CN103572767A - 1000千伏变电站场平排水盲沟的处理方法 - Google Patents
1000千伏变电站场平排水盲沟的处理方法 Download PDFInfo
- Publication number
- CN103572767A CN103572767A CN201310585442.2A CN201310585442A CN103572767A CN 103572767 A CN103572767 A CN 103572767A CN 201310585442 A CN201310585442 A CN 201310585442A CN 103572767 A CN103572767 A CN 103572767A
- Authority
- CN
- China
- Prior art keywords
- thick
- groove
- stone
- geotextile
- meter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
本发明涉及一种1000千伏变电站场平排水盲沟的处理方法,包括以下步骤:步骤S01:在冲沟处挖一条宽2米、深1米的沟槽,所述沟槽的底面为自然地面;步骤S02:在沟槽铺一层土工织物,以阻止泥浆杂物进入盲沟;步骤S03:在土工织物上先铺一层0.2米厚的厚软石或碎石,再在厚软石或碎石层上铺一层0.6米厚的厚块石,最后再在所述厚块石层上铺一层0.2米厚的厚软石或碎石;步骤S04:将沟槽的土工织物把所述步骤S03铺的三层石料包裹起来,以形成2米宽、1米厚的排水盲沟;步骤S05:在盲沟四周回填土方,再进行夯实。本发明有效解决了站内无法开挖明沟的矛盾,利用土工织物包裹、石料分层填满、回填土强夯等工序形成的排水盲沟能有效起到站内地下水排水作用。
Description
技术领域
本发明涉及1000千伏变电站场平排水盲沟的处理方法。
背景技术
在我国降水充沛的地区,变电站场地设计标高为752.2米,为使冲沟、洼地达到设计标高,必须对冲沟、洼地进行强夯回填,在冲沟处设置盲沟以便使地面水流向洼地直至排出站外。现有1000千伏特高压变电站场平排水盲沟在规划设置、现场施工处理技术难度上都比较难,而常规的明沟(渠)不能满足1000千伏特高压变电站场平施工需要,必须设置盲沟排除站内地下水。
发明内容
本发明的目的是提供一种1000千伏变电站场平排水盲沟的处理方法,有利变电站场的排水。
本发明采用以下方案实现:一种1000千伏变电站场平排水盲沟的处理方法,其特征在于包括以下步骤:
步骤S01:在冲沟处挖一条宽2米、深1米的沟槽,所述沟槽的底面为自然地面;
步骤S02:在沟槽铺一层土工织物,以阻止泥浆杂物进入盲沟;
步骤S03:在土工织物上先铺一层0.2米厚的厚软石或碎石,再在厚软石或碎石层上铺一层0.6米厚的厚块石,最后再在所述厚块石层上铺一层0.2米厚的厚软石或碎石;
步骤S04:将沟槽的土工织物把所述步骤S03铺的三层石料包裹起来,以形成2米宽、1米厚的排水盲沟;
步骤S05:在盲沟四周回填土方,再进行夯实,直至设计标高,形成完整的地下排水盲沟。
在本发明一实施例中,所述厚软石或碎石的粒径为4cm~10cm。
在本发明一实施例中,所述厚块石的粒径在20cm~40cm。
本发明的特高压变电站场平排水盲沟有效解决了站内无法开挖明沟(渠)的矛盾,利用土工织物包裹、石料分层填满、回填土强夯等工序形成的排水盲沟能有效起到站内地下水排水作用。
附图说明
图1是本发明流程示意图。
图2是本发明结构示意图。
具体实施方式
下面结合附图及实施例对本发明做进一步说明。
如图1和图2所示,本发明提供一种 1000千伏变电站场平排水盲沟的处理方法,其特征在于包括以下步骤:
步骤S01:在冲沟处挖一条宽2米、深1米的沟槽,所述沟槽的底面为自然地面1;
步骤S02:在沟槽铺一层土工织物2,以阻止泥浆杂物进入盲沟;
步骤S03:在土工织物上先铺一层0.2米厚的厚软石或碎石3,再在厚软石或碎石层上铺一层0.6米厚的厚块石4,最后再在所述厚块石层上铺一层0.2米厚的厚软石或碎石5;
步骤S04:将沟槽的土工织物把所述步骤S03铺的三层石料包裹起来,以形成2米宽、1米厚的排水盲沟;
步骤S05:在盲沟四周回填土方,再进行夯实,直至设计标高,形成完整的地下排水盲沟。
上述厚软石或碎石的粒径为4cm~10cm。厚块石的粒径在20cm~40cm。
以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所做的均等变化与修饰,皆应属本发明的涵盖范围。
Claims (3)
1.一种1000千伏变电站场平排水盲沟的处理方法,其特征在于包括以下步骤:
步骤S01:在冲沟处挖一条宽2米、深1米的沟槽,所述沟槽的底面为自然地面;
步骤S02:在沟槽铺一层土工织物,以阻止泥浆杂物进入盲沟;
步骤S03:在土工织物上先铺一层0.2米厚的厚软石或碎石,再在厚软石或碎石层上铺一层0.6米厚的厚块石,最后再在所述厚块石层上铺一层0.2米厚的厚软石或碎石;
步骤S04:将沟槽的土工织物把所述步骤S03铺的三层石料包裹起来,以形成2米宽、1米厚的排水盲沟;
步骤S05:在盲沟四周回填土方,再进行夯实,直至设计标高,形成完整的地下排水盲沟。
2.根据权利要求1所述的1000千伏变电站场平排水盲沟的处理方法,其特征在于:所述厚软石或碎石的粒径为4cm~10cm。
3.根据权利要求1所述的1000千伏变电站场平排水盲沟的处理方法,其特征在于:所述厚块石的粒径在20cm~40cm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310585442.2A CN103572767A (zh) | 2013-11-21 | 2013-11-21 | 1000千伏变电站场平排水盲沟的处理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310585442.2A CN103572767A (zh) | 2013-11-21 | 2013-11-21 | 1000千伏变电站场平排水盲沟的处理方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103572767A true CN103572767A (zh) | 2014-02-12 |
Family
ID=50045424
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310585442.2A Pending CN103572767A (zh) | 2013-11-21 | 2013-11-21 | 1000千伏变电站场平排水盲沟的处理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103572767A (zh) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030047502A1 (en) * | 2001-09-10 | 2003-03-13 | Roberts R. Lee | Underdrain system |
CN102852151A (zh) * | 2012-08-28 | 2013-01-02 | 国家电网公司 | 一种输电线路排水沟 |
CN203007995U (zh) * | 2013-01-06 | 2013-06-19 | 郑新海 | 地下室底板下盲沟 |
-
2013
- 2013-11-21 CN CN201310585442.2A patent/CN103572767A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030047502A1 (en) * | 2001-09-10 | 2003-03-13 | Roberts R. Lee | Underdrain system |
CN102852151A (zh) * | 2012-08-28 | 2013-01-02 | 国家电网公司 | 一种输电线路排水沟 |
CN203007995U (zh) * | 2013-01-06 | 2013-06-19 | 郑新海 | 地下室底板下盲沟 |
Non-Patent Citations (4)
Title |
---|
冯焕生: "京石公路北京段三期工程及其若干技术措施", 《中国公路学报》, vol. 6, no. 4, 31 December 1993 (1993-12-31), pages 33 - 38 * |
王万朵: "浅谈路基软土地基的几种处理方法", 《路桥工程》, no. 8, 20 March 2013 (2013-03-20), pages 195 * |
罗廷赤: "土工合成材料在古王高速公路地下排水中的应用", 《岩土工程界》, vol. 9, no. 10, 31 October 2006 (2006-10-31), pages 71 - 72 * |
袁鸿钧: "清远市公路软土处理方法及效果分析", 《科技信息》, no. 17, 30 June 2011 (2011-06-30), pages 774 - 775 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104818721B (zh) | 一种适用于陡壁深坑型废弃矿山地质环境治理方法 | |
CN105569058A (zh) | 一种膨胀土路堑结构及其施工方法 | |
CN103882884A (zh) | 一种锚索土工格栅支挡结构及其施工方法 | |
CN103911996B (zh) | 临近既有建筑物钢板桩拔除施工方法 | |
CN113445396B (zh) | 一种高液限土路段的高填土路基填筑施工方法 | |
CN105544576A (zh) | 一种基坑降排水开挖结构及应用方法 | |
CN102926378A (zh) | 导电复合真空软土加固预压方法 | |
CN105887606A (zh) | 高寒冻土区深路堑保温渗水复合式暗沟及其施工方法 | |
CN110777819A (zh) | 一种高陡矿山山体再造生态修复方法 | |
CN105220590A (zh) | 多溶洞塌陷路基注浆处理法 | |
CN104074166A (zh) | 一种恢复干枯河流的方法 | |
CN205399440U (zh) | 一种膨胀土路堑结构 | |
CN104929141B (zh) | 市政道路穿越河塘或沟渠的施工方法 | |
CN102425175B (zh) | 山区大型弃碴场加固防护构造 | |
CN106013178A (zh) | 一种浅埋型岩溶地区岩溶地面塌陷的充填方法 | |
CN103276717B (zh) | 复合土工合成材料加筋垫层处理软土地基的方法 | |
CN106761914B (zh) | 一种浅埋煤层矿井沟道洪水溃水水害防治方法 | |
CN105297572A (zh) | 一种多年冻土填方施工方法 | |
CN108000699A (zh) | 一种城市透水型雨水管道及其制备工艺 | |
CN205775687U (zh) | 高寒冻土区深路堑保温渗水复合式暗沟 | |
CN106930358A (zh) | 一种城市道路绿化带lid生物滞留沟 | |
CN206204970U (zh) | 一种高填方地基排水盲沟 | |
CN111424685A (zh) | 一种大型岩溶洼地内回填地基深部落水洞处理结构及方法 | |
CN204225069U (zh) | 护岸工程不良地质浅层地下排水系统 | |
CN209412838U (zh) | 一种膨胀土路堑边坡结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140212 |