CN103556066A - Nickel-saving high-temperature-resistance seamless steel tube and production technology thereof - Google Patents

Nickel-saving high-temperature-resistance seamless steel tube and production technology thereof Download PDF

Info

Publication number
CN103556066A
CN103556066A CN201310366704.6A CN201310366704A CN103556066A CN 103556066 A CN103556066 A CN 103556066A CN 201310366704 A CN201310366704 A CN 201310366704A CN 103556066 A CN103556066 A CN 103556066A
Authority
CN
China
Prior art keywords
steel
nickel
steel pipe
lubricating fluid
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310366704.6A
Other languages
Chinese (zh)
Inventor
罗庚山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUZHOU HUADING STAINLESS STEEL PIPES CO Ltd
Original Assignee
HUZHOU HUADING STAINLESS STEEL PIPES CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUZHOU HUADING STAINLESS STEEL PIPES CO Ltd filed Critical HUZHOU HUADING STAINLESS STEEL PIPES CO Ltd
Priority to CN201310366704.6A priority Critical patent/CN103556066A/en
Publication of CN103556066A publication Critical patent/CN103556066A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forging (AREA)

Abstract

The invention relates to a nickel-saving high-temperature-resistance seamless steel tube and a production technology thereof. Chemical components of the steel comprise, by mass, 0.03-0.08% of C, 1.60-1.90% of Si, 0.70% or less of Mn, 0.030% or less of P, 0.030% or less of S, 20.00-22.00% of Cr, 9.00-11.00% of Ni, 0.02-0.06% of Ce, 0.13-0.10% of N, and the balance Fe. The production technology comprises the steps of smelting, heating perforation, cold rolling and solid solution heat treatment. The steel has the advantages of substantial reduction of the consumption of Ni, low price, very high strength at 900DEG C, and good high temperature resistance.

Description

The resistant to elevated temperatures weldless steel tube of a kind of joint nickel and production technique thereof
Technical field
The present invention relates to save the resistant to elevated temperatures stainless steel tube of nickel and production technique thereof.
Background technology
Heat-resistance stainless steel is widely used in boiler and pressurized vessel, as TP310S heat-resistance stainless steel, there is good oxidation-resistance, erosion resistance, because the chromium of higher percent and nickel, make to have much better creep strength, at high temperature can continuous operation, there is good high thermal resistance, when temperature surpasses 800 ℃, start to soften, permissible stress starts to continue to reduce.Because nickel (Ni), chromium (Cr) content are high, there is good oxidation, corrosion-resistant, acid and alkali-resistance, resistance to elevated temperatures, high temperature resistant steel pipe is exclusively used in occasions such as manufacturing electric heating boiler tube.
Due to constantly rising violently of nickel valency, the cost of nickel significantly rises.In order to reduce the consumption of nickel, a lot of industries are all attached great importance to joint nickel, for the research and development of the products such as nickel or technique.
Summary of the invention
The object of the invention is to solve the problems of the technologies described above, a kind of content that reduces nickel is provided, the stainless steel tube of the high temperature resistant mechanical property having had of energy.
Technical solution of the present invention is: the resistant to elevated temperatures weldless steel tube of a kind of joint nickel, the Chemical Composition of this steel (quality %) is: C 0.03~0.08, Si l.60~1.90, Mn≤0.70, P≤0.030, S≤0.030, Cr 20.00~22.00, and Ni 9.00~11.00, and Ce 0.02~0.06, N 0.13~0.10, and all the other are Fe.
The present invention also provides a kind of production craft step of above-mentioned steel pipe:
(A) select above-mentioned raw materials to smelt, wherein Ce selects mixed rare-earth materials, contains the Ce of 48 ~ 50% mass parts in mishmetal; In smelting process, mishmetal is wrapped up and is wire and is delivered in smelting furnace by iron sheet, and at the iron sheet that is wire, enter melt place and constantly add shielding gas; By iron sheet, wrap up mishmetal and be wire and be delivered into smelting furnace, the one, can avoid mishmetal directly to contact and react with oxygen in molten steel, sulphur etc., allow oxygen, sulphur etc. first react with iron, and have the protection of shielding gas, more can reduce the loss of rare earth.
(B) steel billet of smelting being made is delivered in process furnace and is heated, and the steel billet laggard eleven punch 11 of coming out of the stove, takes the lead, annealing, and steel pipe is made in pickling again; Wherein, in piercing process, have lubricating fluid taphole on top, the lubricating fluid in order to lubricated top and steel pipe internal-surface, in perforation, can be flowed out in top; Piercing process perforating apparatus used comprises top (1) and push rod (2), described push rod (2) inner hollow setting, form feed pathway (21), and the water pump (6) of lubricating fluid supercharging within the connection of push rod (2) one end is used for to feed pathway (21); In described top (1), offer the sprue (3) being communicated with feed pathway (21), sprue (3) flows to liquid storage district (4), and liquid storage district (4) surrounding is communicated with a plurality of runners (5); Contain the steel billet material of Se and N in hot piercing process, afterbody easily produces the defects such as inner surface cracks, infolding, spiricle, has affected tubing following process quality.In perforation, constantly add lubricant, in perforation, be top and be perforated and between material, have continuously lubricant, in whole perforation procedure, remain that lubricating fluid exists, while having avoided perforation by internal surface plucking, the rate of becoming a useful person and the quality of the material improving, and play cooling, extend the top effect in work-ing life.
(C) steel pipe above-mentioned steps (B) being obtained carries out cold-rolling treatment, and the pass of the roll of cold rolling use is arranged to segment of curve, and makes at least two sections of above curves; Stressed when rolling hole of steel pipe can be improved in the curved hole of rolling, and makes to shut out the stressed property of steel pipe of coming better.Hot piercing during due to front step process, the internal stress of steel pipe internal-surface is larger, so strengthen in this step the stressed of outer surface of steel tube, can effectively alleviate, the internal stress of dispersed steel pipe internal surface.
(D) carry out again solution heat treatment, the steel pipe that step (C) is obtained is sent in high-duty boiler, wherein high-duty boiler processing parameter is set as follows: heat-up time=material wall thickness (millimeter) * (0.8-1.2) minute, soaking time=material wall thickness (millimeter) * (18-22) second, the total time=heat-up time+soaking time of steel pipe in stove.Because FEOL makes the internal stress of steel pipe more concentrated, so eliminate excessive internal stress with thermal treatment here.
The heat-resisting austenitic stainless steel of joint nickel that uses mentioned component, can obtain nickeliferous low weldless steel tube, effectively saves the composition of nickel, reduces costs.And by this processing step, smelt the weldless steel tube and can effectively save smelting step, the mechanical property that improves the high temperature resistant of steel pipe and possessed.
As preferably, in step (2), first stainless steel steel billet material is repaired a die before, to deoil, pickling is lubricated, and wherein the concentration that is selected from of pickle solution is 6% ~ 7% hydrofluoric acid or the concentration nitric acid that is 10% ~ 12% or both mixing; Pickling need to be heated to 60 ℃ ~ 65 ℃ to steel billet from normal temperature, whole acid cleaning process 180-240 minute.Because the billet surface that smelted early stage has a lot of residues, so this step can be removed the residue of billet surface, be conducive to clamping steel billet and the perforation to steel billet of follow-up hot piercing process.And constantly heat in to the process of steel billet pickling, have more than 60 ℃ temperature when finally finishing, so both can decompose the acid that remains in billet surface, the smell of generation is just all removed in this step, while avoiding the later stage to wear piercing process, a large amount of pungent tastes of generation are decomposed in acid.Can first to steel billet, arrive certain temperature again, for later stage hot piercing process, do preheating, save the time, improve efficiency.
The runner of the perforating apparatus in described step (2) is divided into upper runner and lower flow channel.
The gait of march coming directly towards in described step (3) middle punch technique is 3 meters of per minutes, and the take-off rate of lubricating fluid is 0.5 ~ 1 liter of per minute.
Beneficial effect of the present invention is:
1, compare with 310S, performance is more superior, joint Ni, low price.
2, in the time of 900 ℃, have very high intensity, resistance to elevated temperatures is good, and use temperature scope is that 850 ~ 1100 ℃ of performances are better than TP310S, in air, under non-condition of bearing pressure, can use 1150 ℃, has superior high temperature oxidation resistance.
3, tensile strength in short-term at each temperature exceeds more than 20% than the intensity of common stainless steel (as 304,310S).
4, there is high temperature long-term behaviour (creep property, enduring quality).
Accompanying drawing explanation
Fig. 1 is the structural representation of perforating apparatus.
In figure: 1-top, 2-push rod, 21-feed pathway, 3-sprue ,4-liquid storage district, 5-runner,
51-lower flow channel, 52-upper runner, 6-water pump.
Embodiment
Below in conjunction with accompanying drawing, with embodiment, the invention will be further described.
This specific embodiment is only explanation of the invention; it is not limitation of the present invention; those skilled in the art can make to the present embodiment the modification that there is no creative contribution as required after reading this specification sheets, but as long as within the scope of claim of the present invention, are all subject to the protection of patent law.
Embodiment 1, and it is 6mm that the present embodiment is selected wall thickness, 30185 weldless steel tubes of diameter 76mm, the Chemical Composition of this steel (quality %) is: C 0.03~0.08, Si l.60~1.90, Mn≤0.70, P≤0.030, S≤0.030, Cr 20.00~22.00, and Ni 9.00~11.00, and Ce 0.02~0.06, N 0.13~0.10, and all the other are Fe.
The production technique of the described resistant to elevated temperatures weldless steel tube of joint nickel, comprises the steps:
(A) select above-mentioned raw materials to smelt, wherein Ce selects mixed rare-earth materials, contains the Ce of 48% mass parts in mishmetal; In smelting process, mishmetal is wrapped up and is wire and is delivered in smelting furnace by iron sheet, and at the iron sheet that is wire, enter melt place and constantly add shielding gas;
(B) steel billet of making after smelting is delivered in process furnace and heated, the furnace temperature of process furnace is 1150 ℃, and 120 minutes heat-up times, the steel billet laggard eleven punch 11 of coming out of the stove, takes the lead, annealing, and steel pipe is made in pickling again; Wherein, in piercing process, have lubricating fluid taphole on top, the lubricating fluid in order to lubricated top and steel pipe internal-surface, in perforation, can be flowed out in top; Piercing process perforating apparatus used comprises top 1 and push rod 2, and described push rod 2 inner hollow settings form feed pathway 21, and connects for the water pump 6 to the interior lubricating fluid supercharging of feed pathway 21 in push rod 2 one end; In described top 1, offer the sprue 3 being communicated with feed pathway 21, sprue 3 flows to liquid storage district 4, and liquid storage district 4 surroundings are communicated with a plurality of runners 5; By the feed pathway in push rod, be communicated with the sprue in top, make lubricating fluid enter into top, first lubricating fluid arrives liquid storage district, and liquid storage district can store lubricating fluid, by storing some lubricating fluids, can reduce the temperature of top, reach cooling effect.Then lubricating fluid flows to the surface of top by runner from storage area, reaches the effect of lubricated top working face.Because there is the effect of water pump, lubricating fluid itself has certain pressure to flow out outside top, can remain that like this layer protecting film is close to top surperficial.The in the situation that of larger in some tops, if only have a runner, the lubricating fluid probably flowing out is inadequate, but can not expand the size of runner, can cause like this some chip to enter in outlet, so runner 5 is divided into upper runner 52 and lower flow channel 51, is provided with the work output that lower flow channel strengthens lubricating fluid.The gait of march of top is 3 meters of per minutes, and the take-off rate of lubricating fluid is 0.5 ~ 1 liter of per minute.
(C) steel pipe above-mentioned steps (B) being obtained carries out cold-rolling treatment, and the pass of the roll of cold rolling use is arranged to segment of curve, and makes at least two sections of above curves.By rolling mutually of curved shape and steel pipe, can make steel pipe there is good strained condition and intensity preferably.Hot piercing during due to front step process, the internal stress of steel pipe internal-surface is larger, so strengthen in this step the stressed of outer surface of steel tube, can effectively alleviate, the internal stress of dispersed steel pipe internal surface.
(D) carry out again solution heat treatment, the steel pipe that step (C) is obtained is sent in high-duty boiler, wherein processing parameter is set as follows: heat-up time=material wall thickness (millimeter) * 0.8 minute, soaking time=material wall thickness (millimeter) * 18 seconds, the total time=heat-up time+soaking time of steel pipe in stove; In stove, temperature is arranged on 1120 ℃, needs 4.8 minutes, soaking time 108 seconds heat-up time like this.
In step (B), first stainless steel steel billet material is repaired a die before, deoil, pickling is lubricated, and wherein the concentration that is selected from of pickle solution is 6% hydrofluoric acid.Pickling need to be heated to 60 ℃ from normal temperature to steel billet.Whole acid cleaning process cost 180 minutes.Under home, be first normal temperature to 40 ℃ needs 120 minutes, be then incubated 30 minutes 40 ℃ time, then spend 30 minutes and be warmed up to 60 ℃.Normal temperature to 40 ℃, being then incubated this process is mainly that pickle solution carries out acid cleaning process to billet surface, removes impurity.Finally being warmed up to 60 ℃ is mainly the effect of thermolysis pickle solution again.
The compound GBT 13296-2008 of the weldless steel tube standard making.Tensile strength 520MPa, yield-point 205 MPa, density is at 7.98kg/dm 3.
Embodiment 2, and it is 8mm that the present embodiment is selected wall thickness, 30185 weldless steel tubes of diameter 75mm, the Chemical Composition of this steel (quality %) is: C 0.03~0.08, Si l.60~1.90, Mn≤0.70, P≤0.030, S≤0.030, Cr 20.00~22.00, and Ni 9.00~11.00, and Ce 0.02~0.06, N 0.13~0.10, and all the other are Fe.
The production technique of the described resistant to elevated temperatures weldless steel tube of joint nickel, comprises the steps:
(A) select above-mentioned raw materials to smelt, wherein Ce selects mixed rare-earth materials, contains the Ce of 48% mass parts in mishmetal; In smelting process, mishmetal is wrapped up and is wire and is delivered in smelting furnace by iron sheet, and at the iron sheet that is wire, enter melt place and constantly add shielding gas;
(B) steel billet of making after smelting is delivered in process furnace and heated, the furnace temperature of process furnace is 1070 ℃, and 160 minutes heat-up times, the steel billet laggard eleven punch 11 of coming out of the stove, takes the lead, annealing, and steel pipe is made in pickling again; Wherein, in piercing process, have lubricating fluid taphole on top, the lubricating fluid in order to lubricated top and steel pipe internal-surface, in perforation, can be flowed out in top; Piercing process perforating apparatus used comprises top 1 and push rod 2, and described push rod 2 inner hollow settings form feed pathway 21, and connects for the water pump 6 to the interior lubricating fluid supercharging of feed pathway 21 in push rod 2 one end; In described top 1, offer the sprue 3 being communicated with feed pathway 21, sprue 3 flows to liquid storage district 4, and liquid storage district 4 surroundings are communicated with a plurality of runners 5; Runner 5 is divided into upper runner 52 and lower flow channel 51, is provided with the work output that lower flow channel strengthens lubricating fluid.The gait of march of top is 3 meters of per minutes, and the take-off rate of lubricating fluid is 0.5 ~ 1 liter of per minute.
(C) steel pipe above-mentioned steps (B) being obtained carries out cold-rolling treatment, and the pass of the roll of cold rolling use is arranged to segment of curve, and makes at least two sections of above curves.
(D) carry out again solution heat treatment, the steel pipe that step (C) is obtained is sent in high-duty boiler, wherein processing parameter is set as follows: heat-up time=material wall thickness (millimeter) * 1.2 minutes, soaking time=material wall thickness (millimeter) * 22 seconds, the total time=heat-up time+soaking time of steel pipe in stove; In stove, temperature is arranged on 1150 ℃, needs 9.6 minutes, soaking time 176 seconds heat-up time like this.
In step (B), first stainless steel steel billet material is repaired a die before, deoil, pickling is lubricated, and wherein the concentration that is selected from of pickle solution is 10% nitric acid.Pickling need to be heated to 63 ℃ from normal temperature to steel billet.Whole acid cleaning process cost 240 minutes.Under home, be first normal temperature to 40 ℃ needs 120 minutes, be then incubated 60 minutes 40 ℃ time, then spend 60 minutes and be warmed up to 60 ℃.
The compound GBT 13296-2008 of the weldless steel tube standard making.Tensile strength 520MPa, yield-point 202 MPa, density is at 7.93kg/ dm 3.
Embodiment 3, and it is 4mm that the present embodiment is selected wall thickness, 30185 weldless steel tubes of diameter 70mm, the Chemical Composition of this steel (quality %) is: C 0.03~0.08, Si l.60~1.90, Mn≤0.70, P≤0.030, S≤0.030, Cr 20.00~22.00, and Ni 9.00~11.00, and Ce 0.02~0.06, N 0.13~0.10, and all the other are Fe.
The production technique of the described resistant to elevated temperatures weldless steel tube of joint nickel, comprises the steps:
(A) select above-mentioned raw materials to smelt, wherein Ce selects mixed rare-earth materials, contains the Ce of 48% mass parts in mishmetal; In smelting process, mishmetal is wrapped up and is wire and is delivered in smelting furnace by iron sheet, and at the iron sheet that is wire, enter melt place and constantly add shielding gas;
(B) steel billet of making after smelting is delivered in process furnace and heated, the furnace temperature of process furnace is 1200 ℃, and 150 minutes heat-up times, the steel billet laggard eleven punch 11 of coming out of the stove, takes the lead, annealing, and steel pipe is made in pickling again; Wherein, in piercing process, have lubricating fluid taphole on top, the lubricating fluid in order to lubricated top and steel pipe internal-surface, in perforation, can be flowed out in top; Piercing process perforating apparatus used comprises top 1 and push rod 2, and described push rod 2 inner hollow settings form feed pathway 21, and connects for the water pump 6 to the interior lubricating fluid supercharging of feed pathway 21 in push rod 2 one end; In described top 1, offer the sprue 3 being communicated with feed pathway 21, sprue 3 flows to liquid storage district 4, and liquid storage district 4 surroundings are communicated with a plurality of runners 5; Runner 5 is divided into upper runner 52 and lower flow channel 51, is provided with the work output that lower flow channel strengthens lubricating fluid.The gait of march of top is 3 meters of per minutes, and the take-off rate of lubricating fluid is 0.5 ~ 1 liter of per minute.
(C) steel pipe above-mentioned steps (B) being obtained carries out cold-rolling treatment, and the pass of the roll of cold rolling use is arranged to segment of curve, and makes at least two sections of above curves.
(D) carry out again solution heat treatment, the steel pipe that step (C) is obtained is sent in high-duty boiler, wherein processing parameter is set as follows: heat-up time=material wall thickness (millimeter) * 1.2 minutes, soaking time=material wall thickness (millimeter) * 22 seconds, the total time=heat-up time+soaking time of steel pipe in stove; In stove, temperature is arranged on 1200 ℃, needs 4.8 minutes, soaking time 88 seconds heat-up time like this.
In step (B), first stainless steel steel billet material is repaired a die before, deoil, pickling is lubricated, and wherein pickle solution is selected from the mixed solution that concentration is 7% hydrofluoric acid and the concentration nitric acid that is 12%.Pickling need to be heated to 63 ℃ from normal temperature to steel billet.Whole acid cleaning process cost 200 minutes.Under home, be first normal temperature to 40 ℃ needs 120 minutes, be then incubated 40 minutes 40 ℃ time, then spend 40 minutes and be warmed up to 63 ℃.
The compound GBT 13296-2008 of the weldless steel tube standard making.Tensile strength 518MPa, yield-point 200 MPa, density is at 8kg/dm 3.

Claims (5)

1. one kind is saved the resistant to elevated temperatures weldless steel tube of nickel, the Chemical Composition (quality %) that it is characterized in that this steel is: C 0.03~0.08, Si l.60~1.90, Mn≤0.70, P≤0.030, S≤0.030, Cr 20.00~22.00, and Ni 9.00~11.00, and Ce 0.02~0.06, N 0.13~0.10, and all the other are Fe.
2. by a production technique for the high temperature resistant weldless steel tube of joint nickel claimed in claim 1, it is characterized in that, comprise the following steps:
(A) select above-mentioned raw materials to smelt, wherein Ce selects mixed rare-earth materials, contains the Ce of 48 ~ 50% mass parts in mishmetal; In smelting process, mishmetal is wrapped up and is wire and is delivered in smelting furnace by iron sheet, and at the iron sheet that is wire, enter melt place and constantly add shielding gas;
(B) steel billet of smelting being made is delivered in process furnace and is heated, and the steel billet laggard eleven punch 11 of coming out of the stove, takes the lead, annealing, and steel pipe is made in pickling again; Wherein, in piercing process, have lubricating fluid taphole on top, the lubricating fluid in order to lubricated top and steel pipe internal-surface, in perforation, can be flowed out in top; Piercing process perforating apparatus used comprises top (1) and push rod (2), described push rod (2) inner hollow setting, form feed pathway (21), and the water pump (6) of lubricating fluid supercharging within the connection of push rod (2) one end is used for to feed pathway (21); In described top (1), offer the sprue (3) being communicated with feed pathway (21), sprue (3) flows to liquid storage district (4), and liquid storage district (4) surrounding is communicated with a plurality of runners (5);
(C) steel pipe above-mentioned steps (B) being obtained carries out cold-rolling treatment, and the pass of the roll of cold rolling use is arranged to segment of curve, and makes at least two sections of above curves;
(D) carry out again solution heat treatment, the steel pipe that step (C) is obtained is sent in high-duty boiler, wherein high-duty boiler processing parameter is set as follows: heat-up time=material wall thickness (millimeter) * (0.8-1.2) minute, soaking time=material wall thickness (millimeter) * (18-22) second, the total time=heat-up time+soaking time of steel pipe in stove.
3. by a kind of production technique that saves the high temperature resistant weldless steel tube of nickel claimed in claim 2, it is characterized in that: in step (B), first stainless steel steel billet material is repaired a die before, deoil, pickling is lubricated, and wherein the concentration that is selected from of pickle solution is 6% ~ 7% hydrofluoric acid or the concentration nitric acid that is 10% ~ 12% or both mixing; Pickling need to be heated to 60 ℃ ~ 65 ℃ to steel billet from normal temperature, whole acid cleaning process 180-240 minute.
4. by a kind of production technique that saves the high temperature resistant weldless steel tube of nickel claimed in claim 3, it is characterized in that: the runner (5) of the perforating apparatus in described step (B) is divided into upper runner (52) and lower flow channel (51).
5. by a kind of production technique that saves the high temperature resistant weldless steel tube of nickel claimed in claim 4, it is characterized in that: the gait of march coming directly towards in described step (3) middle punch technique is 3 meters of per minutes, the take-off rate of lubricating fluid is 0.5 ~ 1 liter of per minute.
CN201310366704.6A 2013-08-21 2013-08-21 Nickel-saving high-temperature-resistance seamless steel tube and production technology thereof Pending CN103556066A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310366704.6A CN103556066A (en) 2013-08-21 2013-08-21 Nickel-saving high-temperature-resistance seamless steel tube and production technology thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310366704.6A CN103556066A (en) 2013-08-21 2013-08-21 Nickel-saving high-temperature-resistance seamless steel tube and production technology thereof

Publications (1)

Publication Number Publication Date
CN103556066A true CN103556066A (en) 2014-02-05

Family

ID=50010409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310366704.6A Pending CN103556066A (en) 2013-08-21 2013-08-21 Nickel-saving high-temperature-resistance seamless steel tube and production technology thereof

Country Status (1)

Country Link
CN (1) CN103556066A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105331850A (en) * 2015-11-10 2016-02-17 湖州华特不锈钢管制造有限公司 High-corrosion-resistance nickel-copper alloy seamless pipe and manufacturing method thereof
CN105441720A (en) * 2015-11-10 2016-03-30 湖州华特不锈钢管制造有限公司 Copper-nickel alloy seamless tube and manufacturing method thereof
CN105834217A (en) * 2016-03-25 2016-08-10 江苏武进不锈股份有限公司 Preparation process of large-diameter duplex stainless steel seamless steel tube and application to oceanographic engineering

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101612700A (en) * 2008-06-23 2009-12-30 宝山钢铁股份有限公司 The preparation method of seamless steel tubes made of martensite precipitation hardening stainless steel
CN101691630A (en) * 2009-09-17 2010-04-07 苏州贝思特金属制品有限公司 Method for manufacturing seamless steel tubes
CN102274854A (en) * 2011-08-13 2011-12-14 四川三洲特种钢管有限公司 Process for manufacturing superascoloy stainless steel tube

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101612700A (en) * 2008-06-23 2009-12-30 宝山钢铁股份有限公司 The preparation method of seamless steel tubes made of martensite precipitation hardening stainless steel
CN101691630A (en) * 2009-09-17 2010-04-07 苏州贝思特金属制品有限公司 Method for manufacturing seamless steel tubes
CN102274854A (en) * 2011-08-13 2011-12-14 四川三洲特种钢管有限公司 Process for manufacturing superascoloy stainless steel tube

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105331850A (en) * 2015-11-10 2016-02-17 湖州华特不锈钢管制造有限公司 High-corrosion-resistance nickel-copper alloy seamless pipe and manufacturing method thereof
CN105441720A (en) * 2015-11-10 2016-03-30 湖州华特不锈钢管制造有限公司 Copper-nickel alloy seamless tube and manufacturing method thereof
CN105441720B (en) * 2015-11-10 2018-04-24 湖州华特不锈钢管制造有限公司 A kind of corronil seamless pipe and its manufacture method
CN105834217A (en) * 2016-03-25 2016-08-10 江苏武进不锈股份有限公司 Preparation process of large-diameter duplex stainless steel seamless steel tube and application to oceanographic engineering

Similar Documents

Publication Publication Date Title
CN101530869B (en) Process for manufacturing stainless-steel seamless steel pipe used for high-pressure boiler and heat-exchanger
CN103290192B (en) Thermal treatment process of spliced-welding type large tube plate forging of pressure container
CN102581250B (en) Centrifugally cast TP310Cb/T11 bimetal composite tube blank and method for producing same
CN101935807B (en) Rare earth yttrium-containing nickel-saving austenite heat-resistant stainless steel and preparation method thereof
CN101956138A (en) Productions method of Cu-contained low-alloy steel
CN101705437A (en) Heat-resistant stainless steel with high-lasting strength and manufacturing method thereof
CN103521946A (en) High-strength austenitic stainless steel submerged-arc welding wire
CN103667947B (en) Without the stainless manufacturing process of nickel Austriaization body
CN102691002A (en) Nuclear electric weldable seamless carbon steel pipe and production method thereof
CN106282845A (en) A kind of corrosion-resistant gapless stainless steel tube and preparation method thereof
CN108570541A (en) A kind of high-temperature heat treatment method of the high manganese cut deal of LNG storage tank
CN103740977A (en) Corrosion-resistant white copper tube and manufacturing method thereof
CN1923433B (en) High-performance buried arc welding wire and wire rod, and method for manufacturing same
CN104451394B (en) Anti-CO2 corrosion oil well pipe below 150 ksi produced by CPE unit and production method thereof
CN103556066A (en) Nickel-saving high-temperature-resistance seamless steel tube and production technology thereof
CN107620011B (en) A kind of heat-resistance stainless steel seamless pipe and preparation method thereof
CN104775079A (en) Marine highly weldable, large caliber, thick wall and high steel grade seamless steel pipe and preparation technology thereof
CN102703831A (en) Cu-contained and Cr-controlled seamless steel tube for nuclear power station and production method for Cu-contained and Cr-controlled seamless steel tube
CN104831179A (en) High-temperature resistant seamless austenitic stainless steel pipe and preparation method thereof
CN105331850A (en) High-corrosion-resistance nickel-copper alloy seamless pipe and manufacturing method thereof
CN101429627A (en) Austenite valve steel and technique for producing the same
CN100439551C (en) High-grade highly carbon-dioxide resistant chloride ion corrosion oil annular tube steel and method for manufacturing the same
CN103725865A (en) Steel rolling heating furnace slide block and production method thereof
CN103436798A (en) Preparation method for drawing-die steel material
CN105013857A (en) Processing technology of high-temperature seamless carbon steel nominal tubes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20170201

C20 Patent right or utility model deemed to be abandoned or is abandoned