CN103590594A CN201310565024.7A CN201310565024A CN103590594A CN 103590594 A CN103590594 A CN 103590594A CN 201310565024 A CN201310565024 A CN 201310565024A CN 103590594 A CN103590594 A CN 103590594A
Authority
CN
China
Prior art keywords
packway
berm
force bearing
bearing component
installing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310565024.7A
Other languages
Chinese (zh)
Other versions
CN103590594B (en
Inventor
韩志安
周元
邓铁
黄珊
梅红
徐旋
席桢
张雨
龙辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Hongyun Hangxiao Green Construction Technology Co., Ltd.
Original Assignee
Steel Work Co Ltd Of Sichuan Sinorael
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Steel Work Co Ltd Of Sichuan Sinorael filed Critical Steel Work Co Ltd Of Sichuan Sinorael
Priority to CN201310565024.7A priority Critical patent/CN103590594B/en
Publication of CN103590594A publication Critical patent/CN103590594A/en
Application granted granted Critical
Publication of CN103590594B publication Critical patent/CN103590594B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses an assembly type berm, and relates to the field of steel structures. The berm comprises a road surface plate and further comprises a main force bearing component, an auxiliary force bearing component and a connecting piece, wherein the main force bearing component and the auxiliary force bearing component are connected through the connecting piece, a berm installing part is arranged on the main force bearing component and comprises a hoop and a U-type hoop which are fixed through screwed connection, and the main force bearing component is placed in a U-type groove in the U-type hoop in an installation mode. An original traditional welding installation mode is abandoned, the berm is formed in an assembled mode, influence caused by construction on the finished product is reduced, moreover, an installing worker only needs to directly install component materials in needed places, the assembly type berm is easier and more convenient to use for the installing worker, construction operation procedures are reduced, installing accuracy is high, and installing cost is low.

Description

A kind of assembling packway
Technical field
The present invention relates to field of steel structure, be specifically related to a kind of assembling berm structure.
Background technology
Generally at large-scale performance site as sports palace, cinema etc., in order to facilitate staff that the ancillary facilities such as light, sound equipment, stage machinery are set, the aisle in high-altitude walking and work for staff is set, this aisle is just called packway.
Packway adopts solder technology more at present, and after especially long-span roofing structure completes, when packway is installed, welding position is too high, is welded with difficulty.Also larger on impact around when carrying out weld job, the protection of finished product is also had a certain impact.
Summary of the invention
For above-mentioned prior art, the object of the present invention is to provide a kind of without welding assembling packway, with avoid overhead welding inconvenience and on the performance of packway material own and the impact on surrounding environment.
Solve the problems of the technologies described above in order to achieve the above object, the present invention adopts following technical scheme:
A packway, comprises road surface sheet material, it is characterized in that, also comprises main stress member, inferior primary structure member and connector, and described main stress member is connected through connector with time primary structure member; On described main stress member, dispose packway installed part, this packway installed part comprises anchor ear and U-shaped hoop, and anchor ear is fixing through being threaded with U-shaped hoop; Main stress member is installed and is placed in the U-shaped groove of U-shaped hoop.
Described main stress member is that packway girder, inferior primary structure member are packway secondary beam; The packway secondary beam link slot that described connector is integrated with packway girder on packway girder for processing.
Further, described road surface sheet material is checkered steel plate, and described checkered steel plate is fixed on time primary structure member through self threading pin.
Compared with prior art, the present invention has following beneficial effect:
One, the present invention has abandoned original traditional welded and installed mode, in assembling mode, forms, and has lowered the impact that construction brings finished product.
Two, the present invention is specially adapted to the situation of on some completed building, packway being installed, and construction material is directly installed in desired location, concerning installer, easier, reduced construction operation program, installation accuracy is higher, reduce cost, improved reliability.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present invention;
Fig. 2 is the connected node schematic diagram of assembling packway and original structure steel pipe;
Fig. 3 is the connected node schematic diagram of anchor ear and original structure steel pipe;
Fig. 4 is the connection diagram of packway girder and packway secondary beam;
The sectional view that Fig. 5 assembling packway is connected with original structure;
Reference numeral: 1 is that original structure steel pipe, 2 is that anchor ear, 3 is that packway girder, 4 is that packway secondary beam, 5 is that U-shaped hoop, 6 is that screw rod latch, 7 is bolt.
The specific embodiment
Below in conjunction with the drawings and the specific embodiments, the invention will be further described.
Original structure mentioned in this article refers to keel shoe reserved on building, and this keel shoe consists of steel pipe, is original structure steel pipe.
As shown in Figure 1, a kind of assembling packway, comprises road surface sheet material, it is characterized in that, also comprises main stress member, inferior primary structure member and connector, and described main stress member is connected through connector with time primary structure member; On described main stress member, dispose packway installed part, this packway installed part comprises anchor ear and U-shaped hoop, and anchor ear is fixing through being threaded with U-shaped hoop; Main stress member is installed and is placed in the U-shaped groove of U-shaped hoop.
When the present invention specifically implements, mainly comprise the following steps:
1, first make an anchor ear matching with original structure steel pipe, anchor ear is connected with original structure steel pipe by bolt.
2, will on described basis, with a U-shaped hoop, be connected with anchor ear above, U-shaped hoop be rotary hinged state being connected of anchor ear.
3, the groove the inside that again packway girder is placed on to U-shaped hoop, also arranges a packway secondary beam link slot above packway girder, can facilitate packway secondary beam to be connected with it.
4, then packway secondary beam is interconnected by this device and packway girder, and packway girder and packway secondary beam are in same plane.
5, finally the road slab shaped material of packway is placed in the plane that primary and secondary beam surrounds, by self threading pin, the ground surface material of packway is fixed on packway steel frame.
Described anchor ear is special to be formed, and its size matches with original structure steel pipe, and anchor ear is held fixedly original structure steel pipe tightly.On this anchor ear, be welded with in advance round steel, the round steel silk thread mouth of having got on the bus, the U-shaped trench bottom of U-shaped hoop open with round steel on the screw of threaded engagement, anchor ear is flexibly connected with described U-shaped hoop through the threaded round steel of this car.
Embodiment
As Figure 1-5, anchor ear 2 is to be bolted to hold fixedly original structure steel pipe tightly, welds a diameter and be 20 round steel on anchor ear 2, the get on the bus silk mouthful of 20mm of round steel.Rotate anchor ear, anchor ear is connected with U-shaped hoop 5 by the silk mouthful on screw rod latch 6.Described packway girder 3 is placed in the U-shaped groove of U-shaped hoop 5, and several connectors are set on packway girder 3, and packway secondary beam 4 two ends are provided with groove, and connector connects with packway secondary beam 4 insertion slot types.The ground surface material of packway is that checkered steel plate is laid on packway secondary beam 4 and by self threading pin checkered steel plate is fixed on packway secondary beam 4.

Claims (3)

1. an assembling packway, comprises road surface sheet material, it is characterized in that, also comprises main stress member, inferior primary structure member and connector, and described main stress member is connected through connector with time primary structure member; On described main stress member, dispose packway installed part, this packway installed part comprises anchor ear and U-shaped hoop, and anchor ear is fixing through being threaded with U-shaped hoop; Main stress member is installed and is placed in the U-shaped groove of U-shaped hoop.
2. assembling packway according to claim 1, is characterized in that, described main stress member is that packway girder, inferior primary structure member are packway secondary beam; The packway secondary beam link slot that described connector is integrated with packway girder on packway girder for processing.
3. assembling packway according to claim 1, is characterized in that, described road surface sheet material is checkered steel plate, and described checkered steel plate is fixed on time primary structure member through self threading pin.
CN201310565024.7A 2013-11-14 2013-11-14 A kind of assembling packway Active CN103590594B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310565024.7A CN103590594B (en) 2013-11-14 2013-11-14 A kind of assembling packway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310565024.7A CN103590594B (en) 2013-11-14 2013-11-14 A kind of assembling packway

Publications (2)

Publication Number Publication Date
CN103590594A true CN103590594A (en) 2014-02-19
CN103590594B CN103590594B (en) 2015-12-16

Family

ID=50080894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310565024.7A Active CN103590594B (en) 2013-11-14 2013-11-14 A kind of assembling packway

Country Status (1)

Country Link
CN (1) CN103590594B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09125690A (en) * 1995-11-02 1997-05-13 Japan Steels Internatl Kk Built-up type temporary passage
CN201109992Y (en) * 2007-09-13 2008-09-03 江苏通州四建集团有限公司 Self-locking type building scaffold fastener
CN101280626A (en) * 2008-01-14 2008-10-08 重庆第三建设有限责任公司 Quick assembled type platform
CN201221193Y (en) * 2008-06-17 2009-04-15 北京城建集团有限责任公司 High altitude packway ceiling construction operating platform
CN202954552U (en) * 2012-11-19 2013-05-29 广州机施建设集团有限公司 Steel tube concrete column high-altitude construction safety protection system
CN203583855U (en) * 2013-11-14 2014-05-07 四川华铁钢结构有限公司 Assembled riding track

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09125690A (en) * 1995-11-02 1997-05-13 Japan Steels Internatl Kk Built-up type temporary passage
CN201109992Y (en) * 2007-09-13 2008-09-03 江苏通州四建集团有限公司 Self-locking type building scaffold fastener
CN101280626A (en) * 2008-01-14 2008-10-08 重庆第三建设有限责任公司 Quick assembled type platform
CN201221193Y (en) * 2008-06-17 2009-04-15 北京城建集团有限责任公司 High altitude packway ceiling construction operating platform
CN202954552U (en) * 2012-11-19 2013-05-29 广州机施建设集团有限公司 Steel tube concrete column high-altitude construction safety protection system
CN203583855U (en) * 2013-11-14 2014-05-07 四川华铁钢结构有限公司 Assembled riding track

Also Published As

Publication number Publication date
CN103590594B (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN204754274U (en) Transmission line concrete pole reinforcing apparatus
CN203639005U (en) Reinforcing device of tower crane
CN203799586U (en) Signboard mounting support for power transmission line steel tube tower
CN103114733B (en) Rectangular steel pipe concrete column steel beam lower bolt upper welding outer rib annular plate node construction method
CN103615051A (en) U-shaped-hoop joint connector of main beam and auxiliary beam of recombinant-bamboo frame
CN203613817U (en) Base device for steel-structured safety protection fence
CN203583855U (en) Assembled riding track
CN202899301U (en) Hold hoop device for jacking steel pipe concrete
CN202474717U (en) Snakelike pavement work well for high-voltage cable
CN102011432B (en) Novel polygonal combined steel pipe
CN103590594A (en) Assembly type berm
KR20140127542A (en) Portable apparatus for equipping tower of wind turbine
CN105672677A (en) Support tool used for fabricated building wallboard installation and use method of support tool
CN204089082U (en) Lighting proof strip device
CN105804418A (en) Prefabricated wallboard fixed supporting system and construction method
KR102281205B1 (en) Extension arm and construction method of transmission tower
CN103618253B (en) Iron tower operation turns to combination unit
CN203715127U (en) General safety rod system for tower crane attaching device
CN203475315U (en) Shear pin type bracket support
CN202165696U (en) Cable bridge fixing support clamping device of joist steel
CN202181614U (en) Steel pipe fixing device for joist steel
CN201713933U (en) Trench cover plate
CN203362741U (en) Pipe fastening connection assembly
CN103292037B (en) A kind of composite cable bridge-rack trailing arm
KR101536707B1 (en) pole of streetlamp having frame and control board devided and attached to both surface of the frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190626

Address after: 415137 Longtian Road, West Dongting Biotechnology Park, Changde National High-tech Industrial Development Zone, Hunan Province (east of Yuanli Avenue)

Patentee after: Hunan Hongyun Hangxiao Green Construction Technology Co., Ltd.

Address before: 610041 No. 806, 8th floor, No. 150 Tianyun Road, Chengdu High-tech Zone, Sichuan Province

Patentee before: Steel work Co., Ltd of Sichuan Sinorael