CN103523266A - Automatic steel tube binding device - Google Patents

Automatic steel tube binding device Download PDF

Info

Publication number
CN103523266A
CN103523266A CN201310481635.3A CN201310481635A CN103523266A CN 103523266 A CN103523266 A CN 103523266A CN 201310481635 A CN201310481635 A CN 201310481635A CN 103523266 A CN103523266 A CN 103523266A
Authority
CN
China
Prior art keywords
steel pipe
plastic film
power
transport sector
automatic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310481635.3A
Other languages
Chinese (zh)
Other versions
CN103523266B (en
Inventor
冯北麟
杜江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310481635.3A priority Critical patent/CN103523266B/en
Publication of CN103523266A publication Critical patent/CN103523266A/en
Application granted granted Critical
Publication of CN103523266B publication Critical patent/CN103523266B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Basic Packing Technique (AREA)

Abstract

An automatic steel tube binding device is characterized by comprising a chain transmission mechanism or a transmission band transmission mechanism and an automatic binding mechanism. A tube pushing mechanism is arranged beside the chain transmission mechanism or the transmission band transmission mechanism. The automatic binding mechanism comprises a machine frame, a steel tube pushing, shifting and overlapping mechanism and a steel tube binding and pushing-out mechanism. The steel tube pushing, shifting and overlapping mechanism comprises a first up-down power movable pushing plate, a first power movable device and a steel tube piling bench. The steel tube binding and pushing-out mechanism comprises a second up-down power movable pushing plate, a second power moving device, a plastic film releasing mechanism, a plastic film cutting and fusing mechanism and a heating mechanism. Compared with the prior art, the automatic steel tube binding device has the advantages of being effectively, reliably and automatically binding steel tubes.

Description

A kind of automatic bonding unit of steel pipe
Technical field:
The present invention relates to a kind of banding mechanism.
Background technology:
Promote package speed, the minimizing human input of steel pipe, except tube packaging adopts machine automatization packing, several packaged steel pipes are automatically banded together also and are absolutely necessary, still, to so far, the machine that does not also have effective failure-free automatically to tie up steel pipe coordinates steel pipe wrapping machine.
Summary of the invention:
Goal of the invention of the present invention is to provide a kind of effective failure-free automatically to tie up the automatic bonding unit of the steel pipe of steel pipe.
The present invention realizes like this, comprise chain transport sector or transport tape transport sector, automatic flexible strapping machine structure, side at chain transport sector or transport tape transport sector is provided with ejector sleeve mechanism, automatic flexible strapping machine structure comprises frame, steel pipe pushing overlaying mechanism, steel pipe is tied up ejecting mechanism, steel pipe pushing overlaying mechanism comprises power mobile push pedal Shang Xia first, be arranged in frame and drive the first power moving device move up and down power push pedal sway, the steel pipe being arranged in frame is piled up platform, steel pipe is tied up ejecting mechanism and is comprised power mobile push pedal Shang Xia second, be arranged in frame and drive the second power moving device move up and down power push pedal sway, plastic film releasing mechanism, plastic film cuts off fusing mechanism, heating arrangements, the second power moving device be positioned at the first power moving device after, plastic film releasing mechanism be more than two covers along chain transport sector or the setting of transport tape transport sector by two setting up and down devices that form for placing the shelf of plastic film roll, the quantity of plastic film cut-out fusing mechanism is corresponding with the quantity of the shelf of placement plastic film roll, plastic film cut off fusing mechanism comprise by power drive mutual folding heating blade and face the heating plate face of heated blade, heating arrangements is to be positioned at plastic film to cut off fusing mechanism heater blower unit and that its quantity is corresponding with the quantity of plastic film cut-out fusing mechanism below.During work, in advance two plastic film guiding plastic films on every pair of shelf are cut off to fusing mechanism, by cutting off the mode of melting, two plastic films are coupled together, from steel pipe wrapping machine, carry the packing of coming to have the steel pipe of plastic film to send chain transport sector or transport tape transport sector to, by chain transport sector or transport tape transport sector, continued to transmit on packing station, then, the ejector sleeve mechanism on chain transport sector or transport tape transport sector side releases chain transport sector or transport tape transport sector from the side by packed steel pipe, then, control setup is controlled power mobile push pedal Shang Xia first according to the quantity of setting, the first power moving device action, one by one several packaged steel pipes are pushed away at steel pipe and pile up platform side by side, when the quantity of side-by-side stack packaged steel pipe together reaches setting value, power mobile push pedal Shang Xia first, the first power moving device action, push the packaged steel pipe of a pile to heating arrangements, then, Shang Xia second, power mobile push pedal presses down, two plastic films that launch at middle part are sticked together, be positioned at the blade that the plastic film before heating arrangements cuts off the heating of fusing mechanism, the laminating that relatively moves of heating plate face, the two plastic film meltings that launch at middle part are coupled together and the plastic film of leading portion is cut, like this, divide the two ends melting of the two plastic film sections that cut out to connect, the packaged steel pipe of a pile is tied, then, heating arrangements is toward plastic film blowing hot-air, plastic film is shunk, the packaged steel pipe of a pile is bound, finally, the second power moving device action, the packaged steel pipe of a pile of tying up is released to automatic bonding unit.
Here, in order to increase the packaging quantity of steel pipe, it is a platform being moved up and down by power drive that steel pipe is piled up platform.During work, be paved with after the packaged steel pipe of one deck on platform, power band moving platform moves down, to lay the packaged steel pipe more than second layer, like this, just can increase the quantity of the steel pipe that every heap enlacement packaging is good.
Neat for the steel pipe that guarantees to pile up, in frame, be provided with steel pipe registration mechanism, steel pipe registration mechanism comprises dull and stereotyped, the pressing plate being driven by power that is positioned at steel pipe rear end above that is positioned at steel pipe front end.During work, by pressing plate, the front end of all steel pipes is all leaned against dull and stereotyped upper above, thereby guaranteed that follow-up all steel pipes of piling up are all uniform.
Compared with the prior art the present invention, has advantages of that effective failure-free ties up steel pipe automatically.
Accompanying drawing explanation:
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of chain transport sector or transport tape transport sector;
Fig. 3 is the structural representation of automatic flexible strapping machine structure;
Fig. 4 is the structural representation of power mobile push pedal Shang Xia first, the first power moving device;
Fig. 5 is the structural representation of power mobile push pedal Shang Xia second, the second power moving device;
Fig. 6 is the structural representation of the lower blower fan of heating arrangements;
Fig. 7 is the structural representation of the fan of heating arrangements;
Fig. 8 is the structural representation that steel pipe is piled up platform.
The specific embodiment:
Now in conjunction with the accompanying drawings and embodiments the present invention is described in further detail:
As shown in the figure, the present invention includes and be positioned at chain transport sector or the transport tape transport sector 2 with 11 steel pipe automatic packaging machine 1 outlets of automatic feed tube mechanism with steel pipe wrapping machine, automatic flexible strapping machine structure 3, control setup, as Fig. 1, shown in 2, side at chain transport sector or transport tape transport sector 2 is provided with ejector sleeve mechanism 4, ejector sleeve mechanism 4 comprises along two cylinder 4a of chain transport sector or the 2 transmission directions settings of transport tape transport sector, the push pedal 4b being driven by cylinder 4a, automatic flexible strapping machine structure 3 comprises frame 5, steel pipe pushing overlaying mechanism 6, steel pipe is tied up ejecting mechanism 7, as Fig. 1, shown in 3, steel pipe pushing overlaying mechanism 6 comprises the first more than two covers that arrange along 2 transmission directions of chain transport sector or transport tape transport sector that are arranged in frame 5 power moving device 6a, the power mobile push pedal 6b Shang Xia first being driven by the first power moving device 6a, the steel pipe being arranged in frame 5 is piled up platform 6c, respond to the photoelectric sensor that packaged steel pipe puts in place, as shown in Figure 4, in frame 5, be provided with the first guide rail 6e, Shang Xia first, the cylinder 6b2 of the drive push pedal 6b1 of power mobile push pedal 6b is slidably arranged on the first guide rail 6e by the first slide block 6f, as Fig. 1, shown in 3, steel pipe tie up ejecting mechanism 7 comprise be arranged in frame 5 and be positioned at the first power moving device 6a the second above power moving device 7a of two covers below, the power mobile push pedal 7b Shang Xia second being driven by the second power moving device 7a, plastic film releasing mechanism 7c, plastic film cuts off fusing mechanism 7d, heating arrangements 7e, plastic film releasing mechanism 7c be more than two covers along chain transport sector or transport tape transport sector 2, arrange by two setting up and down devices that form for placing the shelf of plastic film roll, the quantity that plastic film cuts off fusing mechanism 7d is with setting up and down corresponding for placing the quantity of the device that the shelf of plastic film roll forms by two, as Fig. 6, shown in 7, plastic film cut off fusing mechanism 7d comprise by power (cylinder) 7d1 drive mutual folding heating blade 7d2 and face the heating plate face 7d3 of heated blade 7d2, heating arrangements 7e is positioned at plastic film to cut off fusing mechanism 7d heater blower unit and that its quantity is corresponding with the quantity of plastic film cut-out fusing mechanism 7d below, heater blower unit consists of two relative air-blast device 7e1 with hot wind heating mechanism of blowing mouth, as shown in Figure 5, in frame 5, be provided with the second guide rail 7f, Shang Xia second, the cylinder 7b2 of the drive push pedal 7b1 of power mobile push pedal 7b is slidably arranged on the second guide rail 7f by the second slide block 7g.
As shown in Figure 8, steel pipe is piled up platform 6c and one by power (cylinder) 6c1, is driven the platform 6c2 move up and down.
As shown in Figure 3, be provided with steel pipe registration mechanism in frame 5, steel pipe registration mechanism comprises dull and stereotyped 8, the pressing plate 10 being driven by power (cylinder) 9 that is positioned at steel pipe rear end above that is positioned at steel pipe front end.

Claims (5)

1. the automatic bonding unit of a steel pipe, it is characterized in that comprising chain transport sector or transport tape transport sector, automatic flexible strapping machine structure, side at chain transport sector or transport tape transport sector is provided with ejector sleeve mechanism, automatic flexible strapping machine structure comprises frame, steel pipe pushing overlaying mechanism, steel pipe is tied up ejecting mechanism, steel pipe pushing overlaying mechanism comprises power mobile push pedal Shang Xia first, be arranged in frame and drive the first power moving device move up and down power push pedal sway, the steel pipe being arranged in frame is piled up platform, steel pipe is tied up ejecting mechanism and is comprised power mobile push pedal Shang Xia second, be arranged in frame and drive the second power moving device move up and down power push pedal sway, plastic film releasing mechanism, plastic film cuts off fusing mechanism, heating arrangements, the second power moving device be positioned at the first power moving device after, plastic film releasing mechanism be more than two covers along chain transport sector or the setting of transport tape transport sector by two setting up and down devices that form for placing the shelf of plastic film roll, the quantity of plastic film cut-out fusing mechanism is corresponding with the quantity of the shelf of placement plastic film roll, plastic film cut off fusing mechanism comprise by power drive mutual folding heating blade and face the heating plate face of heated blade, heating arrangements is to be positioned at plastic film to cut off fusing mechanism heater blower unit and that its quantity is corresponding with the quantity of plastic film cut-out fusing mechanism below.
2. the automatic bonding unit of steel pipe according to claim 1, is characterized in that it is a platform being moved up and down by power drive that steel pipe is piled up platform.
3. the automatic bonding unit of steel pipe according to claim 1 and 2, is characterized in that being provided with steel pipe registration mechanism in frame, and steel pipe registration mechanism comprises dull and stereotyped, the pressing plate being driven by power that is positioned at steel pipe rear end above that is positioned at steel pipe front end.
4. the automatic bonding unit of steel pipe according to claim 1 and 2, is characterized in that heater blower unit consists of two relative air-blast devices with hot wind heating mechanism of blowing mouth.
5. the automatic bonding unit of steel pipe according to claim 3, is characterized in that heater blower unit consists of two relative air-blast devices with hot wind heating mechanism of blowing mouth.
CN201310481635.3A 2013-10-16 2013-10-16 Automatic steel tube binding device Expired - Fee Related CN103523266B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310481635.3A CN103523266B (en) 2013-10-16 2013-10-16 Automatic steel tube binding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310481635.3A CN103523266B (en) 2013-10-16 2013-10-16 Automatic steel tube binding device

Publications (2)

Publication Number Publication Date
CN103523266A true CN103523266A (en) 2014-01-22
CN103523266B CN103523266B (en) 2015-03-25

Family

ID=49925712

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310481635.3A Expired - Fee Related CN103523266B (en) 2013-10-16 2013-10-16 Automatic steel tube binding device

Country Status (1)

Country Link
CN (1) CN103523266B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104071380A (en) * 2014-06-25 2014-10-01 孔令义 Device for piling steel tubes in hexagon shape
CN104071381A (en) * 2014-06-30 2014-10-01 冯北麟 Efficient tube feeding device
CN104691817A (en) * 2015-03-06 2015-06-10 陈松涛 Full-automatic pipeline bundling machine
CN105236178A (en) * 2015-10-22 2016-01-13 南京航空航天大学 Method for rolling and bundling felt through automatic felt rolling machine
CN105480459A (en) * 2015-12-28 2016-04-13 上海屹浩材料科技有限公司 Full-automatic packing production line
CN107738773A (en) * 2017-10-09 2018-02-27 石家庄市梓起机电设备科技有限公司 A kind of steel pipe automatic banding device
CN108248925A (en) * 2017-12-29 2018-07-06 温州智信机电科技有限公司 The group of steel pipe automatic strapping machine is to center
CN108674728A (en) * 2017-12-29 2018-10-19 温州智信机电科技有限公司 The full-automatic bundling technique of steel pipe
CN112061469A (en) * 2020-08-19 2020-12-11 北新禹王防水科技(四川)有限公司 Bundling device for waterproof coiled material
CN115743693A (en) * 2022-11-30 2023-03-07 徐州华晨测控技术有限公司 Electromechanical strapping machine based on automatic control

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10119914A (en) * 1996-10-21 1998-05-12 Mitsuboshi Sangyo Kk Method, structure and device for insertion of anticorrosive string for bound steel pipe bundle
JPH1179129A (en) * 1997-09-09 1999-03-23 Takigawa Kogyo Co Ltd Apparatus for arranging and supplying small bundle of long materials
CN201834235U (en) * 2010-10-19 2011-05-18 上海天阳钢管有限公司 Automatic bundling machine of steel tubes
CN202508303U (en) * 2012-04-20 2012-10-31 郭建君 Automatic packing machine of steel pipe
CN203486183U (en) * 2013-10-16 2014-03-19 冯北麟 Automatic steel pipe bundling device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10119914A (en) * 1996-10-21 1998-05-12 Mitsuboshi Sangyo Kk Method, structure and device for insertion of anticorrosive string for bound steel pipe bundle
JPH1179129A (en) * 1997-09-09 1999-03-23 Takigawa Kogyo Co Ltd Apparatus for arranging and supplying small bundle of long materials
CN201834235U (en) * 2010-10-19 2011-05-18 上海天阳钢管有限公司 Automatic bundling machine of steel tubes
CN202508303U (en) * 2012-04-20 2012-10-31 郭建君 Automatic packing machine of steel pipe
CN203486183U (en) * 2013-10-16 2014-03-19 冯北麟 Automatic steel pipe bundling device

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104071380A (en) * 2014-06-25 2014-10-01 孔令义 Device for piling steel tubes in hexagon shape
CN104071380B (en) * 2014-06-25 2016-04-20 孔令义 A kind of hexagon piles up the device of steel pipe
CN104071381A (en) * 2014-06-30 2014-10-01 冯北麟 Efficient tube feeding device
CN104691817A (en) * 2015-03-06 2015-06-10 陈松涛 Full-automatic pipeline bundling machine
CN105236178A (en) * 2015-10-22 2016-01-13 南京航空航天大学 Method for rolling and bundling felt through automatic felt rolling machine
CN105236178B (en) * 2015-10-22 2018-02-06 南京航空航天大学 A kind of method that felt is rolled up by automatic winder, ties felt
CN105480459B (en) * 2015-12-28 2018-02-06 上海屹浩材料科技有限公司 Production line is tied up in full-automatic packing
CN105480459A (en) * 2015-12-28 2016-04-13 上海屹浩材料科技有限公司 Full-automatic packing production line
CN107738773A (en) * 2017-10-09 2018-02-27 石家庄市梓起机电设备科技有限公司 A kind of steel pipe automatic banding device
CN108248925A (en) * 2017-12-29 2018-07-06 温州智信机电科技有限公司 The group of steel pipe automatic strapping machine is to center
CN108674728A (en) * 2017-12-29 2018-10-19 温州智信机电科技有限公司 The full-automatic bundling technique of steel pipe
CN108674728B (en) * 2017-12-29 2020-06-16 徐一蜜 Full-automatic bundling process for steel pipes
CN112061469A (en) * 2020-08-19 2020-12-11 北新禹王防水科技(四川)有限公司 Bundling device for waterproof coiled material
CN112061469B (en) * 2020-08-19 2021-10-08 北新禹王防水科技(四川)有限公司 Bundling device for waterproof coiled material
CN115743693A (en) * 2022-11-30 2023-03-07 徐州华晨测控技术有限公司 Electromechanical strapping machine based on automatic control

Also Published As

Publication number Publication date
CN103523266B (en) 2015-03-25

Similar Documents

Publication Publication Date Title
CN103523266B (en) Automatic steel tube binding device
CN103523261B (en) Steel tube packing machine
JP5354948B2 (en) Apparatus and method for continuously producing tile stack packages
CN203486183U (en) Automatic steel pipe bundling device
CN101823571B (en) Full-automatic wrapping vacuum packaging machine
CN104058123A (en) Paper corner protection strip bundle stacking device
CN103112610B (en) Packaging mechanism of automatic packaging machine for medical cotton swabs
US6550221B1 (en) Method and a machine for banding groups of sheets, in particular banknotes
CN113148308B (en) Stereoscopic cigarette packaging machine and packaging method thereof
CN104085553B (en) A kind of packing method of pipe and device
CN102785790A (en) Hydraulic bundling device of automatic woven bag
US20020116900A1 (en) Apparatus and method for securing a bundle with a strap
CN203005785U (en) Multi-row stacking high-speed strapping machine
CN203946298U (en) A kind of paper angle protector material strip is tied up bunching device
CN202244137U (en) Semi-automatic bagging equipment for bagged face tissues
CN105501510A (en) Automatic packaging and producing line of tiles and implementation method thereof
CN106114969A (en) Full-automatic film banding machine
CN106394961B (en) A kind of automatic packaging method and equipment of plasterboard
CN202987548U (en) Two-channel stacking, sealing and cutting system
CN203486168U (en) Steel tube packing machine
CN204587376U (en) Automatic packing machine
CN205931426U (en) Full -automatic film bundler
CN203127168U (en) Packaging mechanism of medical cotton swab automated packaging machine
CN102910307B (en) Automatic packaging method and device for pipes
US8650841B2 (en) Packing compressible objects

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150325

Termination date: 20151016

EXPY Termination of patent right or utility model