CN103541434A - Full-fabricated cross concrete combining joint - Google Patents

Full-fabricated cross concrete combining joint Download PDF

Info

Publication number
CN103541434A
CN103541434A CN201310429530.3A CN201310429530A CN103541434A CN 103541434 A CN103541434 A CN 103541434A CN 201310429530 A CN201310429530 A CN 201310429530A CN 103541434 A CN103541434 A CN 103541434A
Authority
CN
China
Prior art keywords
precast concrete
concrete beam
precast
halfpace
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310429530.3A
Other languages
Chinese (zh)
Other versions
CN103541434B (en
Inventor
张延年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201310429530.3A priority Critical patent/CN103541434B/en
Publication of CN103541434A publication Critical patent/CN103541434A/en
Application granted granted Critical
Publication of CN103541434B publication Critical patent/CN103541434B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention provides a full-fabricated cross concrete combining joint which is mainly composed of a precast concrete column, a precast concrete beam column joint core area, precast concrete beams, precast concrete beam upper halfpaces, precast concrete beam lower halfpaces, precast concrete beam lower steel plates, precast concrete beam center penetrating steel plates and the like. All the precast concrete beam center penetrating steel plates pass through the precast concrete beam column joint core area and are welded to be in the shape of a Chinese character 'jing', and the precast concrete beams are mainly divided into the precast concrete beam upper halfpaces, the precast concrete beam lower halfpaces and concrete-free sections. The full-fabricated cross concrete combining joint has the advantages of being high in bearing capacity, good in plasticity and tenacity, convenient to construct, good in economic effect and the like, and construction speed is high. The full-fabricated cross concrete combining joint can be suitable for the requirement that a modern engineering structure develops towards a large span, towering and heavy loading and bears serious conditions, and meets the requirement for modern construction technology industrialization.

Description

The complete cross Combined concrete node of assembling
Technical field
The present invention relates to a kind of building structure novel joint, particularly relate to a kind of cross Combined concrete node of full assembling of prefabricated concrete structure.
Background technology
Assembly concrete building refers to take concrete prefabricated element that batch production produces as main. by the concrete structure class building construction of site-assembled mode design-build.The assembly method of member generally has waters after overlapping layers concrete, Bar Anchorage pouring concrete connection etc. behind scene, and reinforcing bar connects ways such as can adopting sleeve grouting connection, welding, mechanical connection and the connection of reserving hole overlap joint., due to reasons such as structural integrity is poor, seepage, cracks on floor slab, there are many structural safety and normal hidden danger and defects of using of affecting in the popular prefabricated large plate house of , China eighties in 20 century, is replaced gradually by cast-in-place concrete structure.But along with the application of current emerging prefabricated concrete structure, particularly introduced in recent years many advanced foreign technologies, localized prefabricated concrete structure is built new technology and is just progressively formed.
Along with the trend of the appearance house industrial sector of the continuous minimizing building trade recruitment famine of the quickening of China's " industrialization of construction industry, housing industrialization " process and China's " demographic dividend " is day by day obvious.The application of prefabricated concrete structure becomes new technology, the new model that current research focus all parts of the country continue to bring out out housing construction prefabricated concrete structure again.Precast reinforced concrete construction is one of important directions of China's building structure development, and it is conducive to the development of China's industrialization of construction industry, the energy conservation of enhancing productivity, and development Green environmental-protection building, and be conducive to improve and guarantee construction engineering quality.Compare with cast-in-situ construction method; assembling reinforced concrete structure is conducive to green construction; because fabricated construction more can meet the requirements such as the saving land of green construction, energy-conservation, material-saving, water saving and environmental protection; the negative effect of reduction to environment; comprise reduction noise, prevent airborne dust, reduce environment pollution, clean transportation, reduce place interference, save resource and the energy such as water, electricity, material, follow the principle of sustainable development.And, fabricated construction can complete a plurality of or whole operations of engineering continuously in order, thereby reduce engineering machinery kind and the quantity of marching into the arena, eliminate resting the time of procedure connection, realize interchange operation, reduce constructor, thereby improve work efficiency, reduction supplies consumption, minimizing environment pollution, for green construction provides safeguard.In addition, fabricated construction reduces building waste (accounting for the 30%-40% of municipal refuse total amount) largely, as steel scrap muscle, waste iron wire, useless bamboo timber, discarded concrete etc.
Assembly concrete building can be divided into full assembling according to assemblingization degree height and part is assembled two large classes.Full assembling building is generally restricted to low layer or the lower multistory building of requirements for fortification against earthquake; Part is assembled concrete construction main member and is generally adopted prefabricated units, by cast-in-situ concrete, connects at the scene, forms the building of cast in place and precast construction.
North America region mainly be take America & Canada as main. because prefabricated/prestressed concrete association (PCI) studies for a long period of time and promotes pre-cast building, so the Specification of precast concrete is also very perfect. and its assembly concrete Application in Building is very general.The pre-cast building of North America mainly comprises the large series of building prefabrication exterior wall and structure prefabricated units two, and the common feature of prefabricated units is to maximize to combine with prestressing force. can optimize structure arrangement of reinforcement be connected structure.Reduce and make and installation workload, shorten the Yi work duration, fully demonstrate industrialization, standardization and Technical Economy feature.In 20th century, the pre-cast building of North America is mainly used in the non-area of providing fortification against earthquakes of low layer.Due to the earthquake effect in area, California, pay much attention in recent years the engineering application technical research of antidetonation and precast construction on the middle and senior level.PCI has published < < precast concrete seismic design > > mono-book recently, from theory and practice angle, systematically analyzed the seismic design problem of pre-cast building, summed up the latest scientific research of many precast construction seismic design, to instructing precast construction design and engineering application to there is very strong directive significance.
Europe is the cradle of pre-cast building, the road that has just started industrialization of construction industry as far back as the 17th century.After World War II, due to human resources shortage, Europe is research and probe industrialization of construction industry pattern further.No matter be economically developed Northern Europe, West Europe, or Eastern Europe underdeveloped, all actively carrying out the design and construction mode of prefabrication and assembly construction concrete construction always.Accumulated the design and construction experience of many pre-cast buildings, various special precast building systems and standardized general prefabricated product line have been formed, and worked out a series of precast concrete engineering specifications and application manual, to promoting precast concrete, in global application, played very important effect.
Japan and Korea S have used for reference American-European successful experience, are exploring on the standardized designs construction basis of pre-cast building.In conjunction with oneself requirement.In precast construction system globality antidetonation and shock insulation design aspect, obtained breakthrough.Representative achievement be the Tokyo Tower that Japan adopts two 58 floor that prefabrication and assembly construction frame construction builds up for 2008.Simultaneously, the precast concrete building system design of Japan, make and the standard criterion of construction also very perfect, the prefabricated standard of using at present has < < precast concrete engineering } (JASSl0) and < < concrete curtain wall) (JASSl4).
China is from the begin one's study design and construction technology of assembly concrete building of five sixties of 20th century, formed a series of assembly concrete building systems, comparatively typical building system has assembling single storey industry workshop building system, assembling multistory frame building system, assembled large panel building system etc.To the eighties in 20th century, the application of assembly concrete building reaches the period of full bloom, many places, the whole nation have all formed the integrated assembly concrete industrialized building of design, making and construction and installation pattern. and the masonry building of assembly concrete building and employing prefabricated hollow floor becomes two kinds of topmost building systems, and application popularization rate reaches more than 70%.Owing to there is many limitations and deficiency in function and the physical property of assembled architecture, the assembly concrete architectural design of China and construction technology R & D Level also do not catch up with the variation of social demand and Building technology development, to the mid-90 in 20th century, assembly concrete building is replaced by full cast-in-situ concrete building system gradually, at present except the application extensively of assembling single storey industry workshop building system.The engineering application of other prefabrication systems is few.The globality of precast construction antidetonation and the specialization of management in design and operation research not, cause its Technical Economy poor.It is the basic reason that causes precast construction to stagnate for a long time.
Summary of the invention
The object of the present invention is to provide the cross Combined concrete node of a kind of full assembling, mainly for developing, a kind of good integrity, power transmission are clear and definite, simple structure, safe and reliable, save the fabricated construction node of material and easy construction.Bean column node is as a key link of building structure, by the feasibility that directly determines that a kind of novel architecture structure form is applied in Practical Project.Wherein mode of transfer force and construction technology should be two most important links of design of node, and a kind of good joint form should have good unification in these two links.The present invention is intended to the node structure form of developing a kind of constructability and having good anti-seismic performance.
The present invention is achieved through the following technical solutions;
The complete cross Combined concrete node of assembling is mainly by precast concrete column, precast concrete beam column joint cores, precast concrete beam, halfpace on precast concrete beam, halfpace under precast concrete beam, precast concrete beam beam lower steel plate, precast concrete column is indulged muscle, precast concrete column tie-bar, precast concrete beam punching steel plate, concrete beam assembles vertical screw and concrete beam assembles the compositions such as horizontal screw, it is characterized in that, precast concrete beam punching steel plate is all by precast concrete beam column joint cores, and by being welded into groined type, bottom welding precast concrete beam beam lower steel plate at the outside precast concrete beam punching steel plate of precast concrete column, precast concrete beam beam lower steel plate length is the end to precast concrete beam punching steel plate by precast concrete column outside.Precast concrete beam is mainly divided under halfpace on precast concrete beam, precast concrete beam halfpace and without concrete segment three parts; On precast concrete beam, halfpace section is identical with concrete height and precast concrete beam; Under precast concrete beam, the concrete height of halfpace is precast concrete beam 1/2nd; On precast concrete beam, halfpace length is greater than 50 ~ 100mm, halfpace and be 100 ~ 150mm without concrete segment length under precast concrete beam; Under precast concrete beam, halfpace setting at least two row's concrete beam assemble vertical screw.Precast concrete beam arranges respectively the horizontal screw of concrete beam assembling, and level two rows are arranged at the horizontal screw of concrete beam assembling top, and level two rows are arranged at bottom; The horizontal screw of a concrete beam assembling halfpace and vertical row is at least set respectively without concrete segment under halfpace, precast concrete beam on precast concrete beam.
 
The features such as effect of the present invention and advantage are that bearing capacity is high, plasticity and good toughness, easy construction, good economical benefit, speed of application is fast.Can adapt to modern project structure to greatly across, towering, heavy duty development with bear the needs of mal-condition, meet the industrialized requirement of Modern Construction Technology.
Accompanying drawing explanation
Fig. 1 is the cross Combined concrete nodal plane of full assembling schematic diagram;
Fig. 2 is the cross Combined concrete node of full assembling front schematic view;
Fig. 3 is Figure 1A-A generalized section.
In figure, 1 is precast concrete column; 2 is precast concrete beam column joint cores; 3 is precast concrete beam; 4 is halfpace on precast concrete beam; 5 is halfpace under precast concrete beam; 6 is precast concrete beam beam lower steel plate; 7 is the vertical muscle of precast concrete column; 8 is precast concrete column tie-bar; 9 is precast concrete beam punching steel plate; 10 assemble vertical screw for concrete beam; 11 assemble horizontal screw for concrete beam.
The specific embodiment
Below in conjunction with technical scheme with reference to accompanying drawing, the present invention is described in detail.
The cross Combined concrete node of full assembling that the present invention proposes is as shown in Fig. 1 ~ Fig. 3.
Whole device is mainly assembled vertical screw 10 and the horizontal screw 11 of concrete beam assembling etc. and is formed by halfpace 5, precast concrete beam beam lower steel plate 6, the vertical muscle 7 of precast concrete column, precast concrete column tie-bar 8, precast concrete beam punching steel plate 9, concrete beam under halfpace 4, precast concrete beam on precast concrete column 1, precast concrete beam column joint cores 2, precast concrete beam 3, precast concrete beam.Precast concrete beam punching steel plate 9 is all by precast concrete beam column joint cores 2, and by being welded into groined type, at the bottom welding precast concrete beam beam lower steel plate 6 of the outside precast concrete beam punching steel plate 9 of precast concrete column 1, beam lower steel plate 6 length of precast concrete beam are the end to precast concrete beam punching steel plate 9 by precast concrete column 1 outside.Precast concrete beam 3 is divided on precast concrete beam under halfpace 4, precast concrete beam halfpace 5 and without concrete segment three parts; On precast concrete beam, 4 sections of halfpaces are identical with precast concrete beam 3 with concrete height; Under precast concrete beam, the concrete height of halfpace 5 is 1/2nd of precast concrete beam 3; On precast concrete beam, halfpace 4 length are greater than 50 ~ 100mm, halfpace 5 and be 100 ~ 150mm without concrete segment length under precast concrete beam; Under precast concrete beam, halfpace 5 arranges at least two row's concrete beam and assembles vertical screw 10.Precast concrete beam 3 arranges respectively the horizontal screw 11 of concrete beam assembling, and level two rows are arranged at the horizontal screw of concrete beam assembling 11 tops, and level two rows are arranged at bottom; The horizontal screw 11 of a concrete beam assembling halfpace 5 and vertical row is at least set respectively without concrete segment under halfpace 4, precast concrete beam on precast concrete beam.First make precast concrete beam punching steel plate 9, weld as requested, and weld precast concrete beam beam lower steel plate 6.Assembling reinforcement, makes template, builds maintenance.

Claims (3)

1. the cross Combined concrete node of full assembling, it is by precast concrete column (1), precast concrete beam column joint cores (2), precast concrete beam (3), halfpace on precast concrete beam (4), halfpace under precast concrete beam (5), precast concrete beam beam lower steel plate (6), precast concrete column is indulged muscle (7), precast concrete column tie-bar (8), precast concrete beam punching steel plate (9), concrete beam assembles vertical screw (10) and concrete beam assembles horizontal screw (11) composition, it is characterized in that, precast concrete beam punching steel plate (9) is all by precast concrete beam column joint cores (2), and by being welded into groined type, bottom welding precast concrete beam beam lower steel plate (6) at the outside precast concrete beam punching steel plate (9) of precast concrete column (1), beam lower steel plate (6) length of precast concrete beam is the end to precast concrete beam punching steel plate (9) by precast concrete column (1) outside.
2. the cross Combined concrete node of a kind of full assembling according to claim 1, is characterized in that: precast concrete beam (3) is divided under halfpace on precast concrete beam (4), precast concrete beam halfpace (5) and without concrete segment three parts; Halfpace on precast concrete beam (4) section is identical with precast concrete beam (3) with concrete height; The concrete height of halfpace under precast concrete beam (5) is 1/2nd of precast concrete beam (3); Halfpace on precast concrete beam (4) length is greater than 50 ~ 100mm, halfpace under precast concrete beam (5) and be 100 ~ 150mm without concrete segment length; Halfpace under precast concrete beam (5) arranges at least two row's concrete beam and assembles vertical screw (10).
3. the cross Combined concrete node of a kind of full assembling according to claim 2, it is characterized in that: precast concrete beam (3) arranges respectively the horizontal screw of concrete beam assembling (11), concrete beam assembles horizontal screw (11) top level two rows, and level two rows are arranged at bottom; Concrete beam assembles horizontal screw (11) halfpace (5) and vertical row is at least set respectively without concrete segment under halfpace (4), precast concrete beam on precast concrete beam.
CN201310429530.3A 2013-09-22 2013-09-22 The complete cross Combined concrete node of assembled Expired - Fee Related CN103541434B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310429530.3A CN103541434B (en) 2013-09-22 2013-09-22 The complete cross Combined concrete node of assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310429530.3A CN103541434B (en) 2013-09-22 2013-09-22 The complete cross Combined concrete node of assembled

Publications (2)

Publication Number Publication Date
CN103541434A true CN103541434A (en) 2014-01-29
CN103541434B CN103541434B (en) 2016-05-18

Family

ID=49965255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310429530.3A Expired - Fee Related CN103541434B (en) 2013-09-22 2013-09-22 The complete cross Combined concrete node of assembled

Country Status (1)

Country Link
CN (1) CN103541434B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358319A (en) * 2014-09-03 2015-02-18 西安建筑科技大学 Insertion type beam-column joint connecting structure
CN107090908A (en) * 2017-05-09 2017-08-25 广东省建筑科学研究院集团股份有限公司 A kind of new vertical prefabricated components joint connecting method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1704537A (en) * 2004-05-27 2005-12-07 同济大学 Totally assembled type prefabricated concrete structure system
KR20060079949A (en) * 2005-01-04 2006-07-07 삼성물산 주식회사 Hybrid structure system of precast concrete beam and steel beam, precast concrete beam with bracket for connection with steel beam
CN101113604A (en) * 2007-06-22 2008-01-30 东南大学 Full-prefabricated assembled concrete frame construction
CN202672356U (en) * 2012-07-03 2013-01-16 山东科技大学 Rabbet connection node of precast reinforced concrete beam and beam-column joint
CN103104039A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled framework beam-column joint adopting cover plate connection and construction method thereof
CN103114653A (en) * 2013-01-31 2013-05-22 中国建筑第七工程局有限公司 Assembled type construction beam column panel point connection mechanism

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1704537A (en) * 2004-05-27 2005-12-07 同济大学 Totally assembled type prefabricated concrete structure system
KR20060079949A (en) * 2005-01-04 2006-07-07 삼성물산 주식회사 Hybrid structure system of precast concrete beam and steel beam, precast concrete beam with bracket for connection with steel beam
CN101113604A (en) * 2007-06-22 2008-01-30 东南大学 Full-prefabricated assembled concrete frame construction
CN202672356U (en) * 2012-07-03 2013-01-16 山东科技大学 Rabbet connection node of precast reinforced concrete beam and beam-column joint
CN103114653A (en) * 2013-01-31 2013-05-22 中国建筑第七工程局有限公司 Assembled type construction beam column panel point connection mechanism
CN103104039A (en) * 2013-03-08 2013-05-15 郑州大学 Assembled framework beam-column joint adopting cover plate connection and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358319A (en) * 2014-09-03 2015-02-18 西安建筑科技大学 Insertion type beam-column joint connecting structure
CN107090908A (en) * 2017-05-09 2017-08-25 广东省建筑科学研究院集团股份有限公司 A kind of new vertical prefabricated components joint connecting method
CN107090908B (en) * 2017-05-09 2019-11-19 广东省建筑科学研究院集团股份有限公司 A kind of vertical prefabricated components joint connecting method

Also Published As

Publication number Publication date
CN103541434B (en) 2016-05-18

Similar Documents

Publication Publication Date Title
CN106121107B (en) Assemble type concrete slab and its plate dry type connection method
CN103541433B (en) Assembly concrete hook-hang type node
CN106149937A (en) Assembly concrete beam and plate dry type method of attachment thereof
CN103541495B (en) Connecting box assembly concrete beam
CN106869567A (en) A kind of energy-dissipating type cold-formed thin-walled steel pipe concrete Lateral Resistant System
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN104264897B (en) Alternate tooth must superimposed beam and plate
CN212427508U (en) Dry-type connected node of assembled concrete beam column
CN106320601B (en) Assembly concrete is whole without heat bridge board wall and its vertical connection method
CN103541434B (en) The complete cross Combined concrete node of assembled
CN103541435B (en) With the cross node of full assembling of steel plate concrete Cantilever Beams
CN111809729A (en) Dry-type connected node of assembled concrete beam column
CN209468856U (en) A kind of assembly concrete column beam connecting node
CN206016048U (en) Assemble type concrete slab
CN206016002U (en) Assembly concrete beam
CN106284681B (en) Assembly concrete is whole without heat bridge board wall and the connection method of running-on floor
CN103541478B (en) Lattice superposed beam and plate and construction method thereof
CN206289736U (en) A kind of assembly concrete beam-column connection
CN106638956A (en) Concrete wallboard and ribbed slab dry type connection node
CN106284739B (en) Assembly concrete is whole without heat bridge gusset
CN103541479A (en) Latticed two-way laminated slab
CN206408743U (en) A kind of assembly concrete node
CN106223532B (en) Assembly concrete is whole without heat bridge wallboard
CN103586978B (en) Steel pipe and concrete folding case beam and processing method thereof
CN109296074A (en) A kind of assembly concrete column beam connecting node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518

Termination date: 20160922