CN103541291A - Road cross protection device for liquid conveying pipeline - Google Patents

Road cross protection device for liquid conveying pipeline Download PDF

Info

Publication number
CN103541291A
CN103541291A CN201310246060.7A CN201310246060A CN103541291A CN 103541291 A CN103541291 A CN 103541291A CN 201310246060 A CN201310246060 A CN 201310246060A CN 103541291 A CN103541291 A CN 103541291A
Authority
CN
China
Prior art keywords
impact plate
steel bushing
plate
panel
impact
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310246060.7A
Other languages
Chinese (zh)
Other versions
CN103541291B (en
Inventor
袁长友
宋花平
何建设
王正勇
屈海利
姚祖新
王长富
梁江富
闫萌萌
邓红雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute Of Military New Energy Technology Institute Of Systems Engineering Academy Of Military Sciences
Xinxing Heavy Industry Hubei 3611 Mechanical Co Ltd
Original Assignee
Xinxing Heavy Industry Hubei 3611 Mechanical Co Ltd
Oil Research Institute of General Logistic Department of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinxing Heavy Industry Hubei 3611 Mechanical Co Ltd, Oil Research Institute of General Logistic Department of PLA filed Critical Xinxing Heavy Industry Hubei 3611 Mechanical Co Ltd
Priority to CN201310246060.7A priority Critical patent/CN103541291B/en
Publication of CN103541291A publication Critical patent/CN103541291A/en
Application granted granted Critical
Publication of CN103541291B publication Critical patent/CN103541291B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a road cross protection device for a liquid conveying pipeline. The device comprises more than one protection unit, wherein each protection unit comprises a middle anti-shock plate; large anti-shock plates are arranged on the two sides of the middle anti-shock plate; a small anti-shock plate is arranged on the outer side of the large anti-shock plate; a U-shaped slot is formed in the bottom of the middle anti-shock plate; a step connected with the large anti-shock plate is arranged on the middle anti-shock plate; a step connected with the middle anti-shock plate is correspondingly arranged on the large anti-shock plate; mortise and tenon structures for connection positioning are arranged at the step parts of the middle anti-shock plate and the large anti-shock plates; a step connected with the large anti-shock plate is arranged on the small anti-shock plate; a step connected with the small anti-shock plate is correspondingly arranged on the large anti-shock plate; mortise and tenon structures for connection positioning are arranged at the step parts of the large anti-shock plate and the small anti-shock plate. The device disclosed by the invention solves the problems of the prior art that a locking mechanism is difficult to manufacture, the handle body exposed on the two sides of the anti-shock plate is easily damaged, the storage is inconvenient and the facility can not be fixed on a wet slippery pavement and on the uphill and downhill of a highway easily; the device is convenient to assemble/disassemble and use.

Description

A kind of transfer line road passes through protector
Technical field
The invention belongs to road and pass through protector technical field.Be specifically related to a kind of for protect transfer line pass through road and can avoid by automobile by time the transfer line road crossing facility that destroys.
Background technology
At present, transfer line is met an urgent need while passing through road, adopt a kind of by the expander with U-shaped groove and be connected to the transfer line road crossing facility that the anti-impact plate of these expander both sides forms, wherein, anti-impact plate is wedge shape, between expander and anti-impact plate, be provided with the lockable mechanism cooperatively interacting, anti-impact plate and expander upper surface are provided with anti-skidding panel, inside to be provided with reinforcing rib, lockable mechanism are T-shaped buckle and T-shaped groove, both sides are provided with carrying handle, for protect transfer line pass through road and exempt from by automobile by time destroy.Its weak point is that T-shaped button and T-shaped groove are difficult for making, and in anti-impact plate both sides, fragile and body exposes the storage that is not easy to anti-impact plate to carrying handle, on wet and slippery ground and highway goes up a slope, descending place anti-impact plate is difficult for fixing.
Summary of the invention
Object of the present invention be exactly for above-mentioned deficiency, provide a kind of lockable mechanism easily make, without exposing carrying handle, be convenient to dismounting, easy to use, can be on wet and slippery ground and the transfer line road that highway goes up a slope, descending place is used pass through protector.
Technical solution of the present invention is: comprise an above protective unit; Described protective unit comprises a middle anti-impact plate; In the middle of described, anti-impact plate both sides are provided with large anti-impact plate; Described large anti-impact plate outside is provided with little anti-impact plate; In the middle of described, after anti-impact plate and two blocks of large anti-impact plates, two little anti-impact plate assemblings, form the ramp of a leap transfer line; In the middle of described, anti-impact plate bottom is provided with for by the U-lag of transfer line; In the middle of described, anti-impact plate is provided with the step for being connected with large anti-impact plate, and on large anti-impact plate, correspondence is provided with the step for being connected with middle anti-impact plate; Middle anti-impact plate is provided with for being connected the joinery and its construction of location with the stage portion of large anti-impact plate; Described little anti-impact plate is provided with the step for being connected with large anti-impact plate, and on large anti-impact plate, correspondence is provided with the step for being connected with little anti-impact plate; Large anti-impact plate is provided with for being connected the joinery and its construction of location with the stage portion of little anti-impact plate.
Described joinery and its construction comprises short steel bushing, for inserting short steel bushing, coordinates the long steel bushing of location.
In the middle of described, anti-impact plate is provided with for the hole of short steel bushing, long steel bushing is installed with the stage portion of large anti-impact plate; The stage portion of described large anti-impact plate and little anti-impact plate is provided with for the hole of short steel bushing, long steel bushing is installed.
Also comprise that the long steel bushing that front end passes in short steel bushing inserts ground in order to the drill rod of fixed protection unit.
Described drill rod comprises short drill rod, long drill rod; Described short drill rod is arranged in the long steel bushing between large anti-impact plate and little anti-impact plate; In long steel bushing in the middle of described long drill rod is arranged between anti-impact plate and large anti-impact plate.
Described middle anti-impact plate comprises a panel one, is arranged at two side plates one of panel one both sides, is arranged at panel one bottom two the above inner support panels one identical with side plate one shape; In the inner support panels one adjacent with side plate one, have for the groove one of short steel bushing or long steel bushing is installed; On described panel one, be provided with for the installing hole of short steel bushing or long steel bushing is installed with groove one corresponding position.
Described large anti-impact plate comprises a panel two, is arranged at two side plates two of panel two both sides, is arranged at panel two bottoms two the above inner support panels two identical with side plate two shapes; In the inner support panels two adjacent with side plate two, have for the groove two of short steel bushing or long steel bushing is installed; On described panel two, be provided with for the installing hole of short steel bushing or long steel bushing is installed with groove two corresponding positions.
Described little anti-impact plate comprises a panel three, is arranged at two side plates three of panel three both sides, is arranged at panel three bottoms two the above inner support panels three identical with side plate three shapes; In the inner support panels three adjacent with side plate three, have for the groove three of short steel bushing or long steel bushing is installed; On described panel three, be provided with for the installing hole of short steel bushing or long steel bushing is installed with groove three corresponding positions.
Described side plate one, side plate two, side plate three are provided with for inserting the oblong aperture of palm; In described side plate one, side plate two, side plate three, panel one, panel two, panel three, inner support panels one, inner support panels two, inner support panels three, have some through holes for weight reduction.
Described protective unit is two.
The slotted hole that panel three, panel two and panel one are provided with (anti-slide opening) can effectively be avoided vehicle slip.Oblong aperture on side plate three, side plate two, side plate one aims at carrying design, can be convenient to carrying and the dismounting of little anti-impact plate, large anti-impact plate and middle anti-impact plate.Between little anti-impact plate, large anti-impact plate and middle anti-impact plate, adopt step surface fastening, long steel bushing to insert in short steel bushing, make the handling of transfer line road crossing facility simply, firmly.Long steel bushing and short steel bushing form lockable mechanism, in lockable mechanism, can insert drill rod, and drill rod is implanted in highway fixedly anti-impact plate through circular hole, and drill rod can take out with crowbar from circular hole.Dismounting is convenient in the present invention, can be on wet and slippery ground and highway goes up a slope, descending place is used.
Accompanying drawing explanation
Fig. 1 is use schematic diagram of the present invention;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the lateral view of the little anti-impact plate of the present invention;
Fig. 4 is the left view of Fig. 3;
Fig. 5 is the sectional view of Fig. 4;
Fig. 6 is the lateral view of the large anti-impact plate of the present invention;
Fig. 7 is the left view of Fig. 6;
Fig. 8 is the sectional view of Fig. 7;
Fig. 9 is the lateral view of anti-impact plate in the middle of the present invention;
Figure 10 is the left view of Fig. 9;
Figure 11 is the sectional view of Figure 10.
Wherein, 1, little anti-impact plate, 2, large anti-impact plate, 3, transfer line, 4, middle anti-impact plate, 5, short drill rod, 6, long drill rod, 7, side plate three, 8, oblong aperture, 9, panel three, 10, inner support panels three, 11, long steel bushing, 12, side plate two, 13, panel two, 14, short steel bushing, 15, inner support panels two, 16, side plate one, 17, panel one, 18, inner support panels one.
The specific embodiment
In Fig. 1,2, the present invention includes two protective units, each protective unit comprises a middle anti-impact plate 4, middle anti-impact plate 4 both sides are provided with large anti-impact plate 2, large anti-impact plate 2 outsides are provided with little anti-impact plate 1, form the ramp of a leap transfer line after middle anti-impact plate 4 and two blocks of large anti-impact plates 2, two little anti-impact plate 1 assemblings.Middle anti-impact plate 4 bottoms are provided with for by the U-lag of transfer line 3, avoid vehicle by time transfer line 3 destroyed.The step that middle anti-impact plate 4 is provided with for being connected with large anti-impact plate 2, on large anti-impact plate 2, correspondence is provided with the step for being connected with middle anti-impact plate 4.Middle anti-impact plate 4 is provided with for being connected the joinery and its construction of location with the stage portion of large anti-impact plate 2.Little anti-impact plate 1 is provided with the step for being connected with large anti-impact plate 2, and on large anti-impact plate 2, correspondence is provided with the step for being connected with little anti-impact plate 1.Large anti-impact plate 2 is provided with for being connected the joinery and its construction of location with the stage portion of little anti-impact plate 1.Joinery and its construction comprises short steel bushing, for inserting short steel bushing, coordinates the long steel bushing of location.Drill rod front end in order to fixed protection unit inserts ground through the long steel bushing in short steel bushing.Drill rod comprises short drill rod 5, long drill rod 6, and short drill rod 5 is arranged in the long steel bushing between large anti-impact plate 2 and little anti-impact plate 1, in the long steel bushing in the middle of long drill rod 6 is arranged between anti-impact plate 4 and large anti-impact plate 2.Generally, do not use short drill rod 5 and long drill rod 6, only have when ground is wet and slippery or road surface has the gradient easily to make the position of transfer line road crossing facility be moved and just use.
In Fig. 3,4,5, little anti-impact plate is by 37,1 panel 39 of 2 side plates and 5 inner support panels 3 10 welding or be cast as the wedge shape with step surface, and 2 long steel bushing 11 use cementing agents are bonded in the hole of step surface.Carrying, installation and removal for convenience of little anti-impact plate 1 are provided with 2 oblong aperture 8 that can insert palm on side plate 37.For weight reduction, in side plate 37, panel 39 and inner support panels 3 10, be provided with through hole.
As shown in Fig. 6, Fig. 7, Fig. 8, large anti-impact plate is by 2 12,1 panel 2 13 of 2 side plates and 5 inner support panels 2 15 welding or be cast as the wedge shape with two step surfaces, 2 long steel bushing 11 use cementing agents are bonded in the hole of the large end step surface of wedge shape, and 2 short steel bushing 14 use cementing agents are bonded in the hole of wedge shape small end step surface.Carrying, installation and removal for convenience of large anti-impact plate 2 are provided with 2 oblong aperture 8 that can insert palm on side plate 2 12.For weight reduction, in side plate 2 12, panel 2 13 and inner support panels 2 15, be provided with through hole.
In Fig. 9,10,11, middle anti-impact plate is by one 16,1 panel 1 of 2 side plates and 5 inner support panels one 18 welding or be cast as the wedge shape with double step face, and 4 short steel bushing 14 use cementing agents are bonded in the hole of step surface.Carrying, installation and removal for convenience of middle anti-impact plate 3 are provided with 2 oblong aperture 8 that can insert palm on side plate 1.For weight reduction, in side plate 1, panel 1 and inner support panels 1, be provided with through hole.
Using method:
1, select to need the place of laying;
2, according to vehicle pass course, lay middle anti-impact plate 4;
3, the large end step surface of the wedge shape of large anti-impact plate 2 is withheld on the step surface of middle anti-impact plate 4, and steel bushing 11 is inserted in short steel bushing 14;
4, the step surface of little anti-impact plate 1 is withheld on the step surface of large anti-impact plate 2, and steel bushing 11 is inserted in short steel bushing 14;
If 5 are necessary, the endoporus with Churn drill along steel bushing 11 pierces after the certain depth of ground, wedges drill rod in hole.

Claims (10)

1. transfer line road passes through a protector, comprises an above protective unit;
Described protective unit comprises a middle anti-impact plate (4); In the middle of described, anti-impact plate (4) both sides are provided with large anti-impact plate (2); Described large anti-impact plate (2) outside is provided with little anti-impact plate (1); In the middle of described, anti-impact plate (4) assembles with two blocks of large anti-impact plates (2), two blocks of little anti-impact plates (1) ramp that transfer line is crossed in rear formation one;
In the middle of described, anti-impact plate (4) bottom is provided with for by the U-lag of transfer line;
It is characterized in that: in the middle of described, anti-impact plate (4) is provided with the step for being connected with large anti-impact plate (2), the upper correspondence of large anti-impact plate (2) is provided with the step for being connected with middle anti-impact plate (4); Middle anti-impact plate (4) is provided with for being connected the joinery and its construction of location with the stage portion of large anti-impact plate (2);
Described little anti-impact plate (1) is provided with the step for being connected with large anti-impact plate (2), and the upper correspondence of large anti-impact plate (2) is provided with the step for being connected with little anti-impact plate (1); Large anti-impact plate (2) is provided with for being connected the joinery and its construction of location with the stage portion of little anti-impact plate (1).
2. transfer line road according to claim 1 passes through protector, it is characterized in that: described joinery and its construction comprises short steel bushing (14), for inserting short steel bushing (14), coordinates the long steel bushing (11) of location.
3. transfer line road according to claim 2 passes through protector, it is characterized in that: in the middle of described, anti-impact plate (4) is provided with for the hole of short steel bushing (14), long steel bushing (11) is installed with the stage portion of large anti-impact plate (2); Described large anti-impact plate (2) is provided with for the hole of short steel bushing (14), long steel bushing (11) is installed with the stage portion of little anti-impact plate (1).
4. transfer line road according to claim 3 passes through protector, it is characterized in that: also comprise that the long steel bushing (11) that front end passes in short steel bushing (14) inserts ground in order to the drill rod of fixed protection unit.
5. transfer line road according to claim 4 passes through protector, it is characterized in that: described drill rod comprises short drill rod (5), long drill rod (6); Described short drill rod (5) is arranged in the long steel bushing (11) between large anti-impact plate (2) and little anti-impact plate (1); In long steel bushing (11) in the middle of described long drill rod (6) is arranged between anti-impact plate (4) and large anti-impact plate (2).
6. transfer line road according to claim 3 passes through protector, it is characterized in that: described middle anti-impact plate (4) comprises a panel one (17), is arranged at two side plates one (16) of panel one (17) both sides, is arranged at panel one (17) bottom two the above inner support panels one (18) identical with side plate one (16) shape;
In the inner support panels one (18) adjacent with side plate one (16), have for the groove one of short steel bushing (14) or long steel bushing (11) is installed; On described panel one (17) and groove one corresponding position is provided with for the installing hole of short steel bushing (14) or long steel bushing (11) is installed.
7. transfer line road according to claim 3 passes through protector, it is characterized in that: described large anti-impact plate (2) comprises a panel two (13), is arranged at two side plates two (12) of panel two (13) both sides, is arranged at panel two (13) bottoms two the above inner support panels two (15) identical with side plate two (12) shapes;
In the inner support panels two (15) adjacent with side plate two (12), have for the groove two of short steel bushing (14) or long steel bushing (11) is installed; On described panel two (13) and groove two corresponding positions are provided with for the installing hole of short steel bushing (14) or long steel bushing (11) is installed.
8. transfer line road according to claim 3 passes through protector, it is characterized in that: described little anti-impact plate (1) comprises a panel three (9), is arranged at two side plates three (7) of panel three (9) both sides, is arranged at panel three (9) bottoms two the above inner support panels three (10) identical with side plate three (7) shapes;
In the inner support panels three (10) adjacent with side plate three (7), have for the groove three of short steel bushing (14) or long steel bushing (11) is installed; On described panel three (9) and groove three corresponding positions are provided with for the installing hole of short steel bushing (14) or long steel bushing (11) is installed.
9. according to the transfer line road described in claim 6,7,8, pass through protector, it is characterized in that: described side plate one (16), side plate two (12), side plate three (7) are provided with the oblong aperture (8) for inserting palm; In described side plate one (16), side plate two (12), side plate three (7), panel one (17), panel two (13), panel three (9), inner support panels one (18), inner support panels two (15), inner support panels three (10), have some through holes for weight reduction.
10. transfer line road according to claim 1 passes through protector, it is characterized in that: described protective unit is two.
CN201310246060.7A 2013-06-20 2013-06-20 A kind of transfer line road passes through preventer Active CN103541291B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310246060.7A CN103541291B (en) 2013-06-20 2013-06-20 A kind of transfer line road passes through preventer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310246060.7A CN103541291B (en) 2013-06-20 2013-06-20 A kind of transfer line road passes through preventer

Publications (2)

Publication Number Publication Date
CN103541291A true CN103541291A (en) 2014-01-29
CN103541291B CN103541291B (en) 2016-07-06

Family

ID=49965117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310246060.7A Active CN103541291B (en) 2013-06-20 2013-06-20 A kind of transfer line road passes through preventer

Country Status (1)

Country Link
CN (1) CN103541291B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105797299A (en) * 2016-04-29 2016-07-27 苏州市捷达消防车辆装备有限公司 Fire hose bridge structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10137356A (en) * 1996-11-13 1998-05-26 Itachibori Seisakusho Kk Bridge for fire hose
JPH10192434A (en) * 1997-01-16 1998-07-28 Teikoku Sen I Co Ltd Hose bridge
US6067681A (en) * 1997-11-19 2000-05-30 Kuiken N.V. Hose bridge
CN102080754A (en) * 2009-11-29 2011-06-01 新兴重工湖北三六一一机械有限公司 Flexible transfusion pipeline road crossing facility
CN202007957U (en) * 2011-03-17 2011-10-12 新兴重工湖北三六一一机械有限公司 Enhanced road passing facility for flexible liquid conveying pipelines
CN203320373U (en) * 2013-06-20 2013-12-04 中国人民解放军总后勤部油料研究所 Road traversing protective device for liquid transmitting pipeline

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10137356A (en) * 1996-11-13 1998-05-26 Itachibori Seisakusho Kk Bridge for fire hose
JPH10192434A (en) * 1997-01-16 1998-07-28 Teikoku Sen I Co Ltd Hose bridge
US6067681A (en) * 1997-11-19 2000-05-30 Kuiken N.V. Hose bridge
CN102080754A (en) * 2009-11-29 2011-06-01 新兴重工湖北三六一一机械有限公司 Flexible transfusion pipeline road crossing facility
CN202007957U (en) * 2011-03-17 2011-10-12 新兴重工湖北三六一一机械有限公司 Enhanced road passing facility for flexible liquid conveying pipelines
CN203320373U (en) * 2013-06-20 2013-12-04 中国人民解放军总后勤部油料研究所 Road traversing protective device for liquid transmitting pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105797299A (en) * 2016-04-29 2016-07-27 苏州市捷达消防车辆装备有限公司 Fire hose bridge structure
CN105797299B (en) * 2016-04-29 2021-02-09 捷达消防科技(苏州)股份有限公司 Fire hose protects bridge construction

Also Published As

Publication number Publication date
CN103541291B (en) 2016-07-06

Similar Documents

Publication Publication Date Title
JP5514846B2 (en) Simple lining board
CN107974887A (en) A kind of temporary pavement device for road construction
CN203320373U (en) Road traversing protective device for liquid transmitting pipeline
CN103541291A (en) Road cross protection device for liquid conveying pipeline
CN201738251U (en) Box culvert
JP2015021299A (en) Internal reinforcement type reinforcement method for concrete structure
CN203834310U (en) Lightweight universal-type highway crossing device
CN104480944B (en) Unearthed pits rampway structure and construction method thereof
KR100885384B1 (en) Sparated type of circular drainlines support block
CN209389663U (en) Anti-slip cable duct
EP3048873B1 (en) Tree root protection panel
KR102064998B1 (en) Slip reduction type side connection steel pipe and linear and curved line hybrid type tunnel construction using it
CN203895933U (en) Cable protective sleeve
CN102434020B (en) Wire pole base capable of adapting to complex spot environment
KR101204058B1 (en) Steel Pipe for Underground Watertight Wall
CN204691290U (en) A kind of building site protector
CN202258138U (en) Corner type path identifying device of power cable
CN105569366B (en) A kind of falling proof device of building Jing Dong
KR100776778B1 (en) Spacer for protecting and fixing of corrugated tube in transmission/distribution
CN213206964U (en) Slurry pipeline passing trapezoidal cover plate device
CN221138068U (en) Subway carriage reinforcing plate
CN211139386U (en) Trolley for expressway tunnel construction
CN106245471A (en) A kind of light-duty sleeper of rapid-assembling/disassembling and using method thereof
CN213038179U (en) Abutment back of body fills embedded rigidity porous disk of earth
CN214573059U (en) Temporary steel plate noise reduction protection device for traffic fluffing during pipeline road-crossing construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 102300 Beijing city Mentougou District Three Street No. 1

Patentee after: Institute of Military New Energy Technology, Institute of Systems Engineering, Academy of Military Sciences

Patentee after: XINXING HEAVY INDUSTRY HUBEI 3611 MECHANICAL Co.,Ltd.

Address before: 102700 No. 1, Sanjiadian East Street, Mentougou District, Beijing

Patentee before: Petro-Oil and Lubricant Research Institute of The General Logisitic Department of PLA

Patentee before: XINXING HEAVY INDUSTRY HUBEI 3611 MECHANICAL Co.,Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20211207

Address after: 102300 Beijing city Mentougou District Three Street No. 1

Patentee after: Institute of Military New Energy Technology, Institute of Systems Engineering, Academy of Military Sciences

Address before: 102300 Beijing city Mentougou District Three Street No. 1

Patentee before: Institute of Military New Energy Technology, Institute of Systems Engineering, Academy of Military Sciences

Patentee before: XINXING HEAVY INDUSTRY HUBEI 3611 MECHANICAL Co.,Ltd.

TR01 Transfer of patent right