Prior art keywords
optical fiber
fiber
concrete
aluminium alloys
fiber arrangement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310567561.5A
Other languages
Chinese (zh)
Other versions
CN103603458A (en
Inventor
周智
申娟
何建平
王俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN201310567561.5A priority Critical patent/CN103603458B/en
Publication of CN103603458A publication Critical patent/CN103603458A/en
Application granted granted Critical
Publication of CN103603458B publication Critical patent/CN103603458B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/0037Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with elements being able to conduct light, e.g. light conducting fibers

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of transparent concrete through engineering approaches construction method and construction equipment, belong to New Building Materials manufacturing technology field.It is characterized in that a kind of transparent concrete optical fiber arrangement equipment utilizing the present invention to propose, produce fiber arrangement unit, it is stacked according to required form and is fixedly installed togather, namely monolithic becomes block to multi-disc, then several block structure accommodated side-by-side concreting in dismountable forming tank, namely the maintenance demoulding obtains transparent concrete.This optical fiber arrangement equipment comprises triangle fixed base, and top is connected with storage wire tray by rotating shaft, and lower left quarter is connected with moving runner by rotating shaft, and fine plate is led on the moving runner left side; The triangle fixed base left side is the crawler belt with slide plate, slide plate is fixed with the aluminium alloys press strip for the manufacture of fiber arrangement unit.It is quick, convenient, even that the present invention has fiber deployment, easy to operate, and technique is simple, and the feature that efficiency is high, produces various forms of transparent concrete according to individual demand, be applicable to large-scale industrial production.

Description

Transparent concrete through engineering approaches construction method and construction equipment
Technical field
The invention belongs to New Building Materials manufacturing technology field, relate to a kind of transparent concrete through engineering approaches construction method and construction equipment.
Background technology
In recent years, " green energy conservation ", protection of the environment, realize sustainable development and become the topic jointly paid close attention to countries in the world.And solar energy is as inexhaustible on the earth, nexhaustible green energy resource, there is the advantage such as popularity and abundance of the incomparable spatter property of other energy, safety, resource, under the situation of, serious threat economic development nervous in global energy and living environment, increasing country comes into effect " sunlight program ".Along with the construction of large quantities of highrise building, super highrise building and underground building, major part relies on artificial illumination to maintain the light of indoor environment, consumes the energy greatly like this.Therefore, in order to realize sustainable development, make full use of solar energy, change the traditional mode of the closely knit darkness of construction wall, oppressiveness, huge dullness, it is found that and the optical fiber with good guide-lighting performance is joined obtained transparent concrete in concrete, building not only can being made to obtain sunshine, energy conservation when not punching mouth or mounting glass window, reduce energy consumption, building can also be made to have good aesthetic property and ornamental.
In recent years transparent concrete in state-owned research much.From the angle of construction technology, current prior art cannot realize large-scale industrial production.Although Chinese patent 200710007521.X provides the method for disposable production multimode transparent concrete, fiber arrangement is complicated, optical fiber is needed to be cut into several sections of equal lengths, penetrate in prefabricated separator perforation by root, then be fixed on backform and multiple bed die, workload is comparatively large, and operation slowly, and hole can not be completely closed, spillage phenomenon is obvious; Chinese patent 201110316717.3 provides a kind of method of quick layout optical fiber, but two ends optical fiber does not take fixation, disturbance can be produced to optical fiber in casting process, and owing to being comb shape side plate, in casting process, spillage is obvious, device is difficult cleaning after removing, and in addition, this patent does not provide the multimode mode of production; Chinese patent 201110069843.3 has proposed a kind of efficiently, the mode of low cost arrangement optical fiber, but the optical fiber that optical fiber screen is wound around is easy to slippage, and the oblique arrangement of area fiber, the object be evenly arranged can not be reached, and plate and plate gap can not be too close, casting process is relatively slower, and the concrete of building is limited in self-compacting concrete, can not build coarse aggregate concrete.In addition, Chinese patent 201110316717.3 is all restricted to the optical fiber arranged with Chinese patent 201110069843.3, all wants the winding optical fiber of deep camber in the process due to layout optical fiber, the necessary optical fiber that selection and comparison is thin, pliability is good.
The key production technology thereof of current transparent concrete----layout optical fiber quick, even, directed in concrete adopts manual operation usually, and workload is large, operation is slow, efficiency is low, spillage is obvious, it is more to limit.For this reason, how to realize efficiently, optical fiber of arranging fast, uniformly, realize large-scale industrial production, become a difficult problem in the urgent need to address in transparent concrete application.
Summary of the invention
The object of the invention is the deficiency in order to overcome prior art, and in order to reach efficient, quick, uniform laying optical fiber, realize transparent concrete large-scale industrial production, provide a kind of transparent concrete through engineering approaches construction method and construction equipment.
Technical scheme of the present invention is:
In order to achieve the above object, the invention provides a kind of transparent concrete through engineering approaches construction method and construction equipment, it is characterized in that: the construction method utilizing transparent concrete optical fiber arrangement equipment to make transparent concrete comprises the steps:
1) installation of transparent concrete optical fiber arrangement equipment:
Erection triangle fixed base 5, top is connected with moving runner 8 by rotating shaft by the rotating shaft triangle fixed base lower left quarter that to be connected with storage wire tray 6, and moving runner horizontal direction is connected with dismountable fine plate 9 of leading being carved with optic fibre hole, and fixing with bolt 1; Crawler belt 16 is laid on the triangle fixed base left side, the slide plate 15 being fixed with aluminium alloys press strip is placed on crawler belt, wherein the spacing of the thickness of aluminium alloys press strip and optical fiber duct 2, the depth are according to optical fiber pitch 22, the large little makings of fibre diameter laid, the fiber lengths 21 that aluminium alloys press strip discharges is according to the length arrangement of fiber arrangement in required transparent coagulation block, and fiber cut place 18 is to block optical fiber.
2) laying of optical fiber and reinforcing:
Optical fiber in storage wire tray 6 is walked around moving runner 8, through leading fine plate 9, top optical fiber utilizes fixed head 14 to fix, and traction optical fiber moves forward, then by sonet card in the aluminium alloys press strip optical fiber duct laid, now press at aluminium alloys and smear one deck glass cement, optical fiber and optical fiber duct 2 are fixed together, and and then above aluminium alloys press strip, lay last layer aluminium alloys press strip again, draw-in groove wants optical fiber alignment, namely utilize two pieces of press strips to be blocked by optical fiber, between two press strips, can not gap be left.
3) fiber arrangement unit is produced:
After optical fiber on slide plate is fixing, optical fiber is blocked at place of fiber cut place 18, then unnecessary optical fiber, cuts along aluminium alloys press strip limit, namely produce fiber arrangement unit; After optical fiber arrangement unit removes on slide plate, moved forward by slide plate, and by two of last grip optical fibers pieces of aluminium alloys press strips, temporarily stay on slide plate, for fixing next slide plate top optical fiber used, and traction optical fiber moves forward; And then the slide plate that another block fixes aluminium alloys press strip is put, and be close to previous slide plate, now optical fiber also moves forward thereupon, by sonet card in the aluminium alloys press strip optical fiber duct laid, then repeat aforesaid operations, so repeatedly operate and just produce fiber arrangement unit, the object of this method of operating: one is to produce required fiber arrangement unit, two is the objects in order to reach cross construction, realizes large-scale industrial production.
4) transparent concrete multimode fiber arrangement Mold Making:
According to the dimensional requirement of made transparent concrete block, above-mentioned fiber arrangement element stack is stitched together, namely block is become by monolithic to multi-disc, and with bolt 2 11 compact siro spinning technology, can not leave gap, object is tightened together by aluminum alloy bar on the one hand, and grip optical fibers is in case optical fiber loosens, be allow between two fiber arrangement unit to have gap on the other hand, prevent from occurring spillage in concreting process.
Be arranged side by side in dismountable forming tank by several above-mentioned splicing constructions, wherein forming tank is made up of two pieces of side forms one 19, two pieces side form 2 20 and one piece of bed die; Installation process is first emitted on bed die by several above-mentioned splicing constructions, then side form one and side form two are installed, and utilize bolt 3 12 and bed die fastening, clamp aluminium alloys press strip simultaneously, namely transparent concrete multimode fiber arrangement mould has been produced, because the mould in the present invention is dismountable, mould is recycled, and reduces cost.
5) concrete build shaping:
Concrete mortar is poured into and has laid in the multimode forming tank of optical fiber, vibration moulding, goods are placed on maintenance in standard environment; By the concrete demoulding from forming tank after sclerosis, side form, the base plate of mould is removed according to sequencing, then aluminum alloy bar is removed, again the optical fiber severing had more, surface finish polishing, namely obtain multiple transparent concrete block, this method eliminates this procedure of cutting technique, form removal and shaping.
The shaping mode of another concreting is laying optical fiber arrangement unit limit, limit concreting, namely one deck fiber arrangement unit was fixed before this, then concreting, lay one deck fiber arrangement unit again, concreting again, so repeatedly operate, make concrete evenly distribution in a fiber, avoids the concrete containing coarse aggregate to occur segregation phenomenon.
6) folded three layers of fiber arrangement unit is stitched together, then several these splicing structures are arranged in forming tank by the vertical direction in former direction, produce transparent concrete plate fiber arrangement mould, repeat above-mentioned steps, getting final product stripping forming through regulation maintenance after concreting completes be transparent concrete plate.
A kind of transparent concrete optical fiber arrangement equipment, required fiber arrangement unit can be produced, comprise: triangle fixed base 5, top is connected with storage wire tray 6 by rotating shaft 1, storage wire tray refers to the belt wheel of winding optical fiber, for the optical fiber exported, triangle fixed base lower left quarter is connected with moving runner 8 by rotating shaft 2 23, not only can control the level of optical fiber, and slightly can tighten the optical fiber of output, moving runner horizontal direction is connected with dismountable fine plate 9 of leading being carved with optic fibre hole, fix with bolt 1, lead the pore size on fine plate, pitch of holes is according to laying optical fiber spacing 22, the large little makings of fibre diameter, lead fine plate to be mainly used in controlling optical fiber pitch, the triangle fixed base left side is the crawler belt 16 arranged to realize cross construction, slide plate 15 is placed above crawler belt, and utilize bolt, aluminium alloys press strip is fixed on slide plate by the mode of glue bond or draw-in groove, wherein fiber lengths 21 is according to the length arrangement of fiber arrangement in required transparent coagulation block, fiber cut place 18 is to block optical fiber, the thickness of aluminium alloys press strip and the spacing of optical fiber duct 2, the depth are according to optical fiber pitch 22, the large little makings of fibre diameter laid, and fixed head 14 is for fixing top optical fiber.
Compared with prior art, effect of the present invention and benefit are: utilize the fiber arrangement unit that transparent concrete optical fiber arrangement equipment is prepared, monolithic is adopted to become the preparation method of block to multi-disc, fiber deployment is quick, convenient, even, constructing operation is convenient, technique is simple, and efficiency is high, reaches the object of cross construction; Present invention also offers a kind of dismountable multimode fiber arrangement mould, the preparation speed of transparent concrete is fast, form removal and plastic, and save this procedure of cutting technique, mould Reusability, reduces cost; Because fiber arrangement unit is by bolt compact siro spinning technology, in concreting process, avoids the spillage phenomenon that prior art occurs, various forms of transparent concrete can be produced according to individual demand, be applicable to large-scale industrial production.
Accompanying drawing explanation
Fig. 1 is the aluminium alloys press strip stereogram of the trough of belt for fixed fiber.
Fig. 2 leads fine plate stereogram.
Fig. 3 is transparent concrete optical fiber arrangement equipment general structure schematic diagram of the present invention.
Fig. 4 utilizes optical fiber arrangement equipment to produce fiber arrangement cell schematics.
Fig. 5 is fiber arrangement cell schematics.
Fig. 6 is the fast fiber arrangement schematic diagram of transparent concrete utilizing fiber arrangement unit spliced to become.
Fig. 7 produces transparent concrete multimode fiber arrangement mould schematic diagram.
Fig. 8 is mould, as shown in Figure 7, has built multiple transparent concrete block schematic diagrames of concrete form removal aftershaping.
Fig. 9 is transparent concrete plate fiber arrangement mould schematic diagram.
Figure 10 is mould, as shown in Figure 9, has built the transparent concrete plate schematic diagram of concrete form removal aftershaping.
In Fig. 1-10: 1 aluminium alloys press strip; 2 optical fiber ducts; 3 bolts hole; 4 optic fibre holes; 5 triangle fixed bases; 6 storage wire trays; 7 rotating shafts one; 8 moving runners; 9 lead fine plate; 10 bolts one; 11 bolts two; 12 bolts three; 13 optical fiber; 14 top optical fiber fixed heads; 15 slide plates; 16 crawler belts; 17 Athey wheels; 18 fiber cut places; 19 side forms one; 20 side forms two; 21 fiber lengths; 22 optical fiber pitch; 23 rotating shafts two.
Detailed description of the invention
The specific embodiment of the present invention is described in detail below in conjunction with technical scheme and accompanying drawing.The part belonging to current techique in the present invention has done simple description, and the structure shown in figure, construction size do not have restricted.For the ease of to visual understanding of the present invention, in figure, each entity size, proportionate relationship etc. are only for reference, and equipment size can make according to individual demand.
Transparent concrete through engineering approaches construction method and construction equipment embodiment:
Transparent concrete key production technology thereof how to arrange optical fiber fast, uniformly, also be current unsolved a great problem, in order to reach efficient, quick laying optical fiber, realize the object of transparent concrete large-scale industrial production, the invention provides a kind of transparent concrete optical fiber arrangement equipment, can produce required fiber arrangement unit, being stacked together to be emitted in forming tank gets final product concreting.Transparent concrete optical fiber arrangement equipment provided by the invention, as shown in Figure 3, comprising: triangle fixed base 5, and top is connected with storage wire tray 6 by rotating shaft 1, and storage wire tray refers to the belt wheel of winding optical fiber, for the optical fiber exported; Triangle fixed base lower left quarter is connected with moving runner 8 by rotating shaft 2 23, not only can control the level of optical fiber, and slightly can tighten the optical fiber of output, moving runner horizontal direction is connected with dismountable fine plate 9 of leading being carved with optic fibre hole, fix with bolt 1, lead the pore size on fine plate, pitch of holes according to according to laying optical fiber spacing 22, the large little makings of fibre diameter, lead fine plate and be mainly used in controlling optical fiber pitch; The triangle fixed base left side is the crawler belt 16 arranged to realize cross construction, slide plate 15 is placed above crawler belt, and utilize bolt, aluminium alloys press strip is fixed on slide plate by the mode of glue bond or draw-in groove, wherein fiber lengths 21 is according to the length arrangement of fiber arrangement in required transparent coagulation block, fiber cut place 18 is to block optical fiber, the thickness of aluminium alloys press strip and the spacing of optical fiber duct 2, the depth are according to optical fiber pitch 22, the large little makings of fibre diameter laid, and fixed head 14 is for fixing top optical fiber.
The present invention adopts the construction method step of above-mentioned transparent concrete optical fiber arrangement equipment making transparent concrete as follows:
1) installation of transparent concrete optical fiber arrangement equipment;
As shown in Figure 3, erection triangle fixed base 5, top is connected with storage wire tray 6 by rotating shaft 1; Triangle fixed base lower left quarter is connected with moving runner 8 by rotating shaft 2 23, and moving runner horizontal direction is connected with dismountable fine plate 9 of leading being carved with optic fibre hole, and fixes with bolt 1; Crawler belt 16 is laid on the triangle fixed base left side, the slide plate 15 being fixed with aluminium alloys press strip is placed on crawler belt, wherein the spacing of the thickness of aluminium alloys press strip and optical fiber duct 2, the depth are according to optical fiber pitch 22, the large little makings of fibre diameter laid, the fiber lengths 21 of aluminium alloys press strip discharge is apart from the length arrangement according to fiber arrangement in required transparent coagulation block, and fiber cut place 18 is to block optical fiber.
2) laying of optical fiber and reinforcing:
Optical fiber in storage wire tray 6 is walked around moving runner 8, through leading fine plate 9, top optical fiber utilizes fixed head 14 to fix, and traction optical fiber moves forward, then by sonet card in the aluminium alloys press strip optical fiber duct laid, now press at aluminium alloys and smear one deck glass cement, optical fiber and optical fiber duct 2 are fixed together, and then above aluminium alloys press strip, last layer aluminium alloys press strip is laid again, draw-in groove wants optical fiber alignment, namely utilize two pieces of press strips to be blocked by optical fiber, can not gap be left between two press strips, as shown in Figure 4.
3) fiber arrangement unit is produced:
After optical fiber on slide plate is fixing, as shown in Figure 4, optical fiber is blocked at place of fiber cut place 18, then unnecessary optical fiber, cut along aluminium alloys press strip limit, namely produce fiber arrangement unit as shown in Figure 5, after on slide plate, optical fiber arrangement unit removes, slide plate is moved forward, and by two of last grip optical fibers pieces of aluminium alloys press strips, temporarily stay on slide plate, for fixing next slide plate top optical fiber used, and traction optical fiber moves forward, and then the slide plate that another block fixes aluminium alloys press strip is put, and be close to previous slide plate, now optical fiber also moves forward thereupon, by sonet card in the aluminium alloys press strip optical fiber duct laid, then repeat aforesaid operations, so repeatedly operate and just produce fiber arrangement unit, the object of this method of operating: one is to produce required fiber arrangement unit, two is the objects in order to reach cross construction, realize large-scale industrial production.
4) transparent concrete multimode fiber arrangement Mold Making:
According to the dimensional requirement of made transparent concrete block, as shown in Figure 6, above-mentioned fiber arrangement element stack is stitched together, namely become block by monolithic to multi-disc, and with bolt 2 11 compact siro spinning technology, can not gap be left, object is tightened together by aluminum alloy bar on the one hand, grip optical fibers, in case optical fiber loosens, is allow between two fiber arrangement unit to have gap on the other hand, prevents from occurring spillage in concreting process.
As shown in Figure 7, splicing construction shown in several above-mentioned Fig. 6 is arranged side by side in dismountable forming tank; Wherein forming tank is made up of two pieces of side forms one 19, two pieces side form 2 20 and one piece of bed die; Installation process is first emitted on bed die by the structure shown in several Fig. 6, then side form one and side form two are installed, and utilize bolt 3 12 and bed die fastening, clamp aluminium alloys press strip simultaneously, namely transparent concrete multimode fiber arrangement mould has been produced, because the mould in the present invention is dismountable, mould is recycled, and reduces cost.
5) concrete build shaping:
Be poured into by concrete mortar and laid in the multimode forming tank of optical fiber, as shown in Figure 7, vibration moulding, is then placed on maintenance in standard environment goods; By the concrete demoulding from forming tank after sclerosis, side form, the base plate of mould is removed according to sequencing, then aluminum alloy bar is removed, again the optical fiber severing had more, surface finish polishing, namely obtain multiple transparent concrete block, as shown in Figure 8, this method eliminates this procedure of cutting technique, form removal and shaping.
The shaping mode of another concreting is laying optical fiber arrangement unit limit, limit concreting, namely one deck fiber arrangement unit was fixed before this, then concreting, lay one deck fiber arrangement unit again, concreting again, so repeatedly operate, make concrete evenly distribution in a fiber, avoids the concrete containing coarse aggregate to occur segregation phenomenon.
6) folded three layers of fiber arrangement unit being stitched together, by it according to being arranged in forming tank as shown in Figure 9, producing transparent concrete plate fiber arrangement mould, as shown in Figure 9; Repeat above-mentioned steps, getting final product stripping forming through regulation maintenance after concreting completes be transparent concrete plate, as shown in Figure 10.
Construction method of the present invention can produce various forms of transparent concrete according to individual demand, the forming tank side form one used in aforesaid operations, be detachable between side form two and bed die and between aluminum alloy bar and assemble, namely this method facilitates the demoulding of transparent concrete, make again forming tank and aluminium alloys press strip recycle, reduce cost.
Protection scope of the present invention is not limited to above-mentioned related embodiment, and other technical scheme identical with essence of the present invention all belongs to the scope of protection of the invention.

Claims (2)

1. a transparent concrete through engineering approaches construction equipment, i.e. transparent concrete optical fiber arrangement equipment, is characterized in that: triangle fixed base (5) top is connected with storage wire tray (6) by rotating shaft one (7), and storage wire tray refers to the belt wheel of winding optical fiber; Triangle fixed base lower left quarter is connected with moving runner (8) by rotating shaft two (23), moving runner horizontal direction is connected with dismountable fine plate (9) of leading being carved with optic fibre hole, fix with bolt one (10), lead the pore size on fine plate, pitch of holes according to laying optical fiber spacing (22), the large little makings of fibre diameter, lead fine plate and be mainly used in controlling optical fiber pitch; The triangle fixed base left side is crawler belt (16), slide plate (15) is placed above crawler belt, and utilize bolt, aluminium alloys press strip is fixed on slide plate by the mode of glue bond or draw-in groove, wherein fiber lengths (21) is according to the length arrangement of fiber arrangement in required transparent coagulation block, fiber cut place (18) is for blocking optical fiber, the thickness of aluminium alloys press strip and separation, the depth are according to the volume ratio of laying optical fiber, and diameter makes, and fixed head (14) is for fixing top optical fiber.
2. a transparent concrete through engineering approaches construction method, namely a kind of transparent concrete optical fiber arrangement equipment described in claim 1 is utilized, produce required fiber arrangement unit, it is stacked according to required form and is fixedly installed togather, then by several these structure accommodated side-by-side concreting in dismountable forming tank, namely the maintenance demoulding obtains transparent concrete, it is characterized in that: the construction method utilizing transparent concrete optical fiber arrangement equipment to make transparent concrete comprises the steps:
1) installation of transparent concrete optical fiber arrangement equipment:
Erection triangle fixed base (5), top is connected with storage wire tray (6) by rotating shaft, triangle fixed base lower left quarter is connected with moving runner (8) by rotating shaft, and moving runner horizontal direction is connected with dismountable fine plate (9) of leading being carved with optic fibre hole, and fixes with bolt one (10); Crawler belt (16) is laid on the triangle fixed base left side, the slide plate (15) being fixed with aluminium alloys press strip is placed on crawler belt, wherein the spacing of the thickness of aluminium alloys press strip and optical fiber duct (2), the depth are according to optical fiber pitch (22), the large little makings of fibre diameter laid, the fiber lengths (21) that aluminium alloys press strip discharges is according to the length arrangement of fiber arrangement in required transparent coagulation block, and fiber cut place (18) are for blocking optical fiber;
2) laying of optical fiber and reinforcing:
The optical fiber store in wire tray (6) is walked around moving runner (8), through leading fine plate (9), top optical fiber utilizes fixed head (14) to fix, and traction optical fiber moves forward, then by sonet card in the aluminium alloys press strip optical fiber duct laid, now press at aluminium alloys and smear one deck glass cement, optical fiber and optical fiber duct (2) are fixed together, and then above aluminium alloys press strip, last layer aluminium alloys press strip is laid again, draw-in groove wants optical fiber alignment, namely utilize two pieces of press strips to be blocked by optical fiber, between two press strips, can not gap be left;
3) fiber arrangement unit is produced:
After optical fiber on slide plate is fixing, optical fiber is blocked at fiber cut place (18) place, then unnecessary optical fiber, cuts along aluminium alloys press strip limit, namely produce fiber arrangement unit; After on slide plate, optical fiber arrangement unit removes, slide plate is moved forward, and two of last grip optical fibers pieces of aluminium alloys press strips are temporarily stayed on slide plate, for fixing next slide plate top optical fiber used, and traction optical fiber moves forward, and and then puts the slide plate that another block fixes aluminium alloys press strip, and be close to previous slide plate, now optical fiber also moves forward thereupon, by sonet card in the aluminium alloys press strip optical fiber duct laid, then repeats aforesaid operations; So repeatedly operate and just produce fiber arrangement unit;
4) transparent concrete multimode fiber arrangement Mold Making:
According to the dimensional requirement of made transparent concrete block, above-mentioned fiber arrangement element stack is stitched together, namely becomes block by monolithic to multi-disc, and with bolt two (11) compact siro spinning technology, can not gap be left;
Be arranged side by side in dismountable forming tank by several above-mentioned splicing constructions, wherein forming tank is made up of two pieces of side forms one (19), two pieces side form two (20) and one piece of bed die; Installation process is first emitted on bed die by several above-mentioned splicing constructions, then installs side form one and side form two, and utilize bolt three (12) and bed die fastening, clamps aluminium alloys press strip simultaneously, namely produced transparent concrete multimode fiber arrangement mould;
5) concrete build shaping:
Concrete mortar is poured into and has laid in the multimode forming tank of optical fiber, vibration moulding, goods are placed on maintenance in standard environment; By the concrete demoulding from forming tank after sclerosis, remove side form, the base plate of mould according to sequencing, then aluminum alloy bar is removed, then the optical fiber severing had more, surface finish polishing, namely obtain multiple transparent concrete block;
The shaping mode of another concreting is laying optical fiber arrangement unit limit, limit concreting, namely one deck fiber arrangement unit was fixed before this, then concreting, lay one deck fiber arrangement unit again, concreting again, so repeatedly operate, make concrete evenly distribution in a fiber, avoids the concrete containing coarse aggregate to occur segregation phenomenon;
Folded three layers of fiber arrangement unit is stitched together, then several these splicing structures is arranged in forming tank by the vertical direction in former direction, produces transparent concrete plate fiber arrangement mould; Repeat above-mentioned steps, getting final product stripping forming through regulation maintenance after concreting completes be transparent concrete plate.
CN201310567561.5A 2013-11-14 2013-11-14 Transparent concrete through engineering approaches construction method and construction equipment Active CN103603458B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310567561.5A CN103603458B (en) 2013-11-14 2013-11-14 Transparent concrete through engineering approaches construction method and construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310567561.5A CN103603458B (en) 2013-11-14 2013-11-14 Transparent concrete through engineering approaches construction method and construction equipment

Publications (2)

Publication Number Publication Date
CN103603458A CN103603458A (en) 2014-02-26
CN103603458B true CN103603458B (en) 2016-04-06

Family

ID=50121713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310567561.5A Active CN103603458B (en) 2013-11-14 2013-11-14 Transparent concrete through engineering approaches construction method and construction equipment

Country Status (1)

Country Link
CN (1) CN103603458B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP3240660B1 (en) * 2015-05-19 2019-12-11 Zospeum Holding B.V. Translucent building element and method of manufacturing same
CN109382908B (en) * 2018-11-30 2023-12-19 湖南恒盛瑞通新型建材有限公司 Manufacturing method of light-transmitting concrete and production mold thereof
CN109760175A (en) * 2019-03-01 2019-05-17 湖南恒盛瑞通新型建材有限公司 A kind of production method and its production mould of non-light tight concrete

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101234510A (en) * 2007-02-01 2008-08-06 润弘精密工程事业股份有限公司 Translucent concrete producing module group and quick production process thereof
CN101428993A (en) * 2008-12-19 2009-05-13 哈尔滨工业大学 Optical fiber intelligent transparent concrete and method for producing the same
CN102127943A (en) * 2010-03-19 2011-07-20 柳忠林 Large-span prestressed concrete beam plate used as ventilation channel and ventilation channel system
JP2011179213A (en) * 2010-03-01 2011-09-15 Koken Sangyo Kk Foundation structure using concrete block
CN102807343A (en) * 2012-05-24 2012-12-05 廊坊荣盛混凝土有限公司 Translucent concrete and preparation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101234510A (en) * 2007-02-01 2008-08-06 润弘精密工程事业股份有限公司 Translucent concrete producing module group and quick production process thereof
CN101428993A (en) * 2008-12-19 2009-05-13 哈尔滨工业大学 Optical fiber intelligent transparent concrete and method for producing the same
JP2011179213A (en) * 2010-03-01 2011-09-15 Koken Sangyo Kk Foundation structure using concrete block
CN102127943A (en) * 2010-03-19 2011-07-20 柳忠林 Large-span prestressed concrete beam plate used as ventilation channel and ventilation channel system
CN102807343A (en) * 2012-05-24 2012-12-05 廊坊荣盛混凝土有限公司 Translucent concrete and preparation method thereof

Also Published As

Publication number Publication date
CN103603458A (en) 2014-02-26

Similar Documents

Publication Publication Date Title
CN102601845B (en) Manufacturing method and manufacturing device of light-transmitting concrete block
CN103603458B (en) Transparent concrete through engineering approaches construction method and construction equipment
CN1114738C (en) In-situ cast hollow reinforced concrete slab pre-provided with hollow hard thin-wall members and its construction method
CN108166349B (en) Solar pavement structure of micro-array photovoltaic battery pack and construction method thereof
CN102605954A (en) Construction method for casting light transmission concrete in place
CN109382908A (en) The production method and its production mould of non-light tight concrete
CN204531382U (en) Umbrella shape space curved surface clear water concrete template structure
CN106522407A (en) Fabricated cast-in-place concrete sandwich insulation wall steel frame formwork system and connecting parts
CN104074313B (en) High intensity continuous composite material fiber mesh, production line and method
CN205818107U (en) A kind of quick process units of non-light tight concrete modularity
CN102644408A (en) Assembly type reinforced concrete prefabricated wall
CN103419281B (en) A kind of light cellular partition board production line
CN104328855A (en) Light-transmitting adjustable building block and manufacturing method thereof
CN2937291Y (en) Composite wall brick
CN214194660U (en) Prefabricated cable shaft of cordwood system equipment
CN109235186B (en) Triangular light-transmitting concrete pavement brick and manufacturing method thereof
CN202850175U (en) Integral type water ditch side moldboard
CN202559839U (en) Assembling type reinforced concrete prefabricated wall
CN202099924U (en) Light composite stripe-shaped plant fiber wall body plate and forming die thereof
CN210795004U (en) Film paving device for fly ash aerated concrete blocks
CN204640461U (en) A kind of mould making grape cement post
CN213472275U (en) Insulating tower production line based on vertical heavy vertical tension method
CN215039069U (en) Novel well circumference brick positioning and cutting device
CN218265926U (en) Lining cutting platform truck is used in highway tunnel construction
CN203905302U (en) High-strength continuous composite material fiber mesh and production line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant