CN102141775B - 深海平台系泊系统参激-内共振耦合振动分析与控制方法 - Google Patents

深海平台系泊系统参激-内共振耦合振动分析与控制方法 Download PDF

Info

Publication number
CN102141775B
CN102141775B CN2011100271071A CN201110027107A CN102141775B CN 102141775 B CN102141775 B CN 102141775B CN 2011100271071 A CN2011100271071 A CN 2011100271071A CN 201110027107 A CN201110027107 A CN 201110027107A CN 102141775 B CN102141775 B CN 102141775B
Authority
CN
China
Prior art keywords
platform
internal resonance
analysis
parametric excitation
ginseng
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011100271071A
Other languages
English (en)
Other versions
CN102141775A (zh
Inventor
唐友刚
沈文君
张若瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN2011100271071A priority Critical patent/CN102141775B/zh
Publication of CN102141775A publication Critical patent/CN102141775A/zh
Application granted granted Critical
Publication of CN102141775B publication Critical patent/CN102141775B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明公开了深海平台系泊系统参激-内共振耦合振动分析与控制方法,它包括以下步骤:(1)对平台和缆绳进行静力分析,确定平台的固有振动特性;(2)将静力分析的计算结果作为动力分析的条件,分析不同波高和波浪频率对平台和系泊耦合系统动力学特性的影响,计算平台的参激-内共振耦合运动幅值随时间的变化;(3)对于发生参激-内共振耦合运动状态,则调整硬仓和软舱的压载系统,改变平台主体的重心位置和浮心位置以调整平台垂荡、纵摇固有频率之比,使平台主体纵摇运动得到抑制。应用本方法对于可能出现的参激-内共振运动失稳情况,改变平台重心和浮心位置,破坏发生参激-内共振的动力学条件,使平台的参激-内共振运动得到控制。

Description

深海平台系泊系统参激-内共振耦合振动分析与控制方法
技术领域
本发明涉及深海平台参激-内共振耦合振动分析方法与控制技术,具体涉及深海平台系泊系统参激-内共振耦合振动分析程序及振动控制技术。
背景技术
1000米以上的深水海域,采用经典SPAR平台或者桁架式SPAR平台进行石油开采,而平台系泊系统采用钢缆或者聚酯缆。近年来的国外实验和工程实际结果表明,由于该种平台结构形式的特点,平台垂荡和纵摇模态成2∶1内共振关系,当平台主体垂荡运动幅值加大时,引起平台纵摇运动失稳进入大幅混沌运动状态,这称之为参激-内共振耦合运动。
统计表明,Spar平台的纵荡和横荡固有周期一般在150~350s,纵摇和横摇固有周期一般在40~80s,垂荡固有周期大约为25~40s,并且垂荡和纵摇之间固有频率满足2∶1的模态内共振关系。当波浪载荷频率接近垂荡固有频率时,激起大幅垂荡共振运动,当波浪激励幅值超过临界值时,垂荡能量转移到纵摇,导致平台纵摇运动失去稳定性并且纵摇剧烈,在墨西哥湾作业的Spar平台,其垂荡和纵摇固有频率大约分别为2∶1,观察到了长周期波浪时,平台垂荡和纵摇模态之间的相互作用以及运动失稳后的剧烈运动现象。
深海SPAR平台的参激-内共振耦合运动特性严重威胁平台运行的安全,引起平台主体运动剧烈,系泊线动张力突变和采油立管的大幅摆动,导致系泊线和立管的疲劳破坏,减小系泊线和立管的寿命。
发明内容
本发明的目的在于克服现有技术的不足,提供深海平台系泊系统参激-内共振耦合振动分析与控制方法,采用本方法可以识别平台是否发生参激-内共振,并且对参激-内共振引起的大幅纵摇运动进行控制,确保深海平台的作业安全。
本发明的深海平台系泊系统参激-内共振耦合振动分析与控制方法,它包括以下步骤:
(1)对平台和缆绳进行静力分析,确定平台的固有振动特性;
(2)将静力分析的计算结果作为动力分析的条件,分析不同波高和波浪频率对平台和系泊耦合系统动力学特性的影响,计算平台的参激-内共振耦合运动幅值随时间的变化,判断平台是否发生参激-内共振;
(3)对于发生参激-内共振耦合运动状态,则调整硬仓和软舱的压载水与压缩空气,改变平台主体的重心位置和浮心位置以调整平台垂荡、纵摇固有频率之比,使平台主体纵摇运动得到抑制;
(4)重复所述的步骤(1)至步骤(3),直至平台运动趋于安全。
本发明的突出优点是:
应用本发明方法,对不同形式的深海SPAR平台,考虑不同的海洋环境载荷,进行数值分析模拟,可以识别平台是否发生参激-内共振,确定以及发现发生参激-内共振的条件。这在设计阶段可以发挥作用,指导平台的设计。
对于波浪中作业的深海平台,可以由平台监测系统随时采集平台运动响应数据,预报平台是否处于参激-内共振状态,平台运动在当前波浪条件下是否失稳,是否出现大幅运动。
对于可能出现的参激-内共振运动失稳情况,计算机系统分析确定调整平台压载与平台吃水参数,改变平台重心和浮心位置,破坏发生参激-内共振的动力学条件,使平台的参激-内共振运动得到控制,减小运动幅值,这可以指导现场平台的作业安全。
附图说明
图1为本发明的深海平台系泊系统参激-内共振耦合振动分析与控制方法的参激-耦合运动分析流程图;
图2为本发明的深海平台系泊系统参激-内共振耦合振动分析与控制方法中调整压载和吃水,改变平台的重心和浮心的方法。
具体实施方式
下面结合具体的实施例,并参照附图,对本发明技术做进一步的说明:
本发明实施包括以下步骤:(1)对平台和系泊系统进行静力分析,确定平台固有振动特性;(2)将静力分析的计算结果作为动力分析的条件,分析不同波高和波浪频率对平台和系泊耦合系统动力学特性的影响,计算平台的参激-内共振耦合运动幅值随时间的变化(现场垂荡-纵摇运动数据可由计算机监测系统得到),判断平台是否发生参激-内共振;(3)对于发生参激-内共振耦合运动状态,则调整硬仓和软舱的压载系统,改变平台主体的重心位置和浮心位置以调整平台垂荡、纵摇固有频率之比,使平台主体纵摇运动得到抑制。(4)重复所述的步骤(1)至步骤(3),直至平台运动趋于安全。
下面结合图1和图2举一具体实施例对本发明方法加以详细说明:
静力分析包括:将系泊缆绳参数和平台主体参数以及缆绳划分方式输入静力分析模块,步骤101;然后在无波浪力状况下计算平台的静平衡位置、系缆静态预张力、水平向系泊刚度以及系缆静态构型,步骤102;施加波浪载荷之前,进行平台自振特性分析,步骤103;
动力分析包括:将环境参数包括波浪固有频率和波高输入动力分析模块,步骤201;根据步骤201中的环境参数进行载荷计算,得出系缆重力与浮力、系缆附加质量力、系缆粘性阻尼力和系缆海底接触力,以及主体静水恢复力、主体一阶波浪力、主体一阶辐射力和主体二阶纵荡力,步骤202;再将步骤102中的系缆静态构型与系缆静态预张力作为动力计算的初始条件,进行参激-内共振分析,步骤203,得出平台主体与缆绳各个质点的运动响应以及不同位置处缆绳张力的变化情况,步骤204;
根据步骤203的参激-内共振分析结果确定发生参激内共振时,如图2所示计算机输出信号给平台空气压缩系统,若需要降低重心,向硬仓空气压缩系统电磁阀发出信号,注入压缩空气到硬仓,则硬仓压载水减少,同时降低软舱空气压力,向软舱注入压载水,则平台主体重心可降低。如果需要提高平台主体重心,则进行相反方向操作(如图2所示)。改变重心和稳性半径后,启动图1参激-内共振耦合振动分析程序,检测参激-内共振耦合运动响应。
其中步骤101中的系泊缆绳参数为缆绳的直径、弹性模量和长度;平台主体参数为平台重心位置、平台的
Figure GDA0000133545130000041
(重心到稳心)值、吃水以及排水量;缆绳划分方式为缆绳划分的网格数(在程序计算中可任意修改)。
本方法中的所有参数的计算均采用现有公式和现有方法,可以依据下面的参考文献:
1、董艳秋.深海采油平台波浪载荷及响应[M],天津大学出版社,2005.
2、W.Raman-Nair,R.E.Baddour.Three-dimensional dynamics of a flexible marine riserundergoing large elastic deformations[J],Multibody system dynamics,2003,10:393-423.(三维柔性海洋立管在大弹性变形下的动力学特性)

Claims (1)

1.深海平台系泊系统参激-内共振耦合振动分析与控制方法,其特征在于它包括以下步骤:
(1)对平台和缆绳进行静力分析,确定平台的固有振动特性;
(2)将静力分析的计算结果作为动力分析的条件,分析不同波高和波浪频率对平台和系泊耦合系统动力学特性的影响,计算平台的参激-内共振耦合运动幅值随时间的变化,判断平台是否发生参激-内共振;
(3)对于发生参激-内共振耦合运动状态,则调整硬仓和软舱的压载水与压缩空气,改变平台主体的重心位置和浮心位置以调整平台垂荡、纵摇固有频率之比,使平台主体纵摇运动得到抑制;
(4)重复所述的步骤(1)至步骤(3),直至平台运动趋于安全。
CN2011100271071A 2011-01-25 2011-01-25 深海平台系泊系统参激-内共振耦合振动分析与控制方法 Expired - Fee Related CN102141775B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011100271071A CN102141775B (zh) 2011-01-25 2011-01-25 深海平台系泊系统参激-内共振耦合振动分析与控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011100271071A CN102141775B (zh) 2011-01-25 2011-01-25 深海平台系泊系统参激-内共振耦合振动分析与控制方法

Publications (2)

Publication Number Publication Date
CN102141775A CN102141775A (zh) 2011-08-03
CN102141775B true CN102141775B (zh) 2012-07-04

Family

ID=44409359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011100271071A Expired - Fee Related CN102141775B (zh) 2011-01-25 2011-01-25 深海平台系泊系统参激-内共振耦合振动分析与控制方法

Country Status (1)

Country Link
CN (1) CN102141775B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102433867B (zh) * 2011-10-20 2014-11-26 中国科学院力学研究所 深水半潜式钻井平台或采油平台设计方法
CN103278304B (zh) * 2013-06-17 2017-02-15 清华大学 海工振动台装置
CN103353382A (zh) * 2013-07-10 2013-10-16 天津大学 一种深海顶张力立管参激-涡激联合振动疲劳分析方法
CN106547957B (zh) * 2016-10-19 2019-07-26 天津大学 一种旋转环状周期结构参激弹性振动分析方法
CN109163757B (zh) * 2018-08-29 2020-08-04 中国船舶科学研究中心(中国船舶重工集团公司第七0二研究所) 缆索系泊类结构多物理场耦合作用测试装置及其试验方法
CN113266523B (zh) * 2021-04-25 2022-05-03 明阳智慧能源集团股份公司 漂浮式双叶轮风电机组波浪扰动的前馈控制方法与系统
CN117875217B (zh) * 2024-02-04 2024-07-19 安徽省水利水电勘测设计研究总院股份有限公司 CT-Spar平台及其系泊与立管工作系统优化分析方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0256177A1 (en) * 1986-08-07 1988-02-24 Fluor Corporation Spar buoy construction having production and oil storage facilities and method of operation
CN101261177A (zh) * 2008-04-24 2008-09-10 上海交通大学 主动式海洋平台混合模型试验的实现方法
US20090274521A1 (en) * 2008-05-01 2009-11-05 Donald Wayne Allen Systems and methods for selection of suppression devices
CN101710242A (zh) * 2009-12-07 2010-05-19 天津大学 深海平台系泊线监控方法

Also Published As

Publication number Publication date
CN102141775A (zh) 2011-08-03

Similar Documents

Publication Publication Date Title
CN102141775B (zh) 深海平台系泊系统参激-内共振耦合振动分析与控制方法
Karimirad et al. A simplified method for coupled analysis of floating offshore wind turbines
CN103708004B (zh) 减摇装置、浮动基础和海上风力发电机
CN103402865B (zh) 一种环形浮体及消除浮体升沉运动的方法
CN203652079U (zh) 减摇装置、浮动基础和海上风力发电机
JP2017505394A (ja) 上下動ブイポイントアブソーバ
CN201636126U (zh) 一种混凝土臂架泵振动抑制的控制装置
CN103353382A (zh) 一种深海顶张力立管参激-涡激联合振动疲劳分析方法
Ye et al. Joint estimation of vessel position and mooring stiffness during offshore crane operations
CN109163898A (zh) 一种模拟船用旋转机械摇摆性的试验装置及方法
CN101391648A (zh) 单自由度可调振幅平台
CN108946517A (zh) 一种主动升沉补偿起重机的试验方法
CN102445318A (zh) 一种顶张式立管顺流向振动分析方法
Oyejobi et al. Stochastic response of intact and a removed tendon tension leg platform to random wave and current forces
CN104033533B (zh) 一种抑制浮式平台整体运动的蛇形调谐液柱阻尼器
CN105443634A (zh) 一种具有调谐、碰撞双重作用的盆式颗粒减振器
Sun et al. RESPONSE CHARACTERISTIC ANALYSIS OF NONLINEAR VORTEX-INDUCED VIBRATION OF TENSION LEG PLATFORM IN DEEP SEA.
CN106096288A (zh) 吸力式贯入板锚的安全评估及预警方法
US20120263543A1 (en) Fully Constraint Platform in Deepwater
CN106802978A (zh) 一种自升式钻井平台环境图谱绘制方法
Wang et al. Experimental and numerical research on the wet-towing of wide-shallow bucket jacket foundation for offshore substation
CN114809765B (zh) 液位可调节的调谐液柱阻尼器和塔筒
Li et al. Modeling and simulation of active-controlled heave compensation system of deep-sea mining based on dynamic vibration absorber
Deng et al. Impact evaluation of internal solitary waves on a drilling riser
CN102433867B (zh) 深水半潜式钻井平台或采油平台设计方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120704

Termination date: 20130125

CF01 Termination of patent right due to non-payment of annual fee