CN103614631B - Containing the preparation method of rare earth production perforation gun tube body - Google Patents

Containing the preparation method of rare earth production perforation gun tube body Download PDF

Info

Publication number
CN103614631B
CN103614631B CN201310641736.2A CN201310641736A CN103614631B CN 103614631 B CN103614631 B CN 103614631B CN 201310641736 A CN201310641736 A CN 201310641736A CN 103614631 B CN103614631 B CN 103614631B
Authority
CN
China
Prior art keywords
rare earth
temperature
steel
tube body
refining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310641736.2A
Other languages
Chinese (zh)
Other versions
CN103614631A (en
Inventor
张行刚
王金龙
刘金
石晓霞
马爱清
郭智韬
宋江波
董珍
丰小东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Iron and Steel Group Co Ltd
Original Assignee
Baotou Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Iron and Steel Group Co Ltd filed Critical Baotou Iron and Steel Group Co Ltd
Priority to CN201310641736.2A priority Critical patent/CN103614631B/en
Publication of CN103614631A publication Critical patent/CN103614631A/en
Application granted granted Critical
Publication of CN103614631B publication Critical patent/CN103614631B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Steel In Its Molten State (AREA)

Abstract

The invention discloses a kind of preparation method containing rare earth production perforation gun tube body, comprising: the rolling of STEELMAKING PRODUCTION, steel, roll state steel heat treatment and aligning.The present invention is low containing oxygen smelting steel technology by adopting, add rare earth element when Oxygen Content in Liquid Steel is low, prevent rare earth oxidized, avoid generating harmful rare earth and be mingled with, increase metamorphism and the Microalloying Effect of steel rare earth elements, make steel also have high tenacity while high-strength.

Description

Containing the preparation method of rare earth production perforation gun tube body
Technical field
The present invention relates to metal material field, specifically, relate to a kind of preparation method containing rare earth production perforation gun tube body.
Background technology
Perforation is the main completion mode of oil and gas wells in oil fields, plays an important role in petroleum exploration & development, and the object of perforation links up the fluid channel between well and stratum, ensures that Oil/gas Well obtains due production capacity.And production perforation gun tube body is as the material of main part of perforating gun, the enormous impact ripple that gunpowder explosion produces is subject in perforating process, requirement perforation casing not only intensity will meet the demands, and also requires high toughness coupling, does not burst to make perforating gun in perforation job.And to be gone bad and alloying action can improve the toughness of steel greatly at steel grade by rare earth element, but rare earth element is very easily oxidized, in smelting process, therefore need hypoxia condition to ensure that rare earth plays its effect.So, having very important significance containing rare earth perforation casing of exploitation low oxygen content.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of preparation method containing rare earth production perforation gun tube body, can prepare have high tenacity containing rare earth production perforation gun tube body.
Technical solution of the present invention is as follows:
Containing the preparation method of rare earth production perforation gun tube body, comprising: the rolling of STEELMAKING PRODUCTION, steel, roll state steel heat treatment and aligning, the rolling of described steel comprises: the heating of circle base, perforation, tube rolling and tension reducing; The temperature of described round base heating is 1250 ~ 1300 DEG C, and the temperature of described perforation is 1230 ~ 1260 DEG C, and the start rolling temperature of described tube rolling is 1150 ~ 1220 DEG C, temperature >=890 DEG C of finish to gauge; The described state steel heat treatment that rolls comprised Quench and temper, and the temperature of described quenching is 890 ± 10 DEG C, 890 ± 10 DEG C of insulations 70 ~ 80 minutes; The temperature of described tempering was 630 ± 10 DEG C, 630 ± 10 DEG C of insulations 80 ~ 90 minutes; Temperature >=480 DEG C of described aligning; The mass percentage producing the chemical composition of the material containing rare earth production perforation gun tube body obtained comprises: C 0.25% ~ 0.30%, Si 0.20% ~ 0.35%, Mn 1.0% ~ 1.20%, P≤0.020%, S≤0.010%, Cr 0.80% ~ 1.05%, Mo 0.15% ~ 0.25%, Al 0.015% ~ 0.04% and rare earth La 0.01% ~ 0.03%, all the other are Fe and impurity, and massfraction amounts to 100%.
Further, described STEELMAKING PRODUCTION comprises: hot metal pretreatment, converter smelting, LF refining, VD vacuum outgas and round billet continuous casting; Described converter smelting adopts single slag melting technique, and finishing slag basicity controls 3.0, mass percentage >=0.06% of the carbon of converter terminal; Described LF refining time >=40min, temperature >=1500 DEG C in place of described LF refining, temperature >=1650 DEG C of offing normal of described LF refining; When described LF refining is offed normal, in molten steel, the mass percentage of Al is mass percentage≤0.010% of 0.015% ~ 0.035%, S, and described LF refining terminates rear every 100 tons of molten steel feeding 150m rare-earth wires; Vacuum tightness≤the 0.1KPa of described VD vacuum outgas, adopt bottom blowing argon gas, after described VD vacuum outgas soft blow time >=15min; Described round billet continuous casting adopts the constant pulling rate of 1.4 ~ 1.6m/min.
Further, the mass percentage of the described chemical composition containing rare earth production perforation gun tube body prepared comprises: C 0.25%, Si 0.22%, Mn 1.0%, Cr 0.80%, Al 0.015%, P 0.02%, S 0.010%, Mo 0.15% and La 0.01%; Or, C 0.27%, Si 0.27%, Mn 1.10%, Cr 0.90%, Al 0.03%, P 0.010%, S 0.008%, Mo 0.21% and La 0.015%; Or, C 0.28%, Si 0.29%, Mn 1.12%, Cr 0.95%, Al 0.035%, P 0.013%, S 0.007%, Mo 0.23% and La 0.020%; Or, C 0.29%, Si 0.30%, Mn 1.15%, Cr 1.0%, Al 0.037%, P 0.013%, S 0.006%, Mo 0.20% and La 0.025%; Or, C 0.30%, Si 0.35%, Mn 1.20%, Cr 1.05%, Al 0.04%, P 0.02%, S 0.010%, Mo 0.25% and La 0.03%.
Technique effect of the present invention is as follows:
Of the present invention low containing oxygen smelting steel technology by adopting containing rare earth production perforation gun tube body material, rare earth element is added when Oxygen Content in Liquid Steel is low, prevent rare earth oxidized, avoid generating harmful rare earth to be mingled with, increase metamorphism and the Microalloying Effect of steel rare earth elements, make steel also have high tenacity while high-strength.
Embodiment
The concrete steps of the preparation method containing rare earth production perforation gun tube body of the present invention are as follows:
Step S1: STEELMAKING PRODUCTION
STEELMAKING PRODUCTION comprises: hot metal pretreatment, converter smelting, LF refining, VD vacuum outgas and round billet continuous casting.
Molten iron is obtained: C 0.25% ~ 0.30%, Si 0.20% ~ 0.35%, Mn1.0% ~ 1.20%, P≤0.020%, S≤0.010%, Cr 0.80% ~ 1.05%, Mo 0.15% ~ 0.25%, Al 0.015% ~ 0.04% and La 0.01% ~ 0.03% according to following proportion ingredient, all the other are Fe and impurity, and massfraction amounts to 100%.Then by hot metal pretreatment, pre-desulfurization is carried out to molten iron.
Converter smelting adopts desulphurised hot metal, and silicomanganese, ferromanganese and ferrochrome deoxidation alloying, smelted by converter; Adopt single slag melting technique, finishing slag basicity controls 3.0; Mass percentage >=0.06% of the carbon of converter terminal, to reduce the activity of oxygen in steel.
In LF refining, composition is finely tuned, the mass percentage of aluminium in molten steel of being offed normal by LF controls between 0.015% ~ 0.035%, the rising of oxygen content in steel can be prevented, adopt and count to the mode that senior number improves heat-up rate gradually heat temperature raising from rudimentary, carry out slag making desulfurization, trimming according to converter molten steel composition and temperature.The time of LF refining will ensure >=40min, to ensure that LF offs normal mass percentage≤0.010% of S in molten steel, temperature >=1500 DEG C in place of LF refining, in order to avoid refining long increase cost heat-up time, temperature >=1650 DEG C of offing normal of LF refining, LF refining whole process adopts normal Argon.By every 100 tons of molten steel feeding 150m rare-earth wires after LF refining terminates, now oxygen level is low, can ensure that feeding rare-earth wires plays its rotten and Microalloying Effect to greatest extent.
Vacuum tightness≤the 0.1KPa of VD vacuum outgas, adopts bottom blowing argon gas pattern, soft blow time maintenance >=15min after VD vacuum.
Round billet continuous casting process adopts whole process protection cast; be specially: ladle adopts long nozzle to tundish; and carry out blowing argon gas protection; tundish adopts the intrusive mood mouth of a river to crystallizer; covering agent and crystallizer protecting residue during tundish and crystallizer adopt respectively; reduce the secondary oxidation of casting process, will baking of tundish be strengthened simultaneously, prevent molten steel air-breathing.Adopt constant casting speed control technique, speed control is at 1.4 ~ 1.6m/min.
Step S2: the rolling of steel
The rolling of steel mainly comprises: the heating of circle base, perforation, tube rolling and tension reducing, and detailed process is: circle base → sawing → circle base heating → perforation → tube rolling → tension reducing → sampling → cooling → crop end → align → check → pack → weigh → warehouse-in.The heating of circle base should ensure that circle base homogeneous heating controls grain fineness number size and prevents decarburization again, and the temperature of circle base heating is 1250 ~ 1300 DEG C.The temperature of its circle base perforation is 1230 ~ 1260 DEG C, and when can ensure to bore a hole, pipe has good deformability.The start rolling temperature of tube rolling is 1150 ~ 1220 DEG C, and this steel at this temperature plasticity is best, and during rolling, resistance to deformation is little, effectively can ensure the quality of hollow forging surfaces externally and internally.Ensure finishing temperature >=890 DEG C, the high steel pipe that is equivalent to of finishing temperature carries out a normalizing, can crystal grain thinning, eliminates stress, and alleviating banded structure for finished heat treatment provides suitable structural state.
Step S3: roll state steel heat treatment
Roll state steel heat treatment and comprise Quench and temper.The temperature of quenching is 890 ± 10 DEG C, and 890 ± 10 DEG C of insulations 70 ~ 80 minutes, this temperature can ensure steel pipe homogeneous heating and alloying element is dissolved in austenite entirely, can not make coarse grains again.The temperature of tempering is 630 ± 10 DEG C, and 630 ± 10 DEG C of insulations 80 ~ 90 minutes, the tempered sorbite obtained by high tempering can make material have good comprehensive mechanical property.
Step S4: aligning
Ensure that straightening temperature >=480 DEG C crack to avoid steel pipe to produce larger stress.
The mass percentage containing rare earth perforation casing material chemical composition produced through said process is: C 0.25% ~ 0.30%, Si 0.20% ~ 0.35%, Mn 1.0% ~ 1.20%, P≤0.020%, S≤0.010%, Cr 0.80% ~ 1.05%, Mo 0.15% ~ 0.25%, Al 0.015% ~ 0.04% and rare earth La 0.01% ~ 0.03%, all the other are Fe and impurity, and massfraction amounts to 100%.Detect the chemical composition of each embodiment, the mass percentage containing rare earth perforation casing material chemical composition of each embodiment is as shown in table 1.Test the mechanical property containing rare earth perforation casing of each embodiment, result is as shown in table 2.
The chemical composition (%) of each embodiment of table 1
Embodiment C Si Mn P S Cr Mo Al La
Embodiment 1 0.25 0.20 1.0 0.02 0.01 0.80 0.15 0.015 0.01
Embodiment 2 0.27 0.27 1.10 0.01 0.008 0.9 0.21 0.03 0.015
Embodiment 3 0.28 0.29 1.12 0.013 0.007 0.95 0.23 0.035 0.02
Embodiment 4 0.29 0.30 1.15 0.013 0.006 1.0 0.20 0.037 0.025
Embodiment 5 0.30 0.35 1.20 0.02 0.01 1.05 0.25 0.04 0.03
The mechanical experimental results of each embodiment of table 2
As can be seen from Table 2, weldless steel tube material of the present invention has good mechanical property, particularly has high tenacity.
The present invention is by adding by rare earth element on the basis of low-oxygen steel smelting, and the effect playing its alterant and microalloying to greatest extent makes material also have high toughness while high-strength.

Claims (3)

1. containing the preparation method of rare earth production perforation gun tube body, it is characterized in that, comprising: the rolling of STEELMAKING PRODUCTION, steel, roll state steel heat treatment and aligning, the rolling of described steel comprises: the heating of circle base, perforation, tube rolling and tension reducing; The temperature of described round base heating is 1250 ~ 1300 DEG C, and the temperature of described perforation is 1230 ~ 1260 DEG C, and the start rolling temperature of described tube rolling is 1150 ~ 1220 DEG C, temperature >=890 DEG C of finish to gauge; The described state steel heat treatment that rolls comprised Quench and temper, and the temperature of described quenching is 890 ± 10 DEG C, 890 ± 10 DEG C of insulations 70 ~ 80 minutes; The temperature of described tempering was 630 ± 10 DEG C, 630 ± 10 DEG C of insulations 80 ~ 90 minutes; Temperature >=480 DEG C of described aligning; The mass percentage producing the chemical composition of the material containing rare earth production perforation gun tube body obtained comprises: C 0.25% ~ 0.30%, Si 0.20% ~ 0.35%, Mn 1.0% ~ 1.20%, P≤0.020%, S≤0.010%, Cr 0.80% ~ 1.05%, Mo 0.15% ~ 0.25%, Al 0.015% ~ 0.04% and rare earth La 0.01% ~ 0.03%, all the other are Fe and impurity, and massfraction amounts to 100%.
2. the preparation method containing rare earth production perforation gun tube body as claimed in claim 1, it is characterized in that, described STEELMAKING PRODUCTION comprises: hot metal pretreatment, converter smelting, LF refining, VD vacuum outgas and round billet continuous casting; Described converter smelting adopts single slag melting technique, and finishing slag basicity controls 3.0, mass percentage >=0.06% of the carbon of converter terminal; Described LF refining time >=40min, temperature >=1500 DEG C in place of described LF refining, temperature >=1650 DEG C of offing normal of described LF refining; When described LF refining is offed normal, in molten steel, the mass percentage of Al is mass percentage≤0.010% of 0.015% ~ 0.035%, S, and described LF refining terminates rear every 100 tons of molten steel feeding 150m rare-earth wires; Vacuum tightness≤the 0.1kPa of described VD vacuum outgas, adopt bottom blowing argon gas, after described VD vacuum outgas soft blow time >=15min; Described round billet continuous casting adopts the constant pulling rate of 1.4 ~ 1.6m/min.
3. the preparation method containing rare earth production perforation gun tube body as described in any one of claims 1 or 2, it is characterized in that, the mass percentage of the described chemical composition containing rare earth production perforation gun tube body prepared comprises: C 0.25%, Si 0.22%, Mn 1.0%, Cr 0.80%, Al 0.015%, P 0.02%, S 0.010%, Mo 0.15% and La 0.01%; Or, C 0.27%, Si 0.27%, Mn 1.10%, Cr 0.90%, Al 0.03%, P 0.010%, S 0.008%, Mo 0.21% and La 0.015%; Or, C 0.28%, Si 0.29%, Mn 1.12%, Cr 0.95%, Al 0.035%, P 0.013%, S 0.007%, Mo 0.23% and La 0.020%; Or, C 0.29%, Si 0.30%, Mn 1.15%, Cr 1.0%, Al 0.037%, P 0.013%, S 0.006%, Mo 0.20% and La 0.025%; Or, C 0.30%, Si 0.35%, Mn 1.20%, Cr 1.05%, Al 0.04%, P 0.02%, S 0.010%, Mo 0.25% and La 0.03%.
CN201310641736.2A 2013-12-03 2013-12-03 Containing the preparation method of rare earth production perforation gun tube body Active CN103614631B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310641736.2A CN103614631B (en) 2013-12-03 2013-12-03 Containing the preparation method of rare earth production perforation gun tube body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310641736.2A CN103614631B (en) 2013-12-03 2013-12-03 Containing the preparation method of rare earth production perforation gun tube body

Publications (2)

Publication Number Publication Date
CN103614631A CN103614631A (en) 2014-03-05
CN103614631B true CN103614631B (en) 2015-09-30

Family

ID=50165345

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310641736.2A Active CN103614631B (en) 2013-12-03 2013-12-03 Containing the preparation method of rare earth production perforation gun tube body

Country Status (1)

Country Link
CN (1) CN103614631B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118251B (en) 2016-11-30 2020-09-25 宝山钢铁股份有限公司 High-strength high-toughness perforating gun barrel and manufacturing method thereof
CN107841681B (en) * 2017-10-24 2020-01-17 上海大学 Perforating gun barrel material and preparation method thereof
CN111545717B (en) * 2020-06-30 2022-05-17 新余钢铁股份有限公司 Pouring method of rare earth steel

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006265668A (en) * 2005-03-25 2006-10-05 Sumitomo Metal Ind Ltd Seamless steel tube for oil well
CN101153373B (en) * 2006-09-27 2010-10-06 宝山钢铁股份有限公司 Oil bushing steel and manufacturing process thereof
CN102251180A (en) * 2011-07-07 2011-11-23 内蒙古包钢钢联股份有限公司 Rare-earth-containing ultrahigh strength collapse-resistant petroleum casing and production method thereof

Also Published As

Publication number Publication date
CN103614631A (en) 2014-03-05

Similar Documents

Publication Publication Date Title
CN101417296B (en) Manufacture method of large caliber high steel grade corrosion proof seamless steel tube in diameter phi 219.0-460.0mm
JP4453843B2 (en) Method for producing low alloy steel with excellent corrosion resistance
EP2824198B1 (en) Method for producing seamless steel pipe having high-strength and excellent sulfide stress cracking resistance
CN110106446B (en) 400 MPa-grade Ti-containing hot-rolled ribbed steel bar and production process thereof
CN103320711B (en) Weldless steel tube and manufacture method thereof
CN104651754B (en) Low alloy steel for high-pressure boiler tube and preparation method thereof
CN103361561B (en) The preparation method of coupling material weldless steel tube
CN103627962B (en) Thick oil thermal extraction weldless steel tube and preparation method thereof
CN110004357A (en) One kind shale gas seamless steel pipe of high-ductility containing rare earth high-strength and preparation method thereof
CN105970097B (en) The production method of the explosion-proof high-strength steel of RE-treated yield strength 700MPa levels
CN109023035A (en) Ultralow aluminium content high strength bainite steel rail steel and its production method
CN103352169B (en) The heat treating method of perforation casing body weldless steel tube
CN103614631B (en) Containing the preparation method of rare earth production perforation gun tube body
CN105154778A (en) Cold forging steel coil for welding and producing method for cold forging steel coil
CN103194683B (en) Containing rare earth oil well pipe coupling material weldless steel tube material and preparation method thereof
CN101792843B (en) Production process of Nb-containing mill coil for automobile
JP2012052224A (en) Steel material excelling in toughness of weld heat-affected zone
CN106676418B (en) The atmosphere corrosion resistance structural steel molten steel of nitrogen containing niobium and atmosphere corrosion resistance structural steel and its production method
CN102965589A (en) Mechanical expanding machine pull rod shaft with high fatigue strength and preparation method thereof
CN104789871A (en) 27SiMn seamless steel tube for thick-wall cold-drawn hydraulic cylinder barrel and preparation method
CN115505849A (en) Oil casing pipe and preparation method and application thereof
CN110317994B (en) Ultrahigh-strength steel for high heat input welding and manufacturing method thereof
CN112647027A (en) Novel NPR (nitrogen phosphorus) anchor rod or anchor cable material converter and production method of continuous casting billet
CN107587048B (en) One kind atmosphere corrosion resistance structural steel molten steel of nitrogen containing vanadium and atmosphere corrosion resistance structural steel and its production method
CN107587057B (en) A kind of atmosphere corrosion resistance structural steel molten steel and the atmosphere corrosion resistance structural steel of titanium containing chromium and its production method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant