CN104789871A - 27SiMn seamless steel tube for thick-wall cold-drawn hydraulic cylinder barrel and preparation method - Google Patents

27SiMn seamless steel tube for thick-wall cold-drawn hydraulic cylinder barrel and preparation method Download PDF

Info

Publication number
CN104789871A
CN104789871A CN201510159559.3A CN201510159559A CN104789871A CN 104789871 A CN104789871 A CN 104789871A CN 201510159559 A CN201510159559 A CN 201510159559A CN 104789871 A CN104789871 A CN 104789871A
Authority
CN
China
Prior art keywords
hydraulic cylinder
27simn
steel tube
temperature
wall cold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510159559.3A
Other languages
Chinese (zh)
Inventor
张行刚
刘金
王金龙
石晓霞
马爱清
姚晓乐
孙文秀
张学颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baotou Iron and Steel Group Co Ltd
Inner Mongolia Baotou Steel Union Co Ltd
Original Assignee
Baotou Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baotou Iron and Steel Group Co Ltd filed Critical Baotou Iron and Steel Group Co Ltd
Priority to CN201510159559.3A priority Critical patent/CN104789871A/en
Publication of CN104789871A publication Critical patent/CN104789871A/en
Pending legal-status Critical Current

Links

Landscapes

  • Heat Treatment Of Steel (AREA)

Abstract

The invention discloses a 27SiMn seamless steel tube for a thick-wall cold-drawn hydraulic cylinder barrel. The 27SiMn seamless steel tube comprises chemical components in percentage by mass as follows: 0.26%-0.31% of C, 1.20%-1.40% of Si, 1.20%-1.40% of Mn, smaller than or equal to 0.020% of P, smaller than or equal to 0.010% of S, 0.20%-0.30% of Cr, 0.015%-0.04% of Al and the balance of Fe, and the sum of the mass percentages is 100%. The invention further discloses a preparation method of the 27SiMn seamless steel tube for the thick-wall cold-drawn hydraulic cylinder barrel. The seamless steel tube prepared with the method has a good comprehensive mechanical property and can meet the performance of the cold-drawn hydraulic cylinder barrel with the wall thickness larger than or equal to 20 mm.

Description

A kind of heavy wall cold-drawn hydraulic cylinder 27SiMn weldless steel tube and preparation method
Technical field
The present invention relates to metallurgical technology field, be specifically related to a kind of heavy wall cold-drawn hydraulic cylinder 27SiMn weldless steel tube and preparation method.
Background technology
27SiMn is a kind of hydraulic prop weldless steel tube material, be used for the mining hydraulic bracket in colliery, the hydro-cylinder of truck-mounted crane, piston, the specific equipments such as big machinery, a lot of enterprise is by being used for hydraulic support by after 27SiMn cold-drawing seamless tube in recent years, common 27SiMn hardening capacity is poor, produce thick-walled tube time thoroughly do not make the comprehensive mechanical property of material poor owing to quenching, easily brittle failure is there is in Cold Drawing Process, the problem such as to pull, and in Cold Drawing Process, need steel pipe to have good size deviation planeness, therefore develop the heavy wall 27SiMn weldless steel tube that surfaces externally and internally quality well has a good comprehensive mechanical property simultaneously and have important meaning.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of heavy wall cold-drawn hydraulic cylinder 27SiMn weldless steel tube.
To achieve these objectives, a kind of heavy wall cold-drawn of the present invention hydraulic cylinder 27SiMn weldless steel tube, its chemical composition mass percent is: C 0.26 ~ 0.31%, Si 1.20 ~ 1.40%, Mn 1.20 ~ 1.40%, P≤0.020%, S≤0.010%, Cr 0.20 ~ 0.30%, Al 0.015 ~ 0.04%, all the other are Fe, and massfraction amounts to 100%.Add by the addition of C r element the hardening capacity improving steel, material has good comprehensive mechanical property after heat treatment.
Further: the chemical composition mass percentage of described heavy wall cold-drawn hydraulic cylinder 27SiMn weldless steel tube material is: C 0.26%, Si 0.1.20%, Mn 1.20%, Cr 0.20%, Al 0.015%, P 0.02%, S 0.010%, all the other are Fe, and massfraction amounts to 100%; Or, C 0.28%, Si 1.25%, Mn 1.25%, Cr 0.22%, Al 0.020%, P 0.015%, S 0.008% all the other be Fe, massfraction amounts to 100%; Or C 0.29%, Si 1.30%, Mn 1.30%, Cr 0.25%, Al 0.030%, P 0.013%, S 0.007%, all the other are Fe, massfraction amounts to 100%; Or, C 0.30%, Si 1.35%, Mn1.35%, Cr 0.27%, Al 0.035%, P 0.013%, S 0.006% all the other be Fe, massfraction amounts to 100%; Or, C 0.31%, Si 1.40%, Mn 1.40%, Cr 0.30%, Al 0.04%, P 0.02%, S 0.010% all the other be Fe, massfraction amounts to 100%.
Another technical problem that the present invention solves is to provide a kind of preparation method of heavy wall cold-drawn hydraulic cylinder 27SiMn weldless steel tube, makes steel pipe have good dimensional precision and surfaces externally and internally quality by the rolling of Φ 460mmPQF unit simultaneously.
Technical scheme of the present invention is as follows:
A preparation method for heavy wall cold-drawn hydraulic cylinder 27SiMn weldless steel tube, comprising: the operation of rolling of steelmaking process, steel and heat treatment process.The mass percentage of the 27SiMn weldless steel tube material chemical composition obtained is C 0.26 ~ 0.31%, Si 1.20 ~ 1.40%, Mn 1.20 ~ 1.40%, P≤0.020%, S≤0.010%, Cr 0.20 ~ 0.30%, Al 0.015 ~ 0.04%, all the other are Fe, and massfraction amounts to 100%.
Further, described steelmaking process comprises: hot metal pretreatment, converter smelting, LF refining, VD vacuum outgas and round billet continuous casting.
Further: converter smelting adopts desulphurised hot metal, and in pre-desulphurised hot metal, S content controls at below 120ppm, the carbon content of converter terminal wants >=0.06% to reduce the activity of oxygen in steel, finely tunes composition according to going out in composition of steel LF refining of converter.In VD vacuum outgas, vacuum tightness≤0.1KPa, adopts stronger bottom blowing argon gas pattern, the silicon-calcium wire feeding 150m after VD vacuum then keep soft blow time >=13min, to ensure that inclusion fully floats.Keep low superheating temperature in casting process, superheating temperature controls within 30 DEG C, and adopt constant casting speed control, speed control is at 1 ~ 1.2m/min simultaneously.
Further, the operation of rolling of described steel comprises: circle base → sawing → heating → perforation → tube rolling → de-pipe → sizing → cooling → crop end.Heating of pipe blank temperature is 1240 ~ 1290 DEG C; Circle base piercing temperature is 1220 ~ 1250 DEG C; Tube rolling temperature is 1100 ~ 1220 DEG C; Ensure finishing temperature >=880 DEG C.
Further, roll state steel heat treatment process described in comprise: quenching adds tempering; Quenching temperature is 920 ± 15 DEG C, is incubated 60 ~ 70 minutes; Tempering temperature is 610 ± 10 DEG C, is incubated 80 ~ 90 minutes.
Technique effect of the present invention is as follows:
The basis of heavy wall cold-drawn hydraulic cylinder 27SiMn weldless steel tube of the present invention by original common 27SiMn adds and appropriate can improve hardening capacity element Cr, thus improve the hardening capacity of steel, make when production thick-walled seamless steel pipes that thermal treatment can through hardening, steel is made to have good comprehensive mechanical property by tempering, then utilize the rolling of Φ 460PQF unit to make steel pipe have good surfaces externally and internally quality and dimensional precision, the cold-drawn ensureing follow-up provides the steel pipe of superperformance.
Embodiment
Below in conjunction with embodiment, to above-mentioned being described in more detail with other technical characteristic and advantage of the present invention.
Steelmaking process is: pre-desulphurised hot metal → converter smelting → VD vacuum outgas → LF refining → round billet continuous casting.Converter smelting adopts desulphurised hot metal, and silicomanganese, ferromanganese and ferrochrome deoxidation alloying, smelted by converter.Adopt single slag melting technique, finishing slag basicity controls 3.0, the carbon content of converter terminal wants >=0.06% to reduce the activity of oxygen in steel, composition is finely tuned in LF refining according to converter tapping composition, in VD vacuum outgas, vacuum tightness≤0.1KPa, adopts stronger bottom blowing argon gas pattern, according to every 100 tons of molten steel feeding 150m silicon-calcium wire after dark vacuum, soft blow time maintenance >=13min after VD vacuum.Control superheating temperature≤30 DEG C of molten steel, adopt constant casting speed control technique, speed control is at 1 ~ 1.2m/min.
The operation of rolling of steel comprises: circle base → sawing → heating → perforation → tube rolling → de-pipe → sizing → cooling → crop end.Heating of pipe blank temperature is 1240 ~ 1290 DEG C, should ensure that heating of pipe blank equal control grain fineness number size prevents decarburization again.During its circle base perforation, temperature is 1220 ~ 1250 DEG C, and when ensureing to bore a hole, pipe has good deformability; During tube rolling, temperature is 1100 ~ 1220 DEG C, and this steel at this temperature plasticity is best, and during rolling, resistance to deformation is little, effectively can ensure the quality of hollow forging surfaces externally and internally; Ensure finishing temperature >=880 DEG C, the high steel pipe that is equivalent to of finishing temperature carries out a normalizing, can crystal grain thinning, eliminates stress, and alleviating banded structure for finished heat treatment provides suitable structural state.
Roll state steel heat treatment process to comprise: quenching+tempering.Quenching temperature is 920 ± 15 DEG C, is incubated 60 ~ 70 minutes, and this temperature can ensure that the whole austenitizing of material can not make coarse grains again; Tempering temperature is 610 ± 10 DEG C, is incubated 80 ~ 90 minutes, to ensure that material has good comprehensive mechanical property.Enter straightener after tempering fast to ensure that steel pipe has good planeness, the stress of steel can be reduced again.
The thick-walled tube cold-drawn hydraulic cylinder 27SiMn weldless steel tube mass percentage that said process is produced is: C 0.26 ~ 0.31%, Si 1.20 ~ 1.40%, Mn 1.20 ~ 1.40%, P≤0.020%, S≤0.010%, Cr 0.20 ~ 0.30%, Al 0.015 ~ 0.04%, all the other are Fe, and massfraction amounts to 100%.The basis of conventional 27SiMn adding the hardening capacity that steel usually improves in appropriate Cr unit, making the material when producing thick-walled tube have good comprehensive mechanical property.
Detect the chemical composition of each example, chemical composition is as shown in table 1:
The each exemplary chemical composition (%) of table 1
Embodiment C Si Mn P S Cr Al
Embodiment 1 0.26 1.20 1.20 0.020 0.01 0.20 0.015
Embodiment 2 0.28 1.25 1.25 0.015 0.008 0.22 0.020
Embodiment 3 0.29 1.30 1.30 0.013 0.007 0.25 0.030
Embodiment 4 0.30 1.35 1.35 0.013 0.006 0.27 0.035
Embodiment 5 0.31 1.40 1.40 0.010 0.02 0.31 0.040
Each embodiment chemico-mechanic the performance test results is as shown in table 2.
The mechanical experimental results of each embodiment of table 2
As can be seen from Table 2, weldless steel tube material of the present invention has good mechanical property, particularly material and has very high toughness, in follow-up Cold Drawing Process, and the problem such as brittle failure can not occur, pull.
Above-described embodiment is only be described the preferred embodiment of the present invention; not scope of the present invention is limited; under not departing from the present invention and designing the prerequisite of spirit; the various distortion that those of ordinary skill in the art make technical scheme of the present invention and improvement, all should fall in protection domain that claims of the present invention determines.

Claims (7)

1. a heavy wall cold-drawn hydraulic cylinder 27SiMn weldless steel tube, it is characterized in that: described steel pipe chemical composition mass percent is: C 0.26 ~ 0.31%, Si 1.20 ~ 1.40%, Mn 1.20 ~ 1.40%, P≤0.020%, S≤0.010%, Cr 0.20 ~ 0.30%, Al 0.015 ~ 0.04%, and all the other are Fe.
2. prepare a method for heavy wall cold-drawn hydraulic cylinder 27SiMn weldless steel tube as claimed in claim 1, it is characterized in that: production process comprises: hot metal pretreatment, converter smelting, LF refining, VD degassed and round billet continuous casting, heating of pipe blank, tandem rolling and thermal treatment.
3. the heavy wall cold-drawn hydraulic cylinder preparation method of 27SiMn weldless steel tube as claimed in claim 2, is characterized in that: described converter smelting adopts desulphurised hot metal, carbon content >=0.06% of converter terminal.
4. the heavy wall cold-drawn hydraulic cylinder as claimed in claim 2 preparation method of 27SiMn weldless steel tube, it is characterized in that: in described VD vacuum outgas, vacuum tightness≤0.1KPa, adopt bottom blowing argon gas pattern, by every 100 tons of molten steel feeding 150m silicon-calcium wire after dark vacuum terminates, soft blow time maintenance >=13min after VD vacuum.
5. the heavy wall cold-drawn hydraulic cylinder preparation method of 27SiMn weldless steel tube as claimed in claim 2, it is characterized in that: superheating temperature≤30 DEG C in described round billet continuous casting process, pulling rate is 1 ~ 1.2m/min.
6. the heavy wall cold-drawn hydraulic cylinder preparation method of 27SiMn weldless steel tube as claimed in claim 2, is characterized in that: described heating of pipe blank temperature is 1240 ~ 1290 DEG C; Circle base piercing temperature is 1220 ~ 1250 DEG C; Tube rolling temperature is 1100 ~ 1220 DEG C; Finishing temperature >=880 DEG C.
7. the heavy wall cold-drawn hydraulic cylinder preparation method of 27SiMn weldless steel tube as claimed in claim 2, is characterized in that: described heat treatment process comprises: quenching adds tempering, and quenching temperature is 920 ± 15 DEG C, is incubated 60 ~ 70 minutes; Tempering temperature is 610 ± 10 DEG C, is incubated 80 ~ 90 minutes.
CN201510159559.3A 2015-04-07 2015-04-07 27SiMn seamless steel tube for thick-wall cold-drawn hydraulic cylinder barrel and preparation method Pending CN104789871A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510159559.3A CN104789871A (en) 2015-04-07 2015-04-07 27SiMn seamless steel tube for thick-wall cold-drawn hydraulic cylinder barrel and preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510159559.3A CN104789871A (en) 2015-04-07 2015-04-07 27SiMn seamless steel tube for thick-wall cold-drawn hydraulic cylinder barrel and preparation method

Publications (1)

Publication Number Publication Date
CN104789871A true CN104789871A (en) 2015-07-22

Family

ID=53555058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510159559.3A Pending CN104789871A (en) 2015-04-07 2015-04-07 27SiMn seamless steel tube for thick-wall cold-drawn hydraulic cylinder barrel and preparation method

Country Status (1)

Country Link
CN (1) CN104789871A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111304529A (en) * 2019-12-02 2020-06-19 张子夜 Seamless steel tube for multi-stage oil cylinder and manufacturing method thereof
CN114395719A (en) * 2021-12-02 2022-04-26 安阳钢铁股份有限公司 Production method of alloy steel 27SiMn hot rolled steel strip
CN114619004A (en) * 2022-02-28 2022-06-14 包头钢铁(集团)有限责任公司 Rare earth microalloying cold-drawn high-strength seamless steel tube for hydraulic cylinder and preparation method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10324946A (en) * 1997-05-27 1998-12-08 Komatsu Ltd High strength non-heat treated steel for steel tube
JP2001262275A (en) * 2000-03-22 2001-09-26 Nippon Steel Corp High tensile strength seamless steel pipe excellent in toughness, ductility and weldability and its producing method
US20080110533A1 (en) * 2004-02-19 2008-05-15 Makoto Sakamoto High strength seamless steel pipe and its manufacturing method
CN103361561A (en) * 2013-07-05 2013-10-23 内蒙古包钢钢联股份有限公司 Seamless steel tube material for coupling material and preparation method thereof
CN103627962A (en) * 2013-12-03 2014-03-12 内蒙古包钢钢联股份有限公司 Seamless steel pipe for thickened oil thermal production well and preparation method thereof
CN104338777A (en) * 2013-07-31 2015-02-11 无锡大金高精度冷拔钢管有限公司 Production method of cold-drawn precision seamless steel pipes

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10324946A (en) * 1997-05-27 1998-12-08 Komatsu Ltd High strength non-heat treated steel for steel tube
JP2001262275A (en) * 2000-03-22 2001-09-26 Nippon Steel Corp High tensile strength seamless steel pipe excellent in toughness, ductility and weldability and its producing method
US20080110533A1 (en) * 2004-02-19 2008-05-15 Makoto Sakamoto High strength seamless steel pipe and its manufacturing method
CN103361561A (en) * 2013-07-05 2013-10-23 内蒙古包钢钢联股份有限公司 Seamless steel tube material for coupling material and preparation method thereof
CN104338777A (en) * 2013-07-31 2015-02-11 无锡大金高精度冷拔钢管有限公司 Production method of cold-drawn precision seamless steel pipes
CN103627962A (en) * 2013-12-03 2014-03-12 内蒙古包钢钢联股份有限公司 Seamless steel pipe for thickened oil thermal production well and preparation method thereof

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
庄哲峰等: "《工程材料及其应用》", 31 August 2013, 华中科技大学出版社 *
郭智韬等: "27SiMn液压支架管的试制", 《包钢科技》 *
韩波: "液压油缸缸用钢管调质工艺的改进", 《钢管》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111304529A (en) * 2019-12-02 2020-06-19 张子夜 Seamless steel tube for multi-stage oil cylinder and manufacturing method thereof
RU2758739C1 (en) * 2019-12-02 2021-11-01 Цзые ЧЖАН Seamless steel pipe for multistage oil cylinder and its manufacturing method
CN114395719A (en) * 2021-12-02 2022-04-26 安阳钢铁股份有限公司 Production method of alloy steel 27SiMn hot rolled steel strip
CN114619004A (en) * 2022-02-28 2022-06-14 包头钢铁(集团)有限责任公司 Rare earth microalloying cold-drawn high-strength seamless steel tube for hydraulic cylinder and preparation method thereof
CN114619004B (en) * 2022-02-28 2024-06-11 包头钢铁(集团)有限责任公司 Rare earth microalloyed seamless steel tube for cold drawn high-strength hydraulic cylinder barrel and preparation method thereof

Similar Documents

Publication Publication Date Title
CN103160729B (en) Medium-carbon microalloyed steel for engineering machinery caterpillar chain piece and production process thereof
CN101417296B (en) Manufacture method of large caliber high steel grade corrosion proof seamless steel tube in diameter phi 219.0-460.0mm
CN101397635B (en) 12Cr2Mo1R thick steel plate for equipment contacting hydrogen and method for producing the same
CN103361561B (en) The preparation method of coupling material weldless steel tube
CN103320711A (en) Seamless steel tube and manufacturing method thereof
CN102268595A (en) Copper clad steel and production method thereof
CN104775079A (en) Marine highly weldable, large caliber, thick wall and high steel grade seamless steel pipe and preparation technology thereof
CN104131238A (en) High-formability high-weatherability ultrathin hot-rolled steel plate and CSP (compact strip production) technology thereof
CN103882301B (en) J55-grade low-cost steel for electric resistance welding petroleum casing pipe and manufacturing method thereof
CN103194683B (en) Containing rare earth oil well pipe coupling material weldless steel tube material and preparation method thereof
CN104789871A (en) 27SiMn seamless steel tube for thick-wall cold-drawn hydraulic cylinder barrel and preparation method
CN109047692B (en) Ultrathin high-strength steel plate capable of being used at-60 ℃ and manufacturing method thereof
CN114134418B (en) Economical high-strength anti-seismic steel bar and production process thereof
CN116426842A (en) Steel for Nb-Ti component L360M-WG hot-bending bend and production method thereof
CN105274434A (en) Hot rolling low alloy steel capable of reducing cracking caused by segregation and production method of hot rolling low alloy steel
CN113604748B (en) Thick-specification weather-resistant corrosion-resistant Cr alloy steel plate and production method thereof
CN115491576A (en) Smelting continuous casting method of rare earth microalloyed 355 MPa-level low-cost hot-rolled H-shaped steel
CN112853214B (en) Economical type rare earth-containing 80ksi steel grade hydrogen sulfide corrosion and collapse resistant petroleum casing pipe
CN111155027B (en) Low-alloy high-strength seamless steel tube for rare earth-containing Q390 structure and preparation method thereof
CN114107832A (en) Large-size manual tool steel and preparation method thereof
CN112375977A (en) Rare earth microalloyed seamless steel tube for Q390 steel grade structure and production method thereof
CN101921952B (en) Electric resistance welding petroleum casing pipe
CN104233114A (en) Production process of non-tempered ocean engineering structure with steel grade over 360MPa
CN103225042A (en) Production method of easily-shaped high-strength medium-thickness steel plate
CN103451544A (en) Boracic 140 ksi steel grade petroleum casing pipe for deep well and extra-deep well and production method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150722

RJ01 Rejection of invention patent application after publication