CN103556756A - Interlayer shear wall assembly - Google Patents
Interlayer shear wall assembly Download PDFInfo
- Publication number
- CN103556756A CN103556756A CN201310477243.XA CN201310477243A CN103556756A CN 103556756 A CN103556756 A CN 103556756A CN 201310477243 A CN201310477243 A CN 201310477243A CN 103556756 A CN103556756 A CN 103556756A
- Authority
- CN
- China
- Prior art keywords
- shear wall
- plank
- interlayer
- interlayer shear
- board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Finishing Walls (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention discloses an interlayer shear wall assembly which comprises an interlayer shear wall and a shear wall framework. The interlayer shear wall is arranged in the shear wall framework. The interlayer shear wall comprises a shaving board, a first wood board and a second wood board. The first wood board and the second wood board are arranged on two sides of the shaving board respectively. The interlayer shear wall assembly is composed of standard shear wall assemblies used in a common shear wall, and the lateral load resistance is greatly improved after reassembly. Identical framework members, protection boards and nails are used under the same rivet distance. Due to the fact that the shear wall with the wood boards clamped in the middle of a wall body and the shear wall with the wood boards installed on two sides have identical bearing capability, a carpenter can finish installation of the shear wall on site through one step on the basis that a use requirement is met, and labor cost is saved.
Description
Technical field
The present invention relates to a kind of sandwich boards for construction, relate in particular to a kind of interlayer shear wall assembly.
Background technology
In prior art, the shear wall that design engineer explicitly calls for building both sides to be protected by artificial board sometimes provides required lateral resisting performance.In this case, the artificial board of a side can only be installed while erecting shear wall, and the artificial board of opposite side until wiring and insulation could install after ready.Because carpenter must complete the installation of shear wall for twice to building site, this will cause cost of labor high.
Summary of the invention
In order to solve the technical problem existing in background technology, the present invention proposes a kind of interlayer shear wall assembly, can disposable site operation complete the installation of shear wall.
The invention provides a kind of interlayer shear wall assembly, comprising: interlayer shear wall and shear wall framework, it is inner that interlayer shear wall is arranged at shear wall framework; Interlayer shear wall comprises shaving board, the first plank and the second plank, and the first plank and the second plank are arranged at respectively the both sides of shaving board.
Further, the first plank and the second plank are closely against the wall of shear wall framework.
Further, the first plank and the second plank measure-alike, and the first plank stands upside down and arranges with respect to the second plank.
Further, the first plank and the second plank are oppositely arranged between two, or/and be crisscross arranged.
Further, shear wall framework comprises the first metope and the second metope, and the first metope and the second metope are oppositely arranged, and the first plank is closely against the inwall of the first metope, and the second plank is closely against the inwall of the second metope.
Further, shear wall framework also comprise be arranged at two sides side board, be arranged at bottom and the cover plate at top, side board is fastened between the first side panel and the second side panel and holds level with both hands; Cover plate is arranged between side board and holds level with both hands; Interlayer shear wall is arranged in the gap of the first side panel, the second side panel, side board and cover plate formation.
Further, interlayer shear wall assembly also comprises securing member, and securing member runs through shaving board and the first plank, or shaving board and the second plank.
Further, securing member is bolt.
Interlayer shear wall assembly of the present invention, the standard shear wall assembly using in conventional shear wall forms, but after restructuring, lateral resisting performance has improved greatly.Under identical rivet pitch, use identical framing component, backplate and nail, the shear wall of clip with wooden board in the middle of body of wall has identical holding capacity with the shear wall of both sides timber boarding, thereby meeting on the basis of instructions for use, carpenter can disposable site operation completes the installation of shear wall, has saved cost of labor.
Accompanying drawing explanation
Fig. 1 is the front view of a kind of interlayer shear wall assembly of proposing of the present invention;
Fig. 1 a is the sectional view of the A-A line of Fig. 1;
Fig. 1 b is the sectional view of the B-B line of Fig. 1;
Fig. 2 is the front view that relative the second plank of the first plank of embodiment stands upside down and arranges;
Fig. 2 a is the sectional view of the A-A line of Fig. 1;
Fig. 2 b is the sectional view of the B-B line of Fig. 1;
Fig. 3 is the front view that relative the second plank of the first plank of embodiment is crisscross arranged;
Fig. 3 a is the sectional view of the A-A line of Fig. 1;
Fig. 3 b is the sectional view of the B-B line of Fig. 1;
Fig. 4 is that Fig. 1 is the fastening schematic diagram of securing member of the present invention.
Drawing reference numeral explanation
10-interlayer shear wall, 20-shear wall framework, 11-shaving board, 12-the first plank, 13-the second plank, 21-the first metope, 22-the second metope, 23-side board, 24-cover plate.
The specific embodiment
Below in conjunction with accompanying drawing, embodiments of the invention are described in detail.
Refer to Fig. 1,1a and 1b, the invention provides a kind of interlayer shear wall assembly, it comprises interlayer shear wall 10 and shear wall framework 20; Wherein, interlayer shear wall 10 is arranged at shear wall framework 20 inside; And interlayer shear wall 10 comprises that shaving board 11, the first plank 12 and the second plank 13, the first planks 12 and the second plank 13 are arranged at respectively the both sides of shaving board 11.
The first plank 12 and the second plank 13 are closely against the wall of shear wall framework 20.
In conjunction with Fig. 2,2a and 2b, the first plank 12 and the second plank 13 measure-alike, and the first plank 12 stands upside down and arranges with respect to the second plank 13.
Refer to Fig. 3,3a and 3b, the first plank 12 and the second plank 13 are oppositely arranged between two, or/and be crisscross arranged.
Again refer to Fig. 1,1a and 1b, shear wall framework 20 comprises that the first metope 21 and the second metope 22, the first metopes 21 and the second metope 22 are oppositely arranged, and the first plank 12 is closely against the inwall of the first metope 21, and the second plank 13 is closely against the inwall of the second metope 22.
Refer to Fig. 4, interlayer shear wall assembly also comprises securing member 4, and securing member 4 runs through shaving board 11 and the first plank 12, or shaving board 11 and the second plank 13.Preferably, securing member 4 is bolt, and for preventing that bolt end and middle bolt depart from plate interface place in reversible seismic load process, bolt should be connected to each other.This can complete by the securing member that has enough penetration powers along wall height spaced at equal intervals.
In embodiments of the invention, build two 3.5 inches (89 millimeters) and 5.5 inches of interlayer shear walls that (140 millimeters) are thick, double-screw bolt, top board and base plate are taken 2 * 4 timber.For interlayer shear wall 10, a pair of 2 * 4 timber should be arranged on the place that panel-centralized provides better panel edges distance.For interlayer shear wall 10, between adjacent panels, should there is the gap of 3 millimeters.In all positions, by there being the bolt of enough penetration powers to follow identical rivet pitch, shear wall framework 20 and shaving board 11 are nailed together.
Interlayer shear wall assembly of the present invention, the standard shear wall assembly using in conventional shear wall forms, but after restructuring, lateral resisting performance has improved greatly.Under identical rivet pitch, use identical framing component, backplate and nail, the shear wall of clip with wooden board in the middle of body of wall has identical holding capacity with the shear wall of both sides timber boarding, thereby meeting on the basis of instructions for use, carpenter can disposable site operation completes the installation of shear wall, has saved cost of labor.
The above; it is only the preferably specific embodiment of the present invention; but protection scope of the present invention is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; according to technical scheme of the present invention and inventive concept thereof, be equal to replacement or changed, within all should being encompassed in protection scope of the present invention.
Claims (8)
1. an interlayer shear wall assembly, is characterized in that, comprising: interlayer shear wall (10) and shear wall framework (20),
Described interlayer shear wall (10) is arranged at described shear wall framework (20) inside;
Described interlayer shear wall (10) comprises shaving board (11), the first plank (12) and the second plank (13), and described the first plank (12) and the second plank (13) are arranged at respectively the both sides of described shaving board (11).
2. a kind of interlayer shear wall assembly according to claim 1, is characterized in that, described the first plank (12) and the second plank (13) are closely against the wall of described shear wall framework (20).
3. a kind of interlayer shear wall assembly according to claim 2, is characterized in that, described the first plank (12) and the second plank (13) measure-alike, and described the first plank (12) stands upside down and arranges with respect to described the second plank (13).
4. a kind of interlayer shear wall assembly according to claim 2, is characterized in that, described the first plank (12) and the second plank (13) are oppositely arranged between two, or/and be crisscross arranged.
5. a kind of interlayer shear wall assembly according to claim 1, is characterized in that, described shear wall framework (20) comprises the first metope (21) and the second metope (22),
Described the first metope (21) and the second metope (22) are oppositely arranged, and described the first plank (12) is closely against the inwall of described the first metope (21), and described the second plank (13) is closely against the inwall of described the second metope (22).
6. a kind of interlayer shear wall assembly according to claim 5, is characterized in that, described shear wall framework (20) also comprise be arranged at two sides side board (23), be arranged at bottom and the cover plate (24) at top,
Described side board (23) is fastened between described the first side panel (21) and the second side panel (22) and holds level with both hands;
Described cover plate (24) is arranged between described side board (23) and holds level with both hands;
Described interlayer shear wall (10) is arranged in the gap of described the first side panel (21), the second side panel (22), described side board (23) and described cover plate (24) formation.
7. a kind of interlayer shear wall assembly according to claim 1, is characterized in that, also comprises securing member (4),
Described securing member (4) runs through described shaving board (11) and the first plank (12), or described shaving board (11) and the second plank (13).
8. a kind of interlayer shear wall assembly according to claim 7, is characterized in that, described securing member (4) is bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310477243.XA CN103556756A (en) | 2013-10-14 | 2013-10-14 | Interlayer shear wall assembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310477243.XA CN103556756A (en) | 2013-10-14 | 2013-10-14 | Interlayer shear wall assembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103556756A true CN103556756A (en) | 2014-02-05 |
Family
ID=50011093
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310477243.XA Pending CN103556756A (en) | 2013-10-14 | 2013-10-14 | Interlayer shear wall assembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103556756A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110616827A (en) * | 2019-10-09 | 2019-12-27 | 南京林业大学 | Bamboo keel clamping plate shear wall |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030041551A1 (en) * | 2001-08-28 | 2003-03-06 | Boone Glyn Richard | Shear panel assembly |
JP2005248615A (en) * | 2004-03-05 | 2005-09-15 | Porasu Kurashi Kagaku Kenkyusho:Kk | Wall body structure |
GB2430208A (en) * | 2005-09-15 | 2007-03-21 | Proctor Group Ltd A | Thermally insulated wall construction |
CN201180325Y (en) * | 2008-02-19 | 2009-01-14 | 中国林业科学研究院木材工业研究所 | Bidirectional framework structure wall |
CN103147527A (en) * | 2013-03-29 | 2013-06-12 | 苏州皇家整体住宅系统股份有限公司 | Plywood shearing wall |
CN103266688A (en) * | 2013-06-08 | 2013-08-28 | 南京工业大学 | Wood frame shear wall |
CN203559506U (en) * | 2013-10-14 | 2014-04-23 | 苏州皇家整体住宅系统股份有限公司 | Interlayer shear wall component |
-
2013
- 2013-10-14 CN CN201310477243.XA patent/CN103556756A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030041551A1 (en) * | 2001-08-28 | 2003-03-06 | Boone Glyn Richard | Shear panel assembly |
JP2005248615A (en) * | 2004-03-05 | 2005-09-15 | Porasu Kurashi Kagaku Kenkyusho:Kk | Wall body structure |
GB2430208A (en) * | 2005-09-15 | 2007-03-21 | Proctor Group Ltd A | Thermally insulated wall construction |
CN201180325Y (en) * | 2008-02-19 | 2009-01-14 | 中国林业科学研究院木材工业研究所 | Bidirectional framework structure wall |
CN103147527A (en) * | 2013-03-29 | 2013-06-12 | 苏州皇家整体住宅系统股份有限公司 | Plywood shearing wall |
CN103266688A (en) * | 2013-06-08 | 2013-08-28 | 南京工业大学 | Wood frame shear wall |
CN203559506U (en) * | 2013-10-14 | 2014-04-23 | 苏州皇家整体住宅系统股份有限公司 | Interlayer shear wall component |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110616827A (en) * | 2019-10-09 | 2019-12-27 | 南京林业大学 | Bamboo keel clamping plate shear wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9677264B2 (en) | Thermal break wood stud with rigid insulation and wall framing system | |
US20090056255A1 (en) | Rigid wall panel system | |
EA200701334A1 (en) | CONSTRUCTION BETWEEN FLOORING WITH STEEL BEAMS OF CLOSING, FITTED WITH HINGED HOLES | |
US11674300B2 (en) | Connecting device for mounting a wooden construction element | |
CN102864944B (en) | A kind of steel angle bracket masonry structure and reinforcement means thereof | |
CN204001219U (en) | Movable plank house assembly type beam column linkage | |
US5782054A (en) | Wood wall structure | |
CN103147527A (en) | Plywood shearing wall | |
KR20150060107A (en) | Adiabatic concrete connecting structure and constructing method | |
CN105735527A (en) | Shear wall with two sides connected with wholly-assembled double-layer pre-folded-line steel plates | |
KR101293734B1 (en) | Aseismatic reinforcing structure for masonry construction and constructing method thereof | |
CN203559506U (en) | Interlayer shear wall component | |
CN103556756A (en) | Interlayer shear wall assembly | |
US20070251409A1 (en) | Car wall arrangement for an elevator car | |
CN103452209A (en) | Double-layer composite slat cast-in-situ internal parting wall structure | |
KR200418073Y1 (en) | Panel for mold | |
KR100681317B1 (en) | Wood-carving structure for construction and the erection method using that | |
EP3015620A1 (en) | Panel for the enclosure and external thermal insulation of façades and roofs, and the installation procedure | |
JP2012184564A (en) | Beam cover and construction method thereof | |
RU169083U1 (en) | STRUCTURE OF A WOODEN HOUSE BASED ON CONSTRUCTIVE ELEMENTS | |
US20150143764A1 (en) | Framework wall structure, building and framework wall construction method | |
RU107204U1 (en) | OVERLAPPING FOR WOODEN BUILDING (OPTIONS) | |
US20050279051A1 (en) | Structural wall framework | |
US20220356701A1 (en) | Method and device in a floor structure drying process | |
Finch et al. | Cladding Attachment Solutions for Exterior Insulated Commercial Walls |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140205 |