CN102802180B - Radio frequency resource dispatch control method and device - Google Patents

Radio frequency resource dispatch control method and device Download PDF

Info

Publication number
CN102802180B
CN102802180B CN201110133938.7A CN201110133938A CN102802180B CN 102802180 B CN102802180 B CN 102802180B CN 201110133938 A CN201110133938 A CN 201110133938A CN 102802180 B CN102802180 B CN 102802180B
Authority
CN
China
Prior art keywords
rru
critical
transceiver
sector
fault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110133938.7A
Other languages
Chinese (zh)
Other versions
CN102802180A (en
Inventor
姚静
姚幸林
于翔川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201110133938.7A priority Critical patent/CN102802180B/en
Priority to PCT/CN2012/071414 priority patent/WO2012159464A1/en
Publication of CN102802180A publication Critical patent/CN102802180A/en
Application granted granted Critical
Publication of CN102802180B publication Critical patent/CN102802180B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/04Arrangements for maintaining operational condition

Abstract

The invention discloses a kind of radio frequency resource dispatch control method and device, the method includes: when all remote radio unit RRU transceiver association broken down being detected are unavailable, RRU the most available free in sector belonging to detection fault transceiver;If so, RRU idle in sector belonging to selecting uses to described fault transceiver;If it is not, whether there is the critical RRU of free time in inquiring about other sectors;Described critical RRU is the RRU that can dispatch across sector pre-set;When there is the critical RRU of free time in finding other sectors, critical RRU idle in selecting other sectors uses to described fault transceiver.The method RRU scheduling of resource is reasonable, improves resource utilization and System Fault Tolerance redundancy ability.

Description

Radio frequency resource dispatch control method and device
Technical field
The present invention relates to communication technical field, espespecially a kind of radio frequency resource dispatch control method and device.
Background technology
Manufacture field at a new generation's communication apparatus and gradually cause the radio frequency stretch system of concern, its typical frame Structure is baseband processing unit (Baseband Unit, BBU)+remote radio unit (Remote Radio Unit, RRU).BBU is typically mounted in machine room, by LTE Baseband Processing Unit (Baseband Process, BP) composition, constitutes a base band resource pool, can share for multiple RRU, mainly be responsible for digital baseband Signal processing and control management;RRU is then connected with antenna, be responsible for digital baseband signal and radiofrequency signal it Between conversion, and radiofrequency signal is from the transmitting of antenna.Use optical fiber to connect between the two, constitute radio frequency and draw Remote system architecture.
A new generation radio frequency stretch system framework digital mobile communication system compared with traditional networking model, Flexible for installation simply the network coverage is more effective, the theory also brought in management and differed in the past.Example As: the base station of almost all of BBU+RRU framework all uses the pattern of dynamic physical assignment of logical, gram Having taken physical carrier frequency and logic transceiver corresponding relation under traditional mode can not the problem of dynamic realtime distribution.
The base station of above-mentioned BBU+RRU framework the most all uses the networking mode of remote radio, remote radio Construction location and aerial angle between the RRU laid after construction differ greatly, it is contemplated that sector is actual to be covered Lid scope, in existing RRU scheduling of resource controls Managed Solution, RRU is to enter in units of sector Row scheduling.When according to existing sector, the allocation schedule carrying out RRU resource with scheduling scheme is set, one Denier occurs causing RRU inadequate resource because the natural disasters such as earthquake cause RRU hardware in a certain sector the most impaired Situation, even if under same website, there is the RRU resource that position is moderate and idle other sectors neighbouring, These RRU resources also cannot be scheduling by base station main control unit, it is achieved rational fault-tolerant disaster tolerance processes.
Visible, existing RRU scheduling of resource implementation, at the RRU inadequate resource of certain sector Time, not only it cannot be guaranteed that being smoothed out of this Zone, meanwhile, in other sectors that may be present greatly Amount slack resources can not effectively utilize, and the most thoroughly plays the advantage of BBU+RRU framework, money The unreasonable of source scheduling not only reduces resource utilization, meanwhile, has been greatly reduced the fault-tolerant disaster tolerance of system Ability.
Summary of the invention
Embodiments provide a kind of radio frequency resource dispatch control method and device, existing in order to solve The problems such as unreasonable the caused resource utilization of RRU scheduling of resource is low, System Fault Tolerance redundancy ability difference.
A kind of radio frequency resource dispatch control method, including:
When all remote radio unit RRU transceiver association broken down being detected are unavailable, RRU the most available free in sector belonging to detection fault transceiver;
If so, RRU idle in sector belonging to selecting uses to described fault transceiver;If it is not, look into The critical RRU of free time whether is there is in asking other sectors;Described critical RRU be pre-set can be across fan The RRU of district's scheduling;
When there is the critical RRU of free time in finding other sectors, select idle facing in other sectors Boundary RRU uses to described fault transceiver.
A kind of radio frequency resource dispatching control device, including: fault detection module, first performs module and the Two perform module;
Fault detection module, for when all extension radio frequencies transceiver association broken down being detected When unit R RU is unavailable, RRU the most available free in sector belonging to detection fault transceiver, if Then notify the first execution module, otherwise notify the second execution module;
First performs module, for sector belonging to fault transceiver being detected when described fault detection module Interior when there is idle RRU, select belonging in sector idle RRU make to described fault transceiver With;The critical RRU of free time whether is there is in otherwise inquiring about other sectors;Described critical RRU is for set in advance That puts can be across the RRU of sector scheduling;
Second performs module, for idle critical when existing in the first execution module searches to other sectors During RRU, critical RRU idle in selecting other sectors uses to described fault transceiver.
A kind of base station, including: above-mentioned radio frequency resource dispatching device.
The present invention has the beneficial effect that:
The radio frequency resource dispatch control method of embodiment of the present invention offer and device, by arranging critical RRU, Detect the transceiver association broken down all RRU are unavailable and fan belonging to fault transceiver When not having idle RRU in district, the critical RRU called in other sectors uses to fault transceiver, from And it is not enough to avoid certain sector endogenous cause of ill RRU, and the problem that the communication service caused can not be normally carried out, When certain sector RRU deficiency, the RRU of other sectors can be made full use of, improve the utilization of resources Rate, also substantially increases the fault-tolerant redundancy ability of system, has given full play to the excellent of BBU+RRU framework Gesture.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes of the present invention Point, the schematic description and description of the present invention is only used for explaining the present invention, is not intended that the present invention's Improper restriction.In the accompanying drawings:
Fig. 1 is the system principle schematic diagram arranging critical RRU in the embodiment of the present invention;
Fig. 2 is the flow chart of radio frequency resource dispatch control method in the embodiment of the present invention one;
Fig. 3 is the flow chart of radio frequency resource dispatch control method in the embodiment of the present invention two;
Fig. 4 is the flow chart of radio frequency resource dispatching control device in the embodiment of the present invention.
Detailed description of the invention
In order to make the technical problem to be solved, technical scheme and beneficial effect clearer, bright In vain, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that herein Described specific embodiment, only in order to explain the present invention, is not intended to limit the present invention.
The embodiment of the present invention provides a kind of radio frequency resource dispatch control method, arranges critical RRU, Qi Zhongshe The critical RRU put is can be across the RRU, this kind of critical RRU of sector scheduling and other RRU in website Hardware is identical, and meets following condition:
One adjacent part being in each sector.
When constructing in base station, although different sectors covers different regions, but under same website, Between each sector, after all having adjacent part, critical RRU is positioned at this class region.
Two is to complete the scheduling across sector.
Critical RRU typically equips high performance electrical tilt antenna, in order to by antennal interface criterion group (Antenna Interface Standards Group, AISG) interface protocol controls the inclination angle of antenna so that The RRU connecting the same antenna only relies on the amendment of logic parameter, can complete from a sector to other The scheduling configuration of individual sector, i.e. dispatches across sector, thus need not carry out construction and adjust, it is also possible to keep more Preferably coverage.
In sum, critical RRU meets following condition: critical RRU and common RRU hardware configuration phase With;Critical RRU riding position is positioned at the adjacent position of affiliated sector and other sectors;Critical RRU joins It is set to dispatch across sector.
It is illustrated in figure 1 the system principle schematic diagram that critical RRU is set.With a S3/3/3 website it is Example, only gives part related to the present invention in Fig. 1, it will be understood by those skilled in the art that base station has There are other functions and structure, but these are not in the range of the discussion of the present invention.
As shown in Figure 1, base station includes BBU and RRU two parts, and RRU includes common RRU With critical RRU two kinds, different RRU is distributed under different sectors.The most critical RRU is building Stand construction time must the layout adjacent in each sector, be equipped with electrical tilt antenna, concrete by networking of its number Require to determine.As the RRU1 in Fig. 1, RRU2 ..., RRUn broadly fall into common RRU.Respectively The corresponding relation of RRU and transceiver is by base station sets, when there being noncritical common RRU, the most excellent First transceiver is arranged on noncritical RRU, in order to critical RRU is remained consequent malfunction and switches Time use..
It is also preferred that the left as it is shown in figure 1, after networking requirement determines, it is also possible to carry out parameter configuration.Ginseng Number configuration is completed by operation maintenance center (Operations & Maintenance Centre, OMC) and unified It is handed down to each base station, can be completed down by base station controller (Base Station Controller, BSC) when issuing Send out.
The radio frequency resource dispatch control method of the present invention is described in detail below by specific embodiment.
Embodiment one:
The radio frequency resource dispatch control method that the embodiment of the present invention one provides, its flow process is as in figure 2 it is shown, wrap Include following steps:
Step S101: be periodically detected the duty of transceiver.
Base station is periodically interrogated by BP, different in order to determine whether transceiver duty Often, once note abnormalities, then reporting fault is to radio frequency resource dispatching control device, and this device can be arranged on In the main control unit of base station, and controlled subsequent operation by radio frequency resource dispatching control device.
This step detects the duty of each transceiver with the first detection cycle set, logical Cross startup intervalometer 1 and realize the control in the first detection cycle, in order to be periodically detected in its own system of base station The duty of all transceivers under each sector administrative, if be detected that there is transceiver duty Abnormal, perform step S102, otherwise continue detection.
Related when detecting after the radio frequency resource caused due to RRU hardware or software failure operates state obturation Transceiver inaccessible, it is believed that this RRU duty is abnormal, and then confirms the transmitting-receiving associated by this RRU Duty is abnormal because its RRU associated damages for letter machine.
Step S102: when having detected that transceiver breaks down, it is judged that the transceiver broken down All RRU of association are the most unavailable.
If so, perform step S103, otherwise return and continue executing with step S102.
When transceiver duty exception having been detected, poll detects this transceiver broken down Associated all RRU are the most unavailable, when the test results is yes, determine and detect and break down Logic transceiver association all RRU unavailable.
Radio frequency resource dispatching control device receives after the Trouble Report of BP, can basis be currently configured, The all RRU being associated with fault transceiver of poll, it is judged that whether polled RRU resource is because of fault Unavailable.If be detected that all RRU associated by the transceiver broken down are unavailable because of fault, Then perform step 103, otherwise return step 101 and continue detection.
Step S103: RRU the most available free in sector belonging to detection fault transceiver.
Whether radio frequency resource dispatching control device has other in continuing to detect sector belonging to this fault transceiver Idle RRU, wherein idle RRU refer to that RRU physical entity is properly functioning, but not with any one The RRU of individual transceiver association.
If so, perform step S104, otherwise perform step S105.
Step S104: RRU idle in sector belonging to selecting uses to fault transceiver.
When base station initial configuration, in general each sector, the RRU quantity of configuration is greater than equal to transmitting-receiving letter The quantity of machine, so as to when there being RRU fault, can preferentially use the idle RRU of this sector to replace Change the RRU that breaks down to use to fault transceiver.
Step S105: whether there is the critical RRU of free time in inquiring about other sectors.Wherein, critical RRU is the RRU that can dispatch across sector pre-set.
In the website of radio frequency resource dispatching control device poll place, other all sector lower critical RRU use feelings Condition, has searched whether that critical RRU is idle.Wherein, it is queried whether RRU is critical RRU resource, Determined by the configuration of OMC.
If so, perform step S106, otherwise return and continue executing with step S107.
Step S106: critical RRU idle in selecting other sectors uses to fault transceiver.
When there is the critical RRU of free time in finding other sectors, select idle facing in other sectors Boundary RRU uses to fault transceiver.After critical RRU idle in selecting other sectors, according to fault The needs of transceiver, configure RRU parameter and the electrical tilt antenna angle of critical RRU;With facing after configuration Boundary RRU replaces fault RRU of the affiliated sector used before fault transceiver.
I.e. when selecting an idle critical RRU in other sectors to use, dynamically adjust this critical RRU parameter and supporting electrical tilt antenna angle, in order to replace fault RRU.Now, arranging fault RRU is Unavailable.
Wherein, the adjustment work of supporting electrical tilt antenna angle has been controlled by RRU self, and adjusts RRU parameter is then completed by radio frequency resource dispatching control device, and is handed down to this critical RRU.
Step S107: the RRU taken in terminating flow process or searching other sectors is the most releasably to fault Transceiver uses.
When all searching the critical RRU less than the free time in other can search sector, i.e. it is believed that do not have properly Critical RRU and terminate flow process, it is preferred that allocated critical in other sectors can also be searched RRU, sees and whether belongs to the releasable critical RRU used to fault transceiver.
Embodiment two:
The radio frequency resource dispatch control method that the embodiment of the present invention two provides, its flow process is as it is shown on figure 3, wrap Include following steps:
Step S201: be periodically detected the duty of transceiver.
See step S101.
Step S202: when having detected that transceiver breaks down, it is judged that the transceiver broken down All RRU of association are the most unavailable.
If so, perform step S203, otherwise return and continue executing with step S201.
See step S102.
Step S203: RRU the most available free in sector belonging to detection fault transceiver.
See step S103.
If so, perform step S204, otherwise perform step S205.
Step S204: RRU idle in sector belonging to selecting uses to fault transceiver.
See step S104.
Step S205: belonging to detection fault transceiver, the channel of sector is the most occupied.
Unlike embodiment one, inquire about in other sectors whether there is the free time critical RRU it Before, belonging to detection fault transceiver, the channel of sector is the most occupied.When being judged as YES, then perform The step of the critical RRU of free time whether is there is in inquiring about other sectors.Otherwise return and continue executing with step S201。
That inquires about current all channels in sector belonging to fault transceiver in this step takies situation, by The baseband portion of BBU completes this function, reports radio frequency resource scheduling controlling dress by BP after specifically being added up Put, radio frequency resource dispatching control device after adding up, if it is confirmed that not all channel is the most occupied, but There is channel idle.Then the fault of explanation fault transceiver does not have influence on the work of whole sector, Can consider to stop this detection, wait the detection case of next cycle.
Step S206: whether there is the critical RRU of free time in inquiring about other sectors.Wherein, critical RRU is the RRU that can dispatch across sector pre-set.
See step S105.
If so, perform step S207, otherwise return and continue executing with step S208.
Step S207: critical RRU idle in selecting other sectors uses to fault transceiver.
See step S106.
Step S208: according to the channel occupancy situation of critical RRU allocated in other sectors, inquiry is No there is releasable critical RRU.
When finding the critical RRU that there is not the free time in other sectors, distribute in inquiring about other sectors The channel occupancy situation of critical RRU, according to the channel occupancy of critical RRU allocated in other sectors Situation, searches whether to there is releasable critical RRU;If so, step S209 is performed;Otherwise, perform Step S210.
Unoccupied channel quantity according to the allocated critical RRU in other sectors judges that this critical RRU is No for releasable RRU, when the unoccupied channel quantity of allocated critical RRU is setting quantity continuously The second detection cycle in when all exceeding the amount threshold of setting, determine that this critical RRU is releasable facing Boundary RRU.Preferably, the second detection cycle and the product setting quantity were less than for the first detection cycle.
In radio frequency resource dispatching control device this website of poll, all other comprises the fan distributing critical RRU District's channel occupancy situation, if super in having allocated critical RRU unoccupied channel N continuous the cycle Cross the threshold value set, it is believed that allocated critical RRU can discharge.
This step is reported transceiver channel occupancy situation by BP and calculates the channel occupancy of each sector Situation, base station main control unit opening timing device 2, take situation, if continuously for periodically aggregate channels The a certain sectors free channel number that N number of cycle BP reports exceedes threshold value, then show to deprive under this sector Critical RRU does not affect the normal work of this sector.Wherein, timer 2 cycle duration be multiplied by N must be little Cycle duration in cycle timer 1.
Preferably, it is contemplated that efficiency also takes into account the stability of system, and the threshold value of setting can be receipts Sender comprised channel maximum number, to ensure the robustness of whole system.
Step S209: releasable critical RRU is used to fault transceiver.
When find there is releasable critical RRU time, the resource of releasable critical RRU is released Put, dynamically adjust the RRU parameter of critical RRU and supporting electrical tilt antenna angle, in order to replace fault RRU, it is unavailable for arranging fault RRU simultaneously, with reference to step S106 during configuration.
RRU configuration parameter is switched and may be caused abnormal call drop phenomenon, but in view of the index of whole system With disaster tolerance, a small amount of abnormal call drop is to allow.
Step S210: compare the priority of sector belonging to fault transceiver and distributed critical RRU with all The priority of affiliated sector.
When there is not releasable critical RRU, it may be considered that from priority less than fault transceiver institute In the sector of the priority of the sector belonged to, select to have distributed critical RRU and use to fault transceiver.
Comprised by all other in this website of poll and distribute the sector priority of critical RRU, search excellent First level is less than sector belonging to fault RRU and comprises the sector distributing critical RRU.
In this step, the priority of each sector is preset by OMC, is handed down to base station as parameter, Poll work is performed by radio frequency resource dispatching control device, more has the right than low priority sector in high priority sector Limit takies critical RRU.
Step S211: whether there is the priority bag less than the priority of the sector belonging to fault transceiver Containing the sector distributing critical RRU.
If so, step S212 is performed;Otherwise terminate this flow process, return and continue executing with step S201.
Step S212: select less than the sector of the priority of the sector belonging to fault transceiver from priority Select and distribute critical RRU.
Preferably, all comprise distribute the low priority sector of critical RRU in choose priority minimum Sector.
Step S213: detection select critical RRU whether with BCCH (Broadcast Control Channel, BCCH) transceiver binding.
Priority is selected to face less than the distribution in the sector of the priority of the sector belonging to fault transceiver Boundary RRU, it is judged that whether the critical RRU of selection binds with the transceiver in affiliated sector.
Whether the critical RRU that particular exam selects binds with BCCH transceiver, if it is, perform Step 212, otherwise performs step 213.General base station is when carrying out transceiver and RRU binding, preferentially Select non-critical RRU to bind, therefore, once occur that critical RRU with BCCH transceiver is tied up Fixed situation, then illustrate that sector belonging to selected critical RRU is also faced with the situation of the shortage of RRU, It is inappropriate for now depriving its critical RRU, and sector belonging to the most selected critical RRU there will be fan The serious conditions that district interrupts.
In step S212 and step S213, all detection decision making algorithms are filled by radio frequency resource scheduling controlling Put execution.
If so, step S214 is performed;Otherwise perform step S215.
Step S214: the critical RRU bound with BCCH transceiver is deleted from alternative critical RRU Remove.
Return step S212 and be again less than other fans of sector priority belonging to fault transceiver in priority Selection in district has distributed critical RRU.
Step S215: distributed critical RRU to the use of fault transceiver by selected.
Distribute critical RRU for selected, discharged the resource of this critical RRU by force, dynamically adjust The RRU parameter of critical RRU and supporting electrical tilt antenna angle, in order to replace fault RRU, arranged simultaneously Fault RRU is unavailable, with reference to step S106 during configuration.
RRU configuration parameter is switched and may be caused abnormal call drop phenomenon, but in view of the index of whole system With disaster tolerance, a small amount of abnormal call drop is to allow.
Step S212 achieves from priority preferential less than sector belonging to fault transceiver to step S214 In the sector of level, select to have distributed critical RRU and use to fault transceiver.
The radio frequency resource dispatch control method provided based on the embodiment of the present invention, the embodiment of the present invention provides one Planting radio frequency resource dispatching control device, this device can be arranged in a base station, such as, be arranged on the base station of base station In main control unit, this is a logical block, is positioned on BBU, can be positioned at same physics in fact with BP On body, it is also possible to belong on different physical entities, it is achieved the scheduling of radio frequency resource.This device can lead to Crossing software logic unit to realize, its structure as shown in Figure 4, performs including: fault detection module 10, first Module 20 and second performs module 30.
Fault detection module 10, for when all RRU of the transceiver association broken down being detected not Time available, RRU the most available free in sector belonging to detection fault transceiver, if time notify that first holds Row module, otherwise notifies the second execution module.
First performs module 20, for fanning belonging to fault transceiver when described fault detection module detects When there is idle RRU in district, RRU idle in selecting affiliated sector makes to described fault transceiver With;The critical RRU of free time whether is there is in otherwise inquiring about other sectors;Described critical RRU is for set in advance That puts can be across the RRU of sector scheduling.
Preferably, above-mentioned first performs module 20, is additionally operable to: when fault detection module 10 detects fault When there is not the RRU of free time in sector belonging to transceiver, the letter of sector belonging to detection fault transceiver Road is the most occupied;When being judged as YES, more whether there is the free time in performing other sectors of described inquiry The step of critical RRU.
Second performs module 30, for there is idle facing when the first execution module searches in other sectors During boundary RRU, critical RRU idle in selecting other sectors uses to described fault transceiver.
Preferably, above-mentioned radio frequency resource dispatching control device, also include: the 3rd performs module 40 and the 4th Perform module 50.
3rd performs module 40, there is not the free time in finding other sectors when the first execution module 20 Critical RRU time, the channel occupancy situation of allocated critical RRU in inquiring about other sectors;According to it The channel occupancy situation of allocated critical RRU in his sector, searches whether to exist releasable critical RRU。
Preferably, the above-mentioned 3rd module 40 is performed, specifically for allocated critical according to other sectors The unoccupied channel quantity of RRU determines whether releasable RRU, when allocated critical RRU not When busy channel quantity all exceedes the amount threshold of setting within the second detection cycle setting quantity continuously, really This critical RRU fixed is releasable critical RRU.
4th perform module 50, for when the 3rd execution module 40 find exist releasable critical During RRU, releasable critical RRU is used to fault transceiver.
Preferably, above-mentioned radio frequency resource dispatching control device, also include:
5th perform module 60, for when the 3rd execution module 40 determine do not exist releasable critical During RRU, compare the priority of sector belonging to fault transceiver and distributed belonging to critical RRU with all The priority of sector;From priority less than the sector of the priority of the sector belonging to fault transceiver, select Select and distribute critical RRU to the use of fault transceiver.
Preferably, the above-mentioned 5th performs module 60, specifically for selecting priority less than fault transceiver The critical RRU of distribution in the sector of the priority of affiliated sector, it is judged that whether the critical RRU of selection Bind with the transceiver in affiliated sector;The most then reselect priority less than fault transceiver institute The critical RRU of distribution in other sectors of the priority of the sector belonged to;Otherwise the distribution by selection is critical RRU uses to fault transceiver.
The above-mentioned radio frequency resource dispatch control method that the embodiment of the present invention provides, arranging can be across sector scheduling RRU, when RRU inadequate resource in sector belonging to transceiver self, can be across the sector scheduling free time RRU, thus realize Appropriate application and be distributed in the critical RRU of each sector, optimize network resource scheduling and refer to Mark, improves RRU resource utilization and base station disaster tolerance.
Preferably, when critical RRU does not has the free time, release can be determined whether according to the priority of sector Allocated critical RRU uses to fault transceiver, thus ensures the demand priority of high priority sector It is met, it is to avoid because RRU is the most impaired, performance indications decline the busy sector of high priority, and this is not only Improve the resource utilization of whole website, save system resource, thoroughly played BBU+RRU and drawn The advantage of remote framework, improves the fault-tolerant mitigation ability of whole system.
The above-mentioned radio frequency resource dispatch control method that the embodiment of the present invention provides, is applicable to the whole world mobile logical The radio frequency resource scheduling pipe of news system (Global Sysctrl for Mobile Communications, GSM) Reason, it is possible to be applicable to the communication systems such as 3G, to solve the disaster-tolerating and error-tolerating problem of wireless base station.Additionally, also The management and running of the configuration slave site of RRU can be risen to the management and running of communication system the whole network rank.
Described above illustrate and describes a preferred embodiment of the present invention, but as previously mentioned, it should reason Solve the present invention and be not limited to form disclosed herein, be not to be taken as the eliminating to other embodiments, and Can be used for other combinations various, amendment and environment, and can pass through in invention contemplated scope described herein Above-mentioned teaching or the technology of association area or knowledge are modified.And the change that those skilled in the art are carried out and change Change without departing from the spirit and scope of the present invention, the most all should be in the protection domain of claims of the present invention.

Claims (14)

1. a radio frequency resource dispatch control method, it is characterised in that including:
When all remote radio unit RRU transceiver association broken down being detected are unavailable, RRU the most available free in sector belonging to detection fault transceiver;
If so, RRU idle in sector belonging to selecting uses to described fault transceiver;If it is not, look into The critical RRU of free time whether is there is in asking other sectors;Described critical RRU be pre-set can be across fan The RRU of district's scheduling;
When there is the critical RRU of free time in finding other sectors, select idle facing in other sectors Boundary RRU uses to described fault transceiver;
Also include: when finding the critical RRU that there is not the free time in other sectors, inquire about other sectors The channel occupancy situation of interior allocated critical RRU;
According to the channel occupancy situation of critical RRU allocated in other sectors, search whether that existence can be released The critical RRU put;
When find there is releasable critical RRU time, by releasable critical RRU give described fault Transceiver uses.
2. the method for claim 1, it is characterised in that critical RRU meets following condition:
Critical RRU is identical with common RRU hardware configuration;
Critical RRU riding position is positioned at the adjacent position of affiliated sector and other sectors;
Critical RRU is configured to dispatch across sector.
3. the method for claim 1, it is characterised in that described in the logic broken down detected All RRU of transceiver association are unavailable, specifically include:
The duty of each transceiver is detected with the first detection cycle set;
When transceiver duty exception having been detected, poll detects this transceiver broken down Associated all RRU are the most unavailable, when the test results is yes, determine and detect and break down Logic transceiver association all RRU unavailable.
4. the method for claim 1, it is characterised in that whether described inquiry deposits in other sectors Before idle critical RRU, also include:
Belonging to detection fault transceiver, the channel of sector is the most occupied;When being judged as YES, then hold The step of the critical RRU of free time whether is there is in row other sectors of described inquiry.
5. the method for claim 1, it is characterised in that free time in other sectors of described selection Critical RRU uses to described fault transceiver, specifically includes:
Critical RRU idle in selecting other sectors, according to the needs of described fault transceiver, configuration The RRU parameter of described critical RRU and electrical tilt antenna angle;
The fault of the affiliated sector used before fault transceiver is replaced with the critical RRU after configuration RRU。
6. method as claimed in claim 5, it is characterised in that described distribute according in other sectors The channel occupancy situation of critical RRU, search whether to there is releasable critical RRU, specifically include:
Unoccupied channel quantity according to the allocated critical RRU in other sectors determines whether releasable RRU, when the unoccupied channel quantity of allocated critical RRU is in the second detection week setting quantity continuously When all exceeding the amount threshold of setting in the phase, determine that this critical RRU is releasable critical RRU.
7. method as claimed in claim 5, it is characterised in that also include:
When there is not releasable critical RRU, relatively sector belonging to described fault transceiver is preferential Level and the priority of all sectors distributed belonging to critical RRU;
From priority less than the sector of the priority of the sector belonging to fault transceiver, select to distribute Critical RRU uses to described fault transceiver.
8. method as claimed in claim 7, it is characterised in that described receive and dispatch less than fault from priority In the sector of the priority of the sector belonging to letter machine, select to have distributed critical RRU to described fault transmitting-receiving letter Machine uses, and specifically includes:
Priority is selected to face less than the distribution in the sector of the priority of the sector belonging to fault transceiver Boundary RRU, it is judged that whether the critical RRU of selection binds with the transceiver in affiliated sector;
The most then reselect other of the priority priority less than sector belonging to fault transceiver The critical RRU of distribution in sector;Otherwise the critical RRU of distribution selected is believed to the transmitting-receiving of described fault Machine uses.
9. a radio frequency resource dispatching control device, it is characterised in that including: fault detection module, One performs module and second performs module;
Fault detection module, for when all extension radio frequencies transceiver association broken down being detected When unit R RU is unavailable, RRU the most available free in sector belonging to detection fault transceiver, if It is to notify the first execution module, otherwise notifies the second execution module;
First performs module, for sector belonging to fault transceiver being detected when described fault detection module Interior when there is idle RRU, select belonging in sector idle RRU make to described fault transceiver With;The critical RRU of free time whether is there is in otherwise inquiring about other sectors;Described critical RRU is for set in advance That puts can be across the RRU of sector scheduling;
, for there is the critical of free time when the first execution module searches in other sectors in the second execution module During RRU, critical RRU idle in selecting other sectors uses to described fault transceiver;
Described device also includes: the 3rd performs module, for arriving other when described first execution module searches When there is not the critical RRU of free time in sector, the channel of allocated critical RRU in inquiring about other sectors Take situation;According to the channel occupancy situation of critical RRU allocated in other sectors, search whether to deposit At releasable critical RRU;
4th performs module, for when described 3rd execution module searches is to there is releasable critical RRU Time, use releasable critical RRU to described fault transceiver.
10. device as claimed in claim 9, it is characterised in that described first performs module, also uses In:
As the RRU that there is not the free time in sector belonging to described fault detection module detects fault transceiver Time, detect the channel of sector belonging to fault transceiver the most occupied;When being judged as YES, then perform The step of the critical RRU of free time whether is there is in other sectors of described inquiry.
11. devices as claimed in claim 9, it is characterised in that the described 3rd performs module, specifically For:
Unoccupied channel quantity according to the allocated critical RRU in other sectors determines whether releasable RRU, when the unoccupied channel quantity of allocated critical RRU is in the second detection week setting quantity continuously When all exceeding the amount threshold of setting in the phase, determine that this critical RRU is releasable critical RRU.
12. devices as claimed in claim 9, it is characterised in that also include: the 5th performs module, For:
When described 3rd execution module determines and there is not releasable critical RRU, relatively described fault is received The priority of sector belonging to sender and the priority of all sectors distributed belonging to critical RRU;
From priority less than the sector of the priority of the sector belonging to fault transceiver, select to distribute Critical RRU uses to described fault transceiver.
13. devices as claimed in claim 12, it is characterised in that the described 5th performs module, specifically For:
Priority is selected to face less than the distribution in the sector of the priority of the sector belonging to fault transceiver Boundary RRU, it is judged that whether the critical RRU of selection binds with the transceiver in affiliated sector;
The most then reselect other of the priority priority less than sector belonging to fault transceiver The critical RRU of distribution in sector;Otherwise the critical RRU of distribution selected is believed to the transmitting-receiving of described fault Machine uses.
14. 1 kinds of base stations, it is characterised in that including: the radio frequency money as described in claim 9-13 is arbitrary Source dispatching device.
CN201110133938.7A 2011-05-23 2011-05-23 Radio frequency resource dispatch control method and device Active CN102802180B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110133938.7A CN102802180B (en) 2011-05-23 2011-05-23 Radio frequency resource dispatch control method and device
PCT/CN2012/071414 WO2012159464A1 (en) 2011-05-23 2012-02-21 Radio frequency resource scheduling control method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110133938.7A CN102802180B (en) 2011-05-23 2011-05-23 Radio frequency resource dispatch control method and device

Publications (2)

Publication Number Publication Date
CN102802180A CN102802180A (en) 2012-11-28
CN102802180B true CN102802180B (en) 2016-08-24

Family

ID=47201122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110133938.7A Active CN102802180B (en) 2011-05-23 2011-05-23 Radio frequency resource dispatch control method and device

Country Status (2)

Country Link
CN (1) CN102802180B (en)
WO (1) WO2012159464A1 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103281784B (en) * 2013-05-24 2016-03-09 华为技术有限公司 A kind of resource allocation methods and device being total to community based on RRU
CN104661224B (en) * 2013-11-19 2018-05-11 新华三技术有限公司 Applied to the method for channel allocation and device in wireless communication system
CN103874080A (en) * 2014-03-31 2014-06-18 深圳市华为安捷信电气有限公司 Matching method and device
CN105722123A (en) * 2014-12-01 2016-06-29 中兴通讯股份有限公司 Channel sharing and replacing method for base station system and base station system
CN106385688B (en) * 2016-09-05 2019-11-26 中国联合网络通信集团有限公司 A kind of base-band resource distribution method and system and controller

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101312563A (en) * 2007-05-25 2008-11-26 中兴通讯股份有限公司 Wireless access system and backup method for remote radio frequency unit of the system
CN101860802A (en) * 2010-05-21 2010-10-13 中兴通讯股份有限公司 Failure processing method and system
CN101925079A (en) * 2010-06-23 2010-12-22 京信通信系统(中国)有限公司 Radio-frequency remote system and device for performing backup switching on same at relay ends of network

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7548787B2 (en) * 2005-08-03 2009-06-16 Kamilo Feher Medical diagnostic and communication system
CN101553004B (en) * 2008-04-02 2012-07-04 中兴通讯股份有限公司 System and method for sharing resources in mobile communication system
CN101867945B (en) * 2010-05-31 2012-10-31 北京交通大学 High-speed railway mobile network covering method based on distributed antenna and fixed switching channel

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101312563A (en) * 2007-05-25 2008-11-26 中兴通讯股份有限公司 Wireless access system and backup method for remote radio frequency unit of the system
CN101860802A (en) * 2010-05-21 2010-10-13 中兴通讯股份有限公司 Failure processing method and system
CN101925079A (en) * 2010-06-23 2010-12-22 京信通信系统(中国)有限公司 Radio-frequency remote system and device for performing backup switching on same at relay ends of network

Also Published As

Publication number Publication date
CN102802180A (en) 2012-11-28
WO2012159464A1 (en) 2012-11-29

Similar Documents

Publication Publication Date Title
CN102014470B (en) Base station power consumption control method and system
CN102802180B (en) Radio frequency resource dispatch control method and device
CN105338531B (en) Base station control method, base station control device, wireless communication system, and electronic device
CN101622820A (en) Method and system for managing baseband resource pool of global mobile communication system
CN102612088B (en) Based on the communication means of carrier convergence technology and system, base station in heterogeneous network
Peng et al. GreenBSN: Enabling energy-proportional cellular base station networks
CN101203016A (en) Processing method and system for implementation of net element collocation in multi-standard communication system
CN101742484A (en) Method for allocating physical cell identity (PCI) and base station
WO2016011752A1 (en) Load balancing method and device
CN105323830B (en) Energy-saving compensation method, energy-saving compensation recovery method and device
CN101541088A (en) Method, device and system for eliminating interference among cells
CN102264110B (en) Based on changing method and the system of wireless resource distribution database
CN102651869A (en) Method and device for distributing spectrum resources
CN103391597B (en) The connection control method of a kind of multi-module mobile terminal, device and base station
CN1905729A (en) Method for wireless communication resource configuration in distributeel antenna system
CN104768197A (en) Channel selection method and device
CN101179778A (en) Information transmission system and device of coexisting wireless communication system
JPH11275623A (en) Method for selecting zone according to circuit state in mobile radio communication system
CN103428871A (en) Interference coordination method and system
CN104105173A (en) Cell architecture, layout, working method and device
CN103188804B (en) A kind of wireless resource allocation methods, Apparatus and system
CN103079208B (en) The method and device that a kind of base-band resource is dynamically shared
CN102164402B (en) Method and device for configuring carrier transmitting power
CN101146309B (en) A cell resource failure processing method and device in communication system
WO2014023143A1 (en) Performance measurement method and apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant