CN103607773B - Method and device for distributing baseband pool resources - Google Patents
Method and device for distributing baseband pool resources Download PDFInfo
- Publication number
- CN103607773B CN103607773B CN201310626013.5A CN201310626013A CN103607773B CN 103607773 B CN103607773 B CN 103607773B CN 201310626013 A CN201310626013 A CN 201310626013A CN 103607773 B CN103607773 B CN 103607773B
- Authority
- CN
- China
- Prior art keywords
- resource
- cell
- thresholding
- high load
- load capacity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 30
- 240000002853 Nelumbo nucifera Species 0.000 claims description 6
- 235000006508 Nelumbo nucifera Nutrition 0.000 claims description 6
- 235000006510 Nelumbo pentapetala Nutrition 0.000 claims description 6
- 238000010295 mobile communication Methods 0.000 abstract 1
- 230000004913 activation Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000020411 cell activation Effects 0.000 description 1
- 238000013468 resource allocation Methods 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
Abstract
The embodiment of the invention discloses a method and device for distributing baseband pool resources and relates to the technical field of mobile communication. According to the method and device for distributing the baseband pool resources, the shared resources in a baseband pool can be conveniently and reasonably distributed. The method for distributing the baseband pool resources comprises the steps that resource utilization rates of cells, a resource low-load threshold and a resource high-load threshold are periodically obtained; judgment is conducted with the combination of the resource utilization rates of the cells, the resource low-load threshold and the resource high-load threshold; according to the judgment result, the cells in the baseband pool can be grouped, wherein any high-load cell is in the same group with at least one low-load cell and/or at least one middle-load cell; a part of resources of the low-load cell and/or the middle-load cell in the same group are released and the released resources are distributed to the high-load cell in the group.
Description
Technical field
The present invention relates to the communications field, more particularly to a kind of distribution method and equipment of base band Pooled resources.
Background technology
In order to improve the utilization rate of resource, the baseband processing portion in base station introduces the technology of baseband pool shared resource.
Baseband pool is generally made up of multiple base stations, the resource in baseband pool with carrier wave, base band processing capacity etc. as shared resource unit,
Share in the range of little district's groups corresponding with the baseband pool.
Inventor has found that the allocative decision of baseband pool shared resource includes in prior art:Radio network controller (RNC,
Radio Network Controller) when certain local resource service condition changes in little district's groups, calculate the cell
Current resource utilization rate, with reference to local resource set in advance assess the upper limit and local resource assessment lower limit make decisions, be
The cell activation shares carrier resource or deactivates the shared carrier resource of the cell.This allocative decision needs to calculate base in real time
All local resource utilization rates in band pond, and the resource of all cells is transferred according to the local resource service condition for calculating in real time
Reallocated, it is complex, and enforcement difficulty is larger.And technical scheme of the prior art is only applicable to shared carrier wave money
The corresponding network of frequency in source, it is impossible to suitable for the network that 2G, 3G, 4G coexist, i.e. multi-frequency network.
The content of the invention
The technical problem to be solved is the distribution method and equipment for providing a kind of base band Pooled resources, Neng Goujian
Just, rationally the shared resource in baseband pool is allocated, and suitable for multi-frequency network.
To solve above-mentioned technical problem, a kind of distribution method of base band Pooled resources of the invention is adopted the following technical scheme that:
Periodically obtain resource utilization, resource underload thresholding and the resource high load capacity thresholding of cell;
Make decisions with reference to the resource utilization of cell, and resource underload thresholding and resource high load capacity thresholding;If little
The Current resource utilization rate in area is less than or equal to resource underload thresholding, adjudicates the cell for underload cell;If cell work as
Front resource utilization is more than resource underload thresholding, and less than or equal to resource high load capacity thresholding, adjudicates the cell for middle load
Cell;If the Current resource utilization rate of cell is more than resource high load capacity thresholding, the cell is adjudicated for high load capacity cell;
According to court verdict, to baseband pool in each cell be grouped, wherein, arbitrary high load capacity cell and at least one
Loaded cell is at same group in underload cell and/or at least one;
The part resource of underload cell in same group and/or middle loaded cell is discharged, by the part for being discharged
Resource allocation is to the high load capacity cell in the group.
Further, the distribution method also includes:When the number of the high load capacity cell in baseband pool is born more than default height
During lotus cell threshold value, expansion alarm is sent.
Further, resource utilization, resource underload thresholding and the resource high load capacity of cell are obtained in the periodicity
Before thresholding, the distribution method also includes:
Base band Pooled resources are averagely allocated to into each cell;
Resource underload thresholding and resource high load capacity thresholding are set.
Further, resource utilization, resource underload thresholding and the resource high load capacity of cell are obtained in the periodicity
After thresholding, the distribution method also includes:
According to the resource utilization of cell, period modulation step-length is set;
According to period modulation step-length, resource utilization, resource underload thresholding and the resource high load capacity for obtaining cell is updated
The cycle of thresholding.
Further, in the resource utilization with reference to cell, and resource underload thresholding and resource high load capacity thresholding enter
After row judgement, the distribution method also includes:
According to court verdict, resource underload thresholding step-length and/or resource high load capacity thresholding step-length are set;
If being provided with resource underload thresholding step-length, according to resource underload thresholding step-length, more new resources underload door
Limit, uses for adjudicating next time;
If being provided with resource high load capacity thresholding step-length, according to resource high load capacity thresholding step-length, more new resources high load capacity door
Limit, uses for adjudicating next time.
In the technical scheme of the present embodiment, there is provided a kind of distribution method of base band Pooled resources, the method is by judgement
Each cell be underload cell, middle loaded cell or high load capacity cell, to baseband pool in each cell be grouped, wherein, appoint
One high load capacity cell, at same group, discharges afterwards same with loaded cell at least one underload cell and/or at least one
The part resource of underload cell and/or middle loaded cell in group, the part resource for being discharged is distributed in the group
High load capacity cell.Only need to reallocate resource in the group including high load capacity cell, without the need for calling all of cell
Resource, the method is relatively simple easy, reduces the operation burden of the distributing equipments such as server, improves the fortune of distributing equipment
Line efficiency, simultaneously as the present invention is not little to ensure high load capacity using the mode that carrier resource is shared in activation baseband pool
The normal work in area, therefore, technical scheme disclosed by the invention can't be limited by the frequency for sharing carrier wave, i.e. the present invention
Disclosed scheme goes for the network of any frequency range, while being also applied for the network with multiband.
Second aspect present invention provides a kind of distributing equipment of base band Pooled resources, including:
Acquisition module, the acquisition module be used to periodically obtaining the resource utilization of cell, resource underload thresholding and
Resource high load capacity thresholding.
Judging module, the judging module is used for the resource utilization with reference to cell, and resource underload thresholding and money
Source high load capacity thresholding makes decisions;If the Current resource utilization rate of cell is less than or equal to resource underload thresholding, this is adjudicated little
Area is underload cell;If the Current resource utilization rate of cell is more than resource underload thresholding, and high less than or equal to resource negative
Lotus thresholding, adjudicates the cell for middle loaded cell;If the Current resource utilization rate of cell is more than resource high load capacity thresholding, judgement should
Cell is high load capacity cell.
Grouping module, the grouping module according to court verdict, to baseband pool in each cell be grouped, wherein, appoint
One high load capacity cell is with loaded cell at least one underload cell and/or at least one at same group.
Distribute module, the distribute module is used to discharge the portion of underload cell and/or middle loaded cell in same group
Divide resource, the part resource for being discharged is distributed to the high load capacity cell in the group.
Further, the distributing equipment also includes:
Enlargement module, the enlargement module is used for when the number of the high load capacity cell in baseband pool is little more than default high load capacity
During area's threshold value, expansion alarm is sent.
Further, the distribute module is additionally operable to for base band Pooled resources to be averagely allocated to each cell.
Further, the distributing equipment also includes:
Setup module, the setup module is used to arrange resource underload thresholding and resource high load capacity thresholding;
The setup module is additionally operable to according to court verdict, arranges resource underload thresholding step-length and resource high load capacity thresholding
Step-length, also, periodically obtain resource utilization, resource underload thresholding and the resource high load capacity of cell in the acquisition module
After thresholding, if being provided with resource underload thresholding step-length, the setup module is additionally operable to be walked according to resource underload thresholding
Long, more new resources underload thresholding is used for adjudicating next time;It is described to set if being provided with resource high load capacity thresholding step-length
Put module to be additionally operable to and according to resource high load capacity thresholding step-length, more new resources high load capacity thresholding, use for adjudicating next time.
Further, the setup module is additionally operable to the resource utilization according to cell, arranges period modulation step-length;And
The acquisition module is periodically obtained after resource utilization, resource underload thresholding and the resource high load capacity thresholding of cell, institute
State setup module to be additionally operable to according to period modulation step-length, update resource utilization, resource underload thresholding and the money for obtaining cell
The cycle of source high load capacity thresholding.
Description of the drawings
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, embodiment will be described below
Needed for the accompanying drawing to be used be briefly described, it should be apparent that, drawings in the following description be only the present invention some
Embodiment, for those of ordinary skill in the art, on the premise of not paying creative work, can be with attached according to these
Figure obtains other accompanying drawings.
Fig. 1 is the flow chart one of the distribution method in the embodiment of the present invention;
Fig. 2 is the flowchart 2 of the distribution method in the embodiment of the present invention;
Fig. 3 is the flow chart 3 of the distribution method in the embodiment of the present invention;
Fig. 4 is the flow chart four of the distribution method in the embodiment of the present invention;
Fig. 5 is the structural representation one of the distributing equipment in the embodiment of the present invention;
Fig. 6 is the structural representation two of the distributing equipment in the embodiment of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is a part of embodiment of the invention, rather than the embodiment of whole.Based on this
Embodiment in bright, the acquired every other enforcement under the premise of creative work is not made of those of ordinary skill in the art
Example, belongs to the scope of protection of the invention.
Embodiment one
The embodiment of the present invention provides a kind of distribution method of base band Pooled resources, as shown in figure 1, the distribution method includes:
Step S101, the resource utilization, resource underload thresholding and the resource high load capacity thresholding that periodically obtain cell.
Wherein, each cell correspondence has a base station, according to the resource service condition and business service condition of base station
The resource utilization of the cell can be known.
Meanwhile, obtain the resource underload thresholding and resource high load capacity thresholding for pre-setting.
Step S102, carry out with reference to the resource utilization of cell, and resource underload thresholding and resource high load capacity thresholding
Judgement;If the Current resource utilization rate of cell is less than or equal to resource underload thresholding, the cell is adjudicated for underload cell;If
The Current resource utilization rate of cell is more than resource underload thresholding, and less than or equal to resource high load capacity thresholding, adjudicates the cell
For middle loaded cell;If the Current resource utilization rate of cell is more than resource high load capacity thresholding, the cell is adjudicated for high load capacity cell.
In general, the number for ruling out the high load capacity cell come is poor not with the number for ruling out the underload cell come
It is many, and the number of middle loaded cell is most.For example, the number of high load capacity cell respectively accounts for sum with the number of underload cell
30% or so, the number of middle loaded cell accounts for remaining 40%.
Step S103, according to court verdict, to baseband pool in each cell be grouped, wherein, arbitrary high load capacity cell
With loaded cell at least one underload cell and/or at least one at same group.
As a example by one group comprising two cells, preferentially a high load capacity cell and a underload cell are carried out into group
Close, afterwards, if high load capacity cell has residue, high load capacity cell and middle loaded cell are combined, finally, each middle load is little
Area's self assemble.
Or, if after high load capacity cell and underload cell are combined, underload cell has residue, just will be low
Loaded cell and middle loaded cell are combined, finally, each middle loaded cell self assemble.
If in addition, including more than three cells in one group, preferably only having a high load capacity cell in each group.
The part resource of underload cell and/or middle loaded cell in step S104, same group of release, will be discharged
The part resource for coming distributes to the high load capacity cell in the group.
Because the surplus resources of underload cell and middle loaded cell are relatively more, therefore, it can to discharge little with high load capacity
This part resource is distributed to into the height in the group with the part resource in the underload cell and/or middle loaded cell organized in area
Loaded cell uses, i.e., the base-band resource in group is reallocated, can with the corresponding base station of each cell ensured in group
Enough normal works, reduce possibility a problem that traffic congestion occurs in high load capacity cell.
And then resource need not reallocated including remaining each group of high load capacity cell, i.e., only need to including height
Resource is reallocated in the group of loaded cell, the resource without the need for calling all of cell, reduces the distributing equipments such as server
Operation burden, improve the operational efficiency of distributing equipment.
Wherein, if only having two cells in one group, then it is possible that underload cell or middle loaded cell discharge
Come base-band resource cannot meet high load capacity cell needs situation, therefore, it is general, packet when, preferably three and with
On little divide into one group.
It should be noted that the part resource for being distributed can be any one resource, the fortune of the corresponding base station of such as cell
Calculate disposal ability, or the corresponding frequency resource of cell or the corresponding time interval resource of cell, the corresponding voice of cell or data resource
Deng the embodiment of the present invention is not limited to this.
Clearly as the present invention is not little to ensure high load capacity using the mode that carrier resource is shared in activation baseband pool
The normal work in area, therefore, technical scheme disclosed by the invention can't be limited by the frequency for sharing carrier wave, i.e. the present invention
Disclosed scheme goes for the network of any frequency range, while be also applied for the network with multiband, such as 2G, 3G,
The network that 4G coexists.
In the technical scheme of the present embodiment, there is provided a kind of distribution method of base band Pooled resources, the method is by judgement
Each cell be underload cell, middle loaded cell or high load capacity cell, to baseband pool in each cell be grouped, wherein, appoint
One high load capacity cell, at same group, discharges afterwards same with loaded cell at least one underload cell and/or at least one
The part resource of underload cell and/or middle loaded cell in group, the part resource for being discharged is distributed in the group
High load capacity cell.Only need to reallocate resource in the group including high load capacity cell, without the need for calling all of cell
Resource, the method is relatively simple easy, reduces the operation burden of the distributing equipments such as server, improves the fortune of distributing equipment
Line efficiency, simultaneously as the present invention is not little to ensure high load capacity using the mode that carrier resource is shared in activation baseband pool
The normal work in area, therefore, technical scheme disclosed by the invention can't be limited by the frequency for sharing carrier wave, i.e. the present invention
Disclosed scheme goes for the network of any frequency range, while being also applied for the network with multiband.
Further, if after a certain cycle, the number of the high load capacity cell in baseband pool is excessive, then show baseband pool
Resource use already close to saturation, therefore, in the present invention, also pre-set default high load capacity cell threshold value, when
When the number of the high load capacity cell in baseband pool is more than default high load capacity cell threshold value, expansion alarm is sent, to notify correlation
Technical work personnel in time to the base band Pooled resources(Such as bandwidth)Expanded.
From above, after a series of packet, arranging, the base band Pooled resources shared by each cell are usually
It is different, but in fact, when baseband pool is initially just built up, before step S101, as shown in Fig. 2 the present invention is also wrapped
Include:
Step S201, by base band Pooled resources average mark give each cell.
Step S202, setting resource underload thresholding and resource high load capacity thresholding.
Because baseband pool is just built up, it is impossible to predict the resource utilization of each cell, therefore, in order to ensure substantially institute
There is cell there are enough resources to be operated, thus, it may be preferable to give each cell by base band Pooled resources average mark.
Wherein, the resource underload thresholding of each cell and resource high load capacity thresholding should be arranged by systematic unity.
Next, step S101 and its each step afterwards can be carried out.
Further, build up the initial stage in baseband pool, the resource utilization of the cell in baseband pool is relatively low(Such as 30% is left
It is right), now, resource underload thresholding can be set to 20% by system, and resource high load capacity thresholding is set to into 40%, the i.e. utilization of resources
Cell of the rate more than 40% is high load capacity cell, and after making decisions, being grouped, system distributes other for these high load capacity cells
The abundant resources of cell, to improve the fluency of network, improve the experience of user.
As time goes on, the cell that increasing user is entered in the baseband pool uses the resource of baseband pool, this
When, the resource utilization of each cell increased, if still using the initially set resource underload thresholding of system and
Resource high load capacity thresholding, the quantity of the high load capacity cell in the baseband pool can be greatly increased, or even beyond default high load capacity cell
Threshold value, causes system to produce dilatation alarm by mistake.But in fact, the resource utilization of high load capacity cell now in baseband pool may
Only 50%, therefore, in embodiments of the present invention, need to be adjusted resource underload thresholding and resource high load capacity thresholding, have
Body, as shown in figure 3, after step s 102, the method that the present invention is provided also includes:
Step S301, according to court verdict, resource underload thresholding step-length and/or resource high load capacity thresholding step-length are set.
Specifically, if the court verdict shows that the quantity of the high load capacity cell in this cycle was compared in the last cycle
The quantity of high load capacity cell is enhanced, and for example, the quantity of the high load capacity cell in this cycle is in the upper cycle
1.5 times of high load capacity cell, now, can arrange the resource high load capacity thresholding step-length more than zero, otherwise, be not provided with resource high load capacity
Thresholding step-length or the minus resource high load capacity thresholding step-length of setting.
Similar, if the court verdict shows that the quantity of the underload cell in this cycle was compared in the last cycle
The quantity of underload cell is enhanced, and now, can arrange minus resource underload thresholding step-length, otherwise, no
Resource underload thresholding step-length is set or minus resource high load capacity thresholding step-length is set.
In addition, resource underload thresholding step-length and resource high load capacity thresholding step-length may be alternatively provided as zero.
If step S302, resource underload thresholding step-length is provided with, according to resource underload thresholding step-length, more new resources
Underload thresholding, uses for adjudicating next time.
Specifically, it is assumed that current resource underload thresholding is Rlow1, resource underload thresholding step-length is Δ Rlow, then under
Resource underload thresholding corresponding to one cycle is Rlow2=Rlow1+ΔRlow。
If step S303, resource high load capacity thresholding step-length is provided with, according to resource high load capacity thresholding step-length, more new resources
High load capacity thresholding, uses for adjudicating next time.
Similar, it is assumed that current resource high load capacity thresholding is Rhigh1, resource high load capacity thresholding step-length is Δ Rhigh, then under
Resource high load capacity thresholding corresponding to one cycle is Rhigh2=Rhigh1+ΔRhigh。
Because court verdict can more intuitively reactive group, with the current load condition of Pooled resources, sets according to court verdict
Resource underload thresholding step-length and/or resource high load capacity thresholding step-length are put, and then more new resources underload thresholding and/or resource are high
Load thresholding, can before base band Pooled resources do not expand further effectively utilizes system resource.
In general, each cell is in different time sections, its number of users, telephone traffic, data volume business demand amount phase not to the utmost
Together, therefore, if the cycle of resource utilization for obtaining cell immobilizes, then the cell of business demand amount increase suddenly very may be used
A problem that scarcity of resources occur within the cycle, reduces the using experience degree of the user in this cell.In order to prevent
The appearance of above-mentioned situation, as shown in figure 4, after step slol, present invention additionally comprises:
Step S401, according to the resource utilization of cell, period modulation step-length is set.
Specifically, the resource utilization and the resource utilization in a upper cycle in this cycle of the cell can be compared, if
Be gap between the resource utilization in this cycle and the resource utilization in a upper cycle more than default gap, the cycle can be obtained
Adjusting step.Specifically, period modulation step-length can might be less that zero more than zero, should obtain period modulation according to actual conditions
The numerical value of step-length.
It is general, due to cell resource utilization uprush or anticlimax has certain contingency, if providing each time
There is large change, fluctuation and all the cycle is configured in source utilization rate, and the operation burden of system or base station may be excessive.Cause
This, it is preferred that if continuous two cycles, the situation of change of the resource utilization of the cell is all larger, i.e. the cell each week
The resource utilization that the resource utilization that phase obtains is obtained with the previous cycle is compared, and its gap is all higher than default gap, now,
Period modulation step-length is set, to arrange the cycle according to period modulation step-length.
Step S402, according to period modulation step-length, update resource utilization, resource underload thresholding and the money for obtaining cell
The cycle of source high load capacity thresholding.
Specifically, it is assumed that the current cycle is T1, period modulation step-length is Δ T, and next cycle is T2, then T2=T1+ Δ T,
I.e. after this end cycle, through T2Time interval, just obtain again the resource utilization of cell, resource underload thresholding and
The cycle of resource high load capacity thresholding.
Further, the embodiment of the present invention additionally provides a kind of distributing equipment of base band Pooled resources, as shown in figure 5, including:
Acquisition module, the acquisition module be used to periodically obtaining the resource utilization of cell, resource underload thresholding and
Resource high load capacity thresholding.
Judging module, the judging module is used for the resource utilization with reference to cell, and resource underload thresholding and money
Source high load capacity thresholding makes decisions;If the Current resource utilization rate of cell is less than or equal to resource underload thresholding, this is adjudicated little
Area is underload cell;If the Current resource utilization rate of cell is more than resource underload thresholding, and high less than or equal to resource negative
Lotus thresholding, adjudicates the cell for middle loaded cell;If the Current resource utilization rate of cell is more than resource high load capacity thresholding, judgement should
Cell is high load capacity cell.
Grouping module, the grouping module according to court verdict, to baseband pool in each cell be grouped, wherein, appoint
One high load capacity cell is with loaded cell at least one underload cell and/or at least one at same group.
Distribute module, the distribute module is used to discharge the portion of underload cell and/or middle loaded cell in same group
Divide resource, the part resource for being discharged is distributed to the high load capacity cell in the group.
Further, as shown in fig. 6, distributing equipment provided by the present invention also includes enlargement module, the enlargement module
For when the number of the high load capacity cell in baseband pool is more than default high load capacity cell threshold value, sending expansion alarm.
Wherein, when baseband pool is just built up, the distribute module is additionally operable to be averagely allocated to base band Pooled resources each little
Area.
Further, it is in distribute module that base band Pooled resources are average as shown in fig. 6, the equipment also includes setup module
After distributing to each cell, the setup module is used to arrange resource underload thresholding and resource high load capacity thresholding.
Wherein, the setup module is additionally operable to according to court verdict, arranges resource underload thresholding step-length and resource is high negative
Lotus thresholding step-length, also, periodically obtain resource utilization, resource underload thresholding and the resource of cell in the acquisition module
After high load capacity thresholding, if being provided with resource underload thresholding step-length, the setup module is additionally operable to according to resource underload
Thresholding step-length, more new resources underload thresholding, use for adjudicating next time;If being provided with resource high load capacity thresholding step-length,
The setup module is additionally operable to and according to resource high load capacity thresholding step-length, more new resources high load capacity thresholding, for sentencing next time
Certainly use.
Similar, the setup module can be additionally used in the resource utilization according to cell, arrange period modulation step-length;And
The periodicity is obtained after resource utilization, resource underload thresholding and the resource high load capacity thresholding of cell, is additionally operable to basis
Period modulation step-length, updates the cycle of the resource utilization, resource underload thresholding and resource high load capacity thresholding that obtain cell.
Through the above description of the embodiments, those skilled in the art can be understood that the present invention can be borrowed
Software is helped to add the mode of required common hardware to realize, naturally it is also possible to which by hardware, but in many cases the former is more preferably
Embodiment.Based on such understanding, the portion that technical scheme substantially contributes in other words to prior art
Dividing can be embodied in the form of software product, and the computer software product is stored in the storage medium that can read, and such as be counted
The floppy disk of calculation machine, hard disk or CD etc., including some instructions use is so that a computer equipment(Can be personal computer,
Server, or the network equipment etc.)Perform the method described in each embodiment of the invention.
The above, the only specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any
Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, all should contain
Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be defined by the scope of the claims.
Claims (8)
1. a kind of distribution method of base band Pooled resources, it is characterised in that include:
Periodically obtain resource utilization, resource underload thresholding and the resource high load capacity thresholding of cell;
Make decisions with reference to the resource utilization of cell, and resource underload thresholding and resource high load capacity thresholding;If cell
Current resource utilization rate is less than or equal to resource underload thresholding, adjudicates the cell for underload cell;If the current money of cell
Source utilization rate is more than resource underload thresholding, and less than or equal to resource high load capacity thresholding, adjudicates the cell for middle loaded cell;
If the Current resource utilization rate of cell is more than resource high load capacity thresholding, the cell is adjudicated for high load capacity cell;
According to court verdict, to baseband pool in each cell be grouped, wherein, arbitrary high load capacity cell is low with least one negative
Loaded cell is at same group in lotus cell and/or at least one;
The part resource of underload cell in same group and/or middle loaded cell is discharged, by the part resource for being discharged
Distribute to the high load capacity cell in the group;
After resource utilization, resource underload thresholding and resource high load capacity thresholding that the periodicity obtains cell, also wrap
Include:
According to the resource utilization of cell, period modulation step-length is set;
According to period modulation step-length, resource utilization, resource underload thresholding and the resource high load capacity thresholding for obtaining cell is updated
Cycle.
2. distribution method according to claim 1, it is characterised in that also include:When the high load capacity cell in baseband pool
When number is more than default high load capacity cell threshold value, expansion alarm is sent.
3. distribution method according to claim 1, it is characterised in that obtain the utilization of resources of cell in the periodicity
Before rate, resource underload thresholding and resource high load capacity thresholding, also include:
Base band Pooled resources are averagely allocated to into each cell;
Resource underload thresholding and resource high load capacity thresholding are set.
4. distribution method according to claim 1, it is characterised in that in the resource utilization with reference to cell, and resource
After underload thresholding and resource high load capacity thresholding make decisions, also include:
According to court verdict, resource underload thresholding step-length and/or resource high load capacity thresholding step-length are set;
If being provided with resource underload thresholding step-length, according to resource underload thresholding step-length, more new resources underload thresholding, with
Use for adjudicating next time;
If being provided with resource high load capacity thresholding step-length, according to resource high load capacity thresholding step-length, more new resources high load capacity thresholding, with
Use for adjudicating next time.
5. a kind of distributing equipment of base band Pooled resources, it is characterised in that include:
Acquisition module, the acquisition module is used to periodically obtain resource utilization, resource underload thresholding and the resource of cell
High load capacity thresholding;
Judging module, the judging module is used for the resource utilization with reference to cell, and resource underload thresholding and resource height
Load thresholding makes decisions;If the Current resource utilization rate of cell is less than or equal to resource underload thresholding, adjudicating the cell is
Underload cell;If the Current resource utilization rate of cell is more than resource underload thresholding, and less than or equal to resource high load capacity door
Limit, adjudicates the cell for middle loaded cell;If the Current resource utilization rate of cell is more than resource high load capacity thresholding, the cell is adjudicated
For high load capacity cell;
Grouping module, the grouping module according to court verdict, to baseband pool in each cell be grouped, wherein, Ren Yigao
Loaded cell is with loaded cell at least one underload cell and/or at least one at same group;
Distribute module, the distribute module is used to discharge the part money of underload cell and/or middle loaded cell in same group
Source, the part resource for being discharged is distributed to the high load capacity cell in the group;
Setup module, the setup module is used for the resource utilization according to cell, arranges period modulation step-length;And obtain described
Delivery block periodicity is obtained after resource utilization, resource underload thresholding and the resource high load capacity thresholding of cell, the setting
Module is additionally operable to according to period modulation step-length, and resource utilization, resource underload thresholding and the resource for updating acquisition cell is high negative
The cycle of lotus thresholding.
6. distributing equipment according to claim 5, it is characterised in that also include:
Enlargement module, the enlargement module is used for when the number of the high load capacity cell in baseband pool is more than default high load capacity cell door
During limit value, expansion alarm is sent.
7. distributing equipment according to claim 5, it is characterised in that the distribute module is additionally operable to put down base band Pooled resources
Distribute to each cell.
8. distributing equipment according to claim 5, it is characterised in that the setup module is additionally operable to arrange resource underload
Thresholding and resource high load capacity thresholding;
The setup module is additionally operable to according to court verdict, arranges resource underload thresholding step-length and resource high load capacity thresholding step
It is long, also, periodically obtain resource utilization, resource underload thresholding and the resource high load capacity door of cell in the acquisition module
After limit, if being provided with resource underload thresholding step-length, the setup module is additionally operable to according to resource underload thresholding step-length,
More new resources underload thresholding, uses for adjudicating next time;If being provided with resource high load capacity thresholding step-length, the setting mould
Block is additionally operable to according to resource high load capacity thresholding step-length, more new resources high load capacity thresholding, is used for adjudicating next time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310626013.5A CN103607773B (en) | 2013-11-28 | 2013-11-28 | Method and device for distributing baseband pool resources |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310626013.5A CN103607773B (en) | 2013-11-28 | 2013-11-28 | Method and device for distributing baseband pool resources |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103607773A CN103607773A (en) | 2014-02-26 |
CN103607773B true CN103607773B (en) | 2017-04-12 |
Family
ID=50125962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310626013.5A Active CN103607773B (en) | 2013-11-28 | 2013-11-28 | Method and device for distributing baseband pool resources |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103607773B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105474732B (en) * | 2014-07-30 | 2019-04-12 | 华为技术有限公司 | Apparatus control method, equipment and system under a kind of centralization baseband pool framework |
US10278081B2 (en) * | 2014-09-30 | 2019-04-30 | Viavi Solutions Inc. | Methods and apparatus for self optimization and/or improvement of a cloud-based wireless network |
CN105682145A (en) * | 2014-11-21 | 2016-06-15 | 中兴通讯股份有限公司 | Method and device for improving baseband resource utilization rate |
CN107567102A (en) * | 2017-09-22 | 2018-01-09 | 上海华为技术有限公司 | A kind of resource allocation methods and device |
CN109348511B (en) * | 2018-11-30 | 2021-11-19 | 中国联合网络通信集团有限公司 | Method and device for allocating baseband resources |
CN109661000A (en) * | 2018-12-19 | 2019-04-19 | 中国联合网络通信集团有限公司 | Management method, device, equipment and the readable storage medium storing program for executing of inefficient base station |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101562900A (en) * | 2008-04-16 | 2009-10-21 | 中兴通讯股份有限公司 | System and method based on shared baseband pool and distributed radio frequency units |
CN102469593A (en) * | 2010-11-17 | 2012-05-23 | 中国移动通信集团江苏有限公司 | Method and device for distributing shared resources in base band pool |
CN102547719A (en) * | 2011-12-12 | 2012-07-04 | 大唐移动通信设备有限公司 | Method and device for configuring tidal effect |
-
2013
- 2013-11-28 CN CN201310626013.5A patent/CN103607773B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101562900A (en) * | 2008-04-16 | 2009-10-21 | 中兴通讯股份有限公司 | System and method based on shared baseband pool and distributed radio frequency units |
CN102469593A (en) * | 2010-11-17 | 2012-05-23 | 中国移动通信集团江苏有限公司 | Method and device for distributing shared resources in base band pool |
CN102547719A (en) * | 2011-12-12 | 2012-07-04 | 大唐移动通信设备有限公司 | Method and device for configuring tidal effect |
Also Published As
Publication number | Publication date |
---|---|
CN103607773A (en) | 2014-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103607773B (en) | Method and device for distributing baseband pool resources | |
CN102104874B (en) | Distribution method of network transmission resource and relevant device thereof | |
CN102378186B (en) | A kind of base station resource sharing system and method | |
CN102045892B (en) | Baseband pool equipment and method for realizing baseband data distributed switching | |
CN102238631A (en) | Method for managing heterogeneous network resources based on reinforcement learning | |
CN105122876A (en) | Communication system | |
CN103220724A (en) | Cellular and dimension to dimension (D2D) user frequency spectrum accessing method in D2D communication mixing system | |
CN101459597A (en) | Method and system for using logic resource | |
CN101622820A (en) | Method and system for managing baseband resource pool of global mobile communication system | |
CN106304093A (en) | Frequency spectrum optimization system and method is shared between a kind of network | |
CN101772102A (en) | Selecting method for isomeric wireless network | |
CN101472339A (en) | Method for coordinating district interference | |
CN105162133B (en) | Adjust critical point main transformer Target of Reactive Power value distribution method in ground | |
CN103167620B (en) | A kind of wireless resource allocation methods and device | |
CN106937293A (en) | The distribution method and device of a kind of frequency spectrum resource | |
CN102958121A (en) | Cell switching method and device | |
CN102843722B (en) | With the synchronous method, cut-in method and device of coverage cell information on load | |
CN101754436A (en) | Blending agent access control method capable of facing wireless industrial network | |
CN103260196B (en) | A kind of control method of transmission bandwidth, Apparatus and system | |
CN101159974B (en) | Access grade control method | |
CN102802180B (en) | Radio frequency resource dispatch control method and device | |
CN103209025A (en) | Electric light load wireless communication system based on distributed base station pools and implementation method for wireless communication system | |
CN103702320A (en) | Method and device for allocating C-RNTIs (cell radio network temporary identifiers) | |
CN106793045A (en) | Cloud wirelessly networking system and its Energy dissipation method | |
CN103379551B (en) | A kind of distribution method and equipment of High-Level Data Link Control link bandwidth |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |