CN103605840A - 一种桩承式路堤中土拱效应的三维有限元建模方法 - Google Patents

一种桩承式路堤中土拱效应的三维有限元建模方法 Download PDF

Info

Publication number
CN103605840A
CN103605840A CN201310538715.8A CN201310538715A CN103605840A CN 103605840 A CN103605840 A CN 103605840A CN 201310538715 A CN201310538715 A CN 201310538715A CN 103605840 A CN103605840 A CN 103605840A
Authority
CN
China
Prior art keywords
embankment
soil
finite element
weak soil
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310538715.8A
Other languages
English (en)
Inventor
庄妍
王康宇
崔晓艳
陆亚明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201310538715.8A priority Critical patent/CN103605840A/zh
Publication of CN103605840A publication Critical patent/CN103605840A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本发明公开了一种桩承式路堤中土拱效应的三维有限元建模方法。包括以下步骤:对桩承式路堤的实际情况进行简化,提取结构的几何参数,应用有限元分析软件ABAQUS,取1/4的桩、桩周土体和路堤作为典型单元进行分析,建立有限元模型;路堤填料和软土采用摩尔-库伦模型,并赋予相应的材料参数;设置路堤和软土的单元属性,进行网格划分;设置路堤结构的边界条件;对路堤结构施加荷载。本发明基于ABAQUS三维有限元数值软件,通过对桩承式路堤的实际结构进行简化,并同时考虑软土的承载力对土拱效应的影响,建立了研究桩承式路堤中土拱效应的研究三维有限元数值模型,可为桩承式路堤设计研究提供有益的参考。

Description

一种桩承式路堤中土拱效应的三维有限元建模方法
技术领域
本发明涉及公路工程计算机辅助设计技术领域,特别涉及一种桩承式路堤中土拱效应研究的三维有限元建模方法。
背景技术
桩和桩周软土在上部路堤荷载作用下产生的不均匀沉降将会使软土层上方的路堤填土沉降量大于桩上方填土层的沉降量。在路堤填土层中产生的不均匀沉降将会促使剪应变或者剪切面的产生,因此来自于路堤以及上部荷载的竖向应力会重新分布,使得传递到桩顶的竖向应力增加,而传递到软土的竖向应力减少,这种由于不均匀沉降而引起的应力重分布的现象被定义为“土拱效应”。
近年来,国内外学者针对土拱效应进行了大量的研究,提出了不同的土拱效应模型和计算方法:1987年,Guido等提出土拱的形状为正四棱锥,棱锥侧面与底面的夹角假设为45°,土工格栅仅承担该四棱锥部分的荷载,其余荷载由桩来承担。1988年,Hewlett &Randolph提出了基于试验的理论模型,土拱的形状被描述成是半圆形的具有均匀厚度的拱,研究发现土拱的临界破坏点只可能出现在土拱拱顶和拱角处,并据此求解出了桩土应力比。英国规范BS8006采用了Marston 的管道土压力理论来计算桩帽、桩间土土压力。2003 年,刘吉福最早研究得到土拱效应中荷载分担比的表达式。陈仁朋综合考虑路堤填土中的土拱效应,根据Marston 的计算理论,建立了考虑桩-土-路堤变形和应力协调的平衡方程。Ellis &Aslam通过开展离心机试验对桩承式路堤进行研究,研究分析了软土表面的应力分布和路堤表面的不均匀沉降,结果表明路堤的高度和桩帽间的距离比值是衡量土拱效应产生的关键参数。余闯等结合模型试验结果,建立了三维有限元数值模型,对桩承式路堤中土体竖向应力分布规律进行了分析,其结果反映出了土体竖向应力随深度的分布规律、土拱作用机理以及土拱的作用范围。费康等对桩承式路堤中的土拱效应进行了三维模型试验研究,分析了应力折减系数大小和填土中的竖向应力分布特点。
上述理论只考虑了软土的沉降,而没有考虑软土的承载力对土拱效应的影响。从现存的研究中,很难找到一种设计方法可以精准地描述出路堤填土中的土拱效应模型。
发明内容
发明目的:本发明针对现有研究的不足,提供了一种桩承式路堤中土拱效应的三维有限元建模方法。
技术方案:本发明提供的一种桩承式路堤中土拱效应的三维有限元建模方法,包括以下步骤:
(1) 对桩承式路堤的实际情况进行简化,提取结构的几何参数,应用有限元分析软件ABAQUS,取1/4的桩、桩周土体和路堤作为典型单元进行分析,建立有限元模型;
(2) 路堤填料和软土采用摩尔-库伦模型,并赋予相应的材料参数;
(3) 设置路堤填料和软土的单元属性,进行网格划分;
(4) 设置路堤结构的边界条件;
(5) 对路堤结构施加荷载。
所述的步骤(1)中的有限元模型包括路堤和软土2个构件,不考虑桩体的变形,在桩帽处设置固定约束。
    所述的步骤(2)中的材料参数为密度、弹性模量、泊松比、内摩擦角、粘聚力;
    所述的步骤(3)中的路堤填料和软土采用8节点1次实体单元或20节点2次实体单元,网格划分前应以划分均匀合格的有限元网格为准则对几何模型进行整理,并进行网格尺寸敏感性分析,以确定同时满足计算精度和计算效率的最优网格划分方式;
所述的步骤(4)中的路堤结构的边界条件,即根据桩承式路堤的实际情况,约束路堤填料和软土的周围水平位移,同时对路堤底部桩帽区域进行固定约束;
由于本发明主要考虑由于桩和软土的差异沉降在路堤填料中引起的土拱效应,所述的步骤(5)中的路堤结构荷载包括路堤的自重和下部软土的承载力,建模中在路堤和软土的接触面处施加竖向均布荷载模拟软土的承载作用,大小等于路堤填料的自重,随后,将竖向均布荷逐渐载减小到零,以模拟软土的固结作用,软土部分不施加荷载。
有益效果:本发明提供的桩承式路堤中土拱效应的有限元建模方法,基于ABAQUS 三维有限元数值软件,通过对桩承式路堤的实际结构进行合理的简化,并同时考虑软土的承载力对土拱效应的影响,建立了研究桩承式路堤中土拱效应的三维有限元数值模型,可为桩承式路堤设计提供有益的参考。
附图说明
 图1为本发明的方法流程图。
图2为本发明建模方法的模型布置平面图。
图3为本发明建模方法的具体几何模型及网格划分图。
图4为本发明建模方法的路堤填料竖向应力随填土深度的变化曲线。
图中:1为模型的四周边界,2为模型的桩帽区域,3为模型桩周软土,4为路堤。
具体实施方式
下面结合附图对本发明作出进一步说明。
一种桩承式路堤中土拱效应的三维有限元建模方法,如图1所示流程,具体步骤如下:
(1) 根据桩承式路堤的实际受力状态,在保证结构受力状态状态基本不变的前提下,简化路堤结构,并提取结构的几何参数,达到降低工作量,减小数据处理的目的。应用有限元分析软件ABAQUS,取1/4的桩2、软土3和路堤4作为典型单元进行分析(如图2所示),建立如图3所示的有限元模型,模型包括2个构件:路堤4和软土3,分析中忽略桩体的变形,在桩帽2所在区域设置固定约束;
(2) 路堤4填料和软土3采用摩尔-库伦模型,在材料属性模块根据桩承式路堤的实际情况定义路堤4填料和软土3的密度、弹性模量、泊松比、内摩擦角和粘聚力等材料参数。
(3) 以划分均匀合格的有限元网格为准则,对所建立的有限元模型进行整理,在网格划分模块设置路堤4和软土3的单元属性,一般选择8节点1次实体单元或20节点2次实体单元,对模型进行网格尺寸敏感性分析,以确定同时满足计算精度和计算效率的最优网格划分方式,得到如图3所示的有限元网格;
(4) 根据对桩承式路堤的实际受力变形情况的简化,对所建立的有限元模型定义边界条件,包括对模型的四周表面进行水平位移约束,对路堤底部的桩帽2区域进行固定约束;
(5) 根据桩承式路堤的实际受力状态,在保证结构受力状态基本不变的前提下,考虑引起结构受力状态变化的主要荷载,忽略次要的,且计算复杂的荷载。由于本发明主要考虑由于桩2和软土3的差异沉降在路堤4填料中引起的土拱效应,所以考虑的结构荷载包括路堤4的自重荷载和下部软土3的承载力。路堤4自重荷载采用为gravity加载;同时在路堤4与软土3的接触面处施加竖向均布荷载模拟软土的承载作用,其值等于上部路堤4的自重,随后,将竖向均布荷载逐渐减小到零,模拟软土的固结作用,软土部分不施加荷载。
(6) 模型的验证。
Potts & Zdravkovic采用Imperial College Finite Element Program 已建立了有限元分析模型,得出路堤填料竖向应力随填料深度的变化曲线(图4 中P & Z 分析结果)。本发明利用ABAQUS 建立的有限元模型进行分析,得出路堤填料竖向应力随填料深度的变化曲线(图4中本发明分析结果),其中P & Z 分析结果所对应的路堤高度为4.0 m,路堤下存在直径为2.0 m 的孔洞;本发明分析结果所对应的路堤高度为3.5 m,桩间距为2.0 m,且路堤下桩间土对其具有支撑作用。
从图4可以看出,在一定高度时,路堤填料竖向应力随着路堤高度的减小而逐渐增加,且路堤填料中的竖向应力分布特点满足自重应力,表明填料没有受到土拱效应的影响;当路堤填料高度减小到一定值时,路堤填料中的竖向应力逐渐减小,表明在土拱效应的作用下应力发生重分布。由于Potts & Zdravkovic 建立的模型中孔洞对其上部填料没有支撑作用,故在填料高度为零时,填料间竖向应力减小到零;而本发明所建立的模型中,路堤下软土对其上部填料具有支撑作用,因而在填料高度减小为零时,填料间的竖向应力不会减小到零。由于两种情况的路堤填料高度不同,因此两条分析线呈现平行关系,而不是重合。图4 中所描述的路堤填料竖向应力与路堤填土高度的变化关系,可以说明本模型是正确合理的。

Claims (1)

1.一种桩承式路堤中土拱效应的三维有限元建模方法,其特征在于,包括以下步骤:
(1) 对桩承式路堤的实际情况进行简化,提取结构的几何参数,应用有限元分析软件ABAQUS,取1/4的桩、桩周土体和路堤作为典型单元进行分析,建立有限元模型;
(2) 路堤填料和软土采用摩尔-库伦模型,并赋予相应的材料参数;
(3) 设置路堤填料和软土的单元属性,进行网格划分;
(4) 设置路堤结构的边界条件;
(5) 对路堤结构施加荷载;
所述的步骤(1)中的有限元模型包括路堤和软土2个构件,不考虑桩体的变形,在桩帽处设置固定约束;
    所述的步骤(2)中的材料参数为密度、弹性模量、泊松比、内摩擦角、粘聚力;
    所述的步骤(3)中的路堤填料和软土采用8节点1次实体单元或20节点2次实体单元,网格划分前应以划分均匀合格的有限元网格为准则对几何模型进行整理,并进行网格尺寸敏感性分析,以确定同时满足计算精度和计算效率的最优网格划分方式;
所述的步骤(4)中的路堤结构的边界条件,即根据桩承式路堤的实际情况,约束路堤和软土的周围水平位移,同时对路堤底部桩帽区域进行固定约束;
所述的步骤(5)中的结构荷载包括路堤的自重和下部软土的承载力,建模中在路堤和软土的接触面处施加竖向均布荷载模拟软土的承载作用,大小等于路堤填料的自重,随后,将竖向均布荷逐渐载减小到零,以模拟软土的固结作用,软土部分不施加重力荷载。
CN201310538715.8A 2013-11-04 2013-11-04 一种桩承式路堤中土拱效应的三维有限元建模方法 Pending CN103605840A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310538715.8A CN103605840A (zh) 2013-11-04 2013-11-04 一种桩承式路堤中土拱效应的三维有限元建模方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310538715.8A CN103605840A (zh) 2013-11-04 2013-11-04 一种桩承式路堤中土拱效应的三维有限元建模方法

Publications (1)

Publication Number Publication Date
CN103605840A true CN103605840A (zh) 2014-02-26

Family

ID=50124061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310538715.8A Pending CN103605840A (zh) 2013-11-04 2013-11-04 一种桩承式路堤中土拱效应的三维有限元建模方法

Country Status (1)

Country Link
CN (1) CN103605840A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103852570A (zh) * 2014-03-18 2014-06-11 华侨大学 一种新型的悬臂桩土拱效应的测试方法
CN109635489A (zh) * 2018-12-26 2019-04-16 天津大学 一种考虑桩靴脚印卸荷作用对邻近桩基础承载力影响的有限元计算方法
CN110008613A (zh) * 2019-04-12 2019-07-12 交通运输部天津水运工程科学研究所 一种网格式软土地基承载特性计算方法
CN110837667A (zh) * 2019-10-21 2020-02-25 暨南大学 一种基于钢波纹板桥梁加固的填土方法
CN112507488A (zh) * 2020-11-30 2021-03-16 珠海格力智能装备有限公司 机器人关节组件、机器人关节组件过盈量确定的方法
CN113255176A (zh) * 2021-04-15 2021-08-13 东南大学 一种基于数值模拟的多向复合加筋垫层加固方法
CN114139352A (zh) * 2021-11-10 2022-03-04 东北林业大学 基于2d-3d转换系数的加筋路堤加筋体最大垂度的获取方法、系统及装置

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101763447A (zh) * 2009-12-28 2010-06-30 中国农业大学 三维造型软件与有限元分析软件之间数据自动转换的方法

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101763447A (zh) * 2009-12-28 2010-06-30 中国农业大学 三维造型软件与有限元分析软件之间数据自动转换的方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
庄妍等: "桩承式路堤中土拱效应产生机理研究", 《岩土工程学报》, 31 July 2013 (2013-07-31) *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103852570A (zh) * 2014-03-18 2014-06-11 华侨大学 一种新型的悬臂桩土拱效应的测试方法
CN109635489A (zh) * 2018-12-26 2019-04-16 天津大学 一种考虑桩靴脚印卸荷作用对邻近桩基础承载力影响的有限元计算方法
CN109635489B (zh) * 2018-12-26 2022-12-16 天津大学 一种考虑桩靴脚印卸荷作用对邻近桩基础承载力影响的有限元计算方法
CN110008613A (zh) * 2019-04-12 2019-07-12 交通运输部天津水运工程科学研究所 一种网格式软土地基承载特性计算方法
CN110837667A (zh) * 2019-10-21 2020-02-25 暨南大学 一种基于钢波纹板桥梁加固的填土方法
CN112507488A (zh) * 2020-11-30 2021-03-16 珠海格力智能装备有限公司 机器人关节组件、机器人关节组件过盈量确定的方法
CN113255176A (zh) * 2021-04-15 2021-08-13 东南大学 一种基于数值模拟的多向复合加筋垫层加固方法
CN113255176B (zh) * 2021-04-15 2024-01-16 东南大学 一种基于数值模拟的多向复合加筋垫层加固方法
CN114139352A (zh) * 2021-11-10 2022-03-04 东北林业大学 基于2d-3d转换系数的加筋路堤加筋体最大垂度的获取方法、系统及装置
CN114139352B (zh) * 2021-11-10 2024-04-16 东北林业大学 基于2d-3d转换系数的加筋路堤加筋体最大垂度的获取方法、系统及装置

Similar Documents

Publication Publication Date Title
CN103605840A (zh) 一种桩承式路堤中土拱效应的三维有限元建模方法
Zhao et al. Three-dimensional modeling of wave-induced residual seabed response around a mono-pile foundation
AU2020100727A4 (en) Method For Dynamic Test Of 100 m-High Earth And Rockfill Dam Under Real Stress Field
CN103605839B (zh) 一种桩承式加筋路堤的有限元建模分析方法
Wang et al. Seismic wave input method for high earth dams considering the transmission amplification effect of the bedrock–overburden interface
CN114254519A (zh) 岩体稳定性极限分析方法
Chen et al. Spatial estimation of material parameters and refined finite-element analysis of rockfill dam based on construction digitization
Lv et al. Seismic response characteristics of nuclear island structure at generic soil and rock sites
Zhao et al. Study on the ultimate bearing capacity of a strip footing influenced by an irregular underlying cavity in karst areas
Moayed et al. Numerical modeling of direct shear tests on sandy clay
Wang et al. Seismic performances of dyke on liquefiable soils
Yuan et al. Simulation of tensile cracking in earth structures with an adaptive RPIM-FEM coupled method
Zhang Particle finite element method in geomechanics
CN116663370A (zh) 一种深层缝洞型碳酸盐岩油藏流固耦合数值模拟方法
CN103823946A (zh) 一种模拟带有不整合面岩体的方法
Jia et al. Centrifuge modeling and numerical analysis of reservoir bank landslides triggered by a fast two-step drop in water level
Zhang et al. Microscopic insights into suction bucket installation in sand: Coupled coarse-grained CFD-DEM simulations
Gong et al. Liquefaction-induced large deformation method with automatic time-step mapping and interfacial interpolation improvement: Case study of the San Fernando dam
Yan et al. Bearing capacity analysis and mechanism study of shared caisson under multidirectional loading
Zhao et al. Analysis on settlement deformation law and influencing factors of loess high fill foundation
Ghosh et al. Study on the behavior of Pile-Raft foundation in cohesive soil
Ye et al. A constitutive model for cyclic densification of coarse-grained soil filler for the high-speed railway subgrade considering particle breakage
Kim Numerical Modeling of Solid Particle Dynamics Using the Moving Particle Semi-Implicit (MPS) Method in Seabed Penetration Scenarios
Yuan et al. Large deformation assessment of the bearing capacity factor for rigid footing: effect of soil heterogeneity
Ai et al. Fractional Viscoelastic Analysis of Transversely Isotropic Surrounding Rock Along Shallow Buried Elliptical Tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140226