CN103603353A - 振动锤沉桩时防扭转装置 - Google Patents

振动锤沉桩时防扭转装置 Download PDF

Info

Publication number
CN103603353A
CN103603353A CN201310541378.8A CN201310541378A CN103603353A CN 103603353 A CN103603353 A CN 103603353A CN 201310541378 A CN201310541378 A CN 201310541378A CN 103603353 A CN103603353 A CN 103603353A
Authority
CN
China
Prior art keywords
vibratory hammer
pulley
twist device
wire rope
balancing weight
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310541378.8A
Other languages
English (en)
Other versions
CN103603353B (zh
Inventor
黄亮
邓前锋
刘冠梁
查一峰
陆靖
瞿彦忠
王松耀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Foundation Engineering Group Co Ltd
Original Assignee
Shanghai Foundation Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Foundation Engineering Group Co Ltd filed Critical Shanghai Foundation Engineering Group Co Ltd
Priority to CN201310541378.8A priority Critical patent/CN103603353B/zh
Publication of CN103603353A publication Critical patent/CN103603353A/zh
Application granted granted Critical
Publication of CN103603353B publication Critical patent/CN103603353B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及一种振动锤沉桩时防扭转装置,包括钢丝绳、滑轮、配重块。滑轮安装于吊车吊臂上,钢丝绳一端连接振动锤,另一端通过滑轮后与配重块连接,配重块经滑轮与振动锤的两侧相连,连接方式采用钢丝绳。振动锤防扭转装置构造简单,安装方便,一次安装即可永久使用,对吊车的影响也较小。在振动锤起落的过程中,配重平衡始终作用于振动锤的两侧。振动锤在沉桩过程中不发生自转,稳定下沉,减少了振动锤自转导致的钢板桩扭曲变形。

Description

振动锤沉桩时防扭转装置
技术领域
本发明涉及一种振动锤沉桩时防扭转装置,尤其是对钢板桩沉桩时的防扭转装置。
背景技术
水上或者陆地钢板桩工程施工领域常采用振动锤沉桩。振动锤的锤体与桩刚性连接形成一个振动体系。由于振动锤采用偏心轮高速旋转产生振动力的工作原理,在高频锤击时,振动锤自身易产生扭转,进而导致钢板桩受到扭力,使钢板桩在沉桩时发生扭转变形,影响施工质量。
经分析,振动锤与钢板桩之间采用液压钳口连接,可看做为刚性连接,而振动锤与吊车挂钩连接采用钢丝绳连接,振动锤与吊车挂钩之间相对自由。由于振动锤在工作时产生偏心力,由于自身扭转进而引起钢板桩扭转,使钢板桩沉桩时易扭转变形。
发明内容
本发明是要提供一种振动锤沉桩时防扭转装置,用于解决钢板桩沉桩时产生扭转变形的技术问题。
为实现上述目的,本发明的技术方案是:一种振动锤沉桩时防扭转装置,包括钢丝绳、滑轮、配重块,其特点是:滑轮安装于吊车吊臂上,钢丝绳一端连接振动锤,另一端通过滑轮后与配重块连接。
本发明的有益效果是:配重经滑轮与振动锤的两侧相连,连接方式采用钢丝绳。振动锤防扭转装置构造简单,安装方便,一次安装即可永久使用,对吊车的影响也较小。采用本发明装置,限制振动锤自转。在振动锤起落的过程中,配重平衡始终作用于振动锤的两侧。振动锤在沉桩过程中不发生自转,稳定下沉,减少了振动锤自转导致的钢板桩扭曲变形。
附图说明
图1是本发明结构剖视图。
具体实施方式
下面结合附图与实施例对本发明作进一步的说明。
如图1所示,本发明的振动锤防扭转装置,包括钢丝绳1、滑轮2、配重块3。
滑轮2安装于吊车吊臂上,钢丝绳1一端连接振动锤,另一端通过滑轮2后与配重块3连接。在配重块3的平衡下,振动锤的扭转将得到有效控制,减少了钢板桩受振动锤扭转力的影响,从而确保了沉桩质量。
在实施过程中,根据振动锤型号及钢板桩重量选择合理的配重块3,根据吊车把杆的型号、长度及钢板桩的长度调整滑轮2的位置。
本发明应用实施实例
工程位于近海海域,围堰全长520m,由双排钢板桩、围檩拉杆及芯土组成。钢板桩采用WRU26型,最长桩长28.5m,入土22.5m,主要穿越土层为淤泥土及淤泥质粘土。主要施工设备采用船舶、吊车及振动锤等。通过采用本发明的装置,使钢板桩沉桩时减少了扭转变形,施工质量得到有效保证,节约了大量人力、物力和财力,减少了能源与资源的消耗,为工程带来了良好的效益。

Claims (1)

1.一种振动锤沉桩时防扭转装置,包括钢丝绳(1)、滑轮(2)、配重块(3),其特征在于:所述滑轮(2)安装于吊车吊臂上,钢丝绳(1)一端连接振动锤,另一端通过滑轮(2)后与配重块(3)连接。
CN201310541378.8A 2013-11-06 2013-11-06 振动锤沉桩时防扭转装置 Active CN103603353B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310541378.8A CN103603353B (zh) 2013-11-06 2013-11-06 振动锤沉桩时防扭转装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310541378.8A CN103603353B (zh) 2013-11-06 2013-11-06 振动锤沉桩时防扭转装置

Publications (2)

Publication Number Publication Date
CN103603353A true CN103603353A (zh) 2014-02-26
CN103603353B CN103603353B (zh) 2016-03-02

Family

ID=50121608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310541378.8A Active CN103603353B (zh) 2013-11-06 2013-11-06 振动锤沉桩时防扭转装置

Country Status (1)

Country Link
CN (1) CN103603353B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1171758A (ja) * 1997-08-27 1999-03-16 Nippon Steel Corp 岩盤への杭の打ち込み工法
CN201250069Y (zh) * 2008-07-16 2009-06-03 曾祖俊 配重自动平衡吊运机
JP2013060774A (ja) * 2011-09-14 2013-04-04 Ybm Co Ltd 地中杭の引き抜き工法とその装置
CN103132501A (zh) * 2013-03-11 2013-06-05 中联重科股份有限公司 强夯机

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1171758A (ja) * 1997-08-27 1999-03-16 Nippon Steel Corp 岩盤への杭の打ち込み工法
CN201250069Y (zh) * 2008-07-16 2009-06-03 曾祖俊 配重自动平衡吊运机
JP2013060774A (ja) * 2011-09-14 2013-04-04 Ybm Co Ltd 地中杭の引き抜き工法とその装置
CN103132501A (zh) * 2013-03-11 2013-06-05 中联重科股份有限公司 强夯机

Also Published As

Publication number Publication date
CN103603353B (zh) 2016-03-02

Similar Documents

Publication Publication Date Title
Nam et al. Experimental and numerical study on coupled motion responses of a floating crane vessel and a lifted subsea manifold in deep water
CN103558098B (zh) 钢管混凝土柱压扭试验加载装置
Ting Full-scale cyclic dynamic lateral pile responses
CN201636126U (zh) 一种混凝土臂架泵振动抑制的控制装置
CN102877465A (zh) 一种配有钢绞线的管桩钢筋笼
CN106428428A (zh) 一种大抓力型深海锚
CN102141775B (zh) 深海平台系泊系统参激-内共振耦合振动分析与控制方法
CN107725000B (zh) 带火炬臂的海上平台上部组块及其拖航疲劳损伤计算方法
Zhang et al. Response analysis of a lowering operation for a three-bucket jacket foundation for offshore wind turbines
CN103603353B (zh) 振动锤沉桩时防扭转装置
CN104395531A (zh) 组合钢制壁
CN203755278U (zh) 基于调谐质量阻尼器和拉索的自复位海洋平台
CN202492862U (zh) 桩基础斜向动荷载加载试验装置
CN208415121U (zh) 一种道路桥梁裂缝加固结构
CN205035785U (zh) 一种具有助压强夯机夯头
CN209099285U (zh) 码头浮箱定位装置
CN201712770U (zh) 深水土工布铺设船
Li et al. Modeling and simulation of active-controlled heave compensation system of deep-sea mining based on dynamic vibration absorber
CN203768952U (zh) 一种检测基桩质量的应力波多点激振装置
CN102535531A (zh) 一种桩基础斜向动荷载加载试验装置
CN102587375B (zh) 海上潮间带单管桩液压冲击沉桩溜桩预防工艺
CN201420265Y (zh) 一种隔水导管上部打桩防斜装置
CN206928263U (zh) 一种抽水蓄能电站坝坡加固结构
CN206174180U (zh) 一种垂度阻尼索
CN111368483A (zh) 一种基于有限元强度折减法的支护结构边坡稳定评价方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant