CN103557800B - 多层楼板分层水平位移监测方法 - Google Patents
多层楼板分层水平位移监测方法 Download PDFInfo
- Publication number
- CN103557800B CN103557800B CN201310555142.XA CN201310555142A CN103557800B CN 103557800 B CN103557800 B CN 103557800B CN 201310555142 A CN201310555142 A CN 201310555142A CN 103557800 B CN103557800 B CN 103557800B
- Authority
- CN
- China
- Prior art keywords
- floor
- horizontal displacement
- digital display
- forced centering
- display light
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 39
- 238000006073 displacement reaction Methods 0.000 title claims abstract description 37
- 238000000034 method Methods 0.000 title claims abstract description 25
- 238000009428 plumbing Methods 0.000 claims abstract description 20
- 241001269238 Data Species 0.000 claims abstract description 8
- 238000005259 measurement Methods 0.000 claims description 8
- 238000010276 construction Methods 0.000 claims description 5
- 238000012360 testing method Methods 0.000 claims description 4
- 208000015181 infectious disease Diseases 0.000 claims description 3
- 230000003068 static effect Effects 0.000 claims description 3
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 5
- 238000009825 accumulation Methods 0.000 description 2
- 230000001186 cumulative effect Effects 0.000 description 2
- 238000000691 measurement method Methods 0.000 description 2
- 238000003556 assay Methods 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Position Fixing By Use Of Radio Waves (AREA)
- Length Measuring Devices By Optical Means (AREA)
Abstract
本发明公开了一种多层楼板分层水平位移监测方法,包括如下步骤:在首层楼板上安装强制对中装置;调整各数显光靶的位置使其外轮廓平行于建筑轴线,将各数显光靶分别固定到各层待测楼板上;在强制对中的水平位移控制观测墩上架设全站仪;全站仪测取各强制对中装置的中心坐标;启动激光投点仪向各层待测楼板投射激光信号;在各层待测楼板上逐层通过数显光靶承接激光投点仪发出的光源,依次旋转激光投点仪使其以0°、90°、180°、270°不同的方向投点,并记录每层楼板上的数显光靶读取到的四组网格坐标数据,计算四组网格坐标数据的平均值作为监测数据;获取各层楼板各水平位移监测点的位移量;本发明具有省时省力、高精度的特点。
Description
技术领域
本发明涉及一种多层楼板分层水平位移监测方法。
背景技术
建筑工程施工对地下土体产生扰动,破坏了原来的应力平衡,可能造成周围影响区域范围内既有建筑物特别是地下部分在水平位移方向产生位移,这种微小的位移会对既有建筑主体结构产生影响,导致建筑内力分布发生变化,甚至影响建筑质量和使用年限,因此需要在建筑工程施工过程中对影响区域范围内的既有建筑进行变形监测,参考图1所示的传统的多层楼板水平位移监测方法的示意图,传统的方法是利用水平控制点逐层进行导线测量,之后用导线点进行位移监测点的测量,进而比较各次监测成果得到逐层楼板的水平位移变化量和变化趋势,这种方法费时费力、受累计误差影响而精度不高。
发明内容
本发明针对以上问题的提出,而研制一种操作简单、测量精度高的多层楼板分层水平位移监测方法。
本发明的技术手段如下:
一种多层楼板分层水平位移监测方法,包括如下步骤:
①在施工影响区域外布设至少三个强制对中的水平位移控制观测墩,并通过GPS静态测量或精密导线测量方法获取各观测墩的绝对坐标值;
②在首层楼板上具有一定间距的各监测点上安装强制对中装置;
③在各层待测楼板上与强制对中装置中心位于同一铅垂位置的位置上分别钻直径为D的孔洞;
④调整各数显光靶的位置使其外轮廓平行于建筑轴线,然后利用L型角钢架将各数显光靶分别固定到各层待测楼板钻有的孔洞上;
⑤在强制对中的水平位移控制观测墩上架设全站仪,在强制对中装置上架设激光投点仪专用基座,并在该基座上架设与全站仪配套的专用棱镜;
⑥全站仪对步骤①中获取的各观测墩的绝对坐标值进行检验后,测取安装在首层楼板上的各强制对中装置的中心坐标;
⑦保持激光投点仪专用基座不动,通过激光投点仪替换下棱镜,并启动激光投点仪使其向各层待测楼板投射激光信号;
⑧在各层待测楼板上逐层通过数显光靶承接激光投点仪发出的同心环形光源,依次旋转激光投点仪使其以0°、90°、180°、270°四个不同的方向投点,并记录每层楼板上所安装的数显光靶读取到的四组网格坐标数据,计算四组网格坐标数据的平均值作为本楼层、本水平位移监测点和本次观测的监测数据;
⑨通过各次所测量的监测数据的变化量,获取各层楼板各水平位移监测点的位移量;
进一步地,所述强制对中装置为中空螺旋强制对中装置。
进一步地,所述全站仪采用1〃级以上全站仪。
由于采用了上述技术方案,本发明提供的多层楼板分层水平位移监测方法,利用全站仪、激光投点仪和数显光靶组合作业,有效解决了传统的方法由于误差累积而导致精度不高的问题,具有省时省力、高精度、高技术含量的特点,其精确度高于传统测量方法5倍,作业效率提高3倍,且降低了作业过程中的劳动强度和技术要求,克服了逐层导线测量引起的累计误差对测量结果的影响,其成果精确度完全满足规范要求。
附图说明
图1是本发明所述传统的多层楼板分层水平位移监测方法的示意图;
图2是本发明所述中空螺旋强制对中装置的示意图;
图3是本发明所述数显光靶的工作示意图;
图4是本发明所述多层楼板分层水平位移监测方法的示意图;
图中:1、位移监测点,2、导线点,3、平面控制点,4、激光光源,5、数显光靶,6、激光投点仪。
具体实施方式
如图2、图3和图4所示的一种多层楼板分层水平位移监测方法,包括如下步骤:
①在施工影响区域外布设至少三个强制对中的水平位移控制观测墩,并通过GPS静态测量或精密导线测量方法获取各观测墩的绝对坐标值;
②在首层楼板上具有一定间距的各监测点上安装强制对中装置;
③在各层待测楼板上与强制对中装置中心位于同一铅垂位置的位置上分别钻直径为D的孔洞;
④调整各数显光靶的位置使其外轮廓平行于建筑轴线,然后利用L型角钢架将各数显光靶分别固定到各层待测楼板钻有的孔洞上;
⑤在强制对中的水平位移控制观测墩上架设全站仪,在强制对中装置上架设激光投点仪专用基座,并在该基座上架设与全站仪配套的专用棱镜;
⑥全站仪对步骤①中获取的各观测墩的绝对坐标值进行检验后,测取安装在首层楼板上的各强制对中装置的中心坐标;
⑦保持激光投点仪专用基座不动,通过激光投点仪替换下棱镜,并启动激光投点仪使其向各层待测楼板投射激光信号;
⑧在各层待测楼板上逐层通过数显光靶承接激光投点仪发出的同心环形光源,依次旋转激光投点仪使其以0°、90°、180°、270°四个不同的方向投点,并记录每层楼板上所安装的数显光靶读取到的四组网格坐标数据,计算四组网格坐标数据的平均值作为本楼层、本水平位移监测点和本次观测的监测数据;
⑨通过各次所测量的监测数据的变化量,获取各层楼板各水平位移监测点的位移量;
进一步地,所述强制对中装置为中空螺旋强制对中装置。
进一步地,所述全站仪采用1〃级以上全站仪。
步骤②中的各监测点满足一定间距,具体的间距取值可以参考《建筑变形测量规范》和《建筑基坑工程监测技术规范》要求,一般不大于20m,步骤③中孔洞的直径D一般取12cm,步骤⑥中全站仪对步骤①中获取的各观测墩的绝对坐标值进行检验,具体为依照《建筑变形测量规范》和《建筑基坑工程监测技术规范》,或者《城市轨道交通工程测量规范》检验绝对坐标值是否符合相应的规范和技术要求,当检验结果为符合相应的规范和技术要求后,进行各强制对中装置的中心坐标的测取,本发明提供的多层楼板分层水平位移监测方法,利用全站仪、激光投点仪和数显光靶组合作业,有效解决了传统的方法由于误差累积而导致精度不高的问题,具有省时省力、高精度、高技术含量的特点,其精确度高于传统测量方法5倍,作业效率提高3倍,且降低了作业过程中的劳动强度和技术要求,克服了逐层导线测量引起的累计误差对测量结果的影响,其成果精确度完全满足规范要求。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。
Claims (3)
1.一种多层楼板分层水平位移监测方法,其特征在于包括如下步骤:
①在施工影响区域外布设至少三个强制对中的水平位移控制观测墩,并通过GPS静态测量或精密导线测量方法获取各观测墩的绝对坐标值;
②在首层楼板上具有一定间距的各监测点上安装强制对中装置;
③在各层待测楼板上与强制对中装置中心位于同一铅垂位置的位置上分别钻直径为D的孔洞;
④调整各数显光靶的位置使其外轮廓平行于建筑轴线,然后利用L型角钢架将各数显光靶分别固定到各层待测楼板钻有的孔洞上;
⑤在强制对中的水平位移控制观测墩上架设全站仪,在强制对中装置上架设激光投点仪专用基座,并在该基座上架设与全站仪配套的专用棱镜;
⑥全站仪对步骤①中获取的各观测墩的绝对坐标值进行检验后,测取安装在首层楼板上的各强制对中装置的中心坐标;
⑦保持激光投点仪专用基座不动,通过激光投点仪替换下棱镜,并启动激光投点仪使其向各层待测楼板投射激光信号;
⑧在各层待测楼板上逐层通过数显光靶承接激光投点仪发出的同心环形光源,依次旋转激光投点仪使其以0°、90°、180°、270°四个不同的方向投点,并记录每层楼板上所安装的数显光靶读取到的四组网格坐标数据,计算四组网格坐标数据的平均值作为本楼层、本水平位移监测点和本次观测的监测数据;
⑨通过各次所测量的监测数据的变化量,获取各层楼板各水平位移监测点的位移量。
2.根据权利要求1所述的一种多层楼板分层水平位移监测方法,其特征在于所述强制对中装置为中空螺旋强制对中装置。
3.根据权利要求1所述的一种多层楼板分层水平位移监测方法,其特征在于所述全站仪采用1〃级以上全站仪。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310555142.XA CN103557800B (zh) | 2013-11-07 | 2013-11-07 | 多层楼板分层水平位移监测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310555142.XA CN103557800B (zh) | 2013-11-07 | 2013-11-07 | 多层楼板分层水平位移监测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103557800A CN103557800A (zh) | 2014-02-05 |
CN103557800B true CN103557800B (zh) | 2016-03-30 |
Family
ID=50012111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310555142.XA Active CN103557800B (zh) | 2013-11-07 | 2013-11-07 | 多层楼板分层水平位移监测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103557800B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104034319B (zh) * | 2014-05-28 | 2016-08-17 | 同济大学 | 一种高层建筑测量控制点投射定位辅助装置及其使用方法 |
CN104988928B (zh) * | 2015-05-25 | 2017-01-25 | 浙江省围海建设集团股份有限公司 | 基于数字图像实时监测基坑开挖水平位移的方法 |
CN105737754B (zh) * | 2016-02-23 | 2018-08-10 | 武汉大学 | 一种测定高层建筑物摆动形变的方法 |
CN107478209B (zh) * | 2017-07-12 | 2019-11-19 | 中国建筑第八工程局有限公司 | 超高层轴线控制网的检测方法 |
CN108253950A (zh) * | 2018-01-31 | 2018-07-06 | 乐清市建设监理有限公司 | 一种超高层建筑工程测量的监理控制方法 |
CN109115149B (zh) * | 2018-08-13 | 2019-08-27 | 山东大学 | 一种基于坐标测量的基坑土体边坡深层水平位移监测方法 |
CN114252005B (zh) * | 2021-12-22 | 2023-06-13 | 广东石油化工学院 | 一种用于摩天建筑的便捷式摆动监测方法及装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6529854B2 (en) * | 2000-04-25 | 2003-03-04 | Pioneer Corporation | Coordinate position detecting method and display apparatus using the same |
CN202204513U (zh) * | 2011-08-08 | 2012-04-25 | 上海市城市建设设计研究院 | 可整平水平位移监测觇标 |
CN102620699A (zh) * | 2012-04-13 | 2012-08-01 | 靳纪洲 | 定向垂距法测量变形监测定向水平位移的方法 |
CN202442689U (zh) * | 2012-02-15 | 2012-09-19 | 中冶建筑研究总院有限公司 | 一种变位监测设备 |
CN103292762A (zh) * | 2013-05-23 | 2013-09-11 | 青岛理工大学 | 判别大坝稳定性的位移监测方法 |
CN103344185A (zh) * | 2013-07-08 | 2013-10-09 | 刘晓宇 | 一种非接触式位移自动监测装置 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6016455A (en) * | 1997-11-10 | 2000-01-18 | Kabushiki Kaisha Topcon | Automatic control system for construction machinery |
-
2013
- 2013-11-07 CN CN201310555142.XA patent/CN103557800B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6529854B2 (en) * | 2000-04-25 | 2003-03-04 | Pioneer Corporation | Coordinate position detecting method and display apparatus using the same |
CN202204513U (zh) * | 2011-08-08 | 2012-04-25 | 上海市城市建设设计研究院 | 可整平水平位移监测觇标 |
CN202442689U (zh) * | 2012-02-15 | 2012-09-19 | 中冶建筑研究总院有限公司 | 一种变位监测设备 |
CN102620699A (zh) * | 2012-04-13 | 2012-08-01 | 靳纪洲 | 定向垂距法测量变形监测定向水平位移的方法 |
CN103292762A (zh) * | 2013-05-23 | 2013-09-11 | 青岛理工大学 | 判别大坝稳定性的位移监测方法 |
CN103344185A (zh) * | 2013-07-08 | 2013-10-09 | 刘晓宇 | 一种非接触式位移自动监测装置 |
Also Published As
Publication number | Publication date |
---|---|
CN103557800A (zh) | 2014-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103557800B (zh) | 多层楼板分层水平位移监测方法 | |
CN104328799B (zh) | 一种盖挖逆作法地铁车站钢管柱精确定位方法 | |
CN104120656B (zh) | 桥梁高墩施工垂直度自动控制方法 | |
CN101629799B (zh) | 无通视高陡边坡变形监测方法及其装置 | |
CN105973141B (zh) | 一种盾构隧道管片错台测量装置 | |
CN105674952A (zh) | 建筑物沉降测量装置及方法 | |
CN103147466B (zh) | 矩形或空心矩形截面预制桩自动化测斜装置 | |
CN104359406A (zh) | 一种准分布式结构位移光学测量方法 | |
CN104251688A (zh) | 顶管工程中利用激光直线定向测量工法 | |
CN106441101B (zh) | 一种工程监测用高精度结构位移测量方法 | |
CN105973215A (zh) | 一种激光垂准仪进行铅锤定位测量的系统及方法 | |
CN109443327A (zh) | 一种测量控制网的布设方法 | |
CN103411584B (zh) | 一种连铸机扇形段底座检修测量方法及装置 | |
CN108414371A (zh) | 一种沥青路面裂缝状况的无损检测方法 | |
CN111623719A (zh) | 用于监测建筑物形变和沉降的激光网监测系统及监测方法 | |
CN103670386A (zh) | 一种岩石地层多点位移激光测量方法及装置 | |
CN113236260A (zh) | 一种全方位盾构下穿既有地铁车站施工监测方法 | |
CN111854664A (zh) | 一种桥梁桩基托换中墩柱的水平位移监测方法 | |
CN115478567A (zh) | 上穿地下轨道且邻近周边建筑的隧道明挖施工监测方法 | |
CN104634315A (zh) | 多层楼板分层水平位移监测系统 | |
CN103344214B (zh) | 一种1.6次抛物线型特大桥墩测量及墩身线形控制方法 | |
CN103016914A (zh) | 多功能强制对中脚架 | |
CN206540548U (zh) | 具有仪器高精确测量功能的全站仪 | |
CN103741726B (zh) | 一种沉井沉降量测量方法 | |
Fearnhead et al. | Deep excavations: monitoring mechanisms of ground displacement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 116021 No. 1, Floor 2, No. 1, Floor 3, No. 1, Floor 4, No. 186 Shengli Road, Shahekou District, Dalian, Liaoning Patentee after: Dalian survey and Mapping Research Institute Group Co.,Ltd. Address before: 4-5/F, Jindihaijing, No. 188, Shengli Road, Shahekou District, Dalian City, Liaoning Province, 116000 Patentee before: DALIAN ACADEMY OF RECONNAISSANCE AND MAPPING Co.,Ltd. |