CN103603458A - Engineering construction method and construction equipment for transparent concrete - Google Patents

Engineering construction method and construction equipment for transparent concrete Download PDF

Info

Publication number
CN103603458A
CN103603458A CN201310567561.5A CN201310567561A CN103603458A CN 103603458 A CN103603458 A CN 103603458A CN 201310567561 A CN201310567561 A CN 201310567561A CN 103603458 A CN103603458 A CN 103603458A
Authority
CN
China
Prior art keywords
optical fiber
concrete
fiber arrangement
aluminium alloys
fiber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310567561.5A
Other languages
Chinese (zh)
Other versions
CN103603458B (en
Inventor
周智
申娟
何建平
王俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian University of Technology
Original Assignee
Dalian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian University of Technology filed Critical Dalian University of Technology
Priority to CN201310567561.5A priority Critical patent/CN103603458B/en
Publication of CN103603458A publication Critical patent/CN103603458A/en
Application granted granted Critical
Publication of CN103603458B publication Critical patent/CN103603458B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/0037Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with elements being able to conduct light, e.g. light conducting fibers

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses an engineering construction method and construction equipment for transparent concrete and belongs to the technical field of manufacturing of novel building materials. The engineering construction method is characterized by comprising the steps of manufacturing optical fiber arrangement units through transparent concrete optical fiber arrangement equipment disclosed by the invention, wherein the optical fiber arrangement units are fixedly stacked and mounted together according to a required form, namely a single sheet is stacked with another single sheet to obtain multiple sheets, and finally blocks are formed; and mounting a plurality of block structures in a detachable molding tank side by side, pouring concrete and performing maintenance and demolding to obtain the transparent concrete. The optical fiber arrangement equipment comprises a triangular fixed machine seat, wherein the upper part of the triangular fixed machine seat is connected with a wire storage disk through a rotating shaft; the left lower part of the triangular fixed machine seat is connected with a rotating wheel through the rotating shaft; a fiber guide plate is arranged on the left of the rotating wheel; a caterpillar track with a sliding plate is arranged on the left of the triangular fixed machine seat; aluminum alloy pressing strips for manufacturing the optical fiber arrangement units are fixed on the sliding plate. The engineering construction method and construction equipment have the characteristics of high optical fiber arrangement speed, convenience, uniformity, convenience in operation, simple technology and high efficiency; the transparent concrete in various forms can be manufactured according to a personal requirement; the engineering construction method and construction equipment are suitable for large-scale industrial production.

Description

Transparent concrete through engineering approaches construction method and construction equipment
Technical field
The invention belongs to New Building Materials manufacturing technology field, relate to a kind of through engineering approaches construction method and construction equipment of transparent concrete.
Background technology
In recent years, " green energy conservation ", protection of the environment, realize sustainable development and become the common topic of paying close attention in countries in the world.And solar energy is as inexhaustible on the earth, nexhaustible green energy resource, there is the advantages such as the popularity of the incomparable spatter property of other energy, safety, resource and abundance, under the situation of global energy anxiety, serious threat economic development and living environment, increasing country comes into effect " sunlight program ".Along with the construction of large quantities of highrise buildings, super highrise building and underground building, most of light that relies on artificial illumination to maintain indoor environment, the great like this energy that consumed.Therefore, in order to realize sustainable development, make full use of solar energy, change the traditional mode of the closely knit darkness of construction wall, oppressiveness, huge dullness, it is found that the optical fiber with good leaded light performance is joined in concrete and makes transparent concrete, not only can make building in the situation that not punching mouth or mounting glass window, obtain sunshine, energy conservation, reduce energy consumption, can also make building there is good aesthetic property and ornamental.
In recent years transparent concrete in state-owned many research.From the angle of construction technology, prior art cannot realize large-scale industrial production at present.Although Chinese patent 200710007521.X provides the method for disposable production multimode transparent concrete, fiber arrangement is complicated, optical fiber need to be cut into several sections of equal lengths, by root, penetrate in prefabricated separator perforation, then be fixed on backform and a plurality of bed die, workload is larger, and operation slowly, and hole can not seal completely, spillage phenomenon is obvious; Chinese patent 201110316717.3 provides a kind of method of quick layout optical fiber, but two ends optical fiber is not taked fixation, in casting process, can produce disturbance to optical fiber, and owing to being comb shape side plate, in casting process, spillage is obvious, device is difficult cleaning after removing, and in addition, this patent does not provide the multimode mode of production; The mode that Chinese patent 201110069843.3 has proposed a kind of efficiently, low cost is arranged optical fiber, but the optical fiber being wound around on optical fiber screen is easy to slippage, and cross section optical fiber is oblique arranges, can not reach the object being evenly arranged, and plate and plate gap can not be too close, casting process is slower, and the concrete of building is limited in self-compacting concrete, can not build coarse aggregate concrete.In addition, Chinese patent 201110316717.3 is all restricted with the optical fiber of 201110069843.3 pairs of layouts of Chinese patent, all wants the winding optical fiber of deep camber in the process due to layout optical fiber, must select the optical fiber thinner, pliability is good.
At present transparent concrete key production technology thereof----layout optical fiber quick, even, directed in concrete adopts manual operation conventionally, workload is large, operation slowly, efficiency is low, spillage is obvious, it is more to limit.For this reason, how to realize efficiently, the optical fiber of arranging fast, uniformly, realize large-scale industrial production, become a difficult problem in the urgent need to address in transparent concrete application.
Summary of the invention
The object of the invention is in order to overcome the deficiency of prior art, and in order to reach efficient, quick, uniform laying optical fiber, to realize transparent concrete large-scale industrial production, provide a kind of transparent concrete construction method and construction equipment.
Technical scheme of the present invention is:
In order to achieve the above object, the invention provides a kind of transparent concrete construction method and construction equipment, it is characterized in that: utilize the construction method of transparent concrete fiber arrangement equipment making transparent concrete to comprise the steps:
1) installation of transparent concrete fiber arrangement equipment:
Set up triangle fixed base 5, top is connected with moving runner 8 by rotating shaft with the storage wire tray 6 triangle fixed base lower left quarter that is connected by rotating shaft, and moving runner horizontal direction is connected with dismountable fine plate 9 of leading of optic fibre hole that is carved with, and fixes with bolt 1; On the triangle fixed base left side, lay crawler belt 16, the slide plate 15 that is fixed with aluminium alloys press strip is placed on crawler belt, wherein the thickness of aluminium alloys press strip and separation, the depth are according to the volume ratio of laying optical fiber, diameter is made, the long spacing of aluminium alloys press strip discharge is according to the length arrangement of fiber arrangement in needed transparent coagulation piece, and short spacing is in order to block optical fiber.
2) laying of optical fiber and reinforcing:
Optical fiber in storage wire tray 6 is walked around to moving runner 8, through leading fine plate 9, top optical fiber utilizes fixed head 14 fixing, and traction optical fiber moves forward, then by sonet card in the aluminium alloys press strip optical fiber duct of having laid, now at aluminium alloys, press and smear one deck glass cement, optical fiber and optical fiber duct 2 are fixed together, and then above aluminium alloys press strip, lay last layer aluminium alloys press strip again, draw-in groove is wanted optical fiber alignment, utilize two press strips that optical fiber is blocked, between two press strips, can not leave gap.
3) produce fiber arrangement unit:
Optical fiber on slide plate blocks optical fiber, then unnecessary optical fiber, along aluminium alloys press strip limit, cuts after fixing at 18 places, optical fiber truncated position, produce fiber arrangement unit; After optical fiber arrangement unit removes on slide plate, slide plate is moved forward, and by two aluminium alloys press strips 21 of last grip optical fibers, temporarily stay on slide plate, for fixing next slide plate top optical fiber used, and traction optical fiber moves forward; And then put the slide plate that another piece fixes aluminium alloys press strip, and be close to previous slide plate, now optical fiber also moves forward thereupon, by sonet card in the aluminium alloys press strip optical fiber duct of having laid, then repeat aforesaid operations, operation just produces fiber arrangement unit, the object of this method of operating so repeatedly: the one, in order to produce needed fiber arrangement unit, the 2nd, in order to reach the object of flowing water construction, realize large-scale industrial production.
4) transparent concrete multimode fiber arrangement Mold Making:
According to the dimensional requirement of the transparent concrete piece of made, above-mentioned fiber arrangement element stack is stitched together, by monolithic, to multi-disc, become piece, and closely connect with bolt 2 11, can not leave gap, object is that aluminum alloy bar is tightened together on the one hand, and grip optical fibers is in case optical fiber is loosening, be to allow can not have gap between two fiber arrangement unit on the other hand, prevent from occurring spillage in concreting process.
Several above-mentioned splicing constructions are arranged side by side in dismountable forming tank, and wherein forming tank consists of two side forms 1, two pieces side forms 2 20 and a bed die; Installation process is first several above-mentioned splicing constructions to be emitted on bed die, then side form one and side form two are installed, and utilize bolt 3 12 and bed die fastening, clamp aluminium alloys press strip simultaneously, produced transparent concrete multimode fiber arrangement mould, because the mould in the present invention is dismountable, mould is recycled, and has reduced cost.
5) concretely build moulding:
Concrete mortar is poured in the multimode forming tank of having laid optical fiber, vibration moulding, is placed on maintenance in standard environment goods; By the concrete demoulding from forming tank after sclerosis, according to sequencing, remove side form, the base plate of mould, then aluminum alloy bar is removed, again the optical fiber severing having more, surface finish polishing, obtain a plurality of transparent concrete pieces, this method has been saved this procedure of cutting technique, and form removal is moulding.
The mode of another concreting moulding is laying optical fiber arrangement unit limit, limit concreting, i.e. fixing one deck fiber arrangement unit before this, then concreting, lay again one deck fiber arrangement unit, concreting again, operation, is more evenly distributed in optical fiber concrete so repeatedly, avoids the concrete that contains coarse aggregate to occur segregation phenomenon.
6) folded three layers of fiber arrangement unit is stitched together, then several these splicing structures being changed to kind of a mode is arranged in forming tank, producing transparent concrete plate fiber arrangement mould, repeat above-mentioned steps, can stripping forming be transparent concrete plate through regulation maintenance after concreting completes.
A kind of transparent concrete fiber arrangement equipment, can produce needed fiber arrangement unit, comprise: triangle fixed base 5, top is connected with storage wire tray 6 by rotating shaft 7, storage wire tray refers to the belt wheel of winding optical fiber, be used for exporting needed optical fiber, triangle fixed base lower left quarter is connected with moving runner 8 by rotating shaft 7, not only can control the level of optical fiber, and can slightly tighten the optical fiber of output, moving runner horizontal direction is connected with dismountable fine plate 9 of leading of optic fibre hole that is carved with, fixing with bolt 1, lead the pore size on fine plate, pitch of holes is set according to the volume ratio of arranging optical fiber, lead fine plate and be mainly used in controlling optical fiber spacing, the triangle fixed base left side is the crawler belt 16 arranging in order to realize flowing water construction, above crawler belt, place slide plate 15, and utilize the mode of bolt, glue bond or draw-in groove that aluminium alloys press strip is fixed on slide plate, wherein long spacing is according to the length arrangement of fiber arrangement in needed transparent coagulation piece, short spacing is in order to block optical fiber, the thickness of aluminium alloys press strip and separation, the depth be according to the volume ratio of laying optical fiber, and diameter is made, and fixed head 14 is for fixing top optical fiber.
Compared with prior art, effect of the present invention and benefit are: the fiber arrangement unit that utilizes transparent concrete fiber arrangement equipment to prepare, adopt monolithic to multi-disc, to become the preparation method of piece, optical fiber is laid quick, convenient, even, constructing operation is convenient, technique is simple, and efficiency is high, has reached the object of flowing water construction; The present invention also provides a kind of dismountable multimode fiber arrangement mould, and the preparation speed of transparent concrete is fast, and form removal is plastic, saves this procedure of cutting technique, and mould Reusability, has reduced cost; Because fiber arrangement unit closely connects by bolt, the spillage phenomenon of having avoided prior art to occur in concreting process, can produce various forms of transparent concretes according to individual demand, is applicable to large-scale industrial production.
Accompanying drawing explanation
Fig. 1 is the aluminium alloys press strip stereogram for the trough of belt of fixed fiber.
Fig. 2 leads fine plate stereogram.
Fig. 3 is transparent concrete fiber arrangement outfit of equipment structural representation of the present invention.
Fig. 4 utilizes fiber arrangement device fabrication to go out optical fiber arrangement unit schematic diagram.
Fig. 5 is fiber arrangement cell schematics.
Fig. 6 is the fast fiber arrangement schematic diagram of transparent concrete that utilizes fiber arrangement unit spliced to become.
Fig. 7 produces transparent concrete multimode fiber arrangement mould schematic diagram.
Fig. 8 is mould, as shown in Figure 7, has built a plurality of transparent concrete piece schematic diagrames of concrete form removal aftershaping.
Fig. 9 is transparent concrete plate fiber arrangement mould schematic diagram.
Figure 10 is mould, as shown in Figure 9, has built the transparent concrete plate schematic diagram of concrete form removal aftershaping.
In Fig. 1-10: 1 aluminium alloys press strip; 2 optical fiber ducts; 3 bolts hole; 4 optic fibre holes; 5 triangle fixed bases; 6 storage wire trays; 7 rotating shafts; 8 moving runners; 9 lead fine plate; 10 bolts one; 11 bolts two; 12 bolts three; 13 optical fiber; 14 top optical fiber fixed heads; 15 slide plates; 16 crawler belts; 17 Athey wheels; 18 optical fiber truncated positions; 19 side forms one; 20 side forms two.
The specific embodiment
Below in conjunction with technical scheme and accompanying drawing, describe the specific embodiment of the present invention in detail.The part that belongs to current techique in the present invention has been done simple description, and the structure showing in figure, construction size do not have restricted.For the ease of to visual understanding of the present invention, in figure, each entity size, proportionate relationship etc. are only for reference, and equipment size can be made according to individual demand.
Transparent concrete construction method and construction equipment embodiment:
How fast, uniformly transparent concrete key production technology thereof is to arrange optical fiber, also be current unsolved a great problem, in order to reach efficient, quick laying optical fiber, realize the object of transparent concrete large-scale industrial production, the invention provides a kind of transparent concrete fiber arrangement equipment, can produce needed fiber arrangement unit, being stacked together to be emitted on gets final product concreting in forming tank.Transparent concrete fiber arrangement equipment provided by the invention, as shown in Figure 3, comprising: triangle fixed base 5, and top is connected with storage wire tray 6 by rotating shaft 7, and storage wire tray refers to the belt wheel of winding optical fiber, for exporting needed optical fiber; Triangle fixed base lower left quarter is connected with moving runner 8 by rotating shaft 7, not only can control the level of optical fiber, and can slightly tighten the optical fiber of output, moving runner horizontal direction is connected with dismountable fine plate 9 of leading of optic fibre hole that is carved with, fixing with bolt 1, pore size, the pitch of holes led on fine plate are set according to the volume ratio of arranging optical fiber, lead fine plate and are mainly used in controlling optical fiber spacing; The triangle fixed base left side is the crawler belt 16 arranging in order to realize flowing water construction, above crawler belt, place slide plate 15, and utilize the mode of bolt, glue bond or draw-in groove that aluminium alloys press strip is fixed on slide plate, wherein long spacing is according to the length arrangement of fiber arrangement in needed transparent coagulation piece, short spacing is in order to block optical fiber, the thickness of aluminium alloys press strip and separation, the depth be according to the volume ratio of laying optical fiber, and diameter is made, and fixed head 14 is for fixing top optical fiber.
The present invention adopts the construction method step of above-mentioned transparent concrete fiber arrangement equipment making transparent concrete as follows:
1) installation of transparent concrete fiber arrangement equipment;
As shown in Figure 3, set up triangle fixed base 5, top is connected with storage wire tray 6 by rotating shaft; Triangle fixed base lower left quarter is connected with moving runner 8 by rotating shaft, and moving runner horizontal direction is connected with dismountable fine plate 9 of leading of optic fibre hole that is carved with, and fixing with bolt 1; On the triangle fixed base left side, lay crawler belt 16, the slide plate 15 that is fixed with aluminium alloys press strip is placed on crawler belt, wherein the thickness of aluminium alloys press strip and separation, the depth are according to the volume ratio of laying optical fiber, diameter is made, the long spacing of aluminium alloys press strip discharge is according to the length arrangement of fiber arrangement in needed transparent coagulation piece, and short spacing is in order to block optical fiber.
2) laying of optical fiber and reinforcing:
Optical fiber in storage wire tray 6 is walked around to moving runner 8, through leading fine plate 9, top optical fiber utilizes fixed head 14 fixing, and traction optical fiber moves forward, then by sonet card in the aluminium alloys press strip optical fiber duct of having laid, now at aluminium alloys, press and smear one deck glass cement, optical fiber and optical fiber duct 2 are fixed together, and then above aluminium alloys press strip, lay again last layer aluminium alloys press strip, draw-in groove is wanted optical fiber alignment, utilize two press strips that optical fiber is blocked, between two press strips, can not leave gap, as shown in Figure 4.
3) produce fiber arrangement unit:
Optical fiber on slide plate as shown in Figure 4, blocks optical fiber, then unnecessary optical fiber, along aluminium alloys press strip limit, cuts after fixing at 18 places, optical fiber truncated position, produce fiber arrangement unit as shown in Figure 5, after on slide plate, optical fiber arrangement unit removes, slide plate is moved forward, and by two aluminium alloys press strips 21 of last grip optical fibers, temporarily stay on slide plate, for fixing next slide plate top optical fiber used, and traction optical fiber moves forward, and then put the slide plate that another piece fixes aluminium alloys press strip, and be close to previous slide plate, now optical fiber also moves forward thereupon, by sonet card in the aluminium alloys press strip optical fiber duct of having laid, then repeat aforesaid operations, operation just produces fiber arrangement unit so repeatedly, the object of this method of operating: the one, in order to produce needed fiber arrangement unit, the 2nd, in order to reach the object of flowing water construction, realize large-scale industrial production.
4) transparent concrete multimode fiber arrangement Mold Making:
According to the dimensional requirement of the transparent concrete piece of made, as shown in Figure 6, above-mentioned fiber arrangement element stack is stitched together, by monolithic, to multi-disc, become piece, and closely connect with bolt 2 11, can not leave gap, object is that aluminum alloy bar is tightened together on the one hand, grip optical fibers, in case optical fiber is loosening, is to allow can not have gap between two fiber arrangement unit on the other hand, prevents from occurring spillage in concreting process.
As shown in Figure 7, splicing construction shown in several above-mentioned Fig. 6 is arranged side by side in dismountable forming tank; Wherein forming tank consists of two side forms 1, two pieces side forms 2 20 and a bed die; Installation process is first the structure shown in several Fig. 6 to be emitted on bed die, then side form one and side form two are installed, and utilize bolt 3 12 and bed die fastening, clamp aluminium alloys press strip simultaneously, produced transparent concrete multimode fiber arrangement mould, because the mould in the present invention is dismountable, mould is recycled, and has reduced cost.
5) concretely build moulding:
Concrete mortar is poured in the multimode forming tank of having laid optical fiber, as shown in Figure 7, vibration moulding, is then placed on maintenance in standard environment goods; By the concrete demoulding from forming tank after sclerosis, according to sequencing, remove side form, the base plate of mould, then aluminum alloy bar is removed, again the optical fiber severing having more, surface finish polishing, obtain a plurality of transparent concrete pieces, as shown in Figure 8, this method has been saved this procedure of cutting technique, and form removal is moulding.
The mode of another concreting moulding is laying optical fiber arrangement unit limit, limit concreting, i.e. fixing one deck fiber arrangement unit before this, then concreting, lay again one deck fiber arrangement unit, concreting again, operation, is more evenly distributed in optical fiber concrete so repeatedly, avoids the concrete that contains coarse aggregate to occur segregation phenomenon.
6) folded three layers of fiber arrangement unit is stitched together, it,, according to being arranged in as shown in Figure 9 in forming tank, is produced to transparent concrete plate fiber arrangement mould, as shown in Figure 9; Repeating above-mentioned steps, can stripping forming be transparent concrete plate through regulation maintenance after concreting completes, as shown in figure 10.
Construction method of the present invention can be produced various forms of transparent concretes according to individual demand, between the forming tank side form one using in aforesaid operations, side form two and bed die and be detachable and assembling between aluminum alloy bar, this method has facilitated the demoulding of transparent concrete, make again forming tank and aluminium alloys press strip recycle, reduced cost.
Protection scope of the present invention is not limited to above-mentioned related embodiment, and other technical scheme identical with essence of the present invention all belongs to the scope of protection of the invention.

Claims (2)

1. a transparent concrete through engineering approaches construction method, a kind of transparent concrete fiber arrangement equipment that utilizes the present invention to propose, produce needed fiber arrangement unit, it is stacked and be fixedly installed togather according to needed form, then several these structures are placed in to concreting in dismountable forming tank side by side, the maintenance demoulding obtains transparent concrete, it is characterized in that: utilize the construction method of transparent concrete fiber arrangement equipment making transparent concrete to comprise the steps:
1) installation of transparent concrete fiber arrangement equipment:
Set up triangle fixed base (5), top is connected with storage wire tray (6) by rotating shaft, triangle fixed base lower left quarter is connected with moving runner (8) by rotating shaft, and moving runner horizontal direction is connected with dismountable fine plate of leading of optic fibre hole (9) that is carved with, and fixing with bolt one (10); On the triangle fixed base left side, lay crawler belt (16), the slide plate (15) that is fixed with aluminium alloys press strip is placed on crawler belt, wherein the thickness of aluminium alloys press strip and separation, the depth are according to the volume ratio of laying optical fiber, diameter is made, the long spacing of aluminium alloys press strip discharge is according to the length arrangement of fiber arrangement in needed transparent coagulation piece, and short spacing is for blocking optical fiber;
2) laying of optical fiber and reinforcing:
The optical fiber of storing in wire tray (6) is walked around to moving runner (8), through leading fine plate (9), top optical fiber utilizes fixed head (14) fixing, and traction optical fiber moves forward, then by sonet card in the aluminium alloys press strip optical fiber duct of having laid, now at aluminium alloys, press and smear one deck glass cement, optical fiber and optical fiber duct (2) are fixed together, and then above aluminium alloys press strip, lay again last layer aluminium alloys press strip, draw-in groove is wanted optical fiber alignment, utilize two press strips that optical fiber is blocked, between two press strips, can not leave gap;
3) produce fiber arrangement unit:
Optical fiber on slide plate is located optical fiber to block in optical fiber truncated position (18), then unnecessary optical fiber, along aluminium alloys press strip limit, is cut after fixing, and produces fiber arrangement unit; After on slide plate, optical fiber arrangement unit removes, slide plate is moved forward, and two aluminium alloys press strips (21) of last grip optical fibers are temporarily stayed on slide plate, for fixing next slide plate top optical fiber used, and traction optical fiber moves forward, and and then puts the slide plate that another piece fixes aluminium alloys press strip, and be close to previous slide plate, now optical fiber also moves forward thereupon, and sonet card, in the aluminium alloys press strip optical fiber duct of having laid, is then repeated to aforesaid operations; Operation just produces fiber arrangement unit so repeatedly;
4) transparent concrete multimode fiber arrangement Mold Making:
According to the dimensional requirement of the transparent concrete piece of made, above-mentioned fiber arrangement element stack is stitched together, by monolithic, to multi-disc, become piece, and closely connect with bolt two (11), can not leave gap;
Several above-mentioned splicing constructions are arranged side by side in dismountable forming tank, and wherein forming tank consists of two (20) and bed dies of one (19), two side form of two side forms; Installation process is first several above-mentioned splicing constructions to be emitted on bed die, and then side form one and side form two are installed, and utilizes bolt three (12) and bed die fastening, clamps aluminium alloys press strip simultaneously, has produced transparent concrete multimode fiber arrangement mould;
5) concretely build moulding:
Concrete mortar is poured in the multimode forming tank of having laid optical fiber, vibration moulding, is placed on maintenance in standard environment goods; By the concrete demoulding from forming tank after sclerosis, according to sequencing, remove side form, the base plate of mould, then aluminum alloy bar is removed, then the optical fiber severing having more, surface finish polishing, obtained a plurality of transparent concrete pieces;
The mode of another concreting moulding is laying optical fiber arrangement unit limit, limit concreting, i.e. fixing one deck fiber arrangement unit before this, then concreting, lay again one deck fiber arrangement unit, concreting again, operation, is more evenly distributed in optical fiber concrete so repeatedly, avoids the concrete that contains coarse aggregate to occur segregation phenomenon;
6) folded three layers of fiber arrangement unit is stitched together, then several these splicing structures is changed to kind of a mode and be arranged in forming tank, produce transparent concrete plate fiber arrangement mould; Repeating above-mentioned steps, can stripping forming be transparent concrete plate through regulation maintenance after concreting completes.
2. a transparent concrete through engineering approaches construction equipment, transparent concrete fiber arrangement equipment, is characterized in that: triangle fixed base (5) top is connected with storage wire tray (6) by rotating shaft (7), stores the belt wheel that wire tray refers to winding optical fiber; Triangle fixed base lower left quarter is connected with moving runner (8) by rotating shaft (7), moving runner horizontal direction is connected with dismountable fine plate of leading of optic fibre hole (9) that is carved with, fixing with bolt one (10), pore size, the pitch of holes led on fine plate are set according to the volume ratio of arranging optical fiber, lead fine plate and are mainly used in controlling optical fiber spacing; The triangle fixed base left side is crawler belt (16), above crawler belt, place slide plate (15), and utilize the mode of bolt, glue bond or draw-in groove that aluminium alloys press strip is fixed on slide plate, wherein long spacing is according to the length arrangement of fiber arrangement in needed transparent coagulation piece, short spacing is for blocking optical fiber, the thickness of aluminium alloys press strip and separation, the depth be according to the volume ratio of laying optical fiber, and diameter is made, and fixed head (14) is for fixing top optical fiber.
CN201310567561.5A 2013-11-14 2013-11-14 Transparent concrete through engineering approaches construction method and construction equipment Expired - Fee Related CN103603458B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310567561.5A CN103603458B (en) 2013-11-14 2013-11-14 Transparent concrete through engineering approaches construction method and construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310567561.5A CN103603458B (en) 2013-11-14 2013-11-14 Transparent concrete through engineering approaches construction method and construction equipment

Publications (2)

Publication Number Publication Date
CN103603458A true CN103603458A (en) 2014-02-26
CN103603458B CN103603458B (en) 2016-04-06

Family

ID=50121713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310567561.5A Expired - Fee Related CN103603458B (en) 2013-11-14 2013-11-14 Transparent concrete through engineering approaches construction method and construction equipment

Country Status (1)

Country Link
CN (1) CN103603458B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107921662A (en) * 2015-05-19 2018-04-17 梭斯皮岩姆控股有限公司 Translucent constracture unit and its manufacture method
CN109382908A (en) * 2018-11-30 2019-02-26 湖南恒盛瑞通新型建材有限公司 The production method and its production mould of non-light tight concrete
CN109760175A (en) * 2019-03-01 2019-05-17 湖南恒盛瑞通新型建材有限公司 A kind of production method and its production mould of non-light tight concrete

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101234510A (en) * 2007-02-01 2008-08-06 润弘精密工程事业股份有限公司 Translucent concrete producing module group and quick production process thereof
CN101428993A (en) * 2008-12-19 2009-05-13 哈尔滨工业大学 Optical fiber intelligent transparent concrete and method for producing the same
CN102127943A (en) * 2010-03-19 2011-07-20 柳忠林 Large-span prestressed concrete beam plate used as ventilation channel and ventilation channel system
JP2011179213A (en) * 2010-03-01 2011-09-15 Koken Sangyo Kk Foundation structure using concrete block
CN102807343A (en) * 2012-05-24 2012-12-05 廊坊荣盛混凝土有限公司 Translucent concrete and preparation method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101234510A (en) * 2007-02-01 2008-08-06 润弘精密工程事业股份有限公司 Translucent concrete producing module group and quick production process thereof
CN101428993A (en) * 2008-12-19 2009-05-13 哈尔滨工业大学 Optical fiber intelligent transparent concrete and method for producing the same
JP2011179213A (en) * 2010-03-01 2011-09-15 Koken Sangyo Kk Foundation structure using concrete block
CN102127943A (en) * 2010-03-19 2011-07-20 柳忠林 Large-span prestressed concrete beam plate used as ventilation channel and ventilation channel system
CN102807343A (en) * 2012-05-24 2012-12-05 廊坊荣盛混凝土有限公司 Translucent concrete and preparation method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107921662A (en) * 2015-05-19 2018-04-17 梭斯皮岩姆控股有限公司 Translucent constracture unit and its manufacture method
US10906204B2 (en) 2015-05-19 2021-02-02 Zospeum Holding B.V Translucent building element and method of manufacturing same
CN107921662B (en) * 2015-05-19 2021-03-16 梭斯皮岩姆控股有限公司 Translucent building element and method for manufacturing the same
US11945134B2 (en) 2015-05-19 2024-04-02 Zospeum Holding B.V. Translucent building element and method of manufacturing same
CN109382908A (en) * 2018-11-30 2019-02-26 湖南恒盛瑞通新型建材有限公司 The production method and its production mould of non-light tight concrete
CN109382908B (en) * 2018-11-30 2023-12-19 湖南恒盛瑞通新型建材有限公司 Manufacturing method of light-transmitting concrete and production mold thereof
CN109760175A (en) * 2019-03-01 2019-05-17 湖南恒盛瑞通新型建材有限公司 A kind of production method and its production mould of non-light tight concrete

Also Published As

Publication number Publication date
CN103603458B (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN102601845B (en) Manufacturing method and manufacturing device of light-transmitting concrete block
CN1114738C (en) In-situ cast hollow reinforced concrete slab pre-provided with hollow hard thin-wall members and its construction method
CN106945306A (en) Using the technique of the board making wind electricity blade of pultrusion
CN109382908A (en) The production method and its production mould of non-light tight concrete
CN102605954A (en) Construction method for casting light transmission concrete in place
CN103603458B (en) Transparent concrete through engineering approaches construction method and construction equipment
CN102189590B (en) Device and method for making blank of transparent concrete product
CN108166349B (en) Solar pavement structure of micro-array photovoltaic battery pack and construction method thereof
CN204531382U (en) Umbrella shape space curved surface clear water concrete template structure
CN202895411U (en) Laminating apparatus for composite-wall prefabricated part
CN205818107U (en) A kind of quick process units of non-light tight concrete modularity
CN103556774B (en) Integrated house component module manufacturing methods
CN204222205U (en) A kind of comb glass-fiber reinforced plastic grille preparation facilities
CN217834045U (en) Concrete panel preparation mould for building
CN203755493U (en) Short-limb shear wall structure assembled based on hidden beam prefabricated concrete large wall plate with grooves at two sides
CN202556554U (en) Reverse-pouring fibrous plaster continuous production equipment
CN108032426A (en) The laminated type preparation method of trough plate
CN203527628U (en) Mould for preparing decorative modules of wall surface and floor surface
CN210238898U (en) Buckle formula exempts from to tear open form floor
CN203755442U (en) Framework structure assembled based on strip-shaped prefabricated concrete large wall plate with grooves at three sides
CN103358395B (en) Reinforced concrete block prefabricating device and using method thereof
CN202850175U (en) Integral type water ditch side moldboard
CN213472275U (en) Insulating tower production line based on vertical heavy vertical tension method
CN205839794U (en) A kind of city integrated piping lane construction mould component truss
CN2459381Y (en) Semi-precasitng waffle slab floor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406