CN103527102B - Mechanical device capable of being used for carrying out ceiling drilling operation on ground - Google Patents

Mechanical device capable of being used for carrying out ceiling drilling operation on ground Download PDF

Info

Publication number
CN103527102B
CN103527102B CN201310017643.2A CN201310017643A CN103527102B CN 103527102 B CN103527102 B CN 103527102B CN 201310017643 A CN201310017643 A CN 201310017643A CN 103527102 B CN103527102 B CN 103527102B
Authority
CN
China
Prior art keywords
motion bar
fixed
ground
ceiling
fix bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310017643.2A
Other languages
Chinese (zh)
Other versions
CN103527102A (en
Inventor
杨志洲
岳献武
谢敏
黎小玲
黄宝华
廖清金
于恩龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huanan Decoration Design Engineering Co ltd
Shenzhen Huanan Decoration Group Co ltd
Original Assignee
SHENZHEN HUA'NAN DECORATION DESIGN ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN HUA'NAN DECORATION DESIGN ENGINEERING Co Ltd filed Critical SHENZHEN HUA'NAN DECORATION DESIGN ENGINEERING Co Ltd
Priority to CN201310017643.2A priority Critical patent/CN103527102B/en
Publication of CN103527102A publication Critical patent/CN103527102A/en
Application granted granted Critical
Publication of CN103527102B publication Critical patent/CN103527102B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a mechanical device capable of being used for carrying out ceiling drilling operation on the ground. The mechanical device capable of being used for carrying out the ceiling drilling operation on the ground comprises a base, a fixed rod, an operating rod, a movable rod and an electric drill. The base comprises a box body, the fixed rod is of a hollow cylindrical structure and comprises a fixed rod upper end and a fixed rod lower end, the top of the fixed rod lower end is fixed to the box body, the movable rod is arranged on the top of the fixed rod upper end and comprises a movable rod upper end and a movable rod lower end, and the electric drill is fixed to the movable rod upper end. Long-strip-shaped grooves which are communicated with each other are formed in the two sides of the fixed rod upper end, and the operating rod comprises a lever and a supporting rod. The mechanical device has the advantages of being capable of enabling decorators to carry out the ceiling drilling operation on the ground, avoiding working aloft, and reducing potential safety hazards. The decorators can be free from holding a drilling machine in hands when carrying out the ceiling drilling operation, and the mechanical device can reduce consumption of labor amount in operation, and meets environment-friendly and low-carbon requirements.

Description

The machinery of ceiling bore operation can on the ground be carried out
Technical field
The present invention relates to a kind of ceiling bore operation device, especially can on the ground carry out ceiling bore operation Machinery.
Background technology
When decoration worker carries out ceiling construction, the suspension rod of connection furred ceiling should be on the ceiling installed first, and install and hang Before bar, it is necessary to carry out ceiling bore operation, because this suspension rod is by the way that the expansion bolt screw cap anchoring of its upper end is existed In the hole of ceiling, so as to whole suspension rod be fixed on the ceiling.Because the floor height of general house building is generally 3.0~ 4.0m, far above the height of people, the ceiling bore operation that carry out on the ground so decoration worker cannot stand.At present, it is existing It is the method using ladder or operating platform is set up that decoration worker carries out ceiling bore operation, i.e.,:Decoration worker station 1.0~ Ceiling bore operation is carried out on 2.0m high ladder or operating platform.But this method has several drawbacks in that:First, upfitter People stands and during operation, belongs to work high above the ground on ladder or operating platform, dangerous very big;Secondly, decoration worker needs handss during drilling Rig operation is held, the amount of labour consumes big, and decoration worker often bores a hole and just needs a mobile ladder or operating platform, construction Inefficiency.
The content of the invention
In view of above-mentioned condition, it is necessary to provide a kind of machinery that can on the ground carry out ceiling bore operation.
A kind of machinery that can on the ground carry out ceiling bore operation, including base, fix bar, action bars, work Lever and electric drill, the base includes a casing, and the fix bar is hollow cylindrical structure, including fix bar upper end and fix bar Lower end, the fix bar lower end top is fixed on the casing, and the fix bar upper end top is provided with the motion bar, the motion bar bag Motion bar upper end and motion bar lower end are included, the electric drill is fixed on the motion bar upper end;The fix bar upper end both sides are provided with what is communicated Strip groove, the action bars includes lever and strut.
The motion bar is hollow cylindrical structure, and the motion bar lower end external diameter is slightly less than fix bar internal diameter, under the motion bar Insert in the fix bar upper end cavity at end.
Motion bar upper end to the lower end is divided into more piece, and the both sides of each section motion bar are relative to be provided with spacing identical spiral shell Hole, the motion bar gradually reduces from each section motion bar external diameter in lower end to upper end, and the little section motion bar insertion of external diameter is adjacent In the big section motion bar of external diameter, and the two sections motion bar is fixed through any one group of screw by bolt.
The lever includes two parallel pipes and bolt, and two parallel pipes are provided with spiral shell corresponding at three Hole, through the screw at three, bolt two ends make the two parallel pipe be fixed into a constant shape to the bolt by nut screwing clamping Shape, the pipe is provided with the three of screw and is respectively movable end, fixing end and force side.
Bolt on the movable end is located in the strip groove that the both sides of the fix bar upper end communicate, the spiral shell on the movable end Bolt and motion bar lower end top contact.
The strut one end is fixed on the bolt at the fixing end of lever, and the other end of the strut is fixed on casing, should Strut is parallel with fix bar.
The casing upper surface is provided with level indicator, and the casing lower section is provided with roller.
The level indicator is two, and two level indicator is arranged in a mutually vertical manner in tank surface.
The motion bar upper end is additionally provided with dust-proof umbrella.
The electric device is included the step of ceiling bore operation:
Step 1:According to the boring point designed on ceiling, the vertical corresponding point of projection are marked on the ground;
Step 2:By mobile base roller, regulation is fixed on the rig of motion bar upper end so as to drill central line and ground The vertical corresponding point centrage of face projection overlaps.
Step 3:By adjusting action bars, the force side on two parallel levers is exerted a force, control is located at the work in fix bar Lever is moved up so that motion bar and be fixed on the rig of motion bar upper end jack-up upwards, is directed at the brill designed on ceiling Hole point drilling, so as to complete ceiling bore operation.
The above-mentioned machinery that can on the ground carry out ceiling bore operation can not only make decoration worker stand on ground It is upper to carry out ceiling bore operation, it is to avoid work high above the ground, reduction potential safety hazard;And decoration worker can be made to carry out day Without the need for hand-held drill operation during card bore operation, therefore quick construction, efficiency high.Meanwhile, the present invention can reduce labor in operation The consumption of momentum, meets the requirement of green low-carbon.
Description of the drawings
Fig. 1 is the schematic diagram of the embodiment of the present invention.
Fig. 2 is the decomposing schematic representation of the embodiment of the present invention.
Fig. 3 is the base schematic diagram of the embodiment of the present invention.
Fig. 4 is the fix bar schematic diagram of the embodiment of the present invention.
Fig. 5 is the motion bar schematic diagram of the embodiment of the present invention.
Fig. 6 is the action bars schematic diagram of the embodiment of the present invention.
Wherein:10th, base;102nd, roller;104th, casing;106,108, level indicator;
20th, fix bar;202nd, fix bar upper end;204th, fix bar lower end;206th, strip groove;
30th, action bars;302nd, force side;304th, fixing end;306th, movable end;308,310, reinforcing bar;312nd, strut; 314th, bolt;316th, pipe;
40th, motion bar;402nd, screw;404th, bolt;406th, motion bar upper end;408th, motion bar lower end;
50th, dust-proof umbrella.
Specific embodiment
Below in conjunction with the machinery dress that can on the ground carry out ceiling bore operation of the drawings and Examples to the present invention Put and be described in further detail.
Refer to Fig. 1 to Fig. 6, the machinery that can on the ground carry out ceiling bore operation of the embodiment of the present invention.
A kind of machinery that can on the ground carry out ceiling bore operation, including base 10, fix bar 20, action bars 30th, motion bar 40 and electric drill, the base 10 includes a casing 104, and the fix bar 20 is hollow cylindrical structure, including fixation Bar upper end 202 and fix bar lower end 204, the top of fix bar lower end 204 is fixed on the casing 104, the fix bar upper end 202 Top is provided with the motion bar 40, and the motion bar 40 includes motion bar upper end 406 and motion bar lower end 408, and the electric drill is fixed on this Motion bar upper end 406;The both sides of fix bar upper end 202 are provided with the strip groove 206 for communicating, the action bars 30 include lever and Strut 312.
The motion bar 40 is hollow cylindrical structure, and the external diameter of motion bar lower end 408 is slightly less than fix bar internal diameter, the activity To insert in the cavity of fix bar upper end 202 bar lower end 408. the motion bar upper end 406 is divided into more piece to motion bar lower end 408, The both sides of each section motion bar 40 are relative to be provided with spacing identical screw 402, and the motion bar 40 is from motion bar lower end 408 to work The each section external diameter of motion bar 40 in lever upper end 406 gradually reduces, and it is big that the little section motion bar 40 of external diameter inserts adjacent external diameter In one section motion bar 40, and the two sections motion bar 40 is fixed through any one group of screw 402 by bolt 404.
The lever includes two parallel pipes 316 and bolt 314, and this two parallel pipes 316 are provided with phase at three Corresponding screw, through the screw at three, bolt 314 is outer to fix the two parallel pipe 316 to the bolt 314 by nut screwing clamping Into a constant shape, the pipe 316 is provided with the three of screw and is respectively movable end 306, fixing end 304 and force side 302, Bolt 314 on the movable end 306 is located in the strip groove 206 that the both sides of the fix bar upper end 202 communicate, the movable end Bolt 314 on 306 and the top contact of motion bar lower end 408;The one end of strut 312 is fixed at the fixing end 304 of lever On bolt 314, the other end of the strut 312 is fixed on casing 104, and the strut 312 is parallel with fix bar 20, the action bars 30 also include reinforcing bar 308,310, and the one end of reinforcing bar 308 is fixed on the bolt 314 at the fixing end 304 of lever, separately One end is fixed in fix bar 20, and the one end of reinforcing bar 310 is fixed on strut 312, and the other end is fixed in fix bar 20, plus Gu bar 308,310 can make whole operation bar 30 more firm firm.
The upper surface of casing 104 is provided with level indicator 106,108, and the casing lower section is provided with roller 102, the level indicator 106, 108 is two, and two level indicator 106,108 is arranged in a mutually vertical manner on the surface of casing 104;The upper end of motion bar 40 is additionally provided with anti- Dirt umbrella 50.
The machinery is included the step of ceiling bore operation:
Step 1:According to the boring point designed on ceiling, the vertical corresponding point of projection are marked on the ground;
Step 2:By the roller 102 in mobile base 10, regulation is fixed on the rig of the upper end of motion bar 40 so as to rig Centrage overlaps with the vertical corresponding point centrage of floor projection.
Step 3:By adjusting action bars 30, the force side 302 on two parallel levers is exerted a force, control is located at fix bar 20 Interior motion bar 40 is moved up so that motion bar 40 and be fixed on the rig of the upper end of motion bar 40 jack-up upwards, is directed at variola The boring point drilling designed on plate, so as to complete ceiling bore operation.
The above-mentioned machinery that can on the ground carry out ceiling bore operation can not only make decoration worker stand on ground It is upper to carry out ceiling bore operation, it is to avoid work high above the ground, reduction potential safety hazard;And decoration worker can be made to carry out day Without the need for hand-held drill operation during card bore operation, therefore quick construction, efficiency high.Meanwhile, the present invention can reduce labor in operation The consumption of momentum, meets the requirement of green low-carbon.
The above, is only presently preferred embodiments of the present invention, and any pro forma restriction is not made to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, in the range of without departing from technical solution of the present invention, when making a little change or modification using the technology contents of the disclosure above For the Equivalent embodiments of equivalent variations, as long as being without departing from technical solution of the present invention content, according to the technical spirit pair of the present invention Any simple modification, equivalent variations and modification that above example is made, still fall within the range of technical solution of the present invention.

Claims (5)

1. a kind of machinery that can on the ground carry out ceiling bore operation, including base, fix bar, action bars, activity Bar and electric drill, the base includes a casing, and the casing lower section is provided with roller, and the fix bar is hollow cylindrical knot Structure, including fix bar upper end and fix bar lower end, the fix bar lower end top is fixed on the casing, the fix bar upper end Top is provided with the motion bar, and the motion bar includes motion bar upper end and motion bar lower end, and the electric drill is fixed on the motion bar Upper end;Fix bar upper end both sides are provided with the strip groove for communicating, and the action bars includes lever and strut, and its feature exists In:The lever includes two parallel pipes and bolt, and two parallel pipes are provided with screw corresponding at three, Through the screw at three, bolt two ends make the two parallel pipe be fixed into a constant shape to the bolt by nut screwing clamping Shape, the pipe is provided with the three of screw and is respectively movable end, fixing end and force side, and the bolt on the movable end is located at should Bolt and motion bar lower end top contact in the strip groove that the both sides of fix bar upper end communicate, on the movable end;It is described Motion bar is hollow cylindrical structure, and motion bar lower end external diameter is slightly less than fix bar internal diameter, the motion bar lower end insertion In the fix bar upper end cavity;The motion bar upper end to lower end is divided into more piece, and the both sides of each section motion bar are relative to be set There is spacing identical screw, the motion bar gradually reduces from each section motion bar external diameter in lower end to upper end, the little section of external diameter Motion bar is inserted in the big section motion bar of adjacent external diameter, and fixes the two sections activity through any one group of screw by bolt Bar;Described strut one end is fixed on the bolt at the fixing end of lever, and the other end of the strut is fixed on casing, described Strut is parallel with fix bar.
2. the machinery of ceiling bore operation can be carried out on the ground as claimed in claim 1, it is characterised in that:It is described Casing upper surface is provided with level indicator.
3. the machinery of ceiling bore operation can be carried out on the ground as claimed in claim 2, it is characterised in that:It is described Level indicator is two, and two level indicator is arranged in a mutually vertical manner in tank surface.
4. the machinery of ceiling bore operation can be carried out on the ground as claimed in claim 1, it is characterised in that:It is described Motion bar upper end is additionally provided with dust-proof umbrella.
5. the machinery that can on the ground carry out ceiling bore operation as described in any one of Claims 1-4, it is special Levy and be, the machinery is included the step of ceiling bore operation:
Step 1:According to the boring point designed on ceiling, the vertical corresponding point of projection are marked on the ground;
Step 2:By mobile base roller, regulation is fixed on the rig of motion bar upper end so as to which drill central line is thrown with ground The vertical corresponding point centrage of shadow overlaps;
Step 3:By adjusting action bars, the force side on two parallel levers is exerted a force, control is located at the motion bar in fix bar Move up so that motion bar and be fixed on the rig of motion bar upper end jack-up upwards, be directed at the boring point designed on ceiling Drilling, so as to complete ceiling bore operation.
CN201310017643.2A 2013-01-16 2013-01-16 Mechanical device capable of being used for carrying out ceiling drilling operation on ground Active CN103527102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310017643.2A CN103527102B (en) 2013-01-16 2013-01-16 Mechanical device capable of being used for carrying out ceiling drilling operation on ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310017643.2A CN103527102B (en) 2013-01-16 2013-01-16 Mechanical device capable of being used for carrying out ceiling drilling operation on ground

Publications (2)

Publication Number Publication Date
CN103527102A CN103527102A (en) 2014-01-22
CN103527102B true CN103527102B (en) 2017-05-17

Family

ID=49929411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310017643.2A Active CN103527102B (en) 2013-01-16 2013-01-16 Mechanical device capable of being used for carrying out ceiling drilling operation on ground

Country Status (1)

Country Link
CN (1) CN103527102B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2905400Y (en) * 2006-04-03 2007-05-30 朱国青 Mobile floor plate piercer
CN201231532Y (en) * 2008-05-23 2009-05-06 河北省第四建筑工程公司 Mobile boring device for building top board
CN201552557U (en) * 2009-08-04 2010-08-18 浙江海天建设集团有限公司 Novel drilling device
CN201738819U (en) * 2010-07-14 2011-02-09 中建七局第二建筑有限公司石家庄分公司 Drilling moving frame
CN202055763U (en) * 2011-05-23 2011-11-30 胜利油田胜利工程建设(集团)有限责任公司 Building roof precise boring device
CN203081321U (en) * 2013-01-16 2013-07-24 深圳市华南装饰设计工程有限公司 Mechanical device capable of being used for carrying out ceiling drilling operations on ground

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57201492A (en) * 1981-06-02 1982-12-09 Yamamoto Eng Works Drilling apparatus

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2905400Y (en) * 2006-04-03 2007-05-30 朱国青 Mobile floor plate piercer
CN201231532Y (en) * 2008-05-23 2009-05-06 河北省第四建筑工程公司 Mobile boring device for building top board
CN201552557U (en) * 2009-08-04 2010-08-18 浙江海天建设集团有限公司 Novel drilling device
CN201738819U (en) * 2010-07-14 2011-02-09 中建七局第二建筑有限公司石家庄分公司 Drilling moving frame
CN202055763U (en) * 2011-05-23 2011-11-30 胜利油田胜利工程建设(集团)有限责任公司 Building roof precise boring device
CN203081321U (en) * 2013-01-16 2013-07-24 深圳市华南装饰设计工程有限公司 Mechanical device capable of being used for carrying out ceiling drilling operations on ground

Also Published As

Publication number Publication date
CN103527102A (en) 2014-01-22

Similar Documents

Publication Publication Date Title
CN103447579B (en) A kind of combined system and construction method that integrates setting-out, boring, fastening screw
CN204401994U (en) A kind of travel(l)ing rest for building
CN203081321U (en) Mechanical device capable of being used for carrying out ceiling drilling operations on ground
CN204148564U (en) A kind of electric drill bores top special stand
CN204126562U (en) A kind of drilling frame easy to use
CN201730352U (en) Building support
CN103527102B (en) Mechanical device capable of being used for carrying out ceiling drilling operation on ground
CN204401992U (en) A kind of support frame for building
CN204975421U (en) Civil engineering construction support
CN202789833U (en) Hydraulic double-telescopic support
CN202250124U (en) Resin anchoring cartridge mounter
CN202176256U (en) Self-adaption elevator
CN205277318U (en) Mining drill machine drill hole auxiliary stand device
CN203156100U (en) Drilling instrument for suspended ceiling construction
CN202943306U (en) Perforating device
CN207228674U (en) Movable municipal administration open caisson ramp-type platform
CN204867531U (en) Folding flexible drilling equipment of assembled
CN204034091U (en) A kind of multifunctional manual expander
CN204983584U (en) Support with adjustable it is for building
CN104594616A (en) Simple scaffold
CN204112314U (en) A kind of liftable job platform of pile frame front end
CN202645443U (en) Device for drilling installing hole on suspension rod
CN203961810U (en) A kind of bearing diagonal device for rig
CN104234400B (en) A kind of support frame for building
CN205297332U (en) Building pile rig guide rail transfers angle mount to put

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 518000 Guangdong city of Shenzhen province Futian District CaiTian road and Merlin eight road interchange Southern China Industrial and Trading Company office building on the third floor

Patentee after: SHENZHEN HUANAN DECORATION GROUP Co.,Ltd.

Address before: 518000 Guangdong city of Shenzhen province Futian District CaiTian road and Merlin eight road interchange Southern China Office

Patentee before: SHENZHEN HUANAN DECORATION DESIGN ENGINEERING Co.,Ltd.

Address after: 518000 Guangdong city of Shenzhen province Futian District CaiTian road and Merlin eight road interchange Southern China Office

Patentee after: SHENZHEN HUANAN DECORATION DESIGN ENGINEERING Co.,Ltd.

Address before: 518049 Guangdong city of Shenzhen province Futian District CaiTian road and Merlin eight road interchange Southern China Office

Patentee before: SHENZHEN HUANAN DECORATION DESIGN ENGINEERING Co.,Ltd.