CN103507190B CN201310421582.6A CN201310421582A CN103507190B CN 103507190 B CN103507190 B CN 103507190B CN 201310421582 A CN201310421582 A CN 201310421582A CN 103507190 B CN103507190 B CN 103507190B
Authority
CN
China
Prior art keywords
casing
mould
motor
conveying arrangement
thermoplastic elastomer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310421582.6A
Other languages
Chinese (zh)
Other versions
CN103507190A (en
Inventor
吴伟
彭剑
张浩东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AILV HEALTH TECHNOLOGY Co Ltd
Original Assignee
AILV HEALTH TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AILV HEALTH TECHNOLOGY Co Ltd filed Critical AILV HEALTH TECHNOLOGY Co Ltd
Priority to CN201310421582.6A priority Critical patent/CN103507190B/en
Publication of CN103507190A publication Critical patent/CN103507190A/en
Application granted granted Critical
Publication of CN103507190B publication Critical patent/CN103507190B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing And Handling Of Plastics And Other Materials For Molding In General (AREA)

Abstract

The invention discloses a kind of Thermoplastic elastomer production line, including preheating device, some constant temperature control boxes and mould conveying arrangement, frame and feeding machine, mould conveying arrangement is installed in frame, in mould conveying arrangement, warming plate is installed, preheating device and constant temperature control box are installed on the top of mould conveying arrangement, the side of preheating device is connected with constant temperature control box, the front end of feeding machine is provided with blow tank, blow tank uses feed pipe to be connected with filling head, first heating roller is installed in feed pipe, the second heating roller is installed in blow tank.The present invention can make mould from the pollution of impurity in air in transportation, and mould thermal loss in transportation can be reduced, the preheating temperature of mould can be reduced, reduce energy consumption, avoid mould itself to reduce its service life in high temperature environments, reduce production cost, improve the mobility that melt is extruded from feeding machine simultaneously, prevent the blocking of feed pipe, improve production efficiency.

Description

A kind of Thermoplastic elastomer production line
[technical field]
The present invention relates to the technical field of plant equipment, particularly produce the plant equipment of thermoplastic elastomer (TPE) Technical field.
[background technology]
In the production process of thermoplastic elastomer (TPE), it is necessary first to mould is preheating in preheating device certain Temperature, is then transported to the position specified by conveying arrangement, and melt finally injects cooling molding in mould, Therefore the thermal loss how protecting minimizing preheating rear mold in the production process of thermoplastic elastomer (TPE) is to improve to produce The key of quality, simultaneously need to ensure that mould will not be contaminated with dust from the air in transportation, note In material machine, the mobility of melt is also the key improving product quality, and existing thermoplastic elastomer (TPE) produces equipment Have the disadvantage in that
1, traditional calorstat uses enclosed casing mostly, and air flow property is poor, lacks so that air stream Dynamic fortune wind apparatus, although and minority is provided with the calorstat of opening and strengthens the convection effects of air, but lack Few effectively filtering dustproof construction, the dust in air easily flows in casing along with air, causes Pollution in casing, after once polluting in casing, cleans extremely inconvenient, and dust is easily damaged The parts of equipment, have had a strong impact on the service life of equipment;
2, traditional conveying arrangement does not have heat insulation function during mould transports, cold through the mould of preheating Very fast, for ensureing melt molding effect in a mold, need that mould is heated to higher temperature and come more Mending the heat of loss in transportation, energy consumption is higher, and the service life that mould is at high temperature is substantially reduced, Add production cost;
3, traditional feeding machine is when melt extrusion, and owing to feed pipe is longer, melt is easily in course of conveying Reducing along with temperature and mobility is reduced, cause feed pipe to block, production efficiency is low
[summary of the invention]
The purpose of the present invention solves the problems of the prior art exactly, proposes a kind of Thermoplastic elastomer production line, Mould can be made in transportation from the pollution of impurity in air, and mould can be reduced in transportation In thermal loss, it is possible to decrease the preheating temperature of mould, reduce energy consumption, it is to avoid mould this in high temperature ring Reduce its service life under border, reduce production cost, improve the mobility that melt is extruded from feeding machine simultaneously, Prevent the blocking of feed pipe, improve production efficiency.
For achieving the above object, the present invention proposes a kind of Thermoplastic elastomer production line, including preheating device, Some constant temperature control boxes and mould conveying arrangement, frame and feeding machine, described mould conveying arrangement is installed on machine On frame, warming plate, preheating device and constant temperature control box are installed in mould conveying arrangement and are installed on mould transport The top of device, the side of described preheating device is connected with constant temperature control box, the front end peace of described feeding machine Equipped with blow tank, described blow tank uses feed pipe to be connected with filling head, is provided with first and adds in feed pipe Hot-rolling, is provided with the second heating roller in blow tank.
As preferably, described constant temperature control box includes casing, the first motor, power distribution cabinet and some temperature sensing Device, is provided with the first filter screen in described casing is provided with blast pipe and discharge pipe, blast pipe and discharge pipe, First motor and power distribution cabinet are installed on casing, and described first motor is provided with wind wheel, and described wind wheel is positioned at Box house, the lower section of described wind wheel is provided with the second filter screen, and described temperature sensor is installed on the interior of casing Surface, described first filter screen uses airstrainer, the second filter screen to use HEPA filter screen, the setting of filter screen Make box house environment from the pollution of dust in air, it is ensured that cleaning in casing, extend making of equipment Use the life-span.
As preferably, described first motor being provided with outfan, described outfan passes perpendicularly through the upper of casing Surface, the upper end of outfan is connected with the first motor, and the lower end of outfan is connected with wind wheel, the first electricity Machine uses nut to be fixed on the upper of casing.
As preferably, the upper port of described blast pipe is positioned at the outside of casing, and the lower port of blast pipe is positioned at case The inside of body, the upper port of described discharge pipe is positioned at the outside of casing, and the lower port of discharge pipe is positioned at casing Inside, described second filter screen flushes with the lower port of blast pipe and discharge pipe.
As preferably, described mould conveying arrangement includes carrier chain, drivewheel, driven pulley and the second motor, Described carrier chain is installed in frame, carrier chain be arranged above some carrier bars, carrier chain is set in actively Wheel and the outside of driven pulley, the lower section of carrier chain is provided with warming plate, and described second motor uses belt and master Driving wheel is connected.
As preferably, described carrier bar is evenly distributed on the top of carrier chain, and carrier bar scribbles heat insulation coating, institute State warming plate use polyurethane thermal insulation board, described heat insulation coating use aluminum silicate composite heat-insulating coating, carrier bar with Mould directly contacts the heat easily taken away on mould, and heat insulation coating has relatively low heat conductivity, can be effective Preventing the loss of mold heat, saved cost, polyurethane thermal insulation board not only has good heat-insulating property, The thermal loss of mould can be reduced, reduce the preheating temperature of mould, also there is good acoustically effective, can The noise that minimizing equipment produces during using.
As preferably, being provided with some spikes below described frame, the lower section of a spike is provided with regulation foot Cup.
Beneficial effects of the present invention: the invention have the advantages that 1, by arranging outlet and inlet on casing Pipe, the air being increased box house by driven by motor wind wheel is flowed, and makes air take away unnecessary heat, Keep temperature constant in casing, simultaneously arranging two-layer filter screen in airduct and casing so that in casing Portion's environment is from the pollution of dust in air, it is ensured that cleaning in casing, extends the service life of equipment;2、 By coating heat-insulation layer on carrier bar, and warming plate is installed in the lower section of carrier chain, reduces mould in transport During thermal loss, therefore can reduce the preheating temperature of mould, not affect melt in a mold simultaneously Molding effect, reduce energy consumption, and avoid mould itself and reduce its service life in high temperature environments, Save production cost;3, by the installed in front blow tank at feeding machine so that store part in blow tank Melt, the heating roller in blow tank ensure that the melt in blow tank has good mobility, exists simultaneously Heating roller is installed in feeding roller, improves melt mobility in feed pipe greatly, prevent melt from entering After entering feed pipe, its mobility reduces along with the reduction of temperature, it is therefore prevented that the generation of feed pipe clogging, Improve production efficiency.
Inventive feature and advantage will combine accompanying drawing by embodiment and be described in detail.
[accompanying drawing explanation]
Fig. 1 is the main TV structure schematic diagram of a kind of Thermoplastic elastomer production line of the present invention;
Fig. 2 is the main TV structure schematic diagram of constant temperature control box in the present invention;
Fig. 3 is the main TV structure schematic diagram of mould conveying arrangement in the present invention;
Fig. 4 is the main TV structure schematic diagram of major ingredient machine in the present invention.
In figure: 1-preheating device, 2-constant temperature control box, 3-mould conveying arrangement, 4-frame, 5-feeding machine, 21-casing, 22-the first motor, 23-power distribution cabinet, 24-temperature sensor, 25-blast pipe, 26-discharge pipe, 27-the first filter screen, 28-wind wheel, 29-the second filter screen, 211-heating plate, 221-outfan, 32-carrier chain, 33-drivewheel, 34-driven pulley, 35-the second motor, 36-belt, 321-carrier bar, 322-warming plate, 41- Prop up spike, 42-regulates foot cup, 51-blow tank, 52-feed pipe.53-filling head, 54-the first heating roller, 55-the second heating roller.
[detailed description of the invention]
Refering to Fig. 1 and Fig. 4, one Thermoplastic elastomer production line of the present invention, including preheating device 1, some Constant temperature control box 2 and mould conveying arrangement 3, frame 4 and feeding machine 5, described mould conveying arrangement 3 is installed In frame 4, preheating device 1 and constant temperature control box 2 are installed on the top of mould conveying arrangement 3, described The side of preheating device 1 is connected with constant temperature control box 2, and the front end of described feeding machine 5 is provided with blow tank 51, described blow tank 51 uses feed pipe 52 to be connected with filling head 53, is provided with in feed pipe 52 One heating roller 54, is provided with the second heating roller 55 in blow tank 51.
Refering to Fig. 1 and Fig. 2, described constant temperature control box 2 includes casing the 21, first motor 22, power distribution cabinet 23 If with dry temperature sensor 24, described casing 21 being provided with blast pipe 25 and discharge pipe 26, blast pipe 25 With the first filter screen 27 is installed in discharge pipe 26, the first motor 22 and power distribution cabinet 23 are installed on casing 21, Being provided with wind wheel 28 on described first motor 22, it is internal that described wind wheel 28 is positioned at casing 21, described wind wheel The lower section of 28 is provided with the second filter screen 29, and described temperature sensor 24 is installed on the inner surface of casing 21, institute Stating the first filter screen 27 and use airstrainer, the second filter screen 29 uses HEPA filter screen, described first motor Being provided with outfan 221 on 22, described outfan 221 passes perpendicularly through the upper surface of casing 21, outfan 221 Upper end be connected with the first motor 22, the lower end of outfan 221 is connected with wind wheel 28, the first motor 22 use nut to be fixed on the upper of casing 21, and the upper port of described blast pipe 25 is positioned at the outside of casing 21, The lower port of blast pipe 25 is positioned at the inside of casing 21, and the upper port of described discharge pipe 26 is positioned at casing 21 Outside, the lower port of discharge pipe 26 is positioned at the inside of casing 21, described second filter screen 29 and blast pipe 25 Flush with the lower port of discharge pipe 26.
Refering to Fig. 1 and Fig. 3, described mould conveying arrangement 3 includes carrier chain 32, drivewheel 33, driven pulley 34 and second motor 35, described carrier chain 32 is installed in frame 4, if being arranged above of carrier chain 32 Dry carrier bar 321, carrier chain 32 is set in drivewheel 33 and the outside of driven pulley 34, the lower section of carrier chain 32 Being provided with warming plate 322, described second motor 35 uses belt 36 to be connected with drivewheel 33, described chain Plate 321 is evenly distributed on the top of carrier chain 32, and carrier bar 321 scribbles heat insulation coating, described warming plate 322 Using polyurethane thermal insulation board, described heat insulation coating uses aluminum silicate composite heat-insulating coating, below described frame 4 Being provided with some spikes 41, the lower section of a spike 41 is provided with regulation foot cup 42.
Work process of the present invention:
In the course of the work, mould is preheated one Thermoplastic elastomer production line of the present invention by preheating device 1 After, enter constant temperature control box 2 by mould conveying arrangement 3, in temperature sensor 24 detects casing 21 When temperature is too high, power distribution cabinet 23 starts the first motor 22 and wind wheel 28 is rotated, and strengthens in casing 21 Air flows, and cold air flows to from blast pipe 25, and hot-air flows out from discharge pipe 26, is positioned at blast pipe 25 Air can be effectively prevented with the first filter screen 27 in discharge pipe 26 and the second filter screen 29 below wind wheel 28 In dust enter in casing 21, it is ensured that the cleaning within casing 21, prevent the electrostatic damage that dust is carried The part of equipment, extends the service life of equipment, after equipment uses a period of time, can filter first Net 27 and the second filter screen 29 just can be continuing with after disassembling cleaning, by the mould of preheating in transportation Tool is placed on above the carrier bar 321 of carrier chain 32, heat insulation coating above carrier bar 321 and carrier chain 32 times The warming plate 322 of side can reduce mould thermal loss in transportation, therefore can reduce mould Preheating temperature, does not affect melt molding effect in a mold simultaneously, reduces energy consumption, and avoid mould Tool itself reduces its service life in high temperature environments, has saved production cost, and polyurethane thermal insulation board is also There is good acoustically effective, the noise produced during equipment uses can be reduced, when material feeding in mould, Part melt is stored in blow tank 51, and the second heating roller 55 in blow tank 51 ensure that blow tank 51 Interior melt has good mobility, and the melt in blow tank 51 is squeezed from discharge head 53 by feed pipe 52 Going out, the first heating roller 54 installed in feed pipe 52 improves melt flowing in feed pipe 52 greatly Property, after preventing melt from entering feed pipe 52, its mobility reduces along with the reduction of temperature, it is therefore prevented that feed pipe The generation of 52 cloggings, improves production efficiency.
Above-described embodiment is the description of the invention, is not limitation of the invention, any simple to the present invention Scheme after conversion belongs to protection scope of the present invention.

Claims (5)

1. a Thermoplastic elastomer production line, it is characterised in that: include preheating device (1), some thermostatic controls Case (2) and mould conveying arrangement (3), frame (4) and feeding machine (5), described mould conveying arrangement (3) it is installed in frame (4), warming plate (322) is installed in mould conveying arrangement (3), preheating Device (1) and constant temperature control box (2) are installed on the top of mould conveying arrangement (3), described pre-hot charging The side putting (1) is connected with constant temperature control box (2), and the front end of described feeding machine (5) is provided with out Hopper (51), described blow tank (51) uses feed pipe (52) to be connected with filling head (53), send In material pipe (52), the first heating roller (54) is installed, the second heating roller (55) is installed in blow tank (51); Described constant temperature control box (2) includes casing (21), the first motor (22), power distribution cabinet (23) and some Temperature sensor (24), described casing (21) is provided with blast pipe (25) and discharge pipe (26), First filter screen (27) is installed, the first motor (22) and joining in blast pipe (25) and discharge pipe (26) Electricity cabinet (23) is installed on casing (21), and described first motor (22) is provided with wind wheel (28), It is internal that described wind wheel (28) is positioned at casing (21), and the lower section of described wind wheel (28) is provided with the second filter Net (29), described temperature sensor (24) is installed on the inner surface of casing (21), described first filter screen (27) using airstrainer, the second filter screen (29) uses HEPA filter screen;Described mould transport dress Put (3) and include carrier chain (32), drivewheel (33), driven pulley (34) and the second motor (35), In described carrier chain (32) is installed on frame (4), carrier chain (32) be arranged above some carrier bars (321), carrier chain (32) is set in drivewheel (33) and the outside of driven pulley (34), carrier chain (32) lower section is provided with warming plate (322), described second motor (35) use belt (36) with Drivewheel (33) is connected.
2. a kind of Thermoplastic elastomer production line as claimed in claim 1, it is characterised in that: described first motor (22) being provided with outfan (221) on, described outfan (221) passes perpendicularly through the upper of casing (21) Surface, the upper end of outfan (221) is connected with the first motor (22), under outfan (221) End is connected with wind wheel (28), and the first motor (22) uses nut to be fixed on casing (21).
3. a kind of Thermoplastic elastomer production line as claimed in claim 1, it is characterised in that: described blast pipe (25) Upper port be positioned at the outside of casing (21), the lower port of blast pipe (25) is positioned at casing (21) Inside, the upper port of described discharge pipe (26) is positioned at the outside of casing (21), discharge pipe (26) Lower port is positioned at the lower end of the inside of casing (21), described second filter screen (29) and blast pipe (25) The lower port of mouth and discharge pipe (26) flushes.
4. a kind of Thermoplastic elastomer production line as claimed in claim 1, it is characterised in that: described carrier bar (321) It is evenly distributed on the top of carrier chain (32), carrier bar (321) scribbles heat insulation coating, described warming plate (322) using polyurethane thermal insulation board, described heat insulation coating uses aluminum silicate composite heat-insulating coating.
5. a kind of Thermoplastic elastomer production line as according to any one of Claims 1-4, it is characterised in that: Described frame (4) lower section is provided with some spikes (41), and the lower section of a spike (41) is provided with tune Joint foot cup (42).
CN201310421582.6A 2013-09-16 2013-09-16 A kind of Thermoplastic elastomer production line Active CN103507190B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310421582.6A CN103507190B (en) 2013-09-16 2013-09-16 A kind of Thermoplastic elastomer production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310421582.6A CN103507190B (en) 2013-09-16 2013-09-16 A kind of Thermoplastic elastomer production line

Publications (2)

Publication Number Publication Date
CN103507190A CN103507190A (en) 2014-01-15
CN103507190B true CN103507190B (en) 2016-11-23

Family

ID=49890877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310421582.6A Active CN103507190B (en) 2013-09-16 2013-09-16 A kind of Thermoplastic elastomer production line

Country Status (1)

Country Link
CN (1) CN103507190B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104002412B (en) * 2014-05-14 2016-01-27 安徽中意胶带有限责任公司 A kind of hot oil carrier hydronic macromolecular elastomer cast solidification bed
CN112340365A (en) * 2020-10-31 2021-02-09 山东山矿机械有限公司 Automatic temperature-adjusting belt conveyor sealing protective cover and adjusting method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5134262A (en) * 1974-09-19 1976-03-23 Mitsui Toatsu Chemicals Shashutsuseikeiki no seikeihojosochi
CN203485345U (en) * 2013-09-16 2014-03-19 爱侣健康科技有限公司 Thermoplastic elastomer production line

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5134262A (en) * 1974-09-19 1976-03-23 Mitsui Toatsu Chemicals Shashutsuseikeiki no seikeihojosochi
CN203485345U (en) * 2013-09-16 2014-03-19 爱侣健康科技有限公司 Thermoplastic elastomer production line

Also Published As

Publication number Publication date
CN103507190A (en) 2014-01-15

Similar Documents

Publication Publication Date Title
CN205057065U (en) Powder injection molding is with preventing gas -tight bubble injection device that condenses
CN103507190B (en) A kind of Thermoplastic elastomer production line
CN204211932U (en) A kind of cooling body producing bi-component cotton baking oven
CN104527013A (en) Waste heat recovering and utilizing system and method of plastic pipe production line
CN203485345U (en) Thermoplastic elastomer production line
CN206883952U (en) A kind of dual preheating plastic granulator
CN207842018U (en) A kind of twin-screw extrusion equipment being used to prepare thermoplastic elastomer (TPE) TPE
CN206690456U (en) Energy saving and environment friendly injection machine
CN207327537U (en) For injection molding machine or the extrusion mechanism of blow moulding machine
CN208108754U (en) A kind of silicon carbide micro-powder drying equipment
CN110186267B (en) Oven is used in weaving
CN206085389U (en) Granulator heating and material feeding unit
CN204054570U (en) A kind of high-efficient energy-saving environment friendly with electromagnetic induction heating moulds volume wire drawing machine
CN208148340U (en) A kind of injection molding machine
CN203844223U (en) Film blowing cooling device for packaging bag
CN206780841U (en) A kind of energy-conserving and environment-protective injection machine
CN206981448U (en) Aluminum pipe pressurizing unit
CN202507516U (en) Online cooling system of internal surface of polyolefin pipes
CN206983216U (en) Environment-friendly type single-screw extruder
CN206809477U (en) A kind of Full-automatic crystal facial mask machine
CN207290778U (en) A kind of flip injection mold
CN207014605U (en) A kind of plastic engineering prilling granulator
CN207240762U (en) A kind of internal dust removing structure of cooling-down type conveyer
CN205386887U (en) Masterbatch drying device
CN206140884U (en) Polyethylene structure wall winding pipe make -up machine with fan cooler

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant