CN103556556B - 一种碳酸盐岩填方地基滞水结构及其设置方法 - Google Patents
一种碳酸盐岩填方地基滞水结构及其设置方法 Download PDFInfo
- Publication number
- CN103556556B CN103556556B CN201310575821.3A CN201310575821A CN103556556B CN 103556556 B CN103556556 B CN 103556556B CN 201310575821 A CN201310575821 A CN 201310575821A CN 103556556 B CN103556556 B CN 103556556B
- Authority
- CN
- China
- Prior art keywords
- carbonate rock
- fill foundation
- aquitard
- rock fill
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
- Road Paving Structures (AREA)
Abstract
本发明公开了一种碳酸盐岩填方地基滞水结构及其设置方法,它包括碳酸盐岩填方地基(1),碳酸盐岩填方地基(1)上表面是滞水层(2),滞水层(2)上表面是硬化层(3),滞水层(2)的厚度为0.3m~1.5m米,硬化层(3)的厚度为0.3-0.5米;其设置方法,步骤1对碳酸盐岩填方地基(1)进行夯碾处理;步骤2在夯碾处理后的碳酸盐岩填方地基(1)表面铺设粘土,粘土采用分层铺设,每层铺设完毕后采用压路机平碾,直至厚度达到0.5-3.0米,步骤3在铺设完毕的滞水层(2)上铺设自然级配硬岩石,厚度在0.3-0.5米,经过碾压处理后即为硬化层(3);解决了碳酸盐岩填方地基长期在雨水中侵泡和侵蚀,导致碳酸盐岩填方地基稳定性不好等问题。
Description
技术领域
本发明属于碳酸盐岩填方地基滞水防水技术,尤其涉及一种碳酸盐岩填方地基滞水结构及其设置方法。
背景技术
碳酸盐岩广泛分布于我国西部地区,该地区重要的的特点是地貌高低起伏变化大,城市建设、工业用地在很大程度上都受到了限制,因此会出现大规模的土石方开挖与回填,形成大块石高填方地基,这些地基基础很大部分是由可溶性碳酸盐岩组成;另外西部地区常年处于强降雨时期,雨水对可溶性碳酸盐岩的危害极大,碳酸盐岩地基在长期雨水下渗浸泡和侵蚀下,地基稳定性会受到影响,为了防止碳酸盐地基受雨水侵泡和侵蚀,通常采用在碳酸盐岩地基下设置盲沟进行排水,但盲沟表层铺设的土工布容易受细小颗粒附着,影响土工布的虑水作用,导致盲沟排水效果不好。
发明内容
本发明要解决的技术问题:提供一种碳酸盐岩填方地基滞水结构及其设置方法,以解决碳酸盐岩填方地基长期在雨水中侵泡和侵蚀,导致碳酸盐岩填方地基稳定性不好等问题。
发明技术方案:
一种碳酸盐岩填方地基滞水结构,它包括碳酸盐岩填方地基,碳酸盐岩填方地基上表面是滞水层,滞水层上表面是硬化层,滞水层的厚度为0.3m~1.5m米,硬化层的厚度为0.3-0.5米。
滞水层的原材料为粘土。
硬化层原材料为自然级配硬岩石,岩石粒径不大于300毫米,粘土含量不大于5%,抗压强度不低于30Mpa。
所述的碳酸盐岩填方地基滞水结构的设置方法,它包括下述步骤:
步骤1、对碳酸盐岩填方地基进行夯碾处理;
步骤2、在夯碾处理后的碳酸盐岩填方地基表面铺设粘土,粘土采用分层铺设,每层铺设完毕后采用压路机平碾,直至厚度达到0.3m~1.5m米,即成为滞水层;步骤3、在滞水层上铺设自然级配硬岩石,厚度在0.3-0.5米,经过碾压处理后即为硬化层。
步骤2所述的每层铺设完毕后采用压路机平碾,其压路机为25t、施工行驶速度不超过2m/h,碾压时采取分条叠合搭接,每次重叠1/4~1/2碾轮,压实系数不低于0.94。
步骤3所述的碾压处理其采用25t,施工行驶速度不超过2m/h压路机振动碾压,碾压时采取分条叠合搭接,每次重叠1/4~1/2碾轮,碾压次数不低于8次,最后两次碾压平均沉降量不大于10mm。
本发明有益效果:
粘土具有透水性弱、压实后稳定性好、强度较高、毛细作用小等优点,本发明发明利用粘土的该特点,在夯碾处理后的碳酸盐岩大块石填方地基上铺设这样一层粘土作为滞水层,用于阻隔地表水及天然降水对深层地基的浸泡和侵蚀,以减少地表水对地基稳定性的影响;在滞水层上部另铺设有一层经过处理后的大块石夯碾体,此即为硬化层,其作用一方面是为保护滞水层粘土不受雨水从刷而流失;另一方面,粘土受雨水浸泡后,在外力作用下会出现泥泞现象,从而影响路面的美观;滞水层原材料粘土为天然土体,可就地取材,并且资源丰富,投资少,滞水层设置简单,施工方便,且能有效滞水,大大延长了碳酸盐岩填方地基的使用寿命,解决了碳酸盐岩填方地基长期在雨水中侵泡和侵蚀,导致碳酸盐岩填方地基稳定性不好等问题。
附图说明:
图1为本发明结构示意图。
具体实施方式:
一种碳酸盐岩填方地基滞水结构,它包括碳酸盐岩填方地基1,碳酸盐岩填方地基1上表面是滞水层2,滞水层2上表面是硬化层3,滞水层2的厚度为0.3m~1.5m米,硬化层3的厚度为0.3-0.5米。
滞水层2的原材料为粘土。
硬化层3原材料为自然级配硬岩石,岩石粒径不大于300毫米,粘土含量不大于5%,抗压强度不低于30Mpa。
所述的碳酸盐岩填方地基滞水结构的设置方法,它包括下述步骤:
步骤1、对碳酸盐岩填方地基1进行夯碾处理,
步骤2、在夯碾处理后的碳酸盐岩填方地基1在铺设至设计高度时,在其表面铺设粘土,粘土采用分层铺设,每层铺设完毕后采用压路机平碾,其压路机为25t、施工行驶速度不超过2m/h,碾压时采取分条叠合搭接,每次重叠1/4~1/2碾轮,压实系数不低于0.94,以确保有效滞水,直至厚度达到0.3-1.5米,即成为滞水层2,经过这样处理后的滞水层才能够有效阻隔地表水及天然降水对深层地基的浸泡和侵蚀,以减少地表水对地基稳定性的影响。
步骤3、在铺设完工的滞水层2上铺设自然级配硬岩石,岩石粒径不大于300毫米,粘土含量不大于5%,抗压强度不低于30Mpa,铺设厚度在0.3-0.5米,经过碾压处理后即为硬化层3,碾压处理采用25t,施工行驶速度不超过2m/h压路机振动碾压,碾压时采取分条叠合搭接,每次重叠1/4~1/2碾轮,碾压次数不低于8次,最后两次碾压平均沉降量不大于10mm,经过本发明处理后的硬化层3起到保护滞水层粘土不受雨水从刷而流失;解决了粘土受雨水浸泡后,在外力作用下会出现泥泞现象,从而影响路面的美观的问题。
Claims (4)
1.一种碳酸盐岩填方地基滞水结构,它包括碳酸盐岩填方地基(1),其特征在于:碳酸盐岩填方地基(1)上表面是滞水层(2),滞水层(2)上表面是硬化层(3),滞水层(2)的厚度为0.3m~1.5m,硬化层(3)的厚度为0.3-0.5米,滞水层(2)的原材料为粘土,硬化层(3)原材料为自然级配硬岩石,岩石粒径不大于300毫米,粘土含量不大于5%,抗压强度不低于30Mpa。
2.权利要求1所述的碳酸盐岩填方地基滞水结构的设置方法,它包括下述步骤:
步骤1、对碳酸盐岩填方地基(1)进行夯碾处理;
步骤2、在夯碾处理后的碳酸盐岩填方地基(1)表面铺设粘土,粘土采用分层铺设,每层铺设完毕后采用压路机平碾,直至厚度达到0.3m~1.5m,即成为滞水层(2);
步骤3、在铺设完毕的滞水层(2)上铺设自然级配硬岩石,厚度在0.3-0.5米,经过碾压处理后即为硬化层(3)。
3.根据权利要求2所述的碳酸盐岩填方地基滞水结构的设置方法,其特征在于:步骤2所述的每层铺设完毕后采用压路机平碾,其压路机为25t、施工行驶速度不超过2m/h,碾压时采取分条叠合搭接,每次重叠1/4~1/2碾轮,压实系数不低于0.94。
4.根据权利要求2所述的碳酸盐岩填方地基滞水结构的设置方法,其特征在于:步骤3所述的碾压处理其采用25t,施工行驶速度不超过2m/h压路机振动碾压,碾压时采取分条叠合搭接,每次重叠1/4~1/2碾轮,碾压次数不低于8次,最后两次碾压平均沉降量不大于10mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310575821.3A CN103556556B (zh) | 2013-11-18 | 2013-11-18 | 一种碳酸盐岩填方地基滞水结构及其设置方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310575821.3A CN103556556B (zh) | 2013-11-18 | 2013-11-18 | 一种碳酸盐岩填方地基滞水结构及其设置方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103556556A CN103556556A (zh) | 2014-02-05 |
CN103556556B true CN103556556B (zh) | 2015-12-02 |
Family
ID=50010892
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310575821.3A Active CN103556556B (zh) | 2013-11-18 | 2013-11-18 | 一种碳酸盐岩填方地基滞水结构及其设置方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103556556B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109143381B (zh) * | 2018-10-26 | 2019-12-03 | 中国机械设备工程股份有限公司 | 一种黄土高填方滞水层探测方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6439805B1 (en) * | 1998-06-05 | 2002-08-27 | Vladimir Ronin | Method of stabilizing the ground in road construction work |
CN202530351U (zh) * | 2012-03-01 | 2012-11-14 | 长沙理工大学 | 一种炭质泥岩-土分层交错路堤填筑结构 |
CN103276649A (zh) * | 2013-06-21 | 2013-09-04 | 云南云岭高速公路桥梁工程有限公司 | 有侧限分层多厚度填石路堤施工方法 |
CN203212970U (zh) * | 2013-03-29 | 2013-09-25 | 长沙理工大学 | 一种红粘土路基结构 |
CN203583304U (zh) * | 2013-11-18 | 2014-05-07 | 贵州正业工程技术投资有限公司 | 一种碳酸盐岩填方地基滞水结构 |
-
2013
- 2013-11-18 CN CN201310575821.3A patent/CN103556556B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6439805B1 (en) * | 1998-06-05 | 2002-08-27 | Vladimir Ronin | Method of stabilizing the ground in road construction work |
CN202530351U (zh) * | 2012-03-01 | 2012-11-14 | 长沙理工大学 | 一种炭质泥岩-土分层交错路堤填筑结构 |
CN203212970U (zh) * | 2013-03-29 | 2013-09-25 | 长沙理工大学 | 一种红粘土路基结构 |
CN103276649A (zh) * | 2013-06-21 | 2013-09-04 | 云南云岭高速公路桥梁工程有限公司 | 有侧限分层多厚度填石路堤施工方法 |
CN203583304U (zh) * | 2013-11-18 | 2014-05-07 | 贵州正业工程技术投资有限公司 | 一种碳酸盐岩填方地基滞水结构 |
Also Published As
Publication number | Publication date |
---|---|
CN103556556A (zh) | 2014-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103031836B (zh) | 一种在新吹填淤泥地基上快速修筑道路的方法 | |
CN205063005U (zh) | 一种可对地下水进行补偿的新型雨水井 | |
CN102660936A (zh) | 一种用聚氯乙烯膜进行坝墙防渗的方法 | |
CN203546678U (zh) | 一种沥青混凝土心墙堆石坝结构 | |
CN108193648A (zh) | 塑性面板均质坝 | |
CN203741889U (zh) | 一种盲沟排水减浮结构 | |
CN104790404B (zh) | 一种坝基高压灌浆结构及灌浆方法 | |
CN106703053A (zh) | 一种加筋土排水复合型护坡结构的施工方法 | |
CN106638545B (zh) | 包芯法改良加固的膨胀土路堤结构及施工方法 | |
CN103556556B (zh) | 一种碳酸盐岩填方地基滞水结构及其设置方法 | |
CN201502019U (zh) | 一种透水地面结构 | |
CN201080590Y (zh) | 新型渗水地面砖 | |
CN205223770U (zh) | 一种碎石挤密桩加筋路基结构 | |
CN103437338B (zh) | 疏干井结合气压劈裂加固吹填土地基施工方法 | |
CN203583304U (zh) | 一种碳酸盐岩填方地基滞水结构 | |
CN202850013U (zh) | 灰土、防渗膜整片复合地基结构 | |
CN203514330U (zh) | 环保型生态重建修复结构 | |
CN207176431U (zh) | 一种基于海绵城市理念的透水路面结构 | |
CN103132487A (zh) | 一种减小面板堆石坝水平位移的方法及该面板堆石坝 | |
CN101967834A (zh) | 具有抗浮功能的矿浆浓缩池地下基础结构 | |
CN101003973A (zh) | 一种人工岛准预压地基处理方法 | |
CN103485322A (zh) | 一种有效防治路基湿化病害的毛细阻滞路基结构以及施工方法 | |
CN204551160U (zh) | 吹填场地条带状路基的握裹式预压排水固结系统 | |
CN207567719U (zh) | 一种煤矸石废弃料填筑的堤坝 | |
CN202850012U (zh) | 灰土、防渗膜局部复合地基结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Jun Inventor after: Zhang Jianlei Inventor after: Yuan Jiangwen Inventor after: Zhu Jun Inventor after: Luo Huijun Inventor before: Zhang Jianzhong Inventor before: Zhang Jianlei Inventor before: Yuan Jiangwen Inventor before: Zhu Jun Inventor before: Luo Huijun |
|
COR | Change of bibliographic data |