The machinery of ceiling bore operation can on the ground be carried out
Technical field
The present invention relates to a kind of ceiling bore operation device, especially can on the ground carry out ceiling bore operation
Machinery.
Background technology
When decoration worker carries out ceiling construction, the suspension rod of connection furred ceiling should be on the ceiling installed first, and install and hang
Before bar, it is necessary to carry out ceiling bore operation, because this suspension rod is by the way that the expansion bolt screw cap anchoring of its upper end is existed
In the hole of ceiling, so as to whole suspension rod be fixed on the ceiling.Because the floor height of general house building is generally 3.0~
4.0m, far above the height of people, the ceiling bore operation that carry out on the ground so decoration worker cannot stand.At present, it is existing
It is the method using ladder or operating platform is set up that decoration worker carries out ceiling bore operation, i.e.,:Decoration worker station 1.0~
Ceiling bore operation is carried out on 2.0m high ladder or operating platform.But this method has several drawbacks in that:First, upfitter
People stands and during operation, belongs to work high above the ground on ladder or operating platform, dangerous very big;Secondly, decoration worker needs handss during drilling
Rig operation is held, the amount of labour consumes big, and decoration worker often bores a hole and just needs a mobile ladder or operating platform, construction
Inefficiency.
The content of the invention
In view of above-mentioned condition, it is necessary to provide a kind of machinery that can on the ground carry out ceiling bore operation.
A kind of machinery that can on the ground carry out ceiling bore operation, including base, fix bar, action bars, work
Lever and electric drill, the base includes a casing, and the fix bar is hollow cylindrical structure, including fix bar upper end and fix bar
Lower end, the fix bar lower end top is fixed on the casing, and the fix bar upper end top is provided with the motion bar, the motion bar bag
Motion bar upper end and motion bar lower end are included, the electric drill is fixed on the motion bar upper end;The fix bar upper end both sides are provided with what is communicated
Strip groove, the action bars includes lever and strut.
The motion bar is hollow cylindrical structure, and the motion bar lower end external diameter is slightly less than fix bar internal diameter, under the motion bar
Insert in the fix bar upper end cavity at end.
Motion bar upper end to the lower end is divided into more piece, and the both sides of each section motion bar are relative to be provided with spacing identical spiral shell
Hole, the motion bar gradually reduces from each section motion bar external diameter in lower end to upper end, and the little section motion bar insertion of external diameter is adjacent
In the big section motion bar of external diameter, and the two sections motion bar is fixed through any one group of screw by bolt.
The lever includes two parallel pipes and bolt, and two parallel pipes are provided with spiral shell corresponding at three
Hole, through the screw at three, bolt two ends make the two parallel pipe be fixed into a constant shape to the bolt by nut screwing clamping
Shape, the pipe is provided with the three of screw and is respectively movable end, fixing end and force side.
Bolt on the movable end is located in the strip groove that the both sides of the fix bar upper end communicate, the spiral shell on the movable end
Bolt and motion bar lower end top contact.
The strut one end is fixed on the bolt at the fixing end of lever, and the other end of the strut is fixed on casing, should
Strut is parallel with fix bar.
The casing upper surface is provided with level indicator, and the casing lower section is provided with roller.
The level indicator is two, and two level indicator is arranged in a mutually vertical manner in tank surface.
The motion bar upper end is additionally provided with dust-proof umbrella.
The electric device is included the step of ceiling bore operation:
Step 1:According to the boring point designed on ceiling, the vertical corresponding point of projection are marked on the ground;
Step 2:By mobile base roller, regulation is fixed on the rig of motion bar upper end so as to drill central line and ground
The vertical corresponding point centrage of face projection overlaps.
Step 3:By adjusting action bars, the force side on two parallel levers is exerted a force, control is located at the work in fix bar
Lever is moved up so that motion bar and be fixed on the rig of motion bar upper end jack-up upwards, is directed at the brill designed on ceiling
Hole point drilling, so as to complete ceiling bore operation.
The above-mentioned machinery that can on the ground carry out ceiling bore operation can not only make decoration worker stand on ground
It is upper to carry out ceiling bore operation, it is to avoid work high above the ground, reduction potential safety hazard;And decoration worker can be made to carry out day
Without the need for hand-held drill operation during card bore operation, therefore quick construction, efficiency high.Meanwhile, the present invention can reduce labor in operation
The consumption of momentum, meets the requirement of green low-carbon.
Description of the drawings
Fig. 1 is the schematic diagram of the embodiment of the present invention.
Fig. 2 is the decomposing schematic representation of the embodiment of the present invention.
Fig. 3 is the base schematic diagram of the embodiment of the present invention.
Fig. 4 is the fix bar schematic diagram of the embodiment of the present invention.
Fig. 5 is the motion bar schematic diagram of the embodiment of the present invention.
Fig. 6 is the action bars schematic diagram of the embodiment of the present invention.
Wherein:10th, base;102nd, roller;104th, casing;106,108, level indicator;
20th, fix bar;202nd, fix bar upper end;204th, fix bar lower end;206th, strip groove;
30th, action bars;302nd, force side;304th, fixing end;306th, movable end;308,310, reinforcing bar;312nd, strut;
314th, bolt;316th, pipe;
40th, motion bar;402nd, screw;404th, bolt;406th, motion bar upper end;408th, motion bar lower end;
50th, dust-proof umbrella.
Specific embodiment
Below in conjunction with the machinery dress that can on the ground carry out ceiling bore operation of the drawings and Examples to the present invention
Put and be described in further detail.
Refer to Fig. 1 to Fig. 6, the machinery that can on the ground carry out ceiling bore operation of the embodiment of the present invention.
A kind of machinery that can on the ground carry out ceiling bore operation, including base 10, fix bar 20, action bars
30th, motion bar 40 and electric drill, the base 10 includes a casing 104, and the fix bar 20 is hollow cylindrical structure, including fixation
Bar upper end 202 and fix bar lower end 204, the top of fix bar lower end 204 is fixed on the casing 104, the fix bar upper end 202
Top is provided with the motion bar 40, and the motion bar 40 includes motion bar upper end 406 and motion bar lower end 408, and the electric drill is fixed on this
Motion bar upper end 406;The both sides of fix bar upper end 202 are provided with the strip groove 206 for communicating, the action bars 30 include lever and
Strut 312.
The motion bar 40 is hollow cylindrical structure, and the external diameter of motion bar lower end 408 is slightly less than fix bar internal diameter, the activity
To insert in the cavity of fix bar upper end 202 bar lower end 408. the motion bar upper end 406 is divided into more piece to motion bar lower end 408,
The both sides of each section motion bar 40 are relative to be provided with spacing identical screw 402, and the motion bar 40 is from motion bar lower end 408 to work
The each section external diameter of motion bar 40 in lever upper end 406 gradually reduces, and it is big that the little section motion bar 40 of external diameter inserts adjacent external diameter
In one section motion bar 40, and the two sections motion bar 40 is fixed through any one group of screw 402 by bolt 404.
The lever includes two parallel pipes 316 and bolt 314, and this two parallel pipes 316 are provided with phase at three
Corresponding screw, through the screw at three, bolt 314 is outer to fix the two parallel pipe 316 to the bolt 314 by nut screwing clamping
Into a constant shape, the pipe 316 is provided with the three of screw and is respectively movable end 306, fixing end 304 and force side 302,
Bolt 314 on the movable end 306 is located in the strip groove 206 that the both sides of the fix bar upper end 202 communicate, the movable end
Bolt 314 on 306 and the top contact of motion bar lower end 408;The one end of strut 312 is fixed at the fixing end 304 of lever
On bolt 314, the other end of the strut 312 is fixed on casing 104, and the strut 312 is parallel with fix bar 20, the action bars
30 also include reinforcing bar 308,310, and the one end of reinforcing bar 308 is fixed on the bolt 314 at the fixing end 304 of lever, separately
One end is fixed in fix bar 20, and the one end of reinforcing bar 310 is fixed on strut 312, and the other end is fixed in fix bar 20, plus
Gu bar 308,310 can make whole operation bar 30 more firm firm.
The upper surface of casing 104 is provided with level indicator 106,108, and the casing lower section is provided with roller 102, the level indicator 106,
108 is two, and two level indicator 106,108 is arranged in a mutually vertical manner on the surface of casing 104;The upper end of motion bar 40 is additionally provided with anti-
Dirt umbrella 50.
The machinery is included the step of ceiling bore operation:
Step 1:According to the boring point designed on ceiling, the vertical corresponding point of projection are marked on the ground;
Step 2:By the roller 102 in mobile base 10, regulation is fixed on the rig of the upper end of motion bar 40 so as to rig
Centrage overlaps with the vertical corresponding point centrage of floor projection.
Step 3:By adjusting action bars 30, the force side 302 on two parallel levers is exerted a force, control is located at fix bar 20
Interior motion bar 40 is moved up so that motion bar 40 and be fixed on the rig of the upper end of motion bar 40 jack-up upwards, is directed at variola
The boring point drilling designed on plate, so as to complete ceiling bore operation.
The above-mentioned machinery that can on the ground carry out ceiling bore operation can not only make decoration worker stand on ground
It is upper to carry out ceiling bore operation, it is to avoid work high above the ground, reduction potential safety hazard;And decoration worker can be made to carry out day
Without the need for hand-held drill operation during card bore operation, therefore quick construction, efficiency high.Meanwhile, the present invention can reduce labor in operation
The consumption of momentum, meets the requirement of green low-carbon.
The above, is only presently preferred embodiments of the present invention, and any pro forma restriction is not made to the present invention, though
So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people
Member, in the range of without departing from technical solution of the present invention, when making a little change or modification using the technology contents of the disclosure above
For the Equivalent embodiments of equivalent variations, as long as being without departing from technical solution of the present invention content, according to the technical spirit pair of the present invention