CN103552937B CN201310528760.5A CN201310528760A CN103552937B CN 103552937 B CN103552937 B CN 103552937B CN 201310528760 A CN201310528760 A CN 201310528760A CN 103552937 B CN103552937 B CN 103552937B
Authority
CN
China
Prior art keywords
concrete pipe
concrete
lifting hook
cloth
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310528760.5A
Other languages
Chinese (zh)
Other versions
CN103552937A (en
Inventor
蒋孝德
施广明
高玉芬
张绮敏
李桂芳
包静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zoomlion Heavy Industry Science and Technology Co Ltd
Shanghai Power Civil Construction Co Ltd
Original Assignee
Zoomlion Heavy Industry Science and Technology Co Ltd
Shanghai Power Civil Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zoomlion Heavy Industry Science and Technology Co Ltd, Shanghai Power Civil Construction Co Ltd filed Critical Zoomlion Heavy Industry Science and Technology Co Ltd
Priority to CN201310528760.5A priority Critical patent/CN103552937B/en
Publication of CN103552937A publication Critical patent/CN103552937A/en
Application granted granted Critical
Publication of CN103552937B publication Critical patent/CN103552937B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention relates to the technical field of constructional engineering machinery, in particular to a tower type hoisting and distributing dual-purpose machine which is used for shortening the construction period and improving the construction convenience. The invention discloses a tower type hoisting and distributing dual-purpose machine, which comprises: the tower body is provided with a climbing frame, and a crane boom is arranged at the top of the tower body; the derrick mast is fixedly arranged on the crane boom; the lifting hook trolley is slidably arranged on the cargo boom and is fixedly arranged on the tower body and the concrete conveying pipe on the cargo boom; and a cloth concrete pipe; during hoisting operation, the cloth concrete pipe is detachably mounted on the climbing frame; during the cloth operation, the cloth concrete pipe is hung on the lifting hook dolly by the gin pole, and cloth concrete pipe detachable installs on the lifting hook dolly, is carried the setting position by the lifting hook dolly and is separated from the lifting hook dolly, is linked together with the concrete conveying pipe after.

Description

Tower type hoisting and distributing dual-purpose machine
Technical Field
The invention relates to the technical field of constructional engineering machinery, in particular to a tower type hoisting and distributing dual-purpose machine.
Background
In the process of building construction, hoisting and hoisting are usually completed by a tower crane, and concrete is distributed by a concrete distributor; however, as the height of the building is continuously increased, the height of the concrete spreader and the height of the tower crane are increased, so that a large amount of time is consumed for mounting and dismounting the concrete spreader and the tower crane, and the construction period is influenced; in addition, in the occasion of small space of construction site, only one concrete spreader or tower crane can be installed, which brings great inconvenience to the construction, so that it is necessary to provide a device capable of performing both hoisting and concrete spreading, so as to shorten the construction period and improve the construction convenience.
Disclosure of Invention
The invention aims to provide a tower type hoisting and distributing dual-purpose machine which can realize hoisting and distributing and is used for shortening the construction period and improving the construction convenience.
In order to achieve the purpose, the invention provides the following technical scheme:
a tower type dual-purpose machine for hoisting and distributing materials comprises:
a tower body with a climbing frame;
the crane boom is arranged at the top of the tower body;
the derrick mast is fixedly arranged on the crane boom;
a lifting hook trolley which is arranged on the lifting arm in a sliding way,
the concrete conveying pipe is fixedly arranged on the tower body and the crane boom;
and a cloth concrete pipe; during hoisting operation, the cloth concrete pipe is detachably mounted on the climbing frame; during distribution operation, the distribution concrete pipe is hung on the lifting hook trolley by the derrick mast, is detachably mounted on the lifting hook trolley, is conveyed to a set position by the lifting hook trolley and then is separated from the lifting hook trolley and is communicated with the concrete conveying pipe.
Preferably, the climbing frame comprises a first fixing support for fixing the cloth concrete pipe, and the cloth concrete pipe is inserted into the first fixing support during lifting operation.
Preferably, the cloth concrete pipe is fixedly connected with the first fixing bracket through a first positioning pin.
Preferably, the lifting hook trolley comprises a second fixing support for fixing the cloth concrete pipe, and the cloth concrete pipe is inserted into the second fixing support during cloth operation.
Preferably, the cloth concrete pipe is fixedly connected with the second fixing bracket through a second positioning pin.
Preferably, the material distribution concrete pipe is communicated with the concrete conveying pipe through a flange.
In the tower type hoisting and distributing dual-purpose machine provided by the invention, a tower crane and a concrete distributor are combined into a whole, and a distributing concrete pipe is transferred between a lifting hook trolley and a climbing frame by utilizing a derrick so as to realize hoisting operation and distributing operation; specifically, during hoisting operation, the cloth concrete pipe is positioned on the climbing frame; during material distribution operation, the material distribution concrete pipe is lifted from the climbing frame to the lifting hook trolley by the aid of the raking rods, the material distribution concrete pipe is conveyed to a set position by the lifting hook trolley and then is separated from the material distribution concrete pipe, and the material distribution concrete pipe is communicated with a concrete conveying pipe on the crane boom to perform concrete distribution operation; when switching from the material distribution operation to the hoisting operation, firstly the material distribution concrete pipe is conveyed to the inner side of the working radius of the derrick mast through the lifting hook trolley, and then the material distribution concrete pipe is hung to the climbing frame from the lifting hook trolley by the derrick mast and is fixed. Therefore, when the tower type hoisting and distributing dual-purpose machine provided by the invention is adopted, hoisting and hoisting can be realized, concrete distribution can be realized, the construction period is obviously shortened, and the convenience of construction is improved.
Drawings
Fig. 1 is a schematic structural diagram of a tower type lifting and distributing dual-purpose machine provided by an embodiment of the invention during lifting operation;
FIG. 2 is an enlarged partial view of the climbing frame shown in the area A in FIG. 1;
fig. 3 is a schematic structural diagram of a tower crane and cloth dual-purpose machine when switching from a lifting operation to a cloth operation according to an embodiment of the present invention;
FIG. 4 is an enlarged view of a portion of the hook carriage of FIG. 3 in section B;
FIG. 5 is a cross-sectional view taken along line C-C of FIG. 4;
fig. 6 is a schematic structural diagram of a tower crane and cloth dual-purpose machine provided in an embodiment of the present invention during cloth distribution operation.
Reference numerals:
1-a tower body, 2-a concrete conveying pipe, 3-a climbing frame,
31-a first fixed bracket, 4-a crane boom, 5-a derrick mast,
6-lifting hook trolley, 61-second fixing support and 7-distributing concrete pipe.
Detailed Description
In order to shorten the construction period and facilitate construction, the invention provides a tower crane and distributing dual-purpose machine capable of realizing both hoisting and concrete distributing.
In order to make the technical solutions of the present invention better understood by those skilled in the art, the following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings.
Fig. 1 is a schematic structural diagram of a tower crane and distributing dual-purpose machine according to an embodiment of the present invention during a lifting operation; the tower type hoisting and distributing dual-purpose machine provided by the embodiment of the invention comprises: the climbing tower comprises a tower body 1 with a climbing frame 3, a crane boom 4 arranged at the top of the tower body 1, a derrick mast 5 fixedly arranged on the crane boom 4, a lifting hook trolley 6 slidably arranged on the crane boom 4, a concrete conveying pipe 2 fixedly arranged on the tower body 1 and the crane boom 4, and a cloth concrete pipe 7; wherein,
when the hoisting operation is carried out, the cloth concrete pipe 7 is detachably arranged on the climbing frame 3; during the cloth operation, cloth concrete pipe 7 is hung to lifting hook dolly 6 by gin-pole 5 on, and cloth concrete pipe 7 detachable installs on lifting hook dolly 6, is carried the setting position by lifting hook dolly 6 and is separated from lifting hook dolly 6, is linked together with concrete conveying pipe 2 after.
The construction, mounting and operating principles of the tower 1, climbing frame 3, jib 4 and hook trolley 6 are well known to the person skilled in the art and will therefore not be described in detail in this document.
The derrick mast 5 is fixedly arranged on the crane boom 4 and is used for transferring the cloth concrete pipe 7 between the climbing frame 3 and the lifting hook trolley, namely the derrick mast 5 is equivalent to a small-sized hoisting device fixedly arranged on the crane boom 4 and is used for transferring the cloth concrete pipe 7 between the climbing frame 3 and the lifting hook trolley. Therefore, in order to ensure that the derrick 5 can transfer the cloth concrete pipe 7 between the climbing frame 3 and the lifting hook trolley, the operation radius of the derrick 5 covers the climbing frame 3 and the lifting hook trolley 6, and preferably, in order to improve the stability of the tower type hoisting and distributing dual-purpose machine, the lifting hook trolley 6 is stopped at the arm root of the crane boom 4 during the distributing operation, so that the operation radius of the derrick 5 covers the arm root position of the crane boom 4 and the position of the climbing frame 3, that is, the minimum coverage area of the derrick 5 is the shortest distance of the cloth concrete pipe 7 at the arm root of the crane boom 4 and the position of lifting the cloth concrete pipe 7 to the climbing frame 3, so that the cloth concrete pipe 7 can complete the position transfer between the climbing frame 3 and the lifting hook trolley.
The concrete conveying pipe 2 comprises a plurality of sections which can be communicated in an inserting way or communicated through flanges; each concrete conveying pipe 2 is fixedly connected with a corresponding tower body section in the tower body 1 or an arm section in the corresponding crane arm 4; the concrete conveying pipe 2 can be laid synchronously when the tower body and the crane boom are erected, and the concrete conveying pipe is lifted synchronously when the tower body 1 is lifted; because the lifting arm 4 can rotate relative to the tower body 1, a part of the concrete conveying pipe 2 in the tower body 1 and a part of the concrete conveying pipe in the lifting arm 4 can be connected through a rotating joint. It is worth mentioning that the concrete delivery pipe 2 is communicated with a concrete delivery pump at one end of the tower body bottom so as to complete the delivery of concrete.
When the tower type lifting and distributing dual-purpose machine provided by the embodiment of the invention is used for lifting operation and distributing operation, the initial position of the distributing concrete pipe 7 can be positioned on the climbing frame or the crane boom 4; specifically, when the initial position of cloth concrete pipe 7 is on climbing frame 3, because cloth concrete pipe 7 is fixed in climbing frame 3, consequently, when the jack-up operation, not only can make things convenient for the staff to operate on climbing frame 3, but also can furthest reduce cloth concrete pipe 7 to the influence of the jack-up weight of tower jack-up cloth dual-purpose machine. Referring to fig. 2, a partial enlarged view of the climbing frame in the area a of fig. 1 is shown; the climbing frame 3 comprises a first fixing bracket 31 for fixing the cloth concrete pipe 7, and the cloth concrete pipe 7 is inserted on the first fixing bracket 31 during lifting operation; preferably, the cloth concrete pipe 7 is fixedly connected with the first fixing bracket 31 through a first positioning pin.
When the material distribution operation is needed, the material distribution concrete pipe 7 needs to be hung on the lifting hook trolley 6 from the climbing frame 3; fig. 3 is a schematic structural diagram of a tower crane and cloth lifting operation switching device according to an embodiment of the present invention; firstly, an operator detaches the connection between the cloth concrete pipe 7 and the climbing frame 3, then the cloth concrete pipe 7 is hung from the climbing frame 3 to the lifting hook trolley 6 by the derrick 5 and is fixed on the lifting hook trolley 6, the lifting hook trolley 6 is separated from the cloth concrete pipe 7 after conveying the cloth concrete pipe 7 to a set position, and finally the cloth concrete pipe is communicated with a concrete conveying pipe on the crane boom 4 so as to carry out subsequent cloth operation; referring to fig. 4 and 5, fig. 4 is a partially enlarged view of the hook trolley in the area B of fig. 3; FIG. 5 is a cross-sectional view taken along line C-C of FIG. 4; the lifting hook trolley 6 comprises a second fixing support 61 for fixing the cloth concrete pipe 7, and the cloth concrete pipe 7 is inserted on the second fixing support 61 during cloth operation; preferably, the cloth concrete pipe 7 is fixedly connected with the second fixing bracket 61 through a second positioning pin. Therefore, when the lifting hook trolley 6 moves on the lifting arm 4, the cloth concrete pipe 7 can also move on the lifting arm 4; when the distributing concrete pipe 7 is conveyed to a set position by the lifting hook trolley 6, the distributing concrete pipe is separated from the lifting hook trolley 6 and is communicated with the concrete conveying pipe, and then distributing operation can be carried out.
Fig. 6 is a schematic structural diagram of a tower crane and material distribution machine according to an embodiment of the present invention during material distribution operation; after the material distribution concrete pipe 7 is communicated with the concrete conveying pipe 2 through a flange, concrete can be conveyed into the concrete conveying pipeline 2 from the ground through a concrete conveying pump, and then the material distribution of the concrete is completed through the material distribution concrete pipe 7; when the cloth area needs to be moved, the cloth concrete pipe 7 can be detachably mounted on the lifting hook trolley 6, and then the cloth concrete pipe 7 is conveyed to a set position through the lifting hook trolley 6.
When the tower type hoisting and distributing dual-purpose machine is switched from distributing operation to hoisting operation, the distribution concrete pipe 7 can be conveyed to the operation radius of the derrick 5 by using the lifting hook trolley 6, and then the distribution concrete pipe 7 is hung to the climbing frame 3 from the lifting hook trolley 6 by using the derrick 5, so that the influence of the distribution concrete pipe 7 on the hoisting weight is reduced.
The tower type lifting and distributing dual-purpose machine provided by the invention has obvious advantages in the construction process of high-rise buildings, particularly hyperbolic cooling tower buildings and cylindrical buildings.
Fig. 6 is a schematic structural diagram of a tower crane and material distribution machine according to an embodiment of the present invention during material distribution operation; after the material distribution concrete pipe 7 is communicated with the concrete conveying pipe 2 through a flange, concrete can be conveyed into the concrete conveying pipeline 2 from the ground through a concrete conveying pump, and then the material distribution of the concrete is completed through the material distribution concrete pipe 7; when the cloth area needs to be moved, the cloth concrete pipe 7 can be detachably mounted on the lifting hook trolley 6, and then the cloth concrete pipe 7 is conveyed to a set position through the lifting hook trolley 6.
When the tower type hoisting and distributing dual-purpose machine is switched from distributing operation to hoisting operation, the distribution concrete pipe 7 can be conveyed to the operation radius of the derrick 5 by using the lifting hook trolley 6, and then the distribution concrete pipe 7 is hung to the climbing frame 3 from the lifting hook trolley 6 by using the derrick 5, so that the influence of the distribution concrete pipe 7 on the hoisting weight is reduced.
The tower type lifting and distributing dual-purpose machine provided by the invention has obvious advantages in the construction process of high-rise buildings, particularly hyperbolic cooling tower buildings and cylindrical buildings.
In summary, in the dual-purpose machine for tower crane and material distribution provided by the invention, the tower crane and the concrete distributor are combined into a whole, and the material distribution concrete pipe is transferred between the lifting hook trolley and the climbing frame by using the derrick so as to realize the crane operation and the material distribution operation; specifically, during hoisting operation, the cloth concrete pipe is positioned on the climbing frame; during material distribution operation, the material distribution concrete pipe is lifted from the climbing frame to the lifting hook trolley by the aid of the raking rods, the material distribution concrete pipe is conveyed to a set position by the lifting hook trolley and then is separated from the material distribution concrete pipe, and the material distribution concrete pipe is communicated with a concrete conveying pipe on the crane boom to perform concrete distribution operation; when switching from the material distribution operation to the hoisting operation, firstly the material distribution concrete pipe is conveyed to the inner side of the working radius of the derrick mast through the lifting hook trolley, and then the material distribution concrete pipe is hung to the climbing frame from the lifting hook trolley by the derrick mast and is fixed. Therefore, the tower type hoisting and distributing dual-purpose machine provided by the invention can be used for hoisting and distributing concrete, the construction period is obviously shortened, and the construction convenience is improved. In addition, construction equipment is reduced, and construction cost can be saved.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (6)

1. The utility model provides a tower jack-up cloth dual-purpose machine which characterized in that includes:
a tower body with a climbing frame;
the crane boom is arranged at the top of the tower body;
the derrick mast is fixedly arranged on the crane boom;
a lifting hook trolley which is arranged on the lifting arm in a sliding way,
the concrete conveying pipe is fixedly arranged on the tower body and the crane boom;
and a cloth concrete pipe; during hoisting operation, the cloth concrete pipe is detachably mounted on the climbing frame; during distribution operation, the distribution concrete pipe is hung on the lifting hook trolley by the derrick mast, is detachably mounted on the lifting hook trolley, is conveyed to a set position by the lifting hook trolley and then is separated from the lifting hook trolley and is communicated with the concrete conveying pipe.
2. The tower type lifting and distributing dual-purpose machine according to claim 1, wherein the climbing frame comprises a first fixing bracket for fixing the distributing concrete pipe, and the distributing concrete pipe is inserted into the first fixing bracket during lifting operation.
3. The tower type hoisting and distributing dual-purpose machine according to claim 2, wherein the distributing concrete pipe is fixedly connected with the first fixing bracket through a first positioning pin.
4. A tower crane and distribution dual-purpose machine as claimed in any one of claims 1 to 3, wherein said hook carriage comprises a second fixing bracket for fixing said distribution concrete pipe, and said distribution concrete pipe is inserted into said second fixing bracket during distribution operation.
5. The tower type hoisting and distributing dual-purpose machine as claimed in claim 4, wherein the distributing concrete pipe is fixedly connected with the second fixing bracket through a second positioning pin.
6. The tower crane and material distribution dual-purpose machine as claimed in claim 1, wherein the material distribution concrete pipe is communicated with the concrete delivery pipe through a flange.
CN201310528760.5A 2013-10-30 2013-10-30 Tower type hoisting and distributing dual-purpose machine Active CN103552937B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310528760.5A CN103552937B (en) 2013-10-30 2013-10-30 Tower type hoisting and distributing dual-purpose machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310528760.5A CN103552937B (en) 2013-10-30 2013-10-30 Tower type hoisting and distributing dual-purpose machine

Publications (2)

Publication Number Publication Date
CN103552937A CN103552937A (en) 2014-02-05
CN103552937B true CN103552937B (en) 2015-08-05

Family

ID=50007363

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310528760.5A Active CN103552937B (en) 2013-10-30 2013-10-30 Tower type hoisting and distributing dual-purpose machine

Country Status (1)

Country Link
CN (1) CN103552937B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103938900B (en) * 2014-04-29 2015-11-18 中联重科股份有限公司 Construction method of cooling tower and tower crane
CN105883645B (en) * 2016-06-29 2018-01-05 中交路桥华南工程有限公司 The method for dismounting of tower crane attachment device
CN105883646B (en) * 2016-06-29 2018-04-20 中交路桥华南工程有限公司 Tower crane and its used gin-pole truck

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4505397A (en) * 1983-03-30 1985-03-19 Takenaka Komuten Co., Ltd. Apparatus for hoisting materials and placing concrete
CN2172328Y (en) * 1993-07-16 1994-07-20 大连佳云高层建筑机械有限公司 Plane arm elevating, mobile arm discharging machinery
CN2285275Y (en) * 1996-04-25 1998-07-01 建设部长沙建设机械研究院 Two-purpose tower machine for lifting and material distributing
CN201056467Y (en) * 2007-07-09 2008-05-07 杨双来 Tower crane capable of completing concrete distribution

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5998498A (en) * 1998-03-02 1999-12-07 Johnson & Johnson Vision Products, Inc. Soft contact lenses

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4505397A (en) * 1983-03-30 1985-03-19 Takenaka Komuten Co., Ltd. Apparatus for hoisting materials and placing concrete
CN2172328Y (en) * 1993-07-16 1994-07-20 大连佳云高层建筑机械有限公司 Plane arm elevating, mobile arm discharging machinery
CN2285275Y (en) * 1996-04-25 1998-07-01 建设部长沙建设机械研究院 Two-purpose tower machine for lifting and material distributing
CN201056467Y (en) * 2007-07-09 2008-05-07 杨双来 Tower crane capable of completing concrete distribution

Also Published As

Publication number Publication date
CN103552937A (en) 2014-02-05

Similar Documents

Publication Publication Date Title
CN106759883B (en) The tower crane construction method of large-scale steel structure air cooling tower
CN206742768U (en) A kind of telescopic tunnel cable support
CN105421859A (en) Electricity grid telegraph pole erecting device and construction method
CN103552937B (en) Tower type hoisting and distributing dual-purpose machine
CN102923585A (en) Telescopic crane
CN202175469U (en) Cable reel supporting device
CN105271011A (en) Multifunctional micro hoister
CN106241614A (en) A kind of shield machine assembling and dual-purpose straddle truck of slagging tap
CN204848041U (en) Cantilever crane
CN110407109A (en) A kind of assembling device and construction method of large space ultra-large type air hose
CN103422662A (en) Integral mobile construction platform for cast-in-place of elevator shaft and method for using same
CN102926543B (en) Concrete-agitating charge car
CN207647152U (en) Tower lifts constructing device certainly
CN202226572U (en) Miniature remote control crane
CN204401999U (en) Climbing scaffold with unloading platform
CN204077267U (en) The mounting equipment of tire and flat steel ring
CN209038882U (en) A kind of moveable suspended bracket for lifting pipeline in piping lane
CN201338910Y (en) Simple movable type traveling crane
CN205500643U (en) Portable pipe -line equipment installs loop wheel machine
CN204311717U (en) Detachable combined Mobile operating platform
CN105645279A (en) Crawler-type wall hoisting equipment
CN206957175U (en) A kind of planar dimension and adjustable for height operating platform
CN104925687A (en) Electric lifting device and working method thereof
CN204827250U (en) Whitewashing drilling tool
CN107344698A (en) A kind of extraordinary Dramatic Air Lifts

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANGHAI POWER CIVIL CONSTRUCTION COMPANY

Effective date: 20150608

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Jiang Xiaode

Inventor after: Shi Guangming

Inventor after: Gao Yufen

Inventor after: Zhang Qimin

Inventor after: Li Guifang

Inventor after: Bao Jing

Inventor before: Jiang Xiaode

Inventor before: Zhang Qimin

Inventor before: Li Guifang

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: JIANG XIAODE ZHANG QIMIN LI GUIFANG TO: JIANG XIAODE SHI GUANGMING GAO YUFEN ZHANG QIMIN LI GUIFANG BAO JING

TA01 Transfer of patent application right

Effective date of registration: 20150608

Address after: 415106 Dingcheng City, Changde Province, the town of irrigation district ZOOMLION Creek Industrial Park

Applicant after: ZOOMLION HEAVY INDUSTRY SCIENCE&TECHNOLOGY Co.,Ltd.

Applicant after: SHANGHAI POWER CIVIL CONSTRUCTION Co.

Address before: 415106 Dingcheng City, Changde Province, the town of irrigation district ZOOMLION Creek Industrial Park

Applicant before: ZOOMLION HEAVY INDUSTRY SCIENCE&TECHNOLOGY Co.,Ltd.

C14 Grant of patent or utility model
GR01 Patent grant