CN103526975A - Iron tower production process based on three-dimensional space lofting - Google Patents

Iron tower production process based on three-dimensional space lofting Download PDF

Info

Publication number
CN103526975A
CN103526975A CN201310439480.7A CN201310439480A CN103526975A CN 103526975 A CN103526975 A CN 103526975A CN 201310439480 A CN201310439480 A CN 201310439480A CN 103526975 A CN103526975 A CN 103526975A
Authority
CN
China
Prior art keywords
angle steel
workshop
lofting
tower
plated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310439480.7A
Other languages
Chinese (zh)
Inventor
阮仁彤
董广金
王森林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hong Yuan Line Materials Co Ltd
Original Assignee
Anhui Hong Yuan Line Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hong Yuan Line Materials Co Ltd filed Critical Anhui Hong Yuan Line Materials Co Ltd
Priority to CN201310439480.7A priority Critical patent/CN103526975A/en
Publication of CN103526975A publication Critical patent/CN103526975A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses an iron tower production process based on three-dimensional space lofting. The iron tower production process includes the lofting procedure, the machining procedure, the trail assembling procedure, the batch machining procedure, the galvanizing procedure and the finished product detecting procedure, wherein the lofting is three-dimensional lofting based on CAD. The production process is reasonable in design, accuracy of components can be greatly improved, the machining period is shortened, work efficiency is improved, and production cost of an iron tower is reduced. Meanwhile, aeration oxidation, settling and biofilter process are conducted on waste water produced in a galvanizing workshop, and therefore waste water is recycled, and the iron tower production process has the advantages of saving the water resource, protecting the environment and reducing enterprise cost.

Description

Steel tower production technology based on three dimensions setting-out
Technical field
The present invention relates to a kind of production technology of steel tower, be specifically related to a kind of steel tower production technology based on three dimensions setting-out.
Background technology
The facility of the bracing frame ceases to be busy that electric power tower is used while being high-tension overhead line transmission of electricity, it can be divided into angle steel tower, steel pipe pole and steel pipe narrow base tower structure, and wherein angle steel tower is generally used in the wild, and steel pipe pole and steel pipe narrow base tower are mainly used in city.
At present, in the production process of steel tower, the critical process that affects product quality and precision is the audit setting-out of drawing, what labour intensity was larger is processing and zinc-plated, before Applied Computer Techniques, all will not expend a large amount of man-hours, running into engineering duty can only the extend labour time when many, easily like this causes that producers are tired, efficiency reduces, while is difficult quality guarantee not only, also may exist certain potential safety hazard, easily causes the generation of security incident.
The production technology of steel tower mainly comprises the operations such as setting-out, processing, examination assembling, batch machining, zinc-plated and product inspection.There is following defect in existing steel tower production technology:
(1) because steel tower manufacture belongs to roughing, bring no small difficulty to the accuracy of manual lofting, in addition, the size of Ji Ta is very large, cause poor several millimeters by human eye, to have no way of detecting and discovering at all, affected to a great extent operating efficiency and accuracy of gauge.
(2) by hand computation, go out after just size, also need manual drawing bar figure, plate figure, make original table, detailed statement etc., these a series of processes are consuming time and efficiency is low, meanwhile, are also difficult to ensure its accuracy of card.
(3) the various waste water (comprising degreasing water, acid, alkali, washing waste water) that zinc-plated workshop produces are difficult to accomplish zero-emission, not only big for environment pollution, also cause the significant wastage of water resource.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of steel tower production technology based on three dimensions setting-out, this production technology not only can increase substantially member accuracy, shortens the process-cycle, increase work efficiency, and can accomplish zinc-plated wastewater zero discharge, reduced the pollution to surrounding enviroment.
For solving the problems of the technologies described above, the present invention is based on the steel tower production technology of three dimensions setting-out, comprise setting-out, processing, examination assembling, batch machining, zinc-plated and product inspection operation, described setting-out is the three-dimensional lofting based on CAD, and described three-dimensional lofting comprises the steps:
(1), determine the accurate distance of angle steel;
(2), main material segmentation: read the relevant information about tower body segmentation from total figure;
(3), supplement the main material information of tower body;
(4), connect horizontal material angle steel: when connecting horizontal material, first in segmental structure figure, read the relevant information about horizontal material, mainly comprise angle steel numbering, specification, bolts at two ends information, angle steel disposing way;
(5), generate intermediate node: the type of node judges according to the similar figures in structure chart;
(6), definition cross-arm node;
(7), supplement angle steel;
(8), developed surface angle steel connects;
(9), the design of cross-arm place angle steel;
(10), calculate leg of angle direction: tower material is carried out to the line computation of limb method, to determine its folding angle;
(11), structure piece number detects: connect and be over after all single lines, before the connection design of carrying out next part, check member numbering.
Above-mentioned zinc-plated operation is as follows: the tower material that batch machining is good is transported to zinc-plated workshop, carries out pickling and washing, puts into plating stove and carries out galvanizing, then curing, cooling.
For saving water resource, reduce environment pollution, above-mentioned zinc-plated workshop is provided with the zero-discharge treatment system of zinc-plated waste water, it comprises collects the concentrated base pond of galvanizing workshop degreasing water and collects acid, alkali, the aerating regulation pond of washing waste water, described concentrated base pond successively with one-level sedimentation basin, collecting-tank is connected with flotation tank, degreasing water in workshop is through described one-level sedimentation basin, sour with the workshop of collecting after the processing of collecting-tank and flotation tank, alkali, washing waste water enters aerating regulation pond jointly, described aerating regulation pond is connected with bio filter with second-level settling pond more successively, water after process bio filter enters clear water reserviors and enters reservoir after standing again and concentrate, described reservoir is connected with workshop rinsing bath.
Compared with prior art, beneficial effect of the present invention is:
Process design of the present invention is reasonable, only needs to strengthen the check to workpiece in setting-out operation, guarantees that it meets component diagram, and the present invention can increase substantially member accuracy, shortens the process-cycle, increases work efficiency, and reduces the cost of production of steel tower.Simultaneously; the present invention is directed to aeration oxidation for waste water Bian, precipitation and bio filter treatment process that zinc-plated workshop produces; waste water after treatment water quality meets the requirement of industrial water; can be used as workshop alkali cleaning and pickling zone industrial water; thereby realized the recycling of waste water, there is the water resource of saving, protection of the environment, reduction entreprise cost.
The specific embodiment
Steel tower production technology based on three dimensions setting-out, comprises setting-out, processing, examination assembling, batch machining, zinc-plated and product inspection operation, and described setting-out is the three-dimensional lofting based on CAD, and described three-dimensional lofting comprises the steps:
(1), determine the accurate distance of angle steel: whether whether the standard that checks all size angle steel consistent with the standard distance in drawing " Tower processing explanation " apart from arranging;
(2), main material segmentation: in total figure, reading the relevant information about tower body segmentation, full tower is divided into 4 sections, and every segment length is from top to bottom: 6300mm, 6750mm, 6000mm and 5250mm, main material is all that four degree are symmetrical;
(3), supplement the main material information of tower body: completed after the main material segmentation of tower body, again according to the relevant information of in each segment structure figure, the mark of main material being supplemented to main material, the steel tower head first paragraph of take is example, what first paragraph angle steel was used is the angle steel of L56 * 5, there is the bolt of two M16 at top, and terminal has the bolt of three M20;
(4), connect horizontal material angle steel: after having supplemented main material angle steel information, first the horizontal material between each section of angle steel is connected, when connecting horizontal material, first in segmental structure figure, read the relevant information about horizontal material, mainly comprise angle steel numbering, specification, bolts at two ends information, angle steel disposing way etc.It is example that the steel tower head of take is numbered 133 horizontal material, and this angle steel is L56 * 5, and all there is the bolt of a M16 at two ends, and angle steel disposing way is inner iron;
(5), generate intermediate node: the type of node judges according to the similar figures in structure chart;
(6), definition cross-arm node;
(7), supplement angle steel;
(8), developed surface angle steel connects: having position and the cross-arm place of horizontal material all to want Design spreading face, then according to the mark in structure chart, carry out developed surface design, wherein tiltedly the method for attachment of material angle steel and benefit material angle steel is the same;
(9), the design of cross-arm place angle steel: by 4 nodes of the symmetrical generation of method shown in step 6;
(10), calculate leg of angle direction: tower material is carried out to the line computation of limb method, to determine its folding angle;
(11), structure piece number detects: in connection, be over after all single lines, before the connection design of carrying out next part, check member numbering.
Bian of the present invention gets after above-mentioned production technology, only needs to strengthen the check to workpiece in setting-out operation, guarantees that it meets component diagram, steel tower production technology of the present invention can increase substantially member accuracy, shorten the process-cycle, increase work efficiency, reduce the cost of production of steel tower.
The present invention is provided with the zero-discharge treatment system of zinc-plated waste water in zinc-plated workshop, it comprises collects the concentrated base pond of galvanizing workshop degreasing water and collects acid, alkali, the aerating regulation pond of washing waste water, described concentrated base pond successively with one-level sedimentation basin, collecting-tank is connected with flotation tank, degreasing water in workshop is through described one-level sedimentation basin, sour with the workshop of collecting after the processing of collecting-tank and flotation tank, alkali, washing waste water enters aerating regulation pond jointly, described aerating regulation pond is connected with bio filter with second-level settling pond more successively, water after process bio filter enters clear water reserviors and enters reservoir after standing again and concentrate, described reservoir is connected with workshop rinsing bath.
Due to the aeration oxidation for waste water Bian, precipitation and the bio filter treatment process that produce for zinc-plated workshop; waste water after treatment water quality meets the requirement of industrial water; can be used as workshop alkali cleaning and pickling zone industrial water; thereby realized the recycling of waste water, there is the water resource of saving, protection of the environment, reduction entreprise cost.
As mentioned above, although represented and explained the present invention with reference to specific preferred embodiment, it shall not be construed as the restriction to the present invention self.Not departing under the spirit and scope of the present invention prerequisite of claims definition, can make in the form and details various variations to it.

Claims (3)

1. the steel tower production technology based on three dimensions setting-out, comprises setting-out, processing, examination assembling, batch machining, zinc-plated and product inspection operation, it is characterized in that, described setting-out is the three-dimensional lofting based on CAD, and described three-dimensional lofting comprises the steps:
(1), determine the accurate distance of angle steel;
(2), main material segmentation: read the relevant information about tower body segmentation from total figure;
(3), supplement the main material information of tower body;
(4), connect horizontal material angle steel: when connecting horizontal material, first in segmental structure figure, read the relevant information about horizontal material, mainly comprise angle steel numbering, specification, bolts at two ends information, angle steel disposing way;
(5), generate intermediate node: the type of node judges according to the similar figures in structure chart;
(6), definition cross-arm node;
(7), supplement angle steel;
(8), developed surface angle steel connects;
(9), the design of cross-arm place angle steel;
(10), calculate leg of angle direction: tower material is carried out to the line computation of limb method, to determine its folding angle;
(11), structure piece number detects: connect and be over after all single lines, before the connection design of carrying out next part, check member numbering.
2. the steel tower production technology based on three dimensions setting-out as claimed in claim 1, it is characterized in that, described zinc-plated operation is as follows: the tower material that batch machining is good is transported to zinc-plated workshop, carries out pickling and washing, put into plating stove and carry out galvanizing, then curing, cooling.
3. the steel tower production technology based on three dimensions setting-out as claimed in claim 2, it is characterized in that, described zinc-plated workshop is provided with the zero-discharge treatment system of zinc-plated waste water, it comprises collects the concentrated base pond of galvanizing workshop degreasing water and collects acid, alkali, the aerating regulation pond of washing waste water, described concentrated base pond successively with one-level sedimentation basin, collecting-tank is connected with flotation tank, degreasing water in workshop is through described one-level sedimentation basin, sour with the workshop of collecting after the processing of collecting-tank and flotation tank, alkali, washing waste water enters aerating regulation pond jointly, described aerating regulation pond is connected with bio filter with second-level settling pond more successively, water after process bio filter enters clear water reserviors and enters reservoir after standing again and concentrate, described reservoir is connected with workshop rinsing bath.
CN201310439480.7A 2013-09-25 2013-09-25 Iron tower production process based on three-dimensional space lofting Pending CN103526975A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310439480.7A CN103526975A (en) 2013-09-25 2013-09-25 Iron tower production process based on three-dimensional space lofting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310439480.7A CN103526975A (en) 2013-09-25 2013-09-25 Iron tower production process based on three-dimensional space lofting

Publications (1)

Publication Number Publication Date
CN103526975A true CN103526975A (en) 2014-01-22

Family

ID=49929292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310439480.7A Pending CN103526975A (en) 2013-09-25 2013-09-25 Iron tower production process based on three-dimensional space lofting

Country Status (1)

Country Link
CN (1) CN103526975A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103914590A (en) * 2014-03-12 2014-07-09 国家电网公司 Power tower three-dimensional solid model generating method
CN104091015A (en) * 2014-07-03 2014-10-08 王正 C# sampling method for power transmission line iron tower and related framework
CN109339550A (en) * 2018-12-06 2019-02-15 江苏齐天铁塔制造有限公司 A kind of preparation method suitable for extra-high voltage direct-current transmission steel tower

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009114664A (en) * 2007-11-02 2009-05-28 Okabe Noriaki Architecture Network:Kk High-rise tower comprising two hp shells using steel pipe
CN101692566A (en) * 2009-09-09 2010-04-07 中国电力科学研究院 Method for controlling wind vibration of electric transmission line high tower
CN102021916A (en) * 2010-11-02 2011-04-20 河南省电力公司洛阳供电公司 Foundation construction method of iron tower
CN202015935U (en) * 2011-04-28 2011-10-26 青岛海斯壮铁塔有限公司 Steel tube tower multi-angle node assembly tool equipment

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009114664A (en) * 2007-11-02 2009-05-28 Okabe Noriaki Architecture Network:Kk High-rise tower comprising two hp shells using steel pipe
CN101692566A (en) * 2009-09-09 2010-04-07 中国电力科学研究院 Method for controlling wind vibration of electric transmission line high tower
CN102021916A (en) * 2010-11-02 2011-04-20 河南省电力公司洛阳供电公司 Foundation construction method of iron tower
CN202015935U (en) * 2011-04-28 2011-10-26 青岛海斯壮铁塔有限公司 Steel tube tower multi-angle node assembly tool equipment

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
冯国松: "基于CAD的铁塔放样技术", 《硅谷》 *
林榕: "计算机辅助设计三维放样技术在铁塔生产中的应用", 《广西电业》 *
陈鹏等: "热镀锌钢板生产废水的处理与回用", 《中国给水排水》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103914590A (en) * 2014-03-12 2014-07-09 国家电网公司 Power tower three-dimensional solid model generating method
CN103914590B (en) * 2014-03-12 2017-02-01 国家电网公司 Power tower three-dimensional solid model generating method
CN104091015A (en) * 2014-07-03 2014-10-08 王正 C# sampling method for power transmission line iron tower and related framework
CN109339550A (en) * 2018-12-06 2019-02-15 江苏齐天铁塔制造有限公司 A kind of preparation method suitable for extra-high voltage direct-current transmission steel tower
CN109339550B (en) * 2018-12-06 2023-06-27 江苏齐天铁塔制造有限公司 Preparation method suitable for extra-high voltage direct current transmission tower

Similar Documents

Publication Publication Date Title
CN103526975A (en) Iron tower production process based on three-dimensional space lofting
CN104694996A (en) Electrophoresis pretreatment process for vehicle parts
CN103114317A (en) Novel electroplating process
CN204434708U (en) Photovoltaic welding belt is coated with tin device
CN104384738A (en) Framework welding and processing process
CN105274542A (en) Cleaning method of aluminum alloy wheel
CN205710184U (en) A kind of trivalent chromium plating wastewater recycling system
CN103483965A (en) Water-based metallic paint
CN106884564A (en) A kind of steel tower production technology of space setting-out
CN102277600A (en) Surface treatment method for electroplated copper door
CN103469191B (en) A kind of painting dressing automobiles front surface process Phosphating Solution
CN104846410A (en) Method for electroplating nickel on brass and red copper alloy
CN204602716U (en) Ultrasonic cleaning circulating groove in parkerizing process
CN106757111A (en) Metallic article anti-rust cleaning agent
CN202780584U (en) Positioning jig for processing end parts of cylinder workpieces
CN106312463A (en) Processing method for four-piece unequal-diameter bearing body of large hydroelectric generating set
Yogeswary et al. Continuous quality improvement: A study in pressure adhesive process department
CN202705473U (en) Phosphorus treatment system
CN205950544U (en) Anchor clamps of complex space position relation product
CN105063732A (en) Device for cyanide-free copper plating
CN107419323A (en) A kind of production method and its system without waste water environmental protection that electrogalvanizing is carried out to iron wire
CN203845884U (en) Water circulation system applied to aluminum profile spraying workshop
CN206029674U (en) Take frock of L type mounting
CN105200497A (en) Bus body pre-processing electrophoresis production line
CN105088307A (en) Anodic oxidation line and anodic oxidation production technology for special aluminium strip for motor vehicle license plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140122