train; Described motor is connected with described balladeur train; Described bindiny mechanism is provided with gear bar; Described operating desk is provided with limiting and fixing device.By the way, construction working platform steadiness of the present invention is good, and easy for installation, can carry out expanding and deleting unit according to the actual needs in building site, to meet construction requirement.

Description

Construction working platform
Technical field
The present invention relates to building field, particularly relate to a kind of construction working platform.
Background technology
At the realm of building construction, widely used all kinds scaffold, generally also exist and use the problems such as material is many, the time of setting up is long, operating platform height is not easy to constructing operation, construction material is not easy to transmission, safe construction hidden danger is many, especially in high level, Super High engineering, problem is more outstanding, and construction operation platform well solves this problem.But the usual size of traditional construction operation platform is fixed; well actual needs can not be adapted under different scope of operation width requirements; frequent meeting is because construction operation platform is excessive or too small making troubles to construction affects operating efficiency; as manufactured construction operation platform according to building-site situation, complicated operation, losing time and not meeting economic benefit.
Summary of the invention
The technical problem that the present invention mainly solves is to provide a kind of construction working platform, and this construction working platform steadiness is good, and easy for installation, can carry out expanding and deleting unit according to the actual needs in building site, to meet construction requirement.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: a kind of construction working platform, comprising: operating desk, bindiny mechanism, supporting seat and motor, and described operating desk is connected with described bindiny mechanism;
Described bindiny mechanism is connected with described supporting seat;
Described operating desk is provided with balladeur train;
Described motor is connected with described balladeur train;
Described bindiny mechanism is provided with gear bar;
Described operating desk is provided with limiting and fixing device.
In a preferred embodiment of the present invention, described bindiny mechanism comprises: steel pipe, cross fixator and distortion snap close.
In a preferred embodiment of the present invention, described cross fixator is connected with described steel pipe.
In a preferred embodiment of the present invention, described steel pipe is provided with buckle slot, and described buckle slot is provided with circular hole, and described circular hole is connected with described distortion snap close.
In a preferred embodiment of the present invention, be provided with a bonnet lock hole in the middle of described cross fixator, described cross fixator surface is provided with snap close post, and described cross fixator is also provided with reference column and locating hole, and described reference column and described locating hole cooperatively interact.
In a preferred embodiment of the present invention, described latch plate is provided with the hole that is locked.
In a preferred embodiment of the present invention, described distortion snap close two ends are provided with latch plate.
In a preferred embodiment of the present invention, described in be locked hole and described snap close post cooperatively interact.
The invention has the beneficial effects as follows: construction working platform steadiness of the present invention is good, and easy for installation, can carry out expanding and deleting unit according to the actual needs in building site, to meet construction requirement.
Accompanying drawing explanation
Fig. 1 is the structural representation of construction working platform of the present invention;
Fig. 2 is the structural representation of construction working platform bindiny mechanism of the present invention;
Fig. 3 is the structural representation of construction working Platform pipe of the present invention;
Fig. 4 is the top view of construction working platform cross fixator of the present invention;
Fig. 5 is the front view of construction working platform cross fixator of the present invention;
Fig. 6 is the structural representation of construction working platform of the present invention distortion snap close;
Fig. 7 is the expansion schematic diagram of construction working platform of the present invention distortion snap close;
In accompanying drawing, the mark of each parts is as follows: 1, operating desk; 2, bindiny mechanism; 3, supporting seat; 4, motor; 5, balladeur train; 6, gear bar; 7, limiting and fixing device; 8, steel pipe; 9, cross fixator; 10, snap close is out of shape; 11, buckle slot; 12, circular hole; 13, bonnet lock hole; 14, snap close post; 15, latch plate; 16, reference column; 17, locating hole; 18, be locked hole.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present invention is described in detail, can be easier to make advantages and features of the invention be readily appreciated by one skilled in the art, thus more explicit defining is made to protection scope of the present invention.
Refer to Fig. 1 to Fig. 7, the embodiment of the present invention comprises: a kind of construction working platform, comprise: operating desk 1, bindiny mechanism 2, supporting seat 3 and motor 4, described operating desk 1 is connected with described bindiny mechanism 2, described bindiny mechanism 2 comprises: steel pipe 8, cross fixator 9 and distortion snap close 10, described bindiny mechanism 2 can expand this working platform fast, makes it meet the needs of different situations.
Described bindiny mechanism 2 is connected with described supporting seat 3, and described supporting seat 3 plays the effect of a stable center of gravity.
Described operating desk 1 is provided with balladeur train 5, and described bindiny mechanism 2 is provided with gear bar 6, and described balladeur train 5 coordinates with described gear bar 6, and described operating desk can be moved up and down.
Described motor 4 is connected with described balladeur train 5, and described motor 4 plays the effect that a transmitting gear slides.
Described operating desk 1 is provided with limiting and fixing device 7, and when being elevated to the work of a certain height, described limiting and fixing device 7 will make described operating desk 1 fix, and avoids causing injures and deaths because weight too heavily causes described operating desk to glide during work.
Described cross fixator 9 is connected with described steel pipe 8, and described cross fixator 9 serves described steel pipe 8 strengthens fixing effect.
Described steel pipe 8 is provided with buckle slot 11, and described buckle slot 11 is provided with circular hole 12, and described circular hole 12 is connected with described distortion snap close 10, and described circular hole 12 is conducive to described distortion snap close 10 and passes.
Be provided with a bonnet lock hole 13 in the middle of described cross fixator 9, described bonnet lock hole 13 is conducive to described distortion snap close 10 and passes.
Described cross fixator 9 surface is provided with snap close post 14, described distortion snap close 10 two ends are provided with latch plate 15, described latch plate 15 is provided with the hole 18 that is locked, described in be locked hole 18 cooperatively interact with described snap close post 14, be conducive to described distortion snap close 10 by the fixation of described steel pipe 8.
Described cross fixator 9 is provided with reference column 16 and locating hole 17, and described reference column 16 and described locating hole 17 cooperatively interact, and the described steel pipe 8 making described cross fixator 9 two can be had good positioning like this is fixed.
Below the operating principle of construction working platform of the present invention is described in detail.
Bindiny mechanism 2 is connected with supporting seat 3, can according to self needing the quantity increasing bindiny mechanism 2, then gear bar 6 is vertically mounted in bindiny mechanism 2, motor 4 is connected with balladeur train 5 and is arranged on operating desk 1, balladeur train 5 is connected with gear bar 6, operating desk 1 is fixed in bindiny mechanism 2, finally installs limiting and fixing device 7 at lower slide gear 5 place of operating desk 1.
When people this bindiny mechanism 2 assembled, by the right-angled intersection of two steel pipes 8, make buckle slot 11 relatively and insert, then cross fixator 9 is arranged on the infall of two steel pipes 8, make reference column 16 insert locating hole 17 internal fixtion, snap close 10 will be out of shape through circular hole 12 and bonnet lock hole 13, and open the latch plate 15 at distortion snap close 10 two ends, the hole 18 that is locked on latch plate 15 is inserted on the snap close post 14 on cross fixator 9 surface, completes splicing.
Compared with prior art, construction working platform steadiness of the present invention is good, and easy for installation, can carry out expanding and deleting unit according to the actual needs in building site, to meet construction requirement.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize manual of the present invention and accompanying drawing content to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical fields, be all in like manner included in scope of patent protection of the present invention.

Claims (1)

1. a construction working platform, is characterized in that, comprising: operating desk, bindiny mechanism, supporting seat and motor, and described operating desk is connected with described bindiny mechanism;
Described bindiny mechanism is connected with described supporting seat;
Described bindiny mechanism comprises: steel pipe, cross fixator and distortion snap close, described cross fixator is connected with described steel pipe, described steel pipe is provided with buckle slot, described buckle slot is provided with circular hole, described circular hole is connected with described distortion snap close, a bonnet lock hole is provided with in the middle of described cross fixator, described cross fixator surface is provided with snap close post, described cross fixator is also provided with reference column and locating hole, described reference column and described locating hole cooperatively interact, described distortion snap close two ends are provided with latch plate, described latch plate is provided with the hole that is locked, described hole and the described snap close post of being locked cooperatively interacts,
Described operating desk is provided with balladeur train;
Described motor is connected with described balladeur train;
Described bindiny mechanism is provided with gear bar;
Described operating desk is provided with limiting and fixing device.
CN201310580512.5A 2013-11-19 2013-11-19 Construction working platform Expired - Fee Related CN103615102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310580512.5A CN103615102B (en) 2013-11-19 2013-11-19 Construction working platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310580512.5A CN103615102B (en) 2013-11-19 2013-11-19 Construction working platform

Publications (2)

Publication Number Publication Date
CN103615102A CN103615102A (en) 2014-03-05
CN103615102B true CN103615102B (en) 2015-12-30

Family

ID=50165817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310580512.5A Expired - Fee Related CN103615102B (en) 2013-11-19 2013-11-19 Construction working platform

Country Status (1)

Country Link
CN (1) CN103615102B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358407B (en) * 2014-10-30 2016-09-07 江苏江北船业有限公司 A kind of can the scaffold of Fast Installation
CN104358408A (en) * 2014-10-30 2015-02-18 无锡市安捷脚手架有限公司 Square disk scaffold
CN106351431B (en) * 2016-09-29 2018-09-21 四川大学 The mobile working platform that can continuously construct for rail tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2804266Y (en) * 2005-05-10 2006-08-09 白虹 Fastening for fast detaching steel pipe scaffold
CN201011122Y (en) * 2007-03-23 2008-01-23 翁振华 Locating disk of direct plugged self-locking type scaffold
CN101761223A (en) * 2008-11-17 2010-06-30 无锡速捷脚手架工程有限公司 Method for installation of scaffold component
CN201883671U (en) * 2010-12-19 2011-06-29 曾凡荣 Scaffold for engineering building construction
CN202181716U (en) * 2011-08-11 2012-04-04 北京建筑工程学院 Automatic lifting type scaffold for building construction
CN202658869U (en) * 2012-06-19 2013-01-09 张玉家 Bushed rail type electric inserted lift scaffold

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4462441B2 (en) * 2006-08-31 2010-05-12 株式会社豊神 Scaffolding / supporting equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2804266Y (en) * 2005-05-10 2006-08-09 白虹 Fastening for fast detaching steel pipe scaffold
CN201011122Y (en) * 2007-03-23 2008-01-23 翁振华 Locating disk of direct plugged self-locking type scaffold
CN101761223A (en) * 2008-11-17 2010-06-30 无锡速捷脚手架工程有限公司 Method for installation of scaffold component
CN201883671U (en) * 2010-12-19 2011-06-29 曾凡荣 Scaffold for engineering building construction
CN202181716U (en) * 2011-08-11 2012-04-04 北京建筑工程学院 Automatic lifting type scaffold for building construction
CN202658869U (en) * 2012-06-19 2013-01-09 张玉家 Bushed rail type electric inserted lift scaffold

Also Published As

Publication number Publication date
CN103615102A (en) 2014-03-05

Similar Documents

Publication Publication Date Title
CN103615102B (en) Construction working platform
CN206346118U (en) A kind of large-span steel pipe truss beam falsework
CN209458477U (en) A kind of architectural engineering hydraulic push bench
CN204139401U (en) A kind of curtain wall hanger system
CN201850679U (en) Removable stone curtain wall hanging assembly
CN204569072U (en) A kind of erecting frame of cage guide
CN203429634U (en) Engineering pile conduit fixing clamp structure
CN202125168U (en) Openable window frame structure on fully-hidden frame aluminum alloy glass curtain wall
CN206205566U (en) A kind of construction of the highway enclosing
CN203403569U (en) Three-dimensional adjustable connecting piece device
CN103615106B (en) Scaffold
CN203129566U (en) Simple fixing device of movable scaffold
CN210177596U (en) Low foot water tank support frame
CN205151442U (en) Villa elevator well stand section bar
CN204152856U (en) A kind of guide pump assembling set
CN203603509U (en) Pillar steel bar binding four-ring stool
CN202148806U (en) Sash structure with fully-hidden frame of aluminum alloy glass curtain wall
CN204940550U (en) One turns to drawstring connector
CN201202264Y (en) Portal type steel pipe scaffold for construction
CN204843102U (en) Sheet metal cutting device
CN201627283U (en) Stainless steel composite wall surface
CN204778154U (en) Public rail brackets of elevator
CN213626543U (en) Scaffold for civil engineering
CN207988166U (en) A kind of novel embedded part
CN203394160U (en) A quick installation frame for transparent fence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20151111

Address after: Changshou City ancient town Baimao purple Fu Village in Suzhou City, Jiangsu province 215500

Applicant after: CHANGSHU JOINT ENGINEERING MATERIALS CO., LTD.

Address before: The red road Suzhou city Jiangsu province 215500 Baimao Industrial Park of Changshou City ancient town No. 8

Applicant before: Changshu Ancient Town Baimao Construction Deformation Joint Linkage Device Factory

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151230

Termination date: 20161119