CN103512711B - Normalizing annealing stove airtightness testing method - Google Patents

Normalizing annealing stove airtightness testing method Download PDF

Info

Publication number
CN103512711B
CN103512711B CN201210203941.6A CN201210203941A CN103512711B CN 103512711 B CN103512711 B CN 103512711B CN 201210203941 A CN201210203941 A CN 201210203941A CN 103512711 B CN103512711 B CN 103512711B
Authority
CN
China
Prior art keywords
furnace
pressure
gas tightness
normalizing annealing
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210203941.6A
Other languages
Chinese (zh)
Other versions
CN103512711A (en
Inventor
赵叶辉
钟大川
刘小勇
周继军
刘军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201210203941.6A priority Critical patent/CN103512711B/en
Publication of CN103512711A publication Critical patent/CN103512711A/en
Application granted granted Critical
Publication of CN103512711B publication Critical patent/CN103512711B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of normalizing annealing stove airtightness testing method; it is characterized in that comprising the following steps: the preliminary work before a normalizing annealing furnace gas tightness test; b normalizing annealing furnace gas tightness test carries out segmentation; c leading portion normalizing annealing furnace gas tightness test and d back segment normalizing annealing furnace gas tightness test; wherein: in described step c and d, carry out leading portion normalizing annealing furnace gas tightness test and back segment normalizing annealing furnace gas tightness test simultaneously.Normalizing annealing stove airtightness testing method of the present invention has and is divided into two sections, front and back and carries out air-tight test, the advantage of accelerating construction progress and reduction of erection time simultaneously.

Description

Normalizing annealing stove airtightness testing method
Technical field
The present invention relates to a kind of airtightness testing method, specifically, is a kind of normalizing annealing stove airtightness testing method.
Background technology
The bubble-tight quality of annealing furnace is huge on strip quality impact, and improve impermeability and can improve strip quality greatly, add hydrogen in stove, impermeability is bad very easily causes security incident, therefore impermeability requires high.But known annealing furnace airtightness testing method finds slow to the leak source of annealing furnace, the cycle of air-tight test is long, time-consuming, is obviously not suitable for whole project progress requirement when duration anxiety.
Therefore known annealing furnace airtightness testing method also exists above-mentioned all inconvenience and problem.
Summary of the invention
Object of the present invention, is to propose a kind of length shortening annealing furnace air-tight test, can find leak source and the normalizing annealing stove airtightness testing method significantly improving the cycle of doing experiment sooner.
For achieving the above object, technical solution of the present invention is:
A kind of normalizing annealing stove airtightness testing method, is characterized in that comprising the following steps:
Preliminary work before a, normalizing annealing furnace gas tightness test, comprises following steps:
(1) inspection of furnace expansion roller, replacing
Annealing furnace measure expansion roller has the factor of expansion due to the impact that is stressed, and the situation of its installation site and installation is checked comprehensively, remove provisional safeguard measure, carry out inspection record, clear up base plate for annealing furnace simultaneously before air-tight test;
(2) protection annealing body of heater instrument pressure parts
Pressure parts in protective demolition annealing body of heater instrument, and properly preserve; Shutoff is carried out, with it-plate or sealant sealing between steel plate and flange with steel plate;
(3) vent port on body of heater and osculum is sealed
Smear thick white paint with raw material band and seal vent port on all bodies of heater and osculum;
(4) furnace roller is sealed
Furnace roller is sealed with the blind flange of interim sheet asbestos and making; Furnace roller installing plate tightly welds with inside furnace shell tapping, and outside surrounding carries out spending solid welding fixed;
(5) furnace shell inlet chamber is sealed
With the Plate Welding sealing furnace shell inlet chamber of 8mm;
(6) PH/NOF fire grate smoke pipeline and body of heater connector is sealed
Blind flange sealing PH/NOF fire grate smoke pipeline and body of heater connector is made with 12mm steel plate;
(7) PH/NOF stove controling of the pressure of the oven baffle plate and body of heater connector is sealed
Blind flange sealing PH/NOF stove controling of the pressure of the oven baffle plate and body of heater connector is made with 12mm steel plate;
(8) 2# furnace throat top is sealed
With 5mm Plate Welding sealing 2# furnace throat top;
(9) valve-off
Close on-site sampling hole and various medium access apertures leading portion valve, if valveless, then carry out shutoff at flange blank off; Close the connection valve of whole pipeline and equipment room, the blind plate shutoff of PH/NOF blast main valve place, PH/NOF igniter burner is removed and is used plug shutoff;
(10) furnace shell internal cleaning, close
All furnace rollers and radiant tube all install before air-tight test, and furnace shell internal cleaning is clean, provision for sealing manhole and peep-hole;
(11) shutoff 2# furnace throat front end
With 8mm steel plate by the welding shutoff of 2# furnace throat front end;
B, normalizing annealing furnace gas tightness test carry out segmentation
Seal between NOF section and 2# furnace throat, make normalizing annealing furnace gas tightness test be divided into before and after inlet seal room to NOF section and 2# furnace throat to water jacket section two sections;
C, leading portion normalizing annealing furnace gas tightness test
Carry out leading portion inlet seal room to NOF section normalizing annealing furnace gas tightness test, pass into test(ing) medium drying, clean air, during test, pressure should slowly rise, after reaching specified testing pressure, pressurize is no less than 30 minutes, then design pressure is down to, leak detection pressure is 1200Pa, and furnace pressure is timing from 800Pa, and pressurize half an hour is down to more than 350Pa for qualified;
D, back segment normalizing annealing furnace gas tightness test
Carry out back segment 2# furnace throat to water jacket section normalizing annealing furnace gas tightness test, pass into test(ing) medium drying, clean air, during test, pressure should slowly rise, after reaching specified testing pressure, pressurize is no less than 30 minutes, then design pressure is down to, leak detection pressure is 1200Pa, and furnace pressure timing pressurize half an hour from 800Pa is down to more than 350Pa for pressurize success; Or when furnace pressure continues to decline, if when dropping to 60Pa, keeping half an hour not decline, is also qualified;
Wherein: in described step c and d, carry out leading portion normalizing annealing furnace gas tightness test and back segment normalizing annealing furnace gas tightness test simultaneously.
After adopting technique scheme, normalizing annealing stove airtightness testing method of the present invention has the following advantages:
1, shorten the length of annealing furnace air-tight test, can find faster leak source, the cycle of doing air-tight test can be significantly improved;
2, be divided into two sections, front and back and carry out air-tight test, accelerating construction progress, reduction of erection time simultaneously.
Accompanying drawing explanation
Fig. 1 is normalizing annealing furnace gas tightness test schematic flow sheet of the present invention.
Embodiment
Below in conjunction with embodiment and accompanying drawing thereof, the present invention is illustrated further.
Normalizing annealing stove airtightness testing method of the present invention, is characterized in that comprising the following steps:
Preliminary work before a, normalizing annealing furnace gas tightness test, comprises following steps:
(1) inspection of furnace expansion roller, replacing
Annealing furnace measure expansion roller has the factor of expansion due to the impact that is stressed, and the situation of its installation site and installation is checked comprehensively, remove provisional safeguard measure, carry out inspection record, clear up base plate for annealing furnace simultaneously before air-tight test;
(2) protection annealing body of heater instrument pressure parts
Pressure parts in protective demolition annealing body of heater instrument, and properly preserve; Shutoff is carried out, with it-plate or sealant sealing between steel plate and flange with steel plate;
(3) vent port on body of heater and osculum is sealed
Smear thick white paint with raw material band and seal vent port on all bodies of heater and osculum;
(4) furnace roller is sealed
Furnace roller is sealed with the blind flange of interim sheet asbestos and making; Furnace roller installing plate tightly welds with inside furnace shell tapping, and outside surrounding carries out spending solid welding fixed;
(5) furnace shell inlet chamber is sealed
With the Plate Welding sealing furnace shell inlet chamber of 8mm;
(6) PH/NOF fire grate smoke pipeline and body of heater connector is sealed
Blind flange sealing PH/NOF fire grate smoke pipeline and body of heater connector is made with 12mm steel plate;
(7) PH/NOF stove controling of the pressure of the oven baffle plate and body of heater connector is sealed
Blind flange sealing PH/NOF stove controling of the pressure of the oven baffle plate and body of heater connector is made with 12mm steel plate;
(8) 2# furnace throat top is sealed
With 5mm Plate Welding sealing 2# furnace throat top;
(9) valve-off
Close on-site sampling hole and various medium access apertures leading portion valve, if valveless, then carry out shutoff at flange blank off; Close the connection valve of whole pipeline and equipment room, the blind plate shutoff of PH/NOF blast main valve place, PH/NOF igniter burner is removed and is used plug shutoff;
(10) furnace shell internal cleaning, close
All furnace rollers and radiant tube all install before air-tight test, and furnace shell internal cleaning is clean, provision for sealing manhole and peep-hole;
(11) shutoff 2# furnace throat front end
With 8mm steel plate by the welding shutoff of 2# furnace throat front end;
B, normalizing annealing furnace gas tightness test carry out segmentation
Seal between NOF section and 2# furnace throat, make normalizing annealing furnace gas tightness test be divided into before and after inlet seal room to NOF section and 2# furnace throat to water jacket section two sections;
C, leading portion normalizing annealing furnace gas tightness test
Carry out leading portion inlet seal room to NOF section normalizing annealing furnace gas tightness test, pass into test(ing) medium drying, clean air, during test, pressure should slowly rise, after reaching specified testing pressure, pressurize is no less than 30 minutes, then design pressure is down to, leak detection pressure is 1200Pa, and furnace pressure is timing from 800Pa, and pressurize half an hour is down to more than 350Pa for qualified;
D, back segment normalizing annealing furnace gas tightness test
Carry out back segment 2# furnace throat to water jacket section normalizing annealing furnace gas tightness test, pass into test(ing) medium drying, clean air, during test, pressure should slowly rise, after reaching specified testing pressure, pressurize is no less than 30 minutes, then design pressure is down to, leak detection pressure is 1200Pa, and furnace pressure timing pressurize half an hour from 800Pa is down to more than 350Pa for pressurize success; Or when furnace pressure continues to decline, if when dropping to 60Pa, keeping half an hour not decline, is also qualified;
Wherein: in described step c and d, carry out leading portion normalizing annealing furnace gas tightness test and back segment normalizing annealing furnace gas tightness test simultaneously.
Normalizing annealing furnace gas tightness test is divided into two parts by normalizing annealing stove airtightness testing method of the present invention, carries out leading portion normalizing annealing furnace gas tightness test and back segment normalizing annealing furnace gas tightness test, accelerating construction progress, reduction of erection time simultaneously.
Above embodiment is used for illustrative purposes only, but not limitation of the present invention, person skilled in the relevant technique, without departing from the spirit and scope of the present invention, can also make various conversion or change.Therefore, all equivalent technical schemes also should belong to category of the present invention, should be limited by each claim.

Claims (1)

1. a normalizing annealing stove airtightness testing method, is characterized in that comprising the following steps:
Preliminary work before a, normalizing annealing furnace gas tightness test, comprises following steps:
(1) inspection of furnace expansion roller, replacing
Annealing furnace measure expansion roller has the factor of expansion due to the impact that is stressed, and the situation of its installation site and installation is checked comprehensively, remove provisional safeguard measure, carry out inspection record, clear up base plate for annealing furnace simultaneously before air-tight test;
(2) protection annealing body of heater instrument pressure parts
Pressure parts in protective demolition annealing body of heater instrument, and properly preserve; Shutoff is carried out, with it-plate or sealant sealing between steel plate and flange with steel plate;
(3) vent port on body of heater and osculum is sealed
Smear thick white paint with raw material band and seal vent port on all bodies of heater and osculum;
(4) furnace roller is sealed
Furnace roller is sealed with the blind flange of interim sheet asbestos and making; Furnace roller installing plate tightly welds with inside furnace shell tapping, and outside surrounding carries out spending solid welding fixed;
(5) furnace shell inlet chamber is sealed
With the Plate Welding sealing furnace shell inlet chamber of 8mm;
(6) PH/NOF fire grate smoke pipeline and body of heater connector is sealed
Blind flange sealing PH/NOF fire grate smoke pipeline and body of heater connector is made with 12mm steel plate;
(7) PH/NOF stove controling of the pressure of the oven baffle plate and body of heater connector is sealed
Blind flange sealing PH/NOF stove controling of the pressure of the oven baffle plate and body of heater connector is made with 12mm steel plate;
(8) 2# furnace throat top is sealed
With 5mm Plate Welding sealing 2# furnace throat top;
(9) valve-off
Close on-site sampling hole and various medium access apertures leading portion valve, if valveless, then carry out shutoff at flange blank off; Close the connection valve of whole pipeline and equipment room, the place's blind plate shutoff of PH/NOF stove blast main valve, PH/NOF furnace igniting burner is removed and is used plug shutoff;
(10) furnace shell internal cleaning, close
All furnace rollers and radiant tube all install before air-tight test, and furnace shell internal cleaning is clean, provision for sealing manhole and peep-hole;
(11) shutoff 2# furnace throat front end
With 8mm steel plate by the welding shutoff of 2# furnace throat front end;
B, normalizing annealing furnace gas tightness test carry out segmentation
Seal between NOF section and 2# furnace throat, make normalizing annealing furnace gas tightness test be divided into before and after inlet seal room to NOF section and 2# furnace throat to water jacket section two sections;
C, leading portion normalizing annealing furnace gas tightness test
Carry out leading portion inlet seal room to NOF section normalizing annealing furnace gas tightness test, pass into test(ing) medium drying, clean air, during test, pressure should slowly rise, and after reaching specified testing pressure, pressurize is no less than 30 minutes, is then down to design pressure; Leak detection original pressure is 1200Pa, and original pressure of then hunting leak starts to decline, and starts timing when furnace pressure reaches 800Pa, and pressurize half an hour is down to more than 350Pa for qualified;
D, back segment normalizing annealing furnace gas tightness test
Carry out back segment 2# furnace throat to water jacket section normalizing annealing furnace gas tightness test, pass into test(ing) medium drying, clean air, during test, pressure should slowly rise, after reaching specified testing pressure, pressurize is no less than 30 minutes, then design pressure is down to, leak detection pressure is 1200Pa, and furnace pressure timing pressurize half an hour from 800Pa is down to more than 350Pa for pressurize success; Or when furnace pressure continues to decline, if when dropping to 60Pa, keeping half an hour not decline, is also qualified;
Wherein: in described step c and d, carry out leading portion normalizing annealing furnace gas tightness test and back segment normalizing annealing furnace gas tightness test simultaneously.
CN201210203941.6A 2012-06-20 2012-06-20 Normalizing annealing stove airtightness testing method Active CN103512711B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210203941.6A CN103512711B (en) 2012-06-20 2012-06-20 Normalizing annealing stove airtightness testing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210203941.6A CN103512711B (en) 2012-06-20 2012-06-20 Normalizing annealing stove airtightness testing method

Publications (2)

Publication Number Publication Date
CN103512711A CN103512711A (en) 2014-01-15
CN103512711B true CN103512711B (en) 2016-01-20

Family

ID=49895788

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210203941.6A Active CN103512711B (en) 2012-06-20 2012-06-20 Normalizing annealing stove airtightness testing method

Country Status (1)

Country Link
CN (1) CN103512711B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107543659A (en) * 2016-06-28 2018-01-05 五冶集团上海有限公司 Vertical annealing furnace airtightness testing method
CN107560793B (en) * 2017-07-28 2019-09-13 中国二十冶集团有限公司 The jump storehouse formula air-tight test construction method of continuous annealing furnace
CN109000856B (en) * 2018-07-28 2020-09-11 上海二十冶建设有限公司 Air-tight test method for sectional leak detection and integral pressure test
CN110160708B (en) * 2019-03-29 2021-09-10 宁波宝新不锈钢有限公司 Automatic detection method applied to muffle furnace hydrogen leakage
CN111609970B (en) * 2020-05-29 2022-04-26 马鞍山马钢华阳设备诊断工程有限公司 Airtightness detection method for hot galvanizing vertical annealing furnace under production working condition
CN111912573B (en) * 2020-07-09 2022-10-04 首钢京唐钢铁联合有限责任公司 Annealing furnace body air tightness detection method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004263894A (en) * 2003-02-28 2004-09-24 Meidensha Corp Leak inspection method of heat treatment device and heat treatment device
JP2005061999A (en) * 2003-08-12 2005-03-10 Seiko Epson Corp Airtightness testing method and device
CN101762364A (en) * 2008-11-28 2010-06-30 中冶成工上海五冶建设有限公司 Airtightness testing method of ultra-long anneal furnace
CN201785349U (en) * 2010-09-09 2011-04-06 中国十五冶金建设有限公司 Assembled sealing shell sealing device for coke dry quenching furnace

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2842192B1 (en) * 2002-07-12 2004-10-01 Snecma Propulsion Solide PROCESS AND PLANT FOR OBTAINING CARBON PRODUCTS FROM CARBON PRECURSOR PRODUCTS

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004263894A (en) * 2003-02-28 2004-09-24 Meidensha Corp Leak inspection method of heat treatment device and heat treatment device
JP2005061999A (en) * 2003-08-12 2005-03-10 Seiko Epson Corp Airtightness testing method and device
CN101762364A (en) * 2008-11-28 2010-06-30 中冶成工上海五冶建设有限公司 Airtightness testing method of ultra-long anneal furnace
CN201785349U (en) * 2010-09-09 2011-04-06 中国十五冶金建设有限公司 Assembled sealing shell sealing device for coke dry quenching furnace

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
冷轧连续退火炉密闭性的检测与分析;胡广魁;《宝钢技术》;20071031(第5期);第46-50页 *
硅钢带连续退火炉设计及其施工;梁师帅;《武钢技术》;19981130;第36卷(第217期);19-23,62 *

Also Published As

Publication number Publication date
CN103512711A (en) 2014-01-15

Similar Documents

Publication Publication Date Title
CN103512711B (en) Normalizing annealing stove airtightness testing method
CN105699194A (en) Pressure vessel pressure-tight test and airtight test examination method
CN109000856B (en) Air-tight test method for sectional leak detection and integral pressure test
CN206467271U (en) A kind of controling of the pressure of the oven system for annealing furnace
CN101799352B (en) Online and rapid leakage detecting method for roller hearth type non-oxidation furnace radiating pipe
CN103574292B (en) The online method for rapidly positioning of non-oxidation heat processing furnace radiation pipe leak source
CN110160708A (en) A kind of automatic testing method and device applied to Muffle furnace hydrogen gas leakage
CN103091348B (en) Material at high temperature burst tearing test device
CN206014991U (en) A kind of combustion stablized dry-off oven device for blast furnace
CN205403489U (en) Door and book curtain fire resistance testing stove
CN105694920B (en) Coke oven regenerator silicon carbide brick wall string leaks method for repairing and mending in production process
CN101799350B (en) Rapid leakage detecting method for roller hearth type non-oxidation furnace radiating pipes in batch
CN201145403Y (en) Hot-air furnace drying apparatus
CN109752409A (en) A kind of flammable gas explosion propagation law simulation test device
CN110672789A (en) Online detection method for leakage of W-shaped radiant tube of annealing furnace
CN103196641A (en) Hot-blast stove leakproofness pressure test method
CN210108640U (en) Water heater gas tightness detection device
CN214149716U (en) Annealing furnace radiant tube gas tightness detecting system
CN203893983U (en) Boiler water sealing leak detection device
CN103710524A (en) Ignition method of continuous annealing furnace
CN108278854A (en) A kind of diesel oil furnace drying method
CN102853976A (en) Online leakage detection method and device thereof for heat treatment furnace radiant tube
CN111912573B (en) Annealing furnace body air tightness detection method
CN102879155A (en) Online leakage detection method and device for non-oxidation furnace radiant tube containing shielding hydrogen gas
CN204495092U (en) The heating furnace side wall peephole device improved

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant