- CN103541283B CN103541283B CN201210246904.3A CN201210246904A CN103541283B CN 103541283 B CN103541283 B CN 103541283B CN 201210246904 A CN201210246904 A CN 201210246904A CN 103541283 B CN103541283 B CN 103541283B
- Authority
- CN
- China
- Prior art keywords
- rail
- bolt
- clamping device
- joint clamping
- rail joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Clamps And Clips (AREA)
Abstract
The present invention relates to a kind of rail joint clamping device.This clamping device comprises: the splice bar being clipped in rail both sides; By the chuck that described splice bar clamps to rail; And exert a force to described chuck with the forcing unit making it clamp angularly with horizontal plane.This rail joint clamping device is convenient to install, the high and long service life of reliability.To be specially adapted at the bottom of Rail and the occasion of limited space between railway roadbed, as occasion ballastless bed in rail track.
Description
Technical field
The present invention relates to the rail joint clamping device adopted when having hurt to safeguard in the middle part of the emergent installation and rail of railway track joint.
Background technology
In this area, the device of the connection realizing two adjacent one steel rails is in orbit called rail joint.
The mode that the connection of domestic and international conventional railway rail connects based on splice bar, the structure of rail joint comprises the splice bar being arranged on rail both sides, splice bar is fixed with rail by bolt and spring washer circle etc., and between rail, specially leave the requirement of expanding with heat and contract with cold to meet rail in gap.Under this connected mode is also usually applied to the cases of emergency such as the fracture of conventional track, making also can Interim use before broken rail has little time maintenance.The shortcoming of this connected mode needs to hole on rail, wastes time and energy, have impact on operating efficiency when carrying out at the scene.
In order to avoid holing on rail, a kind of rail joint clamping device that is used for is suggested, as shown in Figure 1, it comprises the splice bar 102 be clipped on rail 101 both sides, for clamping chuck 103, the bolt 104 passed below rail 101 of splice bar 102 and being combined with bolt 104, for tightening up the nut 105 of described chuck 103.
But, due to downward moment can be produced at the two ends of bolt 104 when gripping means grips, therefore, bolt 104 can be made after Long-Time Service to bend deformation, cannot recycle.
In addition, ballastless bed for rail track, due to the pitch-limited system between rail and railway roadbed, some minimum spacings only have 25mm, if bolt will be made to pass below rail, then the diameter of bolt must be less than 25mm, otherwise the nut at two ends cannot be tightened.But such bolt cannot meet the requirement in intensity, namely due to above-mentioned moment, bolt is caused to be out of shape or fracture.
In addition, splice bar is provided with hole 106 by prescribed distance.But due to the impact of track condition or obstruction, the density of setting of this some holes 106, be often not enough to meet the requirement of installing, but splice bar is manufactured by Railway Bureau's Uniting, cannot modify, therefore cause the inconvenience of installing to its structure.
Summary of the invention
The object of the invention is to provide a kind of rail joint clamping device, which overcome the problem of the installation inconvenience of installation question and the splice bar caused due to the spacing between rail and railway roadbed in prior art.
Rail joint clamping device of the present invention comprises: the splice bar being clipped in rail both sides; By the chuck that described splice bar clamps to rail; And exert a force to described chuck with the forcing unit making it clamp angularly with horizontal plane.
According to said structure, because rail joint clamping device comprises: be clipped in the splice bar of rail both sides, the chuck clamped to rail by described splice bar and exert a force with the forcing unit making it clamp to described chuck angularly with horizontal plane, therefore the moment that the downward moment produced at the two ends of forcing unit is applied in the component of power is offset, make forcing unit only by pulling force, avoid flexural deformation, extend application life.
In addition, described forcing unit comprises: as the first bolt of force application part; For the matching block of fixing described first bolt; And pass below rail and connect a pair lintel of described matching block, the stage casing of described lintel is cylinder, two ends raise up, the overall width of described lintel is consistent, be that cylindrical diameter is identical with described stage casing, the projection at described lintel two ends being respectively equipped with installing hole, being connected for mating with the described matching block of described forcing unit.
According to said structure, because described forcing unit comprises: as the first bolt of force application part; For the matching block of fixing described first bolt; And pass below rail and connect a pair lintel of described matching block, therefore the downward moment produced at the two ends of lintel is biased the moment counteracting that unit applies the component of power, make lintel only by pulling force, avoid the flexural deformation of lintel, extend application life.And the stage casing due to described lintel is cylinder, and two ends raise up, the overall width of described lintel is consistent, be that cylindrical diameter is identical with described stage casing, therefore, when installing lintel, only it need be made to lie down around axial rotation, pass after below rail with its width distance, then rotation makes it hold up, thus, even if the projection at the two ends of lintel is higher than the spacing between rail and railway roadbed, also installation can be completed like a cork.And, due to the first nut and horizontal plane angled, be therefore convenient to install.
In addition, the cylindrical diameter in the stage casing of described lintel is less than 25mm.
According to said structure, the cylindrical diameter in the stage casing due to described lintel is less than 25mm, therefore can easily through rail and railway roadbed.
In addition, described chuck comprises: for clamp the bottom base of rail rail support clamping part and for mate described first bolt and bear its force the first matching part.
According to said structure, because described chuck comprises: for clamp the bottom base of rail rail support clamping part and for mate described first bolt and bear its force the first matching part, therefore, described first bolt can through the first matching part force of described matching block to described chuck, and then make chuck clamp.
In addition, be provided with cushion block between described first matching part and described first bolt, it is threaded circular that this cushion block is formed as center tool.
According to said structure, owing to being provided with cushion block between described first matching part and described first bolt, the stronger material of rigidity therefore can be adopted to make described cushion block, ensure chuck powerful stressed under there is not deformation.And to be formed as center tool threaded circular due to this cushion block, therefore, easily take out by screw thread pair when taking out.
In addition, described forcing unit also can comprise: through the bending screw rod that, two ends are upturned below rail, and be installed on the first nut of described bending screw rod.
According to said structure, because described forcing unit comprises: through the bending screw rod that, two ends are upturned below rail, and be installed on the first nut of described bending screw rod, therefore the downward moment produced at the two ends of bending screw rod is biased the moment counteracting that unit applies the component of power, make bending screw rod only by pulling force, avoid the flexural deformation of bending screw rod, extend application life.
In addition, between described splice bar and described chuck, be provided with liner plate, described liner plate has been spaced forced section with what specify.
According to said structure, owing to being provided with liner plate between described splice bar and described chuck, be spaced forced section with regulation on described liner plate, even if the setting position in the hole therefore on splice bar does not meet the installation requirement of clamping device, the forced section also by liner plate is installed.
In addition, described chuck also comprises the second matching part passed through for the second bolt, and described second bolt makes it clamp to described splice bar force.
In addition, described forced section is in roughly quadrangle, and the slide plate be wherein provided with, this slide plate can slide along the vertical direction, and is provided with the installing hole mated with described second bolt at center.
According to said structure, because described forced section is in roughly quadrangle, the slide plate be wherein provided with, this slide plate can slide along the vertical direction, and the installing hole mated with described second bolt is provided with at center, therefore the installation site of the second bolt is adjusted by the slip of slide plate, to realize best clamped position.And the center due to slide plate is provided with the installing hole mated with described second bolt, therefore can farthest avoid bolt stress to its destruction.
In addition, fixed by the 3rd bolt between described splice bar and described liner plate, in the head of the described 3rd bolt gap between rail and splice bar.
According to said structure, owing to being fixed by the 3rd bolt between described splice bar and described liner plate, before installation splice bar, in advance described splice bar and described liner plate can be connected and fixed, more together be mounted to rail, simple to operate.And, due in gap between rail and splice bar of the head of bolt, can installation space be saved.
In addition, described first bolt and described second bolt are connected as one by bent plate, and chuck overall structure therefore can be made more stable.
In addition, described second bolt is provided with safety plug, prevents described bent plate from coming off, and no matter is therefore the reason of vibration or artificial reason, all cannot takes off bent plate easily, thus ensure the stability of chuck entirety further.
Accompanying drawing explanation
Fig. 1 is the sectional view of the structure of the rail joint clamping device representing prior art.
Fig. 2 be the structure of the rail joint clamping device representing embodiment of the present invention 1 outline figure, the left side is front view, and the right is sectional view.
Fig. 3 is the top view of the structure of the rail joint clamping device representing embodiment of the present invention 1.
Fig. 4 is the lateral view of the structure of the rail joint clamping device representing embodiment of the present invention 1.
Fig. 5 is the stereogram of the structure of the rail joint clamping device representing embodiment of the present invention 1.
Fig. 6 is the front view of the lintel of the rail joint clamping device representing embodiment of the present invention 1.
Fig. 7 is the top view of the lintel of the rail joint clamping device representing embodiment of the present invention 1.
Fig. 8 is the stereogram of the chuck of the rail joint clamping device representing embodiment of the present invention 1.
Fig. 9 is the sectional view of the chuck of the rail joint clamping device representing embodiment of the present invention 1.
Figure 10 is the front view of the first bolt of the rail joint clamping device representing embodiment of the present invention 1.
Figure 11 is the front view of the second bolt of the rail joint clamping device representing embodiment of the present invention 1.
Figure 12 is the top view of the cushion block of the rail joint clamping device representing embodiment of the present invention 1.
Figure 13 is the sectional view of the cushion block of the rail joint clamping device representing embodiment of the present invention 1.
Figure 14 is the front view of the liner plate of the rail joint clamping device representing embodiment of the present invention 1.
Figure 15 be the structure of the rail joint clamping device representing embodiment of the present invention 2 outline figure, the left side is front view, and the right is sectional view.
The force analysis figure that Figure 16 is the angle at forcing unit of the rail joint clamping device representing embodiment of the present invention 1,2 when being θ 1.
The force analysis figure that Figure 17 is the angle at forcing unit of the rail joint clamping device representing embodiment of the present invention 1,2 when being θ 2.
The force analysis figure that Figure 18 is the angle at forcing unit of the rail joint clamping device representing embodiment of the present invention 1,2 when being θ 3.
Symbol description
1 | Rail |
2 | Splice bar |
3 | Chuck |
3a | Rail support clamping part |
3b | First matching part |
3c | Sawtooth |
3d | Second matching part |
4 | Forcing unit |
4a | Matching block |
4b | First bolt (force application part) |
5 | Lintel |
5a | Protruding |
5b | Installing hole |
6 | Cushion block |
7 | Slide plate |
8 | Second bolt |
9 | Liner plate |
9a | Forced section |
10 | 3rd bolt |
11 | Bent plate |
12 | Safety plug |
13 | Bending screw rod |
14 | First nut |
Detailed description of the invention
Below the specific embodiment of the present invention is elaborated.Following embodiment is only an example of technical solution of the present invention, should not be interpreted as limiting the scope of the present invention.Reference numeral identical in accompanying drawing is for marking same or analogous technical characteristic.Following explanation is only exemplary.
embodiment 1
Fig. 2 be the structure of the rail joint clamping device representing present embodiment 1 outline figure, its left side is front view, and the right is sectional view.Fig. 3, Fig. 4 and Fig. 5 are the top view of the structure of the rail joint clamping device representing present embodiment 1, lateral view and stereogram respectively.
As shown in Figure 2-5, the rail joint clamping device of present embodiment mainly comprises: the splice bar 2 being clipped in rail 1 both sides; By the chuck 3 that splice bar 2 clamps to rail 1; And exert a force to chuck with the forcing unit 4 making it clamp angularly with horizontal plane.
As shown in Figure 1, forcing unit 4 comprises: as the first bolt 4b of force application part; For fixing the matching block 4a of the first bolt 4b; And pass below rail 1 and a pair lintel 5 of matching connection parts 4a.
Fig. 6, Fig. 7 are front view and the top view of the lintel 5 representing present embodiment 1 respectively.As shown in Figure 6, Figure 7, the stage casing of lintel 5 is cylinder, and two ends raise up, the overall width of lintel 5 is consistent, be that cylindrical diameter is identical with stage casing, the protruding 5a at lintel 5 two ends be respectively equipped with installing hole 5b, be connected for mating with the matching block 4a of forcing unit 4.
In addition, the minimum spacing in reality between rail and railway roadbed is mostly 25mm, so in present embodiment, cylindrical for the stage casing of lintel diameter is set as below 25mm.
Fig. 8, Fig. 9 are stereogram and the sectional view of the chuck 3 representing present embodiment 1 respectively.As shown in Figure 8,9, chuck 3 comprises: for clamp the bottom base of rail rail support clamping part 3a and for mate the first bolt 4b and bear its force the first matching part 3b.In addition, the outside of rail support clamping part 3a has sawtooth 3c.
Figure 10 is the front view of the first bolt 4b representing present embodiment 1.Plane is formed on the bottom of the first bolt 4b as shown in Figure 10.
In addition, be provided with cushion block 6 between the first matching part 3b and the first bolt 4b, this cushion block 6 is formed as center and has the circular of screw thread 6a.Figure 12,13 is the top view and the sectional view that represent cushion block respectively.Consider that the stress that the first bolt 4b applies chuck 3 is very big, but chuck 3 must keep certain plasticity, its rigidity can not be excessive, in order to ensure that the contact position of the first bolt 4b and chuck 3 is not subject to stress rupture, and the larger cushion block of rigidity 6 is set, this cushion block is entrenched in the first matching part 3b, has extremely strong rigidity, can bear the power from the first bolt 4b and not be destroyed.In addition, consider that this cushion block 6 is entrenched in the first matching part 3b, not easily take out, therefore be formed centrally screw thread 6a wherein, so that take out.
Figure 16-18 be the rail joint clamping device representing present embodiment 1 take lintel as the force analysis figure of research object.It sets θ 1, θ 2, θ 3 three angles.θ 1 is minimum design angle, and θ 2 is maximum design angle, θ 1< θ 3< θ 2.
Figure 16 illustrates θ 1, the situation of namely minimum design angle.As shown in figure 16, lower bolt to be produced lintel by the cylinder at back rest two ends and level is the power F of θ 1 jiao, is decomposed into horizontal component Fx and vertical stress component.At the bottom of Rail, vertical force Fy1 is produced to lintel.Because the quality of lintel itself is very little, suffered gravity is very little compared with F, omits and disregards.
Equilibrium equation is as follows:
Fx=Fx……①
Fy+Fy=Fy1……②
Fx*y+Fx*y=Fy*x1……③
Fx=F*cosθ1……④
Fy=F*sinθ1……⑤
Arrange above-mentioned equation to be easy to get: θ 1=arctan
.
Figure 17 illustrates θ 2, the situation of namely maximum design angle.As shown in figure 17, lower bolt to be produced lintel by the cylinder at back rest two ends and level is the power F of θ 2 jiaos, is decomposed into horizontal component Fx and vertical stress component.At the bottom of Rail, vertical force Fy2 is produced to lintel.Because the quality of lintel itself is very little, suffered gravity is very little compared with F, omits and disregards.
Equilibrium equation is as follows:
Fx=Fx……①
Fy+Fy=Fy2……②
Fx*y+Fx*y=Fy*x2……③
Fx=F*cosθ2……④
Fy=F*sinθ2……⑤
Arrange above-mentioned equation to be easy to get: θ 2=arctan
.
In sum, ensure an intermediate cylindrical parts tension stress of lintel, lower bolt produces the angle theta 3 of power F and level by the cylinder at back rest two ends between θ 1 and θ 2 jiaos to lintel.Figure 18 illustrates the situation of this θ 3, i.e. θ 1< θ 3< θ 2.As seen from the figure, now, x2<x3<x1.
Lower bolt to be produced lintel by the cylinder at back rest two ends and level is the power F of θ 3 jiaos, is decomposed into horizontal component Fx and vertical stress component.At the bottom of Rail, vertical force Fy3 is produced to lintel.Because the quality of lintel itself is very little, suffered gravity is very little compared with F, omits and disregards.
Equilibrium equation is as follows:
Fx=Fx……①
Fy+Fy=Fy3……②
Fx*y+Fx*y=Fy*x3……③
Fx=F*cosθ3……④
Fy=F*sinθ3……⑤
Arrange above-mentioned equation to be easy to get: θ 3=arctan
Present embodiment, in get θ 3=7 °.But in practical operation, can according to circumstances set the value be more suitable for.
In addition, consider that the hole in prior art on splice bar 2 does not meet the situation of installation requirement, liner plate 9 can be set between splice bar 2 and chuck 3, liner plate 9 has been spaced forced section 9a with what specify.
Figure 14 is the front view of the liner plate 9 representing present embodiment 1.In Figure 14, forced section 9a is arranged on liner plate 9 with certain spacing, and the dotted line in figure represents the hole on the correspondence position of splice bar 2, obviously visible, the arranging density of the upper forced section 9a of liner plate 9 is greater than the hole on splice bar 2, therefore significantly can improve the mobility of installation.In addition, liner plate 9 also has screw 9b, therefore, as shown in Figure 2, fixed by the 3rd bolt 10 between splice bar 2 and liner plate 9, in the head of the 3rd bolt 10 gap between rail 1 and splice bar 2.
The connection operation that splice bar 2 is connected with liner plate 9, can complete in advance, remake and be as a wholely together mounted to rail 1 before installation splice bar 2, simple to operate.And, due in gap between rail 1 and splice bar 2 of the head of bolt, can installation space be saved.
In addition, as shown in figure 14, forced section 9a is in roughly quadrangle, and the slide plate 7 be wherein provided with, this slide plate 7 can slide along the vertical direction, and is provided with the installing hole 7a mated with the second bolt at center.
In addition, as shown in Figure 8,9, chuck 3 also comprises the second matching part 3d passed through for the second bolt 8, and the second bolt 8 exerts a force to splice bar 2 and makes it clamp further.
Figure 11 is the front view of the second bolt 8 representing present embodiment 1.As shown in Figure 11, the bottom of the second bolt 8 is arc-shaped.
In addition, as shown in Figure 2-5, the first bolt 4b and the second bolt 8 are connected as one by bent plate 11, and chuck 3 overall structure therefore can be made more stable.
In addition, as shown in Figure 4,5, the second bolt 8 is provided with safety plug 12, prevents bent plate 11 from coming off, and no matter is therefore the reason of vibration or artificial reason, all cannot takes off bent plate 11 easily, thus ensure the stability of chuck 3 entirety further.
According to said structure, because rail joint clamping device comprises: the splice bar 2 being clipped in rail 1 both sides; By the chuck 3 that splice bar 2 clamps to rail 1; And exert a force with the forcing unit 4 making it clamp to chuck angularly with horizontal plane, therefore the moment that the downward moment produced at the two ends of forcing unit 4 is applied in the component of power is offset, make forcing unit 4 only by pulling force, avoid flexural deformation, extend application life.
According to said structure, because forcing unit 4 comprises: as the first bolt 4b of force application part; For fixing the matching block 4a of the first bolt 4b; And pass below rail 1 and a pair lintel 5 of matching connection parts 4a, the stage casing of lintel 5 is cylinder, and two ends raise up, the overall width of lintel 5 is consistent, be that cylindrical diameter is identical with stage casing, therefore, when installing lintel 5, only it need be made to lie down around axial rotation, pass after below rail 1 with its width distance, then rotation makes it hold up, thus, even if the protruding 5a at the two ends of lintel 5 is higher than the spacing between rail 1 and railway roadbed, also installation can be completed like a cork.And, due to the first nut 4b and horizontal plane angled, be therefore convenient to install.
According to said structure, the cylindrical diameter in the stage casing due to lintel 5 is less than 25mm, therefore can easily through most rail and railway roadbed.
According to said structure, because chuck 3 comprises: for clamp the bottom base of rail rail support clamping part 3a and for mate the first bolt 4b and bear its force the first matching part 3b, therefore, first bolt 4b can through the first coupling 3b portion force of matching block 4a to chuck 3, and then make chuck 3 clamp.
According to said structure, owing to being provided with cushion block 6 between the first matching part 3b and the first bolt 4b, the stronger material of rigidity therefore can be adopted to make cushion block 6, ensure chuck 3 powerful stressed under there is not deformation.And to be formed as center tool threaded circular due to this cushion block 6, therefore, easily take out by screwing togather when taking out.
According to said structure, owing to being provided with liner plate 9 between splice bar 2 and chuck 3, be spaced forced section 9a with regulation on liner plate 9, even if the setting position in the hole therefore on splice bar 2 does not meet the installation requirement of clamping device, the forced section 9a also by liner plate 9 installs.
According to said structure, because forced section 9a is in roughly quadrangle, the slide plate 7 be wherein provided with, this slide plate 7 can slide along the vertical direction, and the installing hole 7a mated with the second bolt 8 is provided with at center, therefore the installation site of the second bolt 8 is adjusted by the slip of slide plate 7, to realize best clamped position.And the center due to slide plate 7 is provided with the installing hole 7a mated with the second bolt 8, therefore can farthest avoid bolt stress to its destruction.
embodiment 2
Figure 15 be the structure of the rail joint clamping device representing present embodiment 2 outline figure, the left side is front view, and the right is sectional view.
As shown in figure 15, the rail joint clamping device of present embodiment mainly comprises: the splice bar 2 being clipped in rail 1 both sides; By the chuck 3 that splice bar 2 clamps to rail 1; And exert a force to chuck with the forcing unit making it clamp angularly with horizontal plane.
As shown in figure 15, forcing unit comprises: through the bending screw rod 13 that, two ends are upturned below rail 1, and be installed on the first nut 14 of bending screw rod 13.
In present embodiment, the force analysis figure of bending screw rod 13 is consistent with the force analysis figure of lintel in embodiment 1, therefore does not repeat to set forth at this.
According to said structure, because forcing unit comprises: through the bending screw rod 13 that, two ends are upturned below rail 1, and be installed on the first nut 14 of bending screw rod 13, therefore the downward moment produced at the two ends of bending screw rod 13 is biased the moment counteracting that unit applies the component of power, make bending screw rod 13 only by pulling force, avoid the flexural deformation of bending screw rod 13, extend application life.
In addition, although present embodiment only depicts sketch, but it is the same with embodiment 1, second bolt 8, liner plate 9, slide plate 7, the 3rd bolt 10, bent plate 11, safety plug 12 etc. can be set, to ensure clip stability further, because facilities is identical with embodiment 1, therefore do not repeat to set forth at this.
Although the present invention describes with reference to current specific embodiment; but those of ordinary skill in the art will be appreciated that; it is of the present invention that above embodiment is only used to explanation; should understand and wherein can make various changes and revise; and do not depart from the present invention in a broad sense; so not as limitation of the invention, as long as in spirit of the present invention, the change of above embodiment, distortion all will be dropped in the protection domain of claims of the present invention.
Claims (11)
1. a rail joint clamping device, is characterized in that, comprising: the splice bar being clipped in rail both sides;
By the chuck that described splice bar clamps to rail; And
Exert a force with the forcing unit making it clamp to described chuck angularly with horizontal plane, described forcing unit comprises: as the first bolt of force application part; For the matching block of fixing described first bolt; And pass below rail and connect a pair lintel of described matching block, the stage casing of described lintel is cylinder, two ends raise up, the overall width of described lintel is consistent, be that cylindrical diameter is identical with described stage casing, the projection at described lintel two ends being respectively equipped with installing hole, being connected for mating with the described matching block of described forcing unit.
2. rail joint clamping device as claimed in claim 1, it is characterized in that, the cylindrical diameter in stage casing of described lintel is less than 25mm.
3. rail joint clamping device as claimed in claim 2, it is characterized in that, described chuck comprises: for clamping the rail support clamping part of the bottom base of rail; And for mating described first bolt and bearing its first matching part exerted a force.
4. rail joint clamping device as claimed in claim 3, it is characterized in that, be provided with cushion block between described first matching part and described first bolt, it is threaded circular that this cushion block is formed as center tool.
5. rail joint clamping device as claimed in claim 1, it is characterized in that, described forcing unit comprises: through the bending screw rod that, two ends are upturned below rail, and be installed on the first nut of described bending screw rod.
6. the rail joint clamping device according to any one of claim 1-5, is characterized in that, is provided with liner plate between described splice bar and described chuck, and described liner plate has been spaced forced section with what specify.
7. rail joint clamping device as claimed in claim 6, is characterized in that, described chuck also comprises the second matching part passed through for the second bolt, and described second bolt makes it clamp to described splice bar force.
8. rail joint clamping device as claimed in claim 7, is characterized in that, described forced section is in roughly quadrangle, and be wherein provided with slide plate, this slide plate can slide along the vertical direction, and is provided with the installing hole mated with described second bolt at center.
9. rail joint clamping device as claimed in claim 8, be is characterized in that, fixed between described splice bar and described liner plate by the 3rd bolt.
10. rail joint clamping device as claimed in claim 7, it is characterized in that, described first bolt and described second bolt are connected as one by bent plate.
11. rail joint clamping devices as claimed in claim 10, it is characterized in that, described second bolt is provided with safety plug, prevents described bent plate from coming off.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210246904.3A CN103541283B (en) | 2012-07-17 | 2012-07-17 | Rail joint clamping device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210246904.3A CN103541283B (en) | 2012-07-17 | 2012-07-17 | Rail joint clamping device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103541283A CN103541283A (en) | 2014-01-29 |
CN103541283B true CN103541283B (en) | 2016-03-09 |
Family
ID=49965109
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210246904.3A Active CN103541283B (en) | 2012-07-17 | 2012-07-17 | Rail joint clamping device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103541283B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202015005277U1 (en) * | 2015-07-24 | 2015-08-26 | Robel Bahnbaumaschinen Gmbh | Securing system for a emergency tab connector. |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2760246A1 (en) * | 1997-01-28 | 1998-09-04 | Robel Georg Gmbh & Co | CLAMP FOR TEMPORARILY CONNECTING TWO SUCCESSIVE RAILS |
DE20311248U1 (en) * | 2003-07-21 | 2003-09-25 | A. Vieregge - Elsethal GmbH & Co., 58840 Plettenberg | Emergency fishplate connector for railway rail butt plate has curved arm supporting screw operated clamp to engage opposing sides of butt plate |
DE20318515U1 (en) * | 2003-11-29 | 2004-03-04 | Robel Bahnbaumaschinen Gmbh | emergency fish-plate |
CN2677428Y (en) * | 2003-06-03 | 2005-02-09 | 上海铁路局工务处 | Large-drag non-porous clamp device for rail joint |
CN202830654U (en) * | 2012-07-17 | 2013-03-27 | 上海瑞纽机械装备制造有限公司 | Clamping device for steel rail joints |
-
2012
- 2012-07-17 CN CN201210246904.3A patent/CN103541283B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2760246A1 (en) * | 1997-01-28 | 1998-09-04 | Robel Georg Gmbh & Co | CLAMP FOR TEMPORARILY CONNECTING TWO SUCCESSIVE RAILS |
CN2677428Y (en) * | 2003-06-03 | 2005-02-09 | 上海铁路局工务处 | Large-drag non-porous clamp device for rail joint |
DE20311248U1 (en) * | 2003-07-21 | 2003-09-25 | A. Vieregge - Elsethal GmbH & Co., 58840 Plettenberg | Emergency fishplate connector for railway rail butt plate has curved arm supporting screw operated clamp to engage opposing sides of butt plate |
DE20318515U1 (en) * | 2003-11-29 | 2004-03-04 | Robel Bahnbaumaschinen Gmbh | emergency fish-plate |
CN202830654U (en) * | 2012-07-17 | 2013-03-27 | 上海瑞纽机械装备制造有限公司 | Clamping device for steel rail joints |
Also Published As
Publication number | Publication date |
---|---|
CN103541283A (en) | 2014-01-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202830654U (en) | Clamping device for steel rail joints | |
KR20090084420A (en) | Guardrail | |
CN103541283B (en) | Rail joint clamping device | |
CN102416969B (en) | Rail clamping device and locomotive traction positioning system | |
CN201581553U (en) | Square flange joint of lattice column | |
CN102996585B (en) | Embracing hoop applied transformer rack assembling method | |
CN215727288U (en) | Clamp for assisting R-area test piece in carrying out impact test | |
CN206690917U (en) | A kind of leading screw applied on underground railway track clamps support | |
CN104901253A (en) | Sliding type electrical equipment armor clamp | |
KR101898620B1 (en) | Seismic clamping device for water tank | |
CN202089083U (en) | Derailer mounting device | |
CN202607184U (en) | Dismounting apparatus of key control unit of common rail oil sprayer | |
CN204030030U (en) | Emergency power supply connecting clamp | |
CN210345237U (en) | Fixing device suitable for fixing bottom of lamp post | |
CN102003436A (en) | Fixing clamp for power engineering | |
CN220538473U (en) | Self-supporting column for fixing rail | |
CN204139010U (en) | Railway track displacement monitoring fixture | |
CN216042001U (en) | Adopt hydraulic shock absorber's protection architecture between shear force wall and cable curtain | |
JP2019094735A (en) | Sleeper with buckling prevention function and movement prevention function | |
CN203499548U (en) | Rapid fixing clip of contact net ladder truck | |
CN104442914B (en) | System for monitoring relative displacement between railway steel rail and rail board | |
CN220504692U (en) | Follow-on safety fence | |
CN205986077U (en) | Cable bracket for tunnel | |
CN204000479U (en) | Device for fixing running tracks | |
CN218549360U (en) | Pipeline supporting mechanism for weak current engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: 201314 Shanghai city Pudong New Area Xuanqiao Town Park Road No. 105 Applicant after: SHANGHAI RUINIU MACHINERY & EQUIPMENT MANUFACTURE CO., LTD. Address before: Shanghai City, Pudong New Area China Xuanqiao Town Park Road No. 105 Applicant before: ShangHai RuiNiu Machinery & Equipment Manufacture Co., Ltd. |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: SHANGHAI RUINIU MACHINERY + EQUIPMENT MANUFACTURE CO., LTD. TO: SHANGHAI RUINIU MACHINERY + EQUIPMENT MANUFACTURE CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |