CN103500237A - 基于逻辑布局的配电网自动成图方法 - Google Patents
基于逻辑布局的配电网自动成图方法 Download PDFInfo
- Publication number
- CN103500237A CN103500237A CN201310276617.1A CN201310276617A CN103500237A CN 103500237 A CN103500237 A CN 103500237A CN 201310276617 A CN201310276617 A CN 201310276617A CN 103500237 A CN103500237 A CN 103500237A
- Authority
- CN
- China
- Prior art keywords
- distribution network
- algorithm
- layout
- power distribution
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/30—Circuit design
- G06F30/39—Circuit design at the physical level
- G06F30/394—Routing
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/18—Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/04—Power grid distribution networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/30—Circuit design
- G06F30/39—Circuit design at the physical level
- G06F30/398—Design verification or optimisation, e.g. using design rule check [DRC], layout versus schematics [LVS] or finite element methods [FEM]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
Abstract
本发明涉及一种基于逻辑布局的配电网自动成图方法,包括(1)对配电网模型进行分析预处理,将其进行分割和剥离,形成局部模型;(2)对拟采用的自动成图算法结合配电网模型进行分析比对,找出局部模型或整体的配电网模型的针对性优化的依据;(3)在对拟采用的自动成图算法进行分析的基础上,结合力导向布局算法、混合布局算法、动态交互布局算法、改进的网格布线算法实现对局部模型或整体的配电网模型的自动布局而生成配网图;(4)对自动布局进行分析,使其达到预期的实用化效果。本发明针对配电网本身的问题,在对配电网进行分析的基础上结合多种成图算法来实现配电网自动成图,可以保证自动生成的配网图布局美观、清晰、合理。
Description
技术领域
本发明涉及一种配电网自动成图的方法。
背景技术
从网络拓扑可视化的角度来看,自动绘图算法大致可分为两大类,即物理布局和逻辑布局。物理布局中最具代表性的就是地理位置映射方法。它只是简单地将节点的地理位置信息解析为与之对应的布局坐标。地理位置映射对于与地理位置信息相关的网络拓扑可视化来说有着重要意义,但同时也使这种方法局限于需要大量的原始地理信息数据,而其生成的电网图形却无法满足走向明确、拓扑清晰的业务需要。
逻辑布局有着地理信息映射所不具备的优势,它可以按需为节点分配布局空间,而无须考虑它们在实际地理位置上的冗余和交错。更重要的是,这种方法可以让研究者们在实现布局的过程中,充分利用与问题域无关的图算法,也可以让他们集中关注图自身的内在特性。逻辑布局是绘图研究的核心内容,在这一分支中产生了非常丰富的算法。树型布局算法,射线布局算法,层次布局算法,直交布局算法,力导向布局算法,混合布局算法,动态交互布局等,此外,还有很多研究借鉴组合优化问题的求解方法来解决图布局问题,这类方法有遗传算法、模拟退火算法等。
国外也有很多研究机构和大学做了很多工作,如CAIDA,Bell实验室,墨尔本大学,罗马大学,但经研究发现普遍存在以下问题:
a)多数网络拓扑可视化中的图布局算法并没有充分考虑并利用电力系统网络拓扑的内在特性,而只是针对一些通用的布局算法,在效率和布局效果上进行改进;
b)在现有的网络拓扑可视化研究中,还缺乏动态交互布局的成果。
因此,在对配电网进行自动布局成图时,单一的布局成图方法并不能满足配电网的需求。
发明内容
本发明的目的是提供一种针对配电网而提出的并保证成图布局美观、清晰、合理的配电网自动成图方法。
为达到上述目的,本发明采用的技术方案是:
一种基于逻辑布局的配电网自动成图方法,用于实现电力系统的配电网络图形的自动成图,该方法包括
(1)对配电网模型进行分析预处理,将其进行分割和剥离,形成局部模型;
(2)对拟采用的自动成图算法结合所述的配电网模型进行分析比对,找出所述的局部模型或整体的配电网模型的针对性优化的依据;
(3)在对拟采用的自动成图算法进行分析的基础上,结合力导向布局算法、混合布局算法、动态交互布局算法、改进的网格布线算法实现对所述的局部模型或整体的配电网模型的自动布局而生成配网图;
(4)对所述的自动布局进行分析,使所述的自动布局达到预期的实用化效果。
优选的,所述的拟采用的自动成图算法包括但不限于树型布局算法、射线布局算法、层次布局算法、直交布局算法、力导向布局算法、混合布局算法、动态交互布局、遗传算法、模拟退火算法。
优选的,该方法还包括:结合现有的CIM模型找出与自动布局相结合的最佳的CIM描述模型。
由于上述技术方案运用,本发明与现有技术相比具有下列优点:本发明的配电网自动成图方法针对配电网本身的问题,在对配电网进行分析的基础上结合多种成图算法来实现配电网自动成图,可以保证自动生成的配网图布局美观、清晰、合理,使得配网图能够有效提高配网日常工作和配网数据维护的效率。
附图说明
附图1为本发明的基于逻辑布局的配电网自动成图方法的自动布局的流程图。
附图2为采用本发明的基于逻辑布局的配电网自动成图方法所成的配网图的示意图。
具体实施方式
下面结合附图所示的实施例对本发明作进一步描述。
实施例一:配电网本身线路、设备数量庞大,切改频繁,使得绘制工作量大,维护和使用复杂,且实时性不高,存在维护不及时,正确性与可靠性严重偏低等问题。针对上述问题,提供一种基于逻辑布局的配电网自动成图方法,用于实现电力系统的配电网络图形的自动成图。
该方法包括
(1)对配电网模型进行分析预处理,将其进行分割和剥离,形成局部模型。
(2)对拟采用的自动成图算法结合配电网模型进行分析比对,找出局部模型或整体的配电网模型的针对性优化的依据。
(3)结合现有的CIM模型找出与自动布局相结合的最佳的CIM描述模型。
CIMIM不同版本都对拓扑进行了不同的描述,最新的CIM版本已经有了相关布局后图形的描述,结合现有的CIM模型,找出和自动布局相结合的最佳CIM描述模型。
(4)在对拟采用的自动成图算法进行分析的基础上,结合力导向布局算法、混合布局算法、动态交互布局算法、改进的网格布线算法实现对局部模型或整体的配电网模型的自动布局而生成配网图。
拟采用的自动成图算法包括但不限于树型布局算法、射线布局算法、层次布局算法、直交布局算法、力导向布局算法、混合布局算法、动态交互布局、遗传算法、模拟退火算法。
力导向算法:通过对每个节点的计算,算出引力和排斥力综合的合力,再由此合力来移动节点的位置。执行一次后根据节点新位置算出新的能量值,能量值越小,表示整个网络越趋于稳定,网络图的配置显示就会越清晰,当能量值到达最小值的时候,网状图的配置状态为最佳呈现效果。
混合布局算法:混合布局算法是将布局过程拆解为不同的步骤或将布局区域分块,然后在不同步骤,不同布局区域采用不用的布局算法,以求在整体上和局部上都尽可能的满足布局需求的条件。
动态交互布局算法:在现实应用中图的大小、形态会随时间动态地发生变化,需要布局方法能够动态适应图的变化,且最大限地保持布局稳定;另一方面,单次的自动布局不能满足人们的要求,通过在布局过程中引入递归修正方法使得布局效果更接近人们的要求。动态交互布局的关键就是有效利用前一次布局的结果,降低单次布局的规模以提高效率,并保持图动态变化过程中的印象图。
生成配网图的流程如附图1所示。而生成的配网图的效果示例如附图2。
(4)对自动布局进行分析,使自动布局达到预期的实用化效果。
单一的布局算法在应用到复杂的配电网络中时存在很多缺陷,不能够满足显示配电网要求,如力导向算法总是有节点在两个不同位置上来回振动,造成算法结果不收敛,无法生成有效图形,同时网状图的节点数太多时,很难随即选取良好的初始节点,生成带有很多交叉、重叠的图形,无法求得满意的结果。本方法将多种布局算法进行有机的结合,有效避免某一单一算法的缺陷,通过对配电网模型的预读取和预分析,对电网进行有效的分割和主干、支路剥离,智能优先选取整体或局部的布局算法,并采用布局节点效果权值比重计算,分析初始布局效果。对效果值未达到布局指标的图形进行二次或多次递归分割和布局,最终实现达到实用化效果的配电网络自动成图。
现场工程应用:结合现场的拓扑结构,导出相应的CIM模型,对其进行布线和布局,基于构建的软件系统可以增加适配器,以达到和其他系统的嵌入和集成,并可以以多种方式为其他系统提供布局服务。
上述实施例只为说明本发明的技术构思及特点,其目的在于让熟悉此项技术的人士能够了解本发明的内容并据以实施,并不能以此限制本发明的保护范围。凡根据本发明精神实质所作的等效变化或修饰,都应涵盖在本发明的保护范围之内。
Claims (3)
1.一种基于逻辑布局的配电网自动成图方法,用于实现电力系统的配电网络图形的自动成图,其特征在于:该方法包括
(1)对配电网模型进行分析预处理,将其进行分割和剥离,形成局部模型;
(2)对拟采用的自动成图算法结合所述的配电网模型进行分析比对,找出所述的局部模型或整体的配电网模型的针对性优化的依据;
(3)在对拟采用的自动成图算法进行分析的基础上,结合力导向布局算法、混合布局算法、动态交互布局算法、改进的网格布线算法实现对所述的局部模型或整体的配电网模型的自动布局而生成配网图;
(4)对所述的自动布局进行分析,使所述的自动布局达到预期的实用化效果。
2.根据权利要求1所述的基于逻辑布局的配电网自动成图方法,其特征在于:所述的拟采用的自动成图算法包括但不限于树型布局算法、射线布局算法、层次布局算法、直交布局算法、力导向布局算法、混合布局算法、动态交互布局、遗传算法、模拟退火算法。
3.根据权利要求1所述的基于逻辑布局的配电网自动成图方法,其特征在于:该方法还包括:结合现有的CIM模型找出与自动布局相结合的最佳的CIM描述模型。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310276617.1A CN103500237A (zh) | 2013-07-03 | 2013-07-03 | 基于逻辑布局的配电网自动成图方法 |
US14/248,114 US9177094B2 (en) | 2013-07-03 | 2014-04-08 | Automatic mapping method for a distribution network based on logical layout |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310276617.1A CN103500237A (zh) | 2013-07-03 | 2013-07-03 | 基于逻辑布局的配电网自动成图方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103500237A true CN103500237A (zh) | 2014-01-08 |
Family
ID=49865447
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310276617.1A Pending CN103500237A (zh) | 2013-07-03 | 2013-07-03 | 基于逻辑布局的配电网自动成图方法 |
Country Status (2)
Country | Link |
---|---|
US (1) | US9177094B2 (zh) |
CN (1) | CN103500237A (zh) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104091034A (zh) * | 2014-07-29 | 2014-10-08 | 国家电网公司 | 基于图形匹配的线路联络图自动成图系统及方法 |
CN104133943A (zh) * | 2014-07-08 | 2014-11-05 | 国家电网公司 | 基于目标导向的配网图形自动生成方法 |
CN104143127A (zh) * | 2014-07-18 | 2014-11-12 | 国家电网公司 | 一种基于cim的配电网三图联动处理方法 |
CN104573868A (zh) * | 2015-01-19 | 2015-04-29 | 国家电网公司 | 一种配电网抢修网格划分方法及设备 |
CN104951844A (zh) * | 2015-05-21 | 2015-09-30 | 北京科东电力控制系统有限责任公司 | 一种配电网专题图布局优化方法 |
CN105488269A (zh) * | 2015-11-29 | 2016-04-13 | 国家电网公司 | 一种基于cim模型的输配电网自动成图系统 |
CN106202662A (zh) * | 2016-06-30 | 2016-12-07 | 中国电力科学研究院 | 一种配电网网架图自动绘制映射方法 |
CN107945245A (zh) * | 2017-11-06 | 2018-04-20 | 许继电气股份有限公司 | 一种配电网络区域图形自动生成方法 |
CN111695223A (zh) * | 2020-06-11 | 2020-09-22 | Ut斯达康通讯有限公司 | 一种网络拓扑布局方法及系统 |
CN113505558A (zh) * | 2021-07-20 | 2021-10-15 | 广东电网有限责任公司 | 基于图算法技术的电网监控系统设备元件自动连线方法 |
CN116109082A (zh) * | 2023-01-04 | 2023-05-12 | 国网河南省电力公司郑州供电公司 | 一种面向分布式配电网的馈线自动化数据信息系统及方法 |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10269152B2 (en) | 2015-06-05 | 2019-04-23 | International Business Machines Corporation | Force-directed graphs |
CN107742883B (zh) * | 2017-09-19 | 2019-12-24 | 中国科学院深圳先进技术研究院 | 一种基于Spark的电力系统拓扑岛快速识别系统和方法 |
CN108074043B (zh) * | 2018-01-04 | 2020-04-03 | 贵州大学 | 一种城市综合管廊配套电网规划方法 |
CN109783575A (zh) * | 2018-12-30 | 2019-05-21 | 国网北京市电力公司 | 数据处理方法及装置 |
US11120170B2 (en) | 2019-05-01 | 2021-09-14 | Primate Technologies, Inc. | Systems and methods of generating a dynamic representation of an electrical grid |
CN111783261B (zh) * | 2020-05-27 | 2024-01-02 | 杭州阳斯信息技术有限公司 | 一种对基于地理走径的电网图自动规整方法 |
CN113761693A (zh) * | 2020-11-27 | 2021-12-07 | 浙江华云信息科技有限公司 | 一种基于拓扑与网格的图形自动调整方法 |
CN113486485A (zh) * | 2021-07-19 | 2021-10-08 | 许昌许继软件技术有限公司 | 一种基于地理沿布图的单线图自动成图布局优化方法及装置 |
CN115688341B (zh) * | 2022-11-15 | 2024-04-16 | 厦门亿力吉奥信息科技有限公司 | 基于多叉树碰撞检测的配网专题图布局方法及存储介质 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5317525A (en) * | 1990-03-06 | 1994-05-31 | Mitsubishi Denki Kabushiki Kaisha | Electric power system simulator |
CN103150425A (zh) * | 2013-02-06 | 2013-06-12 | 上海交通大学 | 基于拓扑分层的配电网单线图自动生成方法 |
Family Cites Families (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6931090B2 (en) * | 2003-02-25 | 2005-08-16 | Westinghouse Electric Company Llc | Method of establishing a nuclear reactor core fuel assembly loading pattern |
US7930159B1 (en) * | 2003-03-31 | 2011-04-19 | Emc Corporation | Method and apparatus for multi-realm system modeling |
WO2006017944A1 (en) * | 2004-08-16 | 2006-02-23 | Abb Research Ltd | Method and system for bi-directional data conversion between iec 61970 and iec 61850 |
US7752588B2 (en) * | 2005-06-29 | 2010-07-06 | Subhasis Bose | Timing driven force directed placement flow |
US9557723B2 (en) * | 2006-07-19 | 2017-01-31 | Power Analytics Corporation | Real-time predictive systems for intelligent energy monitoring and management of electrical power networks |
US9092593B2 (en) * | 2007-09-25 | 2015-07-28 | Power Analytics Corporation | Systems and methods for intuitive modeling of complex networks in a digital environment |
US8255353B2 (en) * | 2006-05-16 | 2012-08-28 | Zhan Zhang | Method for constructing an intelligent system processing uncertain causal relationship information |
US8775934B2 (en) * | 2006-07-19 | 2014-07-08 | Power Analytics Corporation | Systems and methods for creation of a schematic user interface for monitoring and predicting the real-time health, reliability and performance of an electrical power system |
US8190299B2 (en) * | 2006-07-19 | 2012-05-29 | Rovnyak Steven M | Integrated and optimized distributed generation and interconnect system controller |
US8907520B2 (en) * | 2007-03-14 | 2014-12-09 | Zonit Structured Solutions, Llc | Parallel redundant power distribution |
US20080168017A1 (en) * | 2007-01-05 | 2008-07-10 | International Business Machines Corporation | Method and apparatus for configuration modelling and consistency checking of web applications |
US8161550B2 (en) * | 2007-01-23 | 2012-04-17 | Knowledge Based Systems, Inc. | Network intrusion detection |
US8155943B2 (en) * | 2007-10-12 | 2012-04-10 | Power Analytics Corporation | Systems and methods for automatically converting CAD drawing files into intelligent objects with database connectivity for the design, analysis, and simulation of electrical power systems |
EP2101393A1 (en) * | 2008-03-10 | 2009-09-16 | ABB Research Ltd | Distribution controller and a method for indentifying an orphan network and transmitting a standardized description of the orphan network to another distribution controller |
US8171049B2 (en) * | 2009-09-18 | 2012-05-01 | Xerox Corporation | System and method for information seeking in a multimedia collection |
US9477932B2 (en) * | 2011-01-17 | 2016-10-25 | General Electric Company | System and method for providing visualization of a parameter on multiple branches of a distribution network |
US8756449B2 (en) * | 2011-03-08 | 2014-06-17 | Cisco Technology, Inc. | Phase-based operation of devices on a polyphase electric distribution system |
US20120239169A1 (en) * | 2011-03-18 | 2012-09-20 | Rockwell Automation Technologies, Inc. | Transparent models for large scale optimization and control |
US9054531B2 (en) * | 2011-07-19 | 2015-06-09 | Carnegie Mellon University | General method for distributed line flow computing with local communications in meshed electric networks |
WO2013026178A1 (en) * | 2011-08-23 | 2013-02-28 | General Electric Company | Orthogonal layout generation |
-
2013
- 2013-07-03 CN CN201310276617.1A patent/CN103500237A/zh active Pending
-
2014
- 2014-04-08 US US14/248,114 patent/US9177094B2/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5317525A (en) * | 1990-03-06 | 1994-05-31 | Mitsubishi Denki Kabushiki Kaisha | Electric power system simulator |
CN103150425A (zh) * | 2013-02-06 | 2013-06-12 | 上海交通大学 | 基于拓扑分层的配电网单线图自动生成方法 |
Non-Patent Citations (3)
Title |
---|
方正云等: "配电网单线图自动化生成及综合应用", 《电气工程与自动化》 * |
章文俊等: "配电网优化规划研究综述", 《电力系统及其自动化学报》 * |
翁嘉明等: "基于层次分析法的配电网运行方式多目标优化", 《电力系统自动化》 * |
Cited By (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104133943A (zh) * | 2014-07-08 | 2014-11-05 | 国家电网公司 | 基于目标导向的配网图形自动生成方法 |
CN104133943B (zh) * | 2014-07-08 | 2017-06-20 | 国家电网公司 | 基于目标导向的配网图形自动生成方法 |
CN104143127A (zh) * | 2014-07-18 | 2014-11-12 | 国家电网公司 | 一种基于cim的配电网三图联动处理方法 |
CN104143127B (zh) * | 2014-07-18 | 2017-05-10 | 国家电网公司 | 一种基于cim的配电网三图联动处理方法 |
CN104091034A (zh) * | 2014-07-29 | 2014-10-08 | 国家电网公司 | 基于图形匹配的线路联络图自动成图系统及方法 |
CN104573868A (zh) * | 2015-01-19 | 2015-04-29 | 国家电网公司 | 一种配电网抢修网格划分方法及设备 |
CN104573868B (zh) * | 2015-01-19 | 2018-04-06 | 国家电网公司 | 一种配电网抢修网格划分方法及设备 |
CN104951844A (zh) * | 2015-05-21 | 2015-09-30 | 北京科东电力控制系统有限责任公司 | 一种配电网专题图布局优化方法 |
CN104951844B (zh) * | 2015-05-21 | 2018-09-18 | 国网北京市电力公司顺义供电公司 | 一种配电网专题图布局优化方法 |
CN105488269A (zh) * | 2015-11-29 | 2016-04-13 | 国家电网公司 | 一种基于cim模型的输配电网自动成图系统 |
CN106202662B (zh) * | 2016-06-30 | 2023-05-26 | 中国电力科学研究院 | 一种配电网网架图自动绘制映射方法 |
CN106202662A (zh) * | 2016-06-30 | 2016-12-07 | 中国电力科学研究院 | 一种配电网网架图自动绘制映射方法 |
CN107945245A (zh) * | 2017-11-06 | 2018-04-20 | 许继电气股份有限公司 | 一种配电网络区域图形自动生成方法 |
CN107945245B (zh) * | 2017-11-06 | 2021-03-30 | 许继电气股份有限公司 | 一种配电网络区域图形自动生成方法 |
CN111695223B (zh) * | 2020-06-11 | 2023-03-03 | Ut斯达康通讯有限公司 | 一种网络拓扑布局方法及系统 |
CN111695223A (zh) * | 2020-06-11 | 2020-09-22 | Ut斯达康通讯有限公司 | 一种网络拓扑布局方法及系统 |
CN113505558A (zh) * | 2021-07-20 | 2021-10-15 | 广东电网有限责任公司 | 基于图算法技术的电网监控系统设备元件自动连线方法 |
CN113505558B (zh) * | 2021-07-20 | 2023-08-22 | 广东电网有限责任公司 | 基于图算法技术的电网监控系统设备元件自动连线方法 |
CN116109082A (zh) * | 2023-01-04 | 2023-05-12 | 国网河南省电力公司郑州供电公司 | 一种面向分布式配电网的馈线自动化数据信息系统及方法 |
CN116109082B (zh) * | 2023-01-04 | 2023-08-11 | 国网河南省电力公司郑州供电公司 | 一种面向分布式配电网的馈线自动化数据信息系统及方法 |
Also Published As
Publication number | Publication date |
---|---|
US9177094B2 (en) | 2015-11-03 |
US20150012902A1 (en) | 2015-01-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103500237A (zh) | 基于逻辑布局的配电网自动成图方法 | |
Lawrence et al. | AIFdb: Infrastructure for the argument web | |
Wang et al. | Research on power Internet of Things architecture for smart grid demand | |
Xiao et al. | Cascading link failure in the power grid: A percolation-based analysis | |
CN103020335A (zh) | 一种配电网地理接线图到区域正交图的自动转换方法 | |
CN103093007B (zh) | 输电铁塔三维虚拟装配方法 | |
CN105449713A (zh) | 考虑分布式电源特性的有源配电网智能软开关规划方法 | |
Breuer et al. | Determination of alternative bidding areas based on a full nodal pricing approach | |
CN107330056A (zh) | 基于大数据云计算平台的风电场scada系统及其运行方法 | |
CN103066698A (zh) | 在调配系统中自动生成可视化的电网潮流图的实现方法 | |
CN105656028B (zh) | 一种基于gis的电网稳定裕度的可视化显示方法 | |
CN104091034B (zh) | 基于图形匹配的线路联络图自动成图系统及方法 | |
CN104463465B (zh) | 一种基于分布式模型的实时监控集群处理方法 | |
CN104102790A (zh) | 基于gis的供电图自动成图系统及方法 | |
CN104682560A (zh) | 一种配电网模型异动的图形化校核方法 | |
Zhao et al. | Research on the structural characteristics of transmission grid based on complex network theory | |
CN103714124A (zh) | 超大规模低压数据处理方法 | |
CN103093493A (zh) | 既有电网设备的高精度三维对象建模方法 | |
CN104573997B (zh) | 一种配网成图及专题图应用架构设计方法 | |
Melo et al. | Data issues in spatial electric load forecasting | |
Yu et al. | Optimization of an offshore oilfield multi-platform interconnected power system structure | |
CN105305502B (zh) | 基于协调一致性的配电网络分布式电源控制方法及系统 | |
CN111639412A (zh) | 基于地理沿布图自动生成单线图的方法 | |
Li et al. | Distribution feeder one-line diagrams automatic generation from geographic diagrams based on GIS | |
Ergun et al. | Stepwise investment plan optimization for large scale and multi-zonal transmission system expansion |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140108 |
|
RJ01 | Rejection of invention patent application after publication |