CN103556597B - 大体积混凝土表面开裂风险预警与干预决策系统 - Google Patents
大体积混凝土表面开裂风险预警与干预决策系统 Download PDFInfo
- Publication number
- CN103556597B CN103556597B CN201310507984.8A CN201310507984A CN103556597B CN 103556597 B CN103556597 B CN 103556597B CN 201310507984 A CN201310507984 A CN 201310507984A CN 103556597 B CN103556597 B CN 103556597B
- Authority
- CN
- China
- Prior art keywords
- early warning
- temperature
- concrete
- stress
- decision
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigating Or Analyzing Materials Using Thermal Means (AREA)
Abstract
Description
材料名称 | λs | 材料名称 | λs |
泡沫塑料 | 0.1256 | 膨胀珍珠岩 | 0.1675 |
玻璃棉毡 | 0.1674 | 沥青 | 0.938 |
木板 | 0.837 | 干棉絮 | 0.1549 |
木屑 | 0.628 | 油毛毡 | 0.167 |
稻草或麦秸秆 | 0.502 | 干砂 | 1.172 |
炉渣 | 1.674 | 湿砂 | 4.06 |
甘蔗板 | 0.167 | 矿物棉 | 0.209 |
石棉毡 | 0.419 | 麻毡 | 0.188 |
泡沫混凝土 | 0.377 | 普通纸板 | 0.628 |
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310507984.8A CN103556597B (zh) | 2013-10-24 | 2013-10-24 | 大体积混凝土表面开裂风险预警与干预决策系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310507984.8A CN103556597B (zh) | 2013-10-24 | 2013-10-24 | 大体积混凝土表面开裂风险预警与干预决策系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103556597A CN103556597A (zh) | 2014-02-05 |
CN103556597B true CN103556597B (zh) | 2015-10-21 |
Family
ID=50010933
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310507984.8A Expired - Fee Related CN103556597B (zh) | 2013-10-24 | 2013-10-24 | 大体积混凝土表面开裂风险预警与干预决策系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103556597B (zh) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107816936B (zh) * | 2017-09-27 | 2019-08-06 | 三峡大学 | 一种得到非标准温度下硬化水工混凝土湿胀变形的方法 |
CN108763616A (zh) * | 2018-03-30 | 2018-11-06 | 北京城建集团有限责任公司 | 基于跳仓法施工的建筑物的温度场分析方法及设备 |
CN109507398B (zh) * | 2018-11-26 | 2021-04-27 | 河海大学 | 一种表面裂缝对混凝土内部温度场影响范围预测方法 |
CN111441246A (zh) * | 2019-01-16 | 2020-07-24 | 东南大学 | 一种高强大体积强约束索塔混凝土裂缝控制方法 |
CN109992833B (zh) * | 2019-03-01 | 2023-03-10 | 中国三峡建设管理有限公司 | 圆形断面衬砌混凝土温控防裂拉应力安全系数控制设计方法 |
CN110263490B (zh) * | 2019-07-05 | 2023-07-11 | 中国三峡建设管理有限公司 | 混凝土坝体临时面应力分析方法 |
CN111456012A (zh) * | 2020-04-07 | 2020-07-28 | 中铁七局集团郑州工程有限公司 | 一种超长大体积混凝土构件裂缝的控制方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2769089B1 (fr) * | 1997-10-01 | 2003-03-07 | Maurice Ogneux | Dispositif pour mesurer la temperature d'une masse de beton frais, en vue d'en determiner la date previsionnelle de decoffrage |
CN202150037U (zh) * | 2011-04-15 | 2012-02-22 | 中国水利水电科学研究院 | 混凝土坝温控防裂数字式动态监控系统 |
CN102436722A (zh) * | 2011-12-05 | 2012-05-02 | 中国水利水电科学研究院 | 一种混凝土坝的温控防裂监测方法 |
CN102852145A (zh) * | 2012-08-14 | 2013-01-02 | 清华大学 | 在建大坝混凝土智能温度控制方法及系统 |
-
2013
- 2013-10-24 CN CN201310507984.8A patent/CN103556597B/zh not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2769089B1 (fr) * | 1997-10-01 | 2003-03-07 | Maurice Ogneux | Dispositif pour mesurer la temperature d'une masse de beton frais, en vue d'en determiner la date previsionnelle de decoffrage |
CN202150037U (zh) * | 2011-04-15 | 2012-02-22 | 中国水利水电科学研究院 | 混凝土坝温控防裂数字式动态监控系统 |
CN102436722A (zh) * | 2011-12-05 | 2012-05-02 | 中国水利水电科学研究院 | 一种混凝土坝的温控防裂监测方法 |
CN102852145A (zh) * | 2012-08-14 | 2013-01-02 | 清华大学 | 在建大坝混凝土智能温度控制方法及系统 |
Non-Patent Citations (1)
Title |
---|
《混凝土拱坝温控的动态分析理论与实践》;傅少君 等;《岩石力学与工程学报》;20120131;第31卷(第1期);第113-122页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103556597A (zh) | 2014-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103556597B (zh) | 大体积混凝土表面开裂风险预警与干预决策系统 | |
Chen et al. | Long-tern field test and numerical simulation of foamed polyurethane insulation on concrete dam in severely cold region | |
Rush et al. | Towards a fragility assessment of a concrete column exposed to a real fire–Tisova Fire Test | |
CN103324797A (zh) | 一种高层钢框架结构整体抗火性能的检验分析方法 | |
Chen et al. | Failure analysis method of concrete arch dam based on elastic strain energy criterion | |
Yiqiu et al. | Experimental and numerical analysis of the critical heating strategy for hydronic heated snow melting airfield runway | |
Feng et al. | Experimental investigation of temperature gradients in a three-cell concrete box-girder | |
Tahersima et al. | Experimental and numerical study on heating performance of the mass and thin concrete radiant floors with ground source systems | |
Liu et al. | Cracking risk analysis of face slabs in concrete face rockfill dams during the operation period | |
Al-Qadi et al. | Field and theoretical evaluation of thermal fatigue cracking in flexible pavements | |
Zhou et al. | Field test and numerical simulation of the thermal insulation effect of concrete pouring block surface based on DTS | |
Shi et al. | Crack risk evaluation of early age concrete based on the distributed optical fiber temperature sensing | |
CN113821952A (zh) | 一种基于卡尔曼滤波算法的数字孪生无砟轨道优化方法 | |
Zhouc et al. | Optimization of the temperature control scheme for roller compacted concrete dams based on finite element and sensitivity analysis methods | |
Chen et al. | Stress prediction of heated crude oil pipeline in permafrost region via fully coupled heat-moisture-stress numerical simulation and SVM algorithm | |
Adamus et al. | Selected issues of choosing composite materials for window supporting beams | |
Bai et al. | Temperature gradient of composite PK girder based on monitoring and long-term simulation | |
Antonyová et al. | Certain building materials with respect to their thermal properties as well as to their impact to environment | |
Zhou et al. | A numerical and experimental investigation of ground heat transfer including edge insulation effects | |
CN103195072A (zh) | 一种推测冻结帷幕发展情况的算法 | |
CN110263490A (zh) | 混凝土坝体临时面应力分析方法 | |
Ye et al. | Analysis of early-age mechanics and crack of the base plate on the bridge in summer based on eXtended FEM | |
Peng et al. | A positioning method of temperature sensors for monitoring dam global thermal field | |
Tsai et al. | Prediction of reflection cracking in hot-mix asphalt overlays | |
CN116306083A (zh) | 基于位错攀移机制的晶体塑性有限元模拟方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Songhui Inventor after: Chai Fuxin Inventor after: Zhang Guoxin Inventor after: Hu Ping Inventor after: Liu Yi Inventor after: Liu Youzhi Inventor after: Zhang Lei Inventor after: Huang Tao Inventor after: Zhao Lina Inventor after: Zhao Yan Inventor before: Li Songhui Inventor before: Zhang Guoxin Inventor before: Hu Ping Inventor before: Liu Yi Inventor before: Liu Youzhi Inventor before: Zhang Lei Inventor before: Huang Tao Inventor before: Zhao Lina |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LI SONGHUI ZHANG GUOXIN HU PING LIU YI LIU YOUZHI ZHANG LEI HUANG TAO ZHAO LINA TO: LI SONGHUI ZHANG GUOXIN HU PING LIU YI LIU YOUZHI ZHANG LEI HUANG TAO ZHAO LINA ZHAO YAN CHAI FUXIN |
|
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151021 Termination date: 20181024 |