CN103530735A - Assessment method for daily operation and maintenance management capacity of disaster recovery center - Google Patents

Assessment method for daily operation and maintenance management capacity of disaster recovery center Download PDF

Info

Publication number
CN103530735A
CN103530735A CN201310501540.3A CN201310501540A CN103530735A CN 103530735 A CN103530735 A CN 103530735A CN 201310501540 A CN201310501540 A CN 201310501540A CN 103530735 A CN103530735 A CN 103530735A
Authority
CN
China
Prior art keywords
sub
assessment
expressed
assessment result
trannum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310501540.3A
Other languages
Chinese (zh)
Other versions
CN103530735B (en
Inventor
刘建毅
雷鸣涛
朱小陆
王枞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Posts and Telecommunications
Original Assignee
Beijing University of Posts and Telecommunications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Posts and Telecommunications filed Critical Beijing University of Posts and Telecommunications
Priority to CN201310501540.3A priority Critical patent/CN103530735B/en
Publication of CN103530735A publication Critical patent/CN103530735A/en
Application granted granted Critical
Publication of CN103530735B publication Critical patent/CN103530735B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides an assessment method for a daily operation and maintenance management capacity of a disaster recovery center. The assessment method is characterized in that assessment indicators of the daily operation and maintenance management capacity of the disaster recovery center are set comprehensively and reasonably, and the reasonable assessment method is set for different indicators, so that the assessment method can more reflect requirements of daily operation and maintenance management. During assessment, the assessment of the daily operation and maintenance management capacity of the disaster recovery center is classified, so that the assessment can be conducted step by step, assessment results are more referential, and certain evidence can be provided for an improvement on the daily operation and maintenance management.

Description

A kind of Disaster Preparation Center daily operation management capability evaluation method
(1) technical field
What the present invention relates to is a kind of Disaster Preparation Center daily operation management capability evaluation method.
(2) background technology
The foundation of Disaster Preparation Center, to provide one " insurance " for master data center, once master data center goes wrong, Disaster Preparation Center can take over business immediately, and after recovering at master data center by business switchback, to guarantee not interrupting of business, this is very necessary to requiring the user of 7 * 24 hours uninterrupted business.Hence one can see that, and the daily O&M of Disaster Preparation Center is
The present invention is a kind of method of the daily operation management ability of assessment Disaster Preparation Center, and the method can be made evaluation according to the daily operation management ability of operation conditions ,Dui Disaster Preparation Center of Disaster Preparation Center, provides assessment result, for its improvement provides foundation.
(3) summary of the invention
The present invention is to provide a kind of Disaster Preparation Center daily operation management capability evaluation method.The method can, according to the daily O&M situation of Disaster Preparation Center, be made evaluation to its daily O&M, thereby meet the requirement of user's disaster recovery comprehensively.A kind of Disaster Preparation Center daily operation management capability evaluation method lays down a regulation according to different index evaluation items, thereby meet, to the improvement that requires the daily operation management ability of ,Wei Disaster Preparation Center of different index evaluation items, provides foundation.
The object of the present invention is achieved like this:
The C of Disaster Preparation Center, its construction completes and the daily operation management ability of the C of Hou,Dui Disaster Preparation Center that puts into operation is assessed, and finds out the shortcoming and defect of its existence, draws assessment result;
The daily operation management capability evaluation of the C of Disaster Preparation Center is divided into organization and administration assessment, Disaster Preparation Center's day-to-day operation of Disaster Preparation Center's O&M and safeguards assessment and disaster recovery rehearsal assessment, is expressed as D, E, F;
The organization and administration assessment of Disaster Preparation Center's O&M is divided into the assessment of O&M organizational structure, O&M establishment officer qualification and technical capability evaluation and the daily management assessment of O&M team, is expressed as D<sub TranNum="55">1</sub>, D<sub TranNum="56">2</sub>, D<sub TranNum="57">3</sub>disaster Preparation Center's day-to-day operation and safeguard that assessment is divided into benchmark and checks system assessment, subsystem and switch checking assessment, data verification assessment, the assessment of disaster recovery and backup systems availability verification, the assessment of disaster recovery program management, daily O&M workflow management assessment, the assessment of daily operation management system and supervisory system and assess, is expressed as E<sub TranNum="58">1</sub>, E<sub TranNum="59">2</sub>, E<sub TranNum="60">3</sub>, E<sub TranNum="61">4</sub>, E<sub TranNum="62">5</sub>, E<sub TranNum="63">6</sub>, E<sub TranNum="64">7</sub>, E<sub TranNum="65">8</sub>, disaster recovery rehearsal assessment be divided into the preparation of rehearsal, the technical support of the training of rehearsal, rehearsal, the review and summarization of the switching of rehearsal and rollback, accident emergency disposal and rehearsal is expressed as F<sub TranNum="66">1</sub>, F<sub TranNum="67">2</sub>, F<sub TranNum="68">3</sub>, F<sub TranNum="69">4</sub>, F<sub TranNum="70">5</sub>, F<sub TranNum="71">6</sub>;
O&M organizational structure assessment D<sub TranNum="73">1</sub>comprise that full-time responsible official, full-time project manager, infrastructure safeguards the estimation items such as full-time staff, IT system maintainer, O&M workflow management personnel, information security responsible person, emergent and disaster recovery managerial personnel, disaster recovery program management personnel, O&M quality supervision auditor, 7 * 24 hours infrastructure O&M personnel, IT system monitoring in 7 * 24 hours and patrol officer and role arrange, be expressed as D<sub TranNum="74">11</sub>, D<sub TranNum="75">12</sub>... D<sub TranNum="76">112</sub>, D<sub TranNum="77">1a</sub>∈ 0,1}, a=1 ..., 12, D<sub TranNum="78">1</sub>assessment result be expressed as<img TranNum="79" file="BDA0000400150030000021.GIF" he="144" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="297"/>assessment result is expressed as CD<sub TranNum="80">1</sub>;
O&M establishment officer qualification and technical capability evaluation D<sub TranNum="82">2</sub>comprise infrastructure O&M personnel's qualification and technical ability, IT system maintainer's qualification and technical ability, emergent and disaster recovery managerial personnel qualification and technical ability, O&M workflow management personnel's qualification and technical ability, information security management personnel qualification and technical ability, IT system maintainer's equipment debugging experience, management of project manager experience, the estimation items such as emergent and disaster recovery managerial personnel system operation management experience, are expressed as D<sub TranNum="83">21</sub>, D<sub TranNum="84">22</sub>... D<sub TranNum="85">28</sub>, D<sub TranNum="86">2b</sub>∈ 0,1}, b=1 ..., 8, D<sub TranNum="87">2</sub>assessment result be expressed as<img TranNum="88" file="BDA0000400150030000022.GIF" he="141" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="304"/>assessment result is expressed as CD<sub TranNum="89">2</sub>;
The daily management assessment D of O&M team<sub TranNum="91">3</sub>the estimation items such as performance appraisal mechanism, O&M team communication mechanism, O&M team regular meeting system, the staff training of O&M team, O&M workflow and O&M work document that comprise the responsibility in O&M post and management system, recruitment and change management system, each O&M post, are expressed as D<sub TranNum="92">31</sub>, D<sub TranNum="93">32</sub>... D<sub TranNum="94">38</sub>, D<sub TranNum="95">3c</sub>∈ 0,1}, c=1 ..., 8, D<sub TranNum="96">3</sub>assessment result be expressed as<img TranNum="97" file="BDA0000400150030000023.GIF" he="150" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="296"/>assessment result is expressed as CD<sub TranNum="98">3</sub>;
Benchmark is checked system assessment E 1comprise that documents based on is examined, benchmark is checked the estimation items such as record and benchmark change record, be expressed as E 11, E 12, E 13, E 1d∈ { 0,1}, d=1,2,3, E 1assessment result be expressed as
Figure BDA0000400150030000024
assessment result is expressed as CE 1;
Subsystem switches checking assessment E 2the estimation items such as compliance inspection, switching and switchback technical identification, handoff procedure monitoring, innovative approach and technical testing report that comprise switching flow, are expressed as E 21, E 22... E 25, E 2e∈ 0,1}, e=1 ..., 5, E 2assessment result be expressed as assessment result is expressed as CE 2;
Data verification assessment E 3comprise that backup rules, Backup Data are made regular check on, calamity is for estimation items such as data management systems, is expressed as E 31, E 32, E 33, E 3f∈ 0,1}, f=1 ..., 3, E 3assessment result be expressed as
Figure BDA0000400150030000026
assessment result is expressed as CE 3;
Disaster recovery and backup systems availability verification assessment E 4comprise that calamity for estimation items such as the regular availability verification of application software and regularly rehearsal mechanism, is expressed as E for the regular availability verification of platform, calamity for the regular availability verification of end data, calamity 41, E 42... E 44, E 4g∈ 0,1}, g=1 ..., 4, E 4assessment result be expressed as
Figure BDA0000400150030000031
assessment result is expressed as CE 4;
Disaster recovery program management assessment E 5comprise that prediction scheme redaction generates management, new prediction scheme desktop maneuvers, prediction scheme preservation mechanism, prediction scheme distribution mechanisms, prediction scheme call-by mechanism, prediction scheme version management, prediction scheme revision mechanism, prediction scheme evaluation mechanism and prediction scheme and destroys the estimation items such as mechanism, be expressed as E 51, E 52... E 59, E 5h∈ 0,1}, h=1 ..., 9, E 5assessment result be expressed as assessment result is expressed as CE 5;
Daily O&M workflow management assessment E<sub TranNum="145">6</sub>comprise that disaster recovery and backup systems implement that delivery management mechanism, event response are machine-processed, the estimation items such as change auditing flow, account for assets management, job record document and Disaster Preparation Center's knowledge base, be expressed as E<sub TranNum="146">61</sub>, E<sub TranNum="147">62</sub>... E<sub TranNum="148">66</sub>, E<sub TranNum="149">6i</sub>∈ 0,1}, i=1 ..., 6, E<sub TranNum="150">6</sub>assessment result be expressed as<img TranNum="151" file="BDA0000400150030000033.GIF" he="144" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="285"/>assessment result is expressed as CE<sub TranNum="152">6</sub>;
Daily operation management system assessment E 7comprise the estimation items such as outsourcing management, regular job management, document management, quality audit, information security management, backup data management, system account management, system verification management, exercise management and duty management, be expressed as E 71, E 72... E 710, E 7j∈ 0,1}, j=1 ..., 10, E 7assessment result be expressed as
Figure BDA0000400150030000034
assessment result is expressed as CE 7;
Supervisory system assessment E 8comprise the estimation items such as the standby monitoring of the monitoring cycle of operation, monitoring range, data backup and replication status monitoring, monitoring alarm, IT performance monitoring, disaster recovery and backup systems monitoring, data backup or replication status monitoring, supervisory system and other system relevance and production and calamity relevance, be expressed as E 81, E 82... E 89, E 8k∈ 0,1}, k=1 ..., 9, E 8assessment result be expressed as
Figure BDA0000400150030000035
assessment result is expressed as CE 8;
The preparation assessment F of rehearsal 1comprise rehearsal scene analysis, rehearsal flow process, scene prediction scheme and switch handbook and drill the estimation items such as risk disposal, being expressed as F 11, F 12... F 14, F 1o∈ 0,1}, o=1 ..., 4, F 1assessment result be expressed as
Figure BDA0000400150030000036
assessment result is expressed as CF 1;
The Training Evaluation F of rehearsal 2comprise rehearsal Training Evaluation item, be expressed as F 21, F 21∈ { 0,1}, F 2assessment result be expressed as TF 2, assessment result is expressed as CF 2;
The technical support assessment F of rehearsal 3comprise rehearsal technical testing, rehearsal technician audit, rehearsal technology implementing procedure and drill in the estimation items such as accident emergency disposal, be expressed as F 31, F 32... F 34, F 3p∈ 0,1}, p=1 ..., 4, F 3assessment result be expressed as
Figure BDA0000400150030000041
assessment result is expressed as CF 3;
The switching of rehearsal and rollback assessment F 4comprise and drill switching with rollback flow process and drill the estimation items such as switching and backspace record, be expressed as F 41, F 42, F 4q∈ { 0,1}, q=1,2, F 4assessment result be expressed as
Figure BDA0000400150030000042
assessment result is expressed as CF 4;
Accident emergency disposal assessment F 5comprise the estimation items such as emergency disposal implementing procedure and emergency disposal enforcement record, be expressed as F 51, F 52, F 5r∈ { 0,1}, r=1,2, F 5assessment result be expressed as
Figure BDA0000400150030000043
assessment result is expressed as CF 5;
Review and the summarised assessment F of rehearsal 6comprise relevant checking and rehearsal summarised assessment item in rehearsal, be expressed as F 61, F 62, F 6s∈ { 0,1}, s=1,2, F 6assessment result be expressed as
Figure BDA0000400150030000044
assessment result is expressed as CF 6.
Its concrete grammar step is:
1: input O&M organizational structure assessment D<sub TranNum="222">1</sub>estimation items D<sub TranNum="223">1a</sub>∈ 0,1}, a=1 ..., 12, input O&M establishment officer qualification and technical capability evaluation D<sub TranNum="224">2</sub>estimation items D<sub TranNum="225">2b</sub>∈ 0,1}, b=1 ..., 8, the daily management assessment D of input O&M team<sub TranNum="226">3</sub>estimation items D<sub TranNum="227">3c</sub>∈ 0,1}, c=1 ..., 8, input reference is checked system assessment E<sub TranNum="228">1</sub>estimation items E<sub TranNum="229">1d</sub>∈ 0,1}, and d=1,2,3, input subsystem switches checking assessment E<sub TranNum="230">2</sub>estimation items E<sub TranNum="231">2e</sub>∈ 0,1}, e=1 ..., 5, input data variation assessment E<sub TranNum="232">3</sub>estimation items E<sub TranNum="233">3f</sub>∈ 0,1}, f=1 ..., 3, input disaster recovery and backup systems availability verification assessment E<sub TranNum="234">4</sub>estimation items E<sub TranNum="235">4g</sub>∈ 0,1}, g=1 ..., 4, input disaster recovery program management assessment E<sub TranNum="236">5</sub>estimation items E<sub TranNum="237">5h</sub>∈ 0,1}, h=1 ..., 9, input daily O&M workflow management assessment E<sub TranNum="238">6</sub>estimation items E<sub TranNum="239">6i</sub>∈ 0,1}, i=1 ..., 6, input daily operation management system assessment E<sub TranNum="240">7</sub>estimation items E<sub TranNum="241">7j</sub>∈ 0,1}, j=1 ..., 10, input monitoring system evaluation E<sub TranNum="242">8</sub>estimation items E<sub TranNum="243">8k</sub>∈ 0,1}, k=1 ..., 9, the preparation assessment F of input rehearsal<sub TranNum="244">1</sub>estimation items F<sub TranNum="245">1o</sub>∈ 0,1}, o=1 ..., 4, the Training Evaluation F of input rehearsal<sub TranNum="246">2</sub>estimation items F<sub TranNum="247">21</sub>∈ { 0,1}, the technical support assessment F of input rehearsal<sub TranNum="248">3</sub>estimation items F<sub TranNum="249">3p</sub>∈ 0,1}, p=1 ..., 4, the switching of input rehearsal and rollback assessment F<sub TranNum="250">4</sub>estimation items F<sub TranNum="251">4q</sub>∈ { 0,1}, q=1,2, input accident emergency disposal assessment F<sub TranNum="252">5</sub>estimation items F<sub TranNum="253">5r</sub>∈ { 0,1}, r=1,2, review and the summarised assessment F of input rehearsal<sub TranNum="254">6</sub>estimation items F<sub TranNum="255">6s</sub>∈ { 0,1}, s=1,2;
2: calculate D 1assessment result be expressed as
Figure BDA0000400150030000051
3: if TD<sub TranNum="260">1</sub>=12, define D<sub TranNum="261">1</sub>assessment result CD<sub TranNum="262">1</sub>for complete O&M organizational structure, if TD<sub TranNum="263">1</sub>=0, define D<sub TranNum="264">1</sub>assessment result CD<sub TranNum="265">1</sub>for without O&M organizational structure, otherwise, definition D<sub TranNum="266">1</sub>assessment result CD<sub TranNum="267">1</sub>for incomplete O&M organizational structure;
4: calculate D 2assessment result be expressed as
5: if TD<sub TranNum="272">2</sub>=8, define D<sub TranNum="273">2</sub>assessment result CD<sub TranNum="274">2</sub>for comprehensive O&M establishment officer's qualification and technical ability, if TD<sub TranNum="275">2</sub>=0, define D<sub TranNum="276">2</sub>assessment result CD<sub TranNum="277">2</sub>wei Wu O&M establishment officer's qualification and technical ability, otherwise, definition D<sub TranNum="278">2</sub>assessment result CD<sub TranNum="279">2</sub>for incomplete O&M establishment officer's qualification and technical ability;
6: calculate D 3assessment result be expressed as
Figure BDA0000400150030000053
7: if TD<sub TranNum="284">3</sub>=8, define D<sub TranNum="285">3</sub>assessment result CD<sub TranNum="286">3</sub>for complete O&M team daily management, if TD<sub TranNum="287">3</sub>=0, define D<sub TranNum="288">3</sub>assessment result CD<sub TranNum="289">3</sub>the daily management of Wei Wu O&M team, otherwise, definition D<sub TranNum="290">3</sub>assessment result CD<sub TranNum="291">3</sub>for the daily management of incomplete O&M team;
8: calculate E 1assessment result be expressed as
Figure BDA0000400150030000054
9: if TE 1=1, define E 1assessment result CE 1for effective benchmark is checked, otherwise, definition E 1assessment result CE 1for invalid benchmark is checked;
10: calculate E 2assessment result be expressed as
Figure BDA0000400150030000055
11: if TE 2=1, define E 2assessment result CE 2for effectively subsystem switching checking, otherwise, definition E 2assessment result CE 2for invalid subsystem switches checking;
12: calculate E 3assessment result be expressed as
Figure BDA0000400150030000056
13: if TE 3=1, define E 3assessment result CE 3for active data checking, if not, definition E 3assessment result CE 3for invalid data verification;
14: calculate E 4assessment result be expressed as
15: if TE 4=1, define E 4assessment result CE 4for effective disaster recovery and backup systems availability verification, otherwise, definition E 4assessment result CE 4for invalid disaster recovery and backup systems availability verification;
16: calculate E 5assessment result be expressed as
Figure BDA0000400150030000062
17: if TE 5=9, define E 5assessment result CE 5for complete disaster recovery program management, if TE 5=0, define E 5assessment result CE 5for without disaster recovery program management, otherwise, definition E 5assessment result CE 5for incomplete disaster recovery program management;
18: calculate E 6assessment result be expressed as
Figure BDA0000400150030000063
19: if TE<sub TranNum="344">6</sub>=6, define E<sub TranNum="345">6</sub>assessment result CE<sub TranNum="346">6</sub>for complete daily O&M workflow management, if TE<sub TranNum="347">6</sub>=0, define E<sub TranNum="348">6</sub>assessment result CE<sub TranNum="349">6</sub>for without daily O&M workflow management, otherwise, definition E<sub TranNum="350">6</sub>assessment result CE<sub TranNum="351">6</sub>for incomplete daily O&M workflow management;
20: calculate E 7assessment result be expressed as
Figure BDA0000400150030000064
21: if TE 7=10, define E 7assessment result CE 7for complete daily operation management system, if TE 7=0, define E 7assessment result CE 7for without daily operation management system, otherwise, definition E 7assessment result CE 7for incomplete daily operation management system;
22: calculate E 8assessment result be expressed as
Figure BDA0000400150030000065
23: if TE 8=9, define E 8assessment result CE 8for complete supervisory system management, if TE 8=0, define E 8assessment result CE 8for managing without supervisory system, otherwise, definition E 8assessment result CE 8for incomplete supervisory system management;
24: calculate F 1assessment result be expressed as
Figure BDA0000400150030000066
25: if TF 1=11, define F 1assessment result CF 1for effectively rehearsal preparation, otherwise, definition F 1assessment result CF 1for invalid rehearsal is prepared;
26: calculate F 2assessment result be expressed as TF 2;
27: if TF 2=1, define F 2assessment result CF 2for there being the training of rehearsal, otherwise, definition F 2assessment result CF 2for the training without rehearsal;
28: calculate F 3assessment result be expressed as
Figure BDA0000400150030000071
29: if TF 3=1, define F 3assessment result CF 3for effectively rehearsal technical support, otherwise, definition F 3assessment result CF 3for invalid rehearsal technical support;
30: calculate F 4assessment result be expressed as
31: if TF 4=1, define F 4assessment result CF 4for effectively drilling and switch and rollback, otherwise, definition F 4assessment result CF 4for invalid rehearsal switching and rollback;
32: calculate F 5assessment result be expressed as
33: if TF 5=1, define F 5assessment result CF 5for effective accident emergency disposal, otherwise, definition F 5assessment result CF 5for invalid accident emergency disposal;
34: calculate F 6assessment result be expressed as
35: if TF 6=1, define F 6assessment result CF 6for effectively rehearsal review and summary, otherwise, definition F 6assessment result CF 6for invalid rehearsal is looked back and is summed up;
36: finish.
Key of the present invention is how comprehensive and reasonable arranges Disaster Preparation Center's daily operation management capability evaluation index, and for different index item, rational appraisal procedure is set, thereby makes appraisal procedure more reflect the demand of daily operation management.In evaluation process Zhong,Dui Disaster Preparation Center, daily operation management capability evaluation carries out classification, thereby carries out layer by layer deeply, making assessment result more have referential, and the improvement that can be daily operation management provides certain foundation.
Its main innovate point is as follows:
1, Comprehensive Disaster Preparation Center's daily operation management capability evaluation index is set, make its requirement of containing the daily operation management of Disaster Preparation Center completely, and reach the requirement of disaster recovery.
2, realized repeatedly take advantage of, the application in the daily operation management capability evaluation of Disaster Preparation Center of the method for superposition, and provide assessment result according to assessment result, make it more reliable.
(4) accompanying drawing explanation
Without accompanying drawing
(5) embodiment
Algorithm of the present invention is characterised in that:
The C of Disaster Preparation Center, its construction completes and the daily operation management ability of the C of Hou,Dui Disaster Preparation Center that puts into operation is assessed, and finds out the shortcoming and defect of its existence, draws assessment result;
The daily operation management capability evaluation of the C of Disaster Preparation Center is divided into organization and administration assessment, Disaster Preparation Center's day-to-day operation of Disaster Preparation Center's O&M and safeguards assessment and disaster recovery rehearsal assessment, is expressed as D, E, F;
The organization and administration assessment of Disaster Preparation Center's O&M is divided into the assessment of O&M organizational structure, O&M establishment officer qualification and technical capability evaluation and the daily management assessment of O&M team, is expressed as D<sub TranNum="442">1</sub>, D<sub TranNum="443">2</sub>, D<sub TranNum="444">3</sub>disaster Preparation Center's day-to-day operation and safeguard that assessment is divided into benchmark and checks system assessment, subsystem and switch checking assessment, data verification assessment, the assessment of disaster recovery and backup systems availability verification, the assessment of disaster recovery program management, daily O&M workflow management assessment, the assessment of daily operation management system and supervisory system and assess, is expressed as E<sub TranNum="445">1</sub>, E<sub TranNum="446">2</sub>, E<sub TranNum="447">3</sub>, E<sub TranNum="448">4</sub>, E<sub TranNum="449">5</sub>, E<sub TranNum="450">6</sub>, E<sub TranNum="451">7</sub>, E<sub TranNum="452">8</sub>, disaster recovery rehearsal assessment be divided into the preparation of rehearsal, the technical support of the training of rehearsal, rehearsal, the review and summarization of the switching of rehearsal and rollback, accident emergency disposal and rehearsal is expressed as F<sub TranNum="453">1</sub>, F<sub TranNum="454">2</sub>, F<sub TranNum="455">3</sub>, F<sub TranNum="456">4</sub>, F<sub TranNum="457">5</sub>, F<sub TranNum="458">6</sub>;
O&M organizational structure assessment D<sub TranNum="460">1</sub>comprise that full-time responsible official, full-time project manager, infrastructure safeguards the estimation items such as full-time staff, IT system maintainer, O&M workflow management personnel, information security responsible person, emergent and disaster recovery managerial personnel, disaster recovery program management personnel, O&M quality supervision auditor, 7 * 24 hours infrastructure O&M personnel, IT system monitoring in 7 * 24 hours and patrol officer and role arrange, be expressed as D<sub TranNum="461">11</sub>, D<sub TranNum="462">12</sub>... D<sub TranNum="463">112</sub>, D<sub TranNum="464">1a</sub>∈ 0,1}, a=1 ..., 12, D<sub TranNum="465">1</sub>assessment result be expressed as<img TranNum="466" file="BDA0000400150030000081.GIF" he="142" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="290"/>assessment result is expressed as CD<sub TranNum="467">1</sub>;
O&M establishment officer qualification and technical capability evaluation D<sub TranNum="469">2</sub>comprise infrastructure O&M personnel's qualification and technical ability, IT system maintainer's qualification and technical ability, emergent and disaster recovery managerial personnel qualification and technical ability, O&M workflow management personnel's qualification and technical ability, information security management personnel qualification and technical ability, IT system maintainer's equipment debugging experience, management of project manager experience, the estimation items such as emergent and disaster recovery managerial personnel system operation management experience, are expressed as D<sub TranNum="470">21</sub>, D<sub TranNum="471">22</sub>... D<sub TranNum="472">28</sub>, D<sub TranNum="473">2b</sub>∈ 0,1}, b=1 ..., 8, D<sub TranNum="474">2</sub>assessment result be expressed as<img TranNum="475" file="BDA0000400150030000082.GIF" he="142" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="303"/>assessment result is expressed as CD<sub TranNum="476">2</sub>;
The daily management assessment D of O&M team<sub TranNum="478">3</sub>the estimation items such as performance appraisal mechanism, O&M team communication mechanism, O&M team regular meeting system, the staff training of O&M team, O&M workflow and O&M work document that comprise the responsibility in O&M post and management system, recruitment and change management system, each O&M post, are expressed as D<sub TranNum="479">31</sub>, D<sub TranNum="480">32</sub>... D<sub TranNum="481">38</sub>, D<sub TranNum="482">3c</sub>∈ 0,1}, c=1 ..., 8, D<sub TranNum="483">3</sub>assessment result be expressed as<img TranNum="484" file="BDA0000400150030000091.GIF" he="147" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="296"/>assessment result is expressed as CD<sub TranNum="485">3</sub>;
Benchmark is checked system assessment E 1comprise that documents based on is examined, benchmark is checked the estimation items such as record and benchmark change record, be expressed as E 11, E 12, E 13, E 1d∈ { 0,1}, d=1,2,3, E 1assessment result be expressed as
Figure BDA0000400150030000092
assessment result is expressed as CE 1;
Subsystem switches checking assessment E 2the estimation items such as compliance inspection, switching and switchback technical identification, handoff procedure monitoring, innovative approach and technical testing report that comprise switching flow, are expressed as E 21, E 22... E 25, E 2e∈ 0,1}, e=1 ..., 5, E 2assessment result be expressed as assessment result is expressed as CE 2;
Data verification assessment E 3comprise that backup rules, Backup Data are made regular check on, calamity is for estimation items such as data management systems, is expressed as E 31, E 32, E 33, E 3f∈ 0,1}, f=1 ..., 3, E 3assessment result be expressed as
Figure BDA0000400150030000094
assessment result is expressed as CE 3;
Disaster recovery and backup systems availability verification assessment E 4comprise that calamity for estimation items such as the regular availability verification of application software and regularly rehearsal mechanism, is expressed as E for the regular availability verification of platform, calamity for the regular availability verification of end data, calamity 41, E 42... E 44, E 4g∈ 0,1}, g=1 ..., 4, E 4assessment result be expressed as
Figure BDA0000400150030000095
assessment result is expressed as CE 4;
Disaster recovery program management assessment E 5comprise that prediction scheme redaction generates management, new prediction scheme desktop maneuvers, prediction scheme preservation mechanism, prediction scheme distribution mechanisms, prediction scheme call-by mechanism, prediction scheme version management, prediction scheme revision mechanism, prediction scheme evaluation mechanism and prediction scheme and destroys the estimation items such as mechanism, be expressed as E 51, E 52... E 59, E 5h∈ 0,1}, h=1 ..., 9, E 5assessment result be expressed as
Figure BDA0000400150030000096
assessment result is expressed as CE 5;
Daily O&M workflow management assessment E<sub TranNum="532">6</sub>comprise that disaster recovery and backup systems implement that delivery management mechanism, event response are machine-processed, the estimation items such as change auditing flow, account for assets management, job record document and Disaster Preparation Center's knowledge base, be expressed as E<sub TranNum="533">61</sub>, E<sub TranNum="534">62</sub>... E<sub TranNum="535">66</sub>, E<sub TranNum="536">6i</sub>∈ 0,1}, i=1 ..., 6, E<sub TranNum="537">6</sub>assessment result be expressed as<img TranNum="538" file="BDA0000400150030000101.GIF" he="141" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="283"/>assessment result is expressed as CE<sub TranNum="539">6</sub>;
Daily operation management system assessment E 7comprise the estimation items such as outsourcing management, regular job management, document management, quality audit, information security management, backup data management, system account management, system verification management, exercise management and duty management, be expressed as E 71, E 72... E 710, E 7j∈ 0,1}, j=1 ..., 10, E 7assessment result be expressed as
Figure BDA0000400150030000102
assessment result is expressed as CE 7;
Supervisory system assessment E 8comprise the estimation items such as the standby monitoring of the monitoring cycle of operation, monitoring range, data backup and replication status monitoring, monitoring alarm, IT performance monitoring, disaster recovery and backup systems monitoring, data backup or replication status monitoring, supervisory system and other system relevance and production and calamity relevance, be expressed as E 81, E 82... E 89, E 8k∈ 0,1}, k=1 ..., 9, E 8assessment result be expressed as assessment result is expressed as CE 8;
The preparation assessment F of rehearsal 1comprise rehearsal scene analysis, rehearsal flow process, scene prediction scheme and switch handbook and drill the estimation items such as risk disposal, being expressed as F 11, F 12... F 14, F 1o∈ 0,1}, o=1 ..., 4, F 1assessment result be expressed as
Figure BDA0000400150030000104
assessment result is expressed as CF 1;
The Training Evaluation F of rehearsal 2comprise rehearsal Training Evaluation item, be expressed as F 21, F 21∈ { 0,1}, F 2assessment result be expressed as TF 2, assessment result is expressed as CF 2;
The technical support assessment F of rehearsal 3comprise rehearsal technical testing, rehearsal technician audit, rehearsal technology implementing procedure and drill in the estimation items such as accident emergency disposal, be expressed as F 31, F 32... F 34, F 3p∈ 0,1}, p=1 ..., 4, F 3assessment result be expressed as
Figure BDA0000400150030000105
assessment result is expressed as CF 3;
The switching of rehearsal and rollback assessment F 4comprise and drill switching with rollback flow process and drill the estimation items such as switching and backspace record, be expressed as F 41, F 42, F 4q∈ { 0,1}, q=1,2, F 4assessment result be expressed as
Figure BDA0000400150030000106
assessment result is expressed as CF 4;
Accident emergency disposal assessment F 5comprise the estimation items such as emergency disposal implementing procedure and emergency disposal enforcement record, be expressed as F 51, F 52, F 5r∈ { 0,1}, r=1,2, F 5assessment result be expressed as
Figure BDA0000400150030000111
assessment result is expressed as CF 5;
Review and the summarised assessment F of rehearsal 6comprise relevant checking and rehearsal summarised assessment item in rehearsal, be expressed as F 61, F 62, F 6s∈ { 0,1}, s=1,2, F 6assessment result be expressed as
Figure BDA0000400150030000112
assessment result is expressed as CF 6.
Its concrete grammar step is:
1: input O&M organizational structure assessment D<sub TranNum="609">1</sub>estimation items D<sub TranNum="610">1a</sub>∈ 0,1}, a=1 ..., 12, input O&M establishment officer qualification and technical capability evaluation D<sub TranNum="611">2</sub>estimation items D<sub TranNum="612">2b</sub>∈ 0,1}, b=1 ..., 8, the daily management assessment D of input O&M team<sub TranNum="613">3</sub>estimation items D<sub TranNum="614">3c</sub>∈ 0,1}, c=1 ..., 8, input reference is checked system assessment E<sub TranNum="615">1</sub>estimation items E<sub TranNum="616">1d</sub>∈ 0,1}, and d=1,2,3, input subsystem switches checking assessment E<sub TranNum="617">2</sub>estimation items E<sub TranNum="618">2e</sub>∈ 0,1}, e=1 ..., 5, input data variation assessment E<sub TranNum="619">3</sub>estimation items E<sub TranNum="620">3f</sub>∈ 0,1}, f=1 ..., 3, input disaster recovery and backup systems availability verification assessment E<sub TranNum="621">4</sub>estimation items E<sub TranNum="622">4g</sub>∈ 0,1}, g=1 ..., 4, input disaster recovery program management assessment E<sub TranNum="623">5</sub>estimation items E<sub TranNum="624">5h</sub>∈ 0,1}, h=1 ..., 9, input daily O&M workflow management assessment E<sub TranNum="625">6</sub>estimation items E<sub TranNum="626">6i</sub>∈ 0,1}, i=1 ..., 6, input daily operation management system assessment E<sub TranNum="627">7</sub>estimation items E<sub TranNum="628">7j</sub>∈ 0,1}, j=1 ..., 10, input monitoring system evaluation E<sub TranNum="629">8</sub>estimation items E<sub TranNum="630">8k</sub>∈ 0,1}, k=1 ..., 9, the preparation assessment F of input rehearsal<sub TranNum="631">1</sub>estimation items F<sub TranNum="632">1o</sub>∈ 0,1}, o=1 ..., 4, the Training Evaluation F of input rehearsal<sub TranNum="633">2</sub>estimation items F<sub TranNum="634">21</sub>∈ { 0,1}, the technical support assessment F of input rehearsal<sub TranNum="635">3</sub>estimation items F<sub TranNum="636">3p</sub>∈ 0,1}, p=1 ..., 4, the switching of input rehearsal and rollback assessment F<sub TranNum="637">4</sub>estimation items F<sub TranNum="638">4q</sub>∈ { 0,1}, q=1,2, input accident emergency disposal assessment F<sub TranNum="639">5</sub>estimation items F<sub TranNum="640">5r</sub>∈ { 0,1}, r=1,2, review and the summarised assessment F of input rehearsal<sub TranNum="641">6</sub>estimation items F<sub TranNum="642">6s</sub>∈ { 0,1}, s=1,2;
2: calculate D 1assessment result be expressed as
Figure BDA0000400150030000113
3: if TD<sub TranNum="647">1</sub>=12, define D<sub TranNum="648">1</sub>assessment result CD<sub TranNum="649">1</sub>for complete O&M organizational structure, if TD<sub TranNum="650">1</sub>=0, define D<sub TranNum="651">1</sub>assessment result CD<sub TranNum="652">1</sub>for without O&M organizational structure, otherwise, definition D<sub TranNum="653">1</sub>assessment result CD<sub TranNum="654">1</sub>for incomplete O&M organizational structure;
4: calculate D 2assessment result be expressed as
Figure BDA0000400150030000114
5: if TD<sub TranNum="659">2</sub>=8, define D<sub TranNum="660">2</sub>assessment result CD<sub TranNum="661">2</sub>for comprehensive O&M establishment officer's qualification and technical ability, if TD<sub TranNum="662">2</sub>=0, define D<sub TranNum="663">2</sub>assessment result CD<sub TranNum="664">2</sub>wei Wu O&M establishment officer's qualification and technical ability, otherwise, definition D<sub TranNum="665">2</sub>assessment result CD<sub TranNum="666">2</sub>for incomplete O&M establishment officer's qualification and technical ability;
6: calculate D 3assessment result be expressed as
Figure BDA0000400150030000121
7: if TD<sub TranNum="671">3</sub>=8, define D<sub TranNum="672">3</sub>assessment result CD<sub TranNum="673">3</sub>for complete O&M team daily management, if TD<sub TranNum="674">3</sub>=0, define D<sub TranNum="675">3</sub>assessment result CD<sub TranNum="676">3</sub>the daily management of Wei Wu O&M team, otherwise, definition D<sub TranNum="677">3</sub>assessment result CD<sub TranNum="678">3</sub>for the daily management of incomplete O&M team;
8: calculate E 1assessment result be expressed as
Figure BDA0000400150030000122
9: if TE 1=1, define E 1assessment result CE 1for effective benchmark is checked, otherwise, definition E 1assessment result CE 1for invalid benchmark is checked;
10: calculate E 2assessment result be expressed as
11: if TE 2=1, define E 2assessment result CE 2for effectively subsystem switching checking, otherwise, definition E 2assessment result CE 2for invalid subsystem switches checking;
12: calculate E 3assessment result be expressed as
Figure BDA0000400150030000124
13: if TE 3=1, define E 3assessment result CE 3for active data checking, if not, definition E 3assessment result CE 3for invalid data verification;
14: calculate E 4assessment result be expressed as
Figure BDA0000400150030000125
15: if TE 4=1, define E 4assessment result CE 4for effective disaster recovery and backup systems availability verification, otherwise, definition E 4assessment result CE 4for invalid disaster recovery and backup systems availability verification;
16: calculate E 5assessment result be expressed as
17: if TE 5=9, define E 5assessment result CE 5for complete disaster recovery program management, if TE 5=0, define E 5assessment result CE 5for without disaster recovery program management, otherwise, definition E 5assessment result CE 5for incomplete disaster recovery program management;
18: calculate E 6assessment result be expressed as
Figure BDA0000400150030000127
19: if TE<sub TranNum="731">6</sub>=6, define E<sub TranNum="732">6</sub>assessment result CE<sub TranNum="733">6</sub>for complete daily O&M workflow management, if TE<sub TranNum="734">6</sub>=0, define E<sub TranNum="735">6</sub>assessment result CE<sub TranNum="736">6</sub>for without daily O&M workflow management, otherwise, definition E<sub TranNum="737">6</sub>assessment result CE<sub TranNum="738">6</sub>for incomplete daily O&M workflow management;
20: calculate E 7assessment result be expressed as
Figure BDA0000400150030000131
21: if TE 7=10, define E 7assessment result CE 7for complete daily operation management system, if TE 7=0, define E 7assessment result CE 7for without daily operation management system, otherwise, definition E 7assessment result CE 7for incomplete daily operation management system;
22: calculate E 8assessment result be expressed as
Figure BDA0000400150030000132
23: if TE 8=9, define E 8assessment result CE 8for complete supervisory system management, if TE 8=0, define E 8assessment result CE 8for managing without supervisory system, otherwise, definition E 8assessment result CE 8for incomplete supervisory system management;
24: calculate F 1assessment result be expressed as
Figure BDA0000400150030000133
25: if TF 1=11, define F 1assessment result CF 1for effectively rehearsal preparation, otherwise, definition F 1assessment result CF 1for invalid rehearsal is prepared;
26: calculate F 2assessment result be expressed as TF 2;
27: if TF 2=1, define F 2assessment result CF 2for there being the training of rehearsal, otherwise, definition F 2assessment result CF 2for the training without rehearsal;
28: calculate F 3assessment result be expressed as
Figure BDA0000400150030000134
29: if TF 3=1, define F 3assessment result CF 3for effectively rehearsal technical support, otherwise, definition F 3assessment result CF 3for invalid rehearsal technical support;
30: calculate F 4assessment result be expressed as
Figure BDA0000400150030000135
31: if TF 4=1, define F 4assessment result CF 4for effectively drilling and switch and rollback, otherwise, definition F 4assessment result CF 4for invalid rehearsal switching and rollback;
32: calculate F 5assessment result be expressed as
Figure BDA0000400150030000141
33: if TF 5=1, define F 5assessment result CF 5for effective accident emergency disposal, otherwise, definition F 5assessment result CF 5for invalid accident emergency disposal;
34: calculate F 6assessment result be expressed as
35: if TF 6=1, define F 6assessment result CF 6for effectively rehearsal review and summary, otherwise, definition F 6assessment result CF 6for invalid rehearsal is looked back and is summed up;
36: finish.
Disaster Preparation Center's concrete Implementation Modes of daily operation management capability evaluation method is such:
The C of Disaster Preparation Center, after its construction completes and puts into operation, the organization and administration of Disaster Preparation Center's O&M of the C of Disaster Preparation Center, Disaster Preparation Center's day-to-day operation and maintenance and disaster recovery rehearsal are assessed, calculate assessment result, and derive assessment result by assessment result, so far, whole method Implementation Modes finishes.

Claims (2)

1.Yi Zhong Disaster Preparation Center daily operation management capability evaluation method, is characterized in that: the C of Disaster Preparation Center, and its construction completes and the daily operation management ability of the C of Hou,Dui Disaster Preparation Center that puts into operation is assessed, and finds out the shortcoming and defect of its existence, draws assessment result;
The daily operation management capability evaluation of the C of Disaster Preparation Center is divided into organization and administration assessment, Disaster Preparation Center's day-to-day operation of Disaster Preparation Center's O&M and safeguards assessment and disaster recovery rehearsal assessment, is expressed as D, E, F;
The organization and administration assessment of Disaster Preparation Center's O&M is divided into the assessment of O&M organizational structure, O&M establishment officer qualification and technical capability evaluation and the daily management assessment of O&M team, is expressed as D<sub TranNum="826">1</sub>, D<sub TranNum="827">2</sub>, D<sub TranNum="828">3</sub>disaster Preparation Center's day-to-day operation and safeguard that assessment is divided into benchmark and checks system assessment, subsystem and switch checking assessment, data verification assessment, the assessment of disaster recovery and backup systems availability verification, the assessment of disaster recovery program management, daily O&M workflow management assessment, the assessment of daily operation management system and supervisory system and assess, is expressed as E<sub TranNum="829">1</sub>, E<sub TranNum="830">2</sub>, E<sub TranNum="831">3</sub>, E<sub TranNum="832">4</sub>, E<sub TranNum="833">5</sub>, E<sub TranNum="834">6</sub>, E<sub TranNum="835">7</sub>, E<sub TranNum="836">8</sub>, disaster recovery rehearsal assessment be divided into the preparation of rehearsal, the technical support of the training of rehearsal, rehearsal, the review and summarization of the switching of rehearsal and rollback, accident emergency disposal and rehearsal is expressed as F<sub TranNum="837">1</sub>, F<sub TranNum="838">2</sub>, F<sub TranNum="839">3</sub>, F<sub TranNum="840">4</sub>, F<sub TranNum="841">5</sub>, F<sub TranNum="842">6</sub>;
O&M organizational structure assessment D<sub TranNum="844">1</sub>comprise that full-time responsible official, full-time project manager, infrastructure safeguards the estimation items such as full-time staff, IT system maintainer, O&M workflow management personnel, information security responsible person, emergent and disaster recovery managerial personnel, disaster recovery program management personnel, O&M quality supervision auditor, 7 * 24 hours infrastructure O&M personnel, IT system monitoring in 7 * 24 hours and patrol officer and role arrange, be expressed as D<sub TranNum="845">11</sub>, D<sub TranNum="846">12</sub>... D<sub TranNum="847">112</sub>, D<sub TranNum="848">1a</sub>∈ 0,1}, a=1 ..., 12, D<sub TranNum="849">1</sub>assessment result be expressed as<img TranNum="850" file="FDA0000400150020000011.GIF" he="141" id="ifm0001" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="290"/>assessment result is expressed as CD<sub TranNum="851">1</sub>;
O&M establishment officer qualification and technical capability evaluation D<sub TranNum="853">2</sub>comprise infrastructure O&M personnel's qualification and technical ability, IT system maintainer's qualification and technical ability, emergent and disaster recovery managerial personnel qualification and technical ability, O&M workflow management personnel's qualification and technical ability, information security management personnel qualification and technical ability, IT system maintainer's equipment debugging experience, management of project manager experience, the estimation items such as emergent and disaster recovery managerial personnel system operation management experience, are expressed as D<sub TranNum="854">21</sub>, D<sub TranNum="855">22</sub>... D<sub TranNum="856">28</sub>, D<sub TranNum="857">2b</sub>∈ 0,1}, b=1 ..., 8, D<sub TranNum="858">2</sub>assessment result be expressed as<img TranNum="859" file="FDA0000400150020000012.GIF" he="141" id="ifm0002" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="299"/>assessment result is expressed as CD<sub TranNum="860">2</sub>;
The daily management assessment D of O&M team<sub TranNum="862">3</sub>the estimation items such as performance appraisal mechanism, O&M team communication mechanism, O&M team regular meeting system, the staff training of O&M team, O&M workflow and O&M work document that comprise the responsibility in O&M post and management system, recruitment and change management system, each O&M post, are expressed as D<sub TranNum="863">31</sub>, D<sub TranNum="864">32</sub>... D<sub TranNum="865">38</sub>, D<sub TranNum="866">3c</sub>∈ 0,1}, c=1 ..., 8, D<sub TranNum="867">3</sub>assessment result be expressed as<img TranNum="868" file="FDA0000400150020000021.GIF" he="143" id="ifm0003" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="296"/>assessment result is expressed as CD<sub TranNum="869">3</sub>;
Benchmark is checked system assessment E 1comprise that documents based on is examined, benchmark is checked the estimation items such as record and benchmark change record, be expressed as E 11, E 12, E 13, E 1d∈ { 0,1}, d=1,2,3, E 1assessment result be expressed as assessment result is expressed as CE 1;
Subsystem switches checking assessment E 2the estimation items such as compliance inspection, switching and switchback technical identification, handoff procedure monitoring, innovative approach and technical testing report that comprise switching flow, are expressed as E 21, E 22... E 25, E 2e∈ 0,1}, e=1 ..., 5, E 2assessment result be expressed as
Figure FDA0000400150020000023
assessment result is expressed as CE 2;
Data verification assessment E 3comprise that backup rules, Backup Data are made regular check on, calamity is for estimation items such as data management systems, is expressed as E 31, E 32, E 33, E 3f∈ 0,1}, f=1 ..., 3, E 3assessment result be expressed as
Figure FDA0000400150020000024
assessment result is expressed as CE 3;
Disaster recovery and backup systems availability verification assessment E 4comprise that calamity for estimation items such as the regular availability verification of application software and regularly rehearsal mechanism, is expressed as E for the regular availability verification of platform, calamity for the regular availability verification of end data, calamity 41, E 42... E 44, E 4g∈ 0,1}, g=1 ..., 4, E 4assessment result be expressed as assessment result is expressed as CE 4;
Disaster recovery program management assessment E 5comprise that prediction scheme redaction generates management, new prediction scheme desktop maneuvers, prediction scheme preservation mechanism, prediction scheme distribution mechanisms, prediction scheme call-by mechanism, prediction scheme version management, prediction scheme revision mechanism, prediction scheme evaluation mechanism and prediction scheme and destroys the estimation items such as mechanism, be expressed as E 51, E 52... E 59, E 5h∈ 0,1}, h=1 ..., 9, E 5assessment result be expressed as
Figure FDA0000400150020000026
assessment result is expressed as CE 5;
Daily O&M workflow management assessment E<sub TranNum="916">6</sub>comprise that disaster recovery and backup systems implement that delivery management mechanism, event response are machine-processed, the estimation items such as change auditing flow, account for assets management, job record document and Disaster Preparation Center's knowledge base, be expressed as E<sub TranNum="917">61</sub>, E<sub TranNum="918">62</sub>... E<sub TranNum="919">66</sub>, E<sub TranNum="920">6i</sub>∈ 0,1}, i=1 ..., 6, E<sub TranNum="921">6</sub>assessment result be expressed as<img TranNum="922" file="FDA0000400150020000027.GIF" he="141" id="ifm0009" img-content="drawing" img-format="GIF" inline="no" orientation="portrait" wi="282"/>assessment result is expressed as CE<sub TranNum="923">6</sub>;
Daily operation management system assessment E 7comprise the estimation items such as outsourcing management, regular job management, document management, quality audit, information security management, backup data management, system account management, system verification management, exercise management and duty management, be expressed as E 71, E 72... E 710, E 7j∈ 0,1}, j=1 ..., 10, E 7assessment result be expressed as
Figure FDA0000400150020000031
assessment result is expressed as CE 7;
Supervisory system assessment E 8comprise the estimation items such as the standby monitoring of the monitoring cycle of operation, monitoring range, data backup and replication status monitoring, monitoring alarm, IT performance monitoring, disaster recovery and backup systems monitoring, data backup or replication status monitoring, supervisory system and other system relevance and production and calamity relevance, be expressed as E 81, E 82... E 89, E 8k∈ 0,1}, k=1 ..., 9, E 8assessment result be expressed as assessment result is expressed as CE 8;
The preparation assessment F of rehearsal 1comprise rehearsal scene analysis, rehearsal flow process, scene prediction scheme and switch handbook and drill the estimation items such as risk disposal, being expressed as F 11, F 12... F 14, F 1o∈ 0,1}, o=1 ..., 4, F 1assessment result be expressed as
Figure FDA0000400150020000033
assessment result is expressed as CF 1;
The Training Evaluation F of rehearsal 2comprise rehearsal Training Evaluation item, be expressed as F 21, F 21∈ { 0,1}, F 2assessment result be expressed as TF 2, assessment result is expressed as CF 2;
The technical support assessment F of rehearsal 3comprise rehearsal technical testing, rehearsal technician audit, rehearsal technology implementing procedure and drill in the estimation items such as accident emergency disposal, be expressed as F 31, F 32... F 34, F 3p∈ 0,1}, p=1 ..., 4, F 3assessment result be expressed as assessment result is expressed as CF 3;
The switching of rehearsal and rollback assessment F 4comprise and drill switching with rollback flow process and drill the estimation items such as switching and backspace record, be expressed as F 41, F 42, F 4q∈ { 0,1}, q=1,2, F 4assessment result be expressed as
Figure FDA0000400150020000035
assessment result is expressed as CF 4;
Accident emergency disposal assessment F 5comprise the estimation items such as emergency disposal implementing procedure and emergency disposal enforcement record, be expressed as F 51, F 52, F 5r∈ { 0,1}, r=1,2, F 5assessment result be expressed as
Figure FDA0000400150020000036
assessment result is expressed as CF 5;
Review and the summarised assessment F of rehearsal 6comprise relevant checking and rehearsal summarised assessment item in rehearsal, be expressed as F 61, F 62, F 6s∈ { 0,1}, s=1,2, F 6assessment result be expressed as
Figure FDA0000400150020000041
assessment result is expressed as CF 6.
2. the daily operation management capability evaluation of Disaster Preparation Center according to claim 1 method, is characterized in that: its concrete grammar step is:
1: input O&M organizational structure assessment D<sub TranNum="994">1</sub>estimation items D<sub TranNum="995">1a</sub>∈ 0,1}, a=1 ..., 12, input O&M establishment officer qualification and technical capability evaluation D<sub TranNum="996">2</sub>estimation items D<sub TranNum="997">2b</sub>∈ 0,1}, b=1 ..., 8, the daily management assessment D of input O&M team<sub TranNum="998">3</sub>estimation items D<sub TranNum="999">3c</sub>∈ 0,1}, c=1 ..., 8, input reference is checked system assessment E<sub TranNum="1000">1</sub>estimation items E<sub TranNum="1001">1d</sub>∈ 0,1}, and d=1,2,3, input subsystem switches checking assessment E<sub TranNum="1002">2</sub>estimation items E<sub TranNum="1003">2e</sub>∈ 0,1}, e=1 ..., 5, input data variation assessment E<sub TranNum="1004">3</sub>estimation items E<sub TranNum="1005">3f</sub>∈ 0,1}, f=1 ..., 3, input disaster recovery and backup systems availability verification assessment E<sub TranNum="1006">4</sub>estimation items E<sub TranNum="1007">4g</sub>∈ 0,1}, g=1 ..., 4, input disaster recovery program management assessment E<sub TranNum="1008">5</sub>estimation items E<sub TranNum="1009">5h</sub>∈ 0,1}, h=1 ..., 9, input daily O&M workflow management assessment E<sub TranNum="1010">6</sub>estimation items E<sub TranNum="1011">6i</sub>∈ 0,1}, i=1 ..., 6, input daily operation management system assessment E<sub TranNum="1012">7</sub>estimation items E<sub TranNum="1013">7j</sub>∈ 0,1}, j=1 ..., 10, input monitoring system evaluation E<sub TranNum="1014">8</sub>estimation items E<sub TranNum="1015">8k</sub>∈ 0,1}, k=1 ..., 9, the preparation assessment F of input rehearsal<sub TranNum="1016">1</sub>estimation items F<sub TranNum="1017">1o</sub>∈ 0,1}, o=1 ..., 4, the Training Evaluation F of input rehearsal<sub TranNum="1018">2</sub>estimation items F<sub TranNum="1019">21</sub>∈ { 0,1}, the technical support assessment F of input rehearsal<sub TranNum="1020">3</sub>estimation items F<sub TranNum="1021">3p</sub>∈ 0,1}, p=1 ..., 4, the switching of input rehearsal and rollback assessment F<sub TranNum="1022">4</sub>estimation items F<sub TranNum="1023">4q</sub>∈ { 0,1}, q=1,2, input accident emergency disposal assessment F<sub TranNum="1024">5</sub>estimation items F<sub TranNum="1025">5r</sub>∈ { 0,1}, r=1,2, review and the summarised assessment F of input rehearsal<sub TranNum="1026">6</sub>estimation items F<sub TranNum="1027">6s</sub>∈ { 0,1}, s=1,2;
2: calculate D 1assessment result be expressed as
3: if TD<sub TranNum="1032">1</sub>=12, define D<sub TranNum="1033">1</sub>assessment result CD<sub TranNum="1034">1</sub>for complete O&M organizational structure, if TD<sub TranNum="1035">1</sub>=0, define D<sub TranNum="1036">1</sub>assessment result CD<sub TranNum="1037">1</sub>for without O&M organizational structure, otherwise, definition D<sub TranNum="1038">1</sub>assessment result CD<sub TranNum="1039">1</sub>for incomplete O&M organizational structure;
4: calculate D 2assessment result be expressed as
Figure FDA0000400150020000043
5: if TD<sub TranNum="1044">2</sub>=8, define D<sub TranNum="1045">2</sub>assessment result CD<sub TranNum="1046">2</sub>for comprehensive O&M establishment officer's qualification and technical ability, if TD<sub TranNum="1047">2</sub>=0, define D<sub TranNum="1048">2</sub>assessment result CD<sub TranNum="1049">2</sub>wei Wu O&M establishment officer's qualification and technical ability, otherwise, definition D<sub TranNum="1050">2</sub>assessment result CD<sub TranNum="1051">2</sub>for incomplete O&M establishment officer's qualification and technical ability;
6: calculate D 3assessment result be expressed as
Figure FDA0000400150020000044
7: if TD<sub TranNum="1056">3</sub>=8, define D<sub TranNum="1057">3</sub>assessment result CD<sub TranNum="1058">3</sub>for complete O&M team daily management, if TD<sub TranNum="1059">3</sub>=0, define D<sub TranNum="1060">3</sub>assessment result CD<sub TranNum="1061">3</sub>the daily management of Wei Wu O&M team, otherwise, definition D<sub TranNum="1062">3</sub>assessment result CD<sub TranNum="1063">3</sub>for the daily management of incomplete O&M team;
8: calculate E 1assessment result be expressed as
Figure FDA0000400150020000051
9: if TE 1=1, define E 1assessment result CE 1for effective benchmark is checked, otherwise, definition E 1assessment result CE 1for invalid benchmark is checked;
10: calculate E 2assessment result be expressed as
Figure FDA0000400150020000052
11: if TE 2=1, define E 2assessment result CE 2for effectively subsystem switching checking, otherwise, definition E 2assessment result CE 2for invalid subsystem switches checking;
12: calculate E 3assessment result be expressed as
Figure FDA0000400150020000053
13: if TE 3=1, define E 3assessment result CE 3for active data checking, if not, definition E 3assessment result CE 3for invalid data verification;
14: calculate E 4assessment result be expressed as
Figure FDA0000400150020000054
15: if TE 4=1, define E 4assessment result CE 4for effective disaster recovery and backup systems availability verification, otherwise, definition E 4assessment result CE 4for invalid disaster recovery and backup systems availability verification;
16: calculate E 5assessment result be expressed as
17: if TE 5=9, define E 5assessment result CE 5for complete disaster recovery program management, if TE 5=0, define E 5assessment result CE 5for without disaster recovery program management, otherwise, definition E 5assessment result CE 5for incomplete disaster recovery program management;
18: calculate E 6assessment result be expressed as
Figure FDA0000400150020000056
19: if TE<sub TranNum="1116">6</sub>=6, define E<sub TranNum="1117">6</sub>assessment result CE<sub TranNum="1118">6</sub>for complete daily O&M workflow management, if TE<sub TranNum="1119">6</sub>=0, define E<sub TranNum="1120">6</sub>assessment result CE<sub TranNum="1121">6</sub>for without daily O&M workflow management, otherwise, definition E<sub TranNum="1122">6</sub>assessment result CE<sub TranNum="1123">6</sub>for incomplete daily O&M workflow management;
20: calculate E 7assessment result be expressed as
Figure FDA0000400150020000061
21: if TE 7=10, define E 7assessment result CE 7for complete daily operation management system, if TE 7=0, define E 7assessment result CE 7for without daily operation management system, otherwise, definition E 7assessment result CE 7for incomplete daily operation management system;
22: calculate E 8assessment result be expressed as
Figure FDA0000400150020000062
23: if TE 8=9, define E 8assessment result CE 8for complete supervisory system management, if TE 8=0, define E 8assessment result CE 8for managing without supervisory system, otherwise, definition E 8assessment result CE 8for incomplete supervisory system management;
24: calculate F 1assessment result be expressed as
Figure FDA0000400150020000063
25: if TF 1=11, define F 1assessment result CF 1for effectively rehearsal preparation, otherwise, definition F 1assessment result CF 1for invalid rehearsal is prepared;
26: calculate F 2assessment result be expressed as TF 2;
27: if TF 2=1, define F 2assessment result CF 2for there being the training of rehearsal, otherwise, definition F 2assessment result CF 2for the training without rehearsal;
28: calculate F 3assessment result be expressed as
Figure FDA0000400150020000064
29: if TF 3=1, define F 3assessment result CF 3for effectively rehearsal technical support, otherwise, definition F 3assessment result CF 3for invalid rehearsal technical support;
30: calculate F 4assessment result be expressed as
31: if TF 4=1, define F 4assessment result CF 4for effectively drilling and switch and rollback, otherwise, definition F 4assessment result CF 4for invalid rehearsal switching and rollback;
32: calculate F 5assessment result be expressed as
Figure FDA0000400150020000066
33: if TF 5=1, define F 5assessment result CF 5for effective accident emergency disposal, otherwise, definition F 5assessment result CF 5for invalid accident emergency disposal;
34: calculate F 6assessment result be expressed as
Figure FDA0000400150020000071
35: if TF 6=1, define F 6assessment result CF 6for effectively rehearsal review and summary, otherwise, definition F 6assessment result CF 6for invalid rehearsal is looked back and is summed up;
36: finish.
CN201310501540.3A 2013-10-23 2013-10-23 A kind of Disaster Preparation Center daily operation management capability assessment method Expired - Fee Related CN103530735B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310501540.3A CN103530735B (en) 2013-10-23 2013-10-23 A kind of Disaster Preparation Center daily operation management capability assessment method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310501540.3A CN103530735B (en) 2013-10-23 2013-10-23 A kind of Disaster Preparation Center daily operation management capability assessment method

Publications (2)

Publication Number Publication Date
CN103530735A true CN103530735A (en) 2014-01-22
CN103530735B CN103530735B (en) 2016-08-17

Family

ID=49932725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310501540.3A Expired - Fee Related CN103530735B (en) 2013-10-23 2013-10-23 A kind of Disaster Preparation Center daily operation management capability assessment method

Country Status (1)

Country Link
CN (1) CN103530735B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103905252A (en) * 2014-04-03 2014-07-02 北京邮电大学 Disaster backup system evaluation tool based on disaster simulation
CN104657667A (en) * 2015-02-10 2015-05-27 国网四川省电力公司电力科学研究院 Evaluating and predicting method for state of B/S architecture system
CN104820908A (en) * 2015-05-22 2015-08-05 中国石油化工股份有限公司 A risk-based equipment integrity management system for oil refining enterprises
CN106686104A (en) * 2017-01-04 2017-05-17 上海上讯信息技术股份有限公司 Method and device used for operation and maintenance of target server
CN106933156A (en) * 2017-04-14 2017-07-07 南方电网科学研究院有限责任公司 The O&M quality control method and device of a kind of transformer station
CN107766502A (en) * 2017-10-20 2018-03-06 上海新炬网络信息技术股份有限公司 A kind of Oracle RAC databases disaster tolerance switches drilling method
CN108153621A (en) * 2018-01-15 2018-06-12 农信银资金清算中心有限责任公司 A kind of standby emergent handover management system of cloud calamity
US10997015B2 (en) 2019-02-28 2021-05-04 International Business Machines Corporation Self-learning disaster-avoidance and recovery
CN112783889A (en) * 2019-11-07 2021-05-11 中国石油化工股份有限公司 Method and apparatus for establishing a library of change risk control measures
US11194628B2 (en) 2019-12-03 2021-12-07 International Business Machines Corporation Workload allocation utilizing real-time enterprise resiliency scoring
CN116185723A (en) * 2023-04-28 2023-05-30 杭州美创科技股份有限公司 Database disaster recovery switching exercise method, device, computer equipment and storage medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100077257A1 (en) * 2008-09-24 2010-03-25 At&T Intellectual Property I, L.P. Methods for disaster recoverability testing and validation
CN102932399A (en) * 2012-07-17 2013-02-13 中国电力科学研究院 Cloud disaster recovery system for power grid dispatching
CN103051473A (en) * 2012-12-18 2013-04-17 王钰 Network operation and maintenance support effect simulation method and system
CN103166798A (en) * 2013-03-27 2013-06-19 山东省计算中心 Integrated monitoring system for data backup and disaster recovery system and backup and disaster recovery device
CN103324715A (en) * 2013-06-20 2013-09-25 交通银行股份有限公司 Disaster recovery backup system availability detection method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100077257A1 (en) * 2008-09-24 2010-03-25 At&T Intellectual Property I, L.P. Methods for disaster recoverability testing and validation
CN102932399A (en) * 2012-07-17 2013-02-13 中国电力科学研究院 Cloud disaster recovery system for power grid dispatching
CN103051473A (en) * 2012-12-18 2013-04-17 王钰 Network operation and maintenance support effect simulation method and system
CN103166798A (en) * 2013-03-27 2013-06-19 山东省计算中心 Integrated monitoring system for data backup and disaster recovery system and backup and disaster recovery device
CN103324715A (en) * 2013-06-20 2013-09-25 交通银行股份有限公司 Disaster recovery backup system availability detection method and device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王桠楠: "信息系统灾难恢复能力评估方法研究", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *
陈敏刚等: "AHP和模糊综合评判在灾难恢复能力评估中的应用", 《计算机工程》 *

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103905252A (en) * 2014-04-03 2014-07-02 北京邮电大学 Disaster backup system evaluation tool based on disaster simulation
CN104657667A (en) * 2015-02-10 2015-05-27 国网四川省电力公司电力科学研究院 Evaluating and predicting method for state of B/S architecture system
CN104657667B (en) * 2015-02-10 2017-09-29 国网四川省电力公司电力科学研究院 A kind of B/S architecture systems state evaluation and Forecasting Methodology
CN104820908B (en) * 2015-05-22 2019-01-04 中国石油化工股份有限公司 A kind of appliance integrality management system of the oil refining enterprise based on risk
CN104820908A (en) * 2015-05-22 2015-08-05 中国石油化工股份有限公司 A risk-based equipment integrity management system for oil refining enterprises
CN106686104A (en) * 2017-01-04 2017-05-17 上海上讯信息技术股份有限公司 Method and device used for operation and maintenance of target server
CN106686104B (en) * 2017-01-04 2020-08-18 上海上讯信息技术股份有限公司 Method and equipment for operation and maintenance of target server
CN106933156A (en) * 2017-04-14 2017-07-07 南方电网科学研究院有限责任公司 The O&M quality control method and device of a kind of transformer station
CN106933156B (en) * 2017-04-14 2019-04-23 南方电网科学研究院有限责任公司 A kind of the O&M quality control method and device of substation
CN107766502A (en) * 2017-10-20 2018-03-06 上海新炬网络信息技术股份有限公司 A kind of Oracle RAC databases disaster tolerance switches drilling method
CN107766502B (en) * 2017-10-20 2021-03-23 上海新炬网络信息技术股份有限公司 Oracle RAC database disaster recovery switching drilling method
CN108153621A (en) * 2018-01-15 2018-06-12 农信银资金清算中心有限责任公司 A kind of standby emergent handover management system of cloud calamity
CN108153621B (en) * 2018-01-15 2021-03-02 农信银资金清算中心有限责任公司 Cloud disaster backup emergency switching management system
US10997015B2 (en) 2019-02-28 2021-05-04 International Business Machines Corporation Self-learning disaster-avoidance and recovery
CN112783889A (en) * 2019-11-07 2021-05-11 中国石油化工股份有限公司 Method and apparatus for establishing a library of change risk control measures
US11194628B2 (en) 2019-12-03 2021-12-07 International Business Machines Corporation Workload allocation utilizing real-time enterprise resiliency scoring
CN116185723A (en) * 2023-04-28 2023-05-30 杭州美创科技股份有限公司 Database disaster recovery switching exercise method, device, computer equipment and storage medium
CN116185723B (en) * 2023-04-28 2023-08-08 杭州美创科技股份有限公司 Database disaster recovery switching exercise method, device, computer equipment and storage medium

Also Published As

Publication number Publication date
CN103530735B (en) 2016-08-17

Similar Documents

Publication Publication Date Title
CN103530735A (en) Assessment method for daily operation and maintenance management capacity of disaster recovery center
He et al. A process mining approach to improve emergency rescue processes of fatal gas explosion accidents in Chinese coal mines
Cai Local governments and the suppression of popular resistance in China
McCool The need to be prepared: Disaster management in the hospitality industry
Wells et al. Modeling critical infrastructure resilience under compounding threats: A systematic literature review
CN104376430A (en) Hidden risk management system based on cloud service platform and implementing method of hidden risk management system
CN102496087A (en) HSE management system using computer technology, and application of the same
Janati et al. Emergency response of Iranian hospitals against disasters: a practical framework for improvement
Zare et al. Business continuity plan and risk assessment analysis in case of a cyber attack disaster in healthcare organizations
CN115860495A (en) Emergency plan processing method, device, equipment, medium and product
Tao et al. Analysis of traumatic occupational fatalities in China
CN104463448A (en) Emergency plan estimating system based on case reasoning
Pingel et al. World marrow donor association crisis response, business continuity, and disaster recovery guidelines
Pallagi et al. Increasing the resilience of critical infrastructures with defense zone system
Fitzgerald EDP risk analysis for contingency planning
Roycroft A Blended Model for the Public—Private Provision of Policing for England and Wales
Wong et al. Preparing for Euro 2012: developing a hazard risk assessment
Mahmoudi et al. A review of hospitals functional resilience and performance indicators
Zhang Notice of Retraction: E-government information security: Challenges and recommendations
Juri et al. The Effectiveness of SPPB-PKK and SKEB in Security Control Management and Key Management in Pasir Salak Community College
Shiu et al. The Database of Facilities Asset Management Application in the Disaster Reduction–Case Study of Ching Yun Building in Ching Yun University
Stephens et al. Continuity of Government as a Framework for Local Emergency Managers
Gui et al. Information technology risk management using frap (a case of insurance company)
Dixon Jr Information Technology Disaster Recovery Planning for Court Institutions
Golovina et al. Legal aspects of legislative regulation of information security and protection of information in data centers

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817