CN103488883A - 一种高压直流输电换流阀换相失败监测方法 - Google Patents

一种高压直流输电换流阀换相失败监测方法 Download PDF

Info

Publication number
CN103488883A
CN103488883A CN201310412303.XA CN201310412303A CN103488883A CN 103488883 A CN103488883 A CN 103488883A CN 201310412303 A CN201310412303 A CN 201310412303A CN 103488883 A CN103488883 A CN 103488883A
Authority
CN
China
Prior art keywords
converter valve
turn
basal area
commutation failure
monitoring method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310412303.XA
Other languages
English (en)
Inventor
刘泽洪
汤广福
许韦华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
China EPRI Electric Power Engineering Co Ltd
Original Assignee
State Grid Corp of China SGCC
China EPRI Electric Power Engineering Co Ltd
Smart Grid Research Institute of SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China EPRI Electric Power Engineering Co Ltd, Smart Grid Research Institute of SGCC filed Critical State Grid Corp of China SGCC
Priority to CN201310412303.XA priority Critical patent/CN103488883A/zh
Publication of CN103488883A publication Critical patent/CN103488883A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及一种换流阀的监测方法,具体涉及一种高压直流输电换流阀换相失败监测方法。该方法包括下述步骤:(1)建立换流阀关断时间数学模型;(2)实时监测换流阀电流导数是否小于0;(3)确定换流阀关断面积;(4)确定临界关断面积;(5)确定实际关断面积;(6)比较实际关断面积和临界关断面积,判断换流阀是否换相失败。本发明提供的方法从换流阀设备角度对换相失败的监测更为直接,反应了换相失败故障的本质;硬件方面易于实现,在TE板上增加积分功能,计算关断面积简单方便。

Description

一种高压直流输电换流阀换相失败监测方法
技术领域
本发明涉及一种换流阀的监测方法,具体涉及一种高压直流输电换流阀换相失败监测方法。
背景技术
20世纪70年代以来,采用晶闸管作为换相元件的高压直流输电工程以其大容量远距离输电、有功功率快速可控等特点在世界范围内得到了快速的发展。换相失败(CommutationFailure,CF)是逆变器较为常见的故障形式,其发生使得传输功率从正常值突然下降到很小的值甚至是零,为整个交直交系统带来巨大的扰动,严重影响了直流系统的可靠运行。我国电网中因直流工程输送容量提升,多馈入直流以及大直流弱交流等问题造成换相失败的风险进一步提高。
换相失败故障是不可避免的,晶闸管是非理想半控型器件,其阻断能力需要在反向电压作用下,经过一段时间才能恢复,但实际系统中,总不免存在着故障或扰动,引起电压跌落,晶闸管无法关断,引发换相失败。其本质为:当电网发生故障时,线电压过零点提前,换相阀臂的换流重叠角将增大,关断角γ将减小并小于晶闸管所需的最小关断角γmin,换相桥臂失去正向阻断能力,导致换相失败。
根据工程经验,换流站内控制保护系统对换相失败的监测、预测主要通过检测交、直流系统的电压、电流,进行换相面积计算、零序电压计算,交直流电流比较等。以上监测、预测方法均属于对换相失败的间接判别,并未从发生换相失败的设备本身:换流阀设备角度进行监测和判断。
发明内容
针对现有技术的不足,本发明的目的是提供一种基于临界关断面积数学模型的高压直流输电换相失败的监测方法,通过换流阀的智能触发监测系统,从换流阀电压的角度对换相后的晶闸管阀正向阻断能力进行判断,以此对换相失败进行直接监测。
本发明的目的是采用下述技术方案实现的:
本发明提供一种高压直流输电换流阀换相失败监测方法,其改进之处在于,所述方法是基于临界关断面积数学模型的,该方法用的系统为监测系统,包括依次连接的积分器、比较器、计时器;所述方法包括下述步骤:
(1)建立换流阀关断时间数学模型;
(2)实时监测换流阀电流导数是否小于0;
(3)确定换流阀关断面积;
(4)确定临界关断面积;
(5)确定实际关断面积;
(6)比较实际关断面积和临界关断面积,判断换流阀是否换相失败。
进一步地,所述步骤(1)中,关断时间包括关断开始时刻t1和关断结束时刻t2,分别用下述数学表达式表示:
关断开始时刻t1的表达式如下:
t 1 = t 0 + 1 2 &pi;f ( 2 &pi; 3 + &mu; ) - - - < 1 > ;
关断结束时刻t2的表达式如下:
t 2 = t 0 + 1 2 &pi;f ( 5 &pi; 6 - &alpha; ) - - - < 2 > ;
其中:t0为触发导通时刻,α为逆变器的触发角,f为换流阀交流系统频率。
进一步地,所述步骤(2)中,当换流阀电流导数小于0时,进行步骤(3),否则返回步骤(1)。
进一步地,所述步骤(3)中,采用对关断过程中换流阀电压积分的方式确定换流阀关断面积;
换流阀关断面积用下述表达式表示:
S cm = | &Integral; t 1 t 2 U Vi ( t ) dt | - - - < 3 > ;
其中:t1为关断开始时刻,t2为关断结束时刻,UVi(t)为目标换相阀的阀电压,Vi为目标换相阀,Scm为关断面积。
进一步地,所述逆变器包括三相六脉动的整流桥,在三相六脉动整流桥的输入侧连接有平波电抗器,输出侧的每一相均连接有电抗器-变压器串联支路;
三相六脉动整流桥的每个桥臂由晶闸管阀构成。
进一步地,所述步骤(4)中,临界关断面积Scr为晶闸管关断的最小关断面积,数值范围为200~450kV·μs。
进一步地,所述步骤(5)中,实际关断面积Scm由表达式<3>进行确定。
进一步地,所述步骤(6)中,当实际换相过程中的关断面积Scm小于临界关断面积Scr时,发生换相失败;反之,则换相成功,计算关断面积的积分器数据清零。
与现有技术比,本发明达到的有益效果是:
1、本发明提供的方法通过换流阀的智能触发监测系统,从换流阀电压的角度对换相后的晶闸管阀正向阻断能力进行判断,以此对换相失败进行直接监测,从换流阀设备角度对换相失败的监测更为直接,反应了换相失败故障的本质;
2、硬件方面易于实现,在晶闸管的TE板上增加积分、比较、计时等功能即可实现全部监测过程,计算关断面积简单方便。
附图说明
图1是本发明提供的逆变器原理接线图;
图2是本发明提供的阀V1与V3的换相过程图;
图3是本发明提供的换流阀换相过程中某一桥臂的阀电压波形及关断面积图;
图4是本发明提供的基于临界关断面积数学模型的高压直流输电换相失败监测方法工作流程图。
具体实施方式
下面结合附图对本发明的具体实施方式作进一步的详细说明。
本发明提供一种基于临界关断面积数学模型的高压直流输电换相失败的监测方法。该方法是:监测计算晶闸管阀关断所必须的关断面积,即临界关断面积Scr。当实际换相过程中的关断面积Scm小于临界关断面积Scr时,判断会发生换相失败。
本发明提供的基于临界关断面积数学模型的高压直流输电换相失败监测方法工作流程图如图4所示,包括下述步骤:
(1)对晶闸管承受的反向电压进行积分得到换流阀关断时间数学模型;
以图1中的V1阀向V3阀换相为例,在正常运行情况下,其换相过程中电压电流波形如图2所示,其中:μ和γ分别为换相角和熄弧角,β为触发越前角。
关断时间包括关断开始时刻记作t1和关断结束时刻记作t2,则t1和t2的表达式分别为:
t 1 = t 0 + 1 2 &pi;f ( 2 &pi; 3 + &mu; ) - - - < 1 > ;
t 2 = t 0 + 1 2 &pi;f ( 5 &pi; 6 - &alpha; ) - - - < 2 > ;
其中,t0为触发导通时刻,α为逆变器的触发角,f为换流阀交流系统频率。
换流阀交流系统为12脉动换流单元,由两个6脉动换流单元串联组成。
所述6脉动换流单元包括:换流变压器、换流阀和阀避雷器;换流变压器通过换流阀系统的等效电抗器与三相整流桥连接;三相整流桥的每一相均由上下两桥臂构成,每个桥臂均由换流阀构成;每个换流阀两端并联阀避雷器;所述换流阀包括阻尼回路、直流均压回路、晶闸管、饱和电抗器和阀内杂散电容;所述阻尼回路、直流均压回路和晶闸管并联后组成阻尼回路-直流均压回路-晶闸管并联支路,阻尼回路-直流均压回路-晶闸管并联支路与饱和电抗器串联与阀内杂散电容并联。
两个6脉动换流单元的两个换流变压器,一个为星型连接,一个为三角形连接。
(2)实时监测换流阀电流导数是否小于0:当换流阀电流导数小于0时,进行步骤(3),否则返回步骤(1)。
(3)确定换流阀关断面积:换流阀关断面积用下述表达式表示:
S cm = | &Integral; t 1 t 2 U Vi ( t ) dt | - - - < 3 > ;
其中:t1为关断开始时刻,t2为关断结束时刻,UVi(t)为目标换相阀的阀电压,Vi为目标换相阀,Scm为关断面积。换流阀换相过程中某一桥臂的阀电压波形及关断面积图如图3所示。
(4)确定临界关断面积:临界关断面积为晶闸管关断所需要的最小关断面积,该数值可由试验数据得到,不同型号的晶闸管该数值将有所不同。
(5)确定实际关断面积:
由公式<3>可得每个周期内V3阀的实际关断面积。
(6)比较实际关断面积和临界关断面积,判断换流阀是否换相失败:当实际换相过程中的关断面积Scm小于临界关断面积Scr时,判断发生换相失败;反之,则换相成功,并且积分清零。
本发明提供的基于临界关断面积数学模型的高压直流输电换相失败监测方法,通过换流阀内智能触发监测系统,从换流阀电压的角度对换相后的晶闸管阀正向阻断能力进行判断,以此对换相失败进行直接监测,该方法从换流阀设备角度对换相失败的监测更为直接,反映了换相失败故障的本质。
以±800kV/5000A工程为例,换流器采用某型号晶闸管,单极晶闸管的临界关断面积Scr为278kV·μs,采用上述方法,在监测系统中实时对关断过程中的晶闸管电压进行积分,得到晶闸管关断面积Scm,并将其与临界关断面积Scr进行比较,判断该晶闸管是否换相成功。
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,而未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本发明的权利要求范围当中。

Claims (8)

1.一种高压直流输电换流阀换相失败监测方法,其特征在于,所述方法是基于临界关断面积数学模型的,该方法用的系统为监测系统,包括依次连接的积分器、比较器、计时器;所述方法包括下述步骤:
(1)建立换流阀关断时间数学模型;
(2)实时监测换流阀电流导数是否小于0;
(3)确定换流阀关断面积;
(4)确定临界关断面积;
(5)确定实际关断面积;
(6)比较实际关断面积和临界关断面积,判断换流阀是否换相失败。
2.如权利要求1所述的换流阀换相失败监测方法,其特征在于,所述步骤(1)中,关断时间包括关断开始时刻t1和关断结束时刻t2,分别用下述数学表达式表示:
关断开始时刻t1的表达式如下:
t 1 = t 0 + 1 2 &pi;f ( 2 &pi; 3 + &mu; ) - - - < 1 > ;
关断结束时刻t2的表达式如下:
t 2 = t 0 + 1 2 &pi;f ( 5 &pi; 6 - &alpha; ) - - - < 2 > ;
其中:t0为触发导通时刻,α为逆变器的触发角,f为换流阀交流系统频率。
3.如权利要求1所述的换流阀换相失败监测方法,其特征在于,所述步骤(2)中,当换流阀电流导数小于0时,进行步骤(3),否则返回步骤(1)。
4.如权利要求1所述的换流阀换相失败监测方法,其特征在于,所述步骤(3)中,采用对关断过程中换流阀电压积分的方式确定换流阀关断面积;
换流阀关断面积用下述表达式表示:
S cm = | &Integral; t 1 t 2 U Vi ( t ) dt | - - - < 3 > ;
其中:t1为关断开始时刻,t2为关断结束时刻,UVi(t)为目标换相阀的阀电压,Vi为目标换相阀,Scm为关断面积。
5.如权利要求4所述的换流阀换相失败监测方法,其特征在于,所述逆变器包括三相六脉动的整流桥,在三相六脉动整流桥的输入侧连接有平波电抗器,输出侧的每一相均连接有电抗器-变压器串联支路;
三相六脉动整流桥的每个桥臂由晶闸管阀构成。
6.如权利要求1所述的换流阀换相失败监测方法,其特征在于,所述步骤(4)中,临界关断面积Scr为晶闸管关断的最小关断面积,数值范围为200~450kV·μs。
7.如权利要求1所述的换流阀换相失败监测方法,其特征在于,所述步骤(5)中,实际关断面积Scm由表达式<3>进行确定。
8.如权利要求1所述的换流阀换相失败监测方法,其特征在于,所述步骤(6)中,当实际换相过程中的关断面积Scm小于临界关断面积Scr时,发生换相失败;反之,则换相成功,计算关断面积的积分器数据清零。
CN201310412303.XA 2013-09-11 2013-09-11 一种高压直流输电换流阀换相失败监测方法 Pending CN103488883A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310412303.XA CN103488883A (zh) 2013-09-11 2013-09-11 一种高压直流输电换流阀换相失败监测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310412303.XA CN103488883A (zh) 2013-09-11 2013-09-11 一种高压直流输电换流阀换相失败监测方法

Publications (1)

Publication Number Publication Date
CN103488883A true CN103488883A (zh) 2014-01-01

Family

ID=49829099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310412303.XA Pending CN103488883A (zh) 2013-09-11 2013-09-11 一种高压直流输电换流阀换相失败监测方法

Country Status (1)

Country Link
CN (1) CN103488883A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104965172A (zh) * 2015-07-28 2015-10-07 南京南瑞继保电气有限公司 换流阀运行试验换相角调整装置及方法
CN105743115A (zh) * 2016-02-29 2016-07-06 全球能源互联网研究院 用于直流输电换相失败故障的并联防御及修复装置和方法
CN108491656A (zh) * 2018-03-31 2018-09-04 华南理工大学 一种自动快速逼近换相失败临界阻抗方法
CN110323773A (zh) * 2019-07-03 2019-10-11 中国电力科学研究院有限公司 一种考虑多因素影响的换相失败预测方法及系统
CN111157827A (zh) * 2020-01-21 2020-05-15 华南理工大学 一种基于端口电流时序特征的直流换流阀状态检测方法
CN111555640A (zh) * 2020-03-31 2020-08-18 清华大学 一种高压直流输电混合换流器的控制方法
CN113484578A (zh) * 2021-07-14 2021-10-08 南方电网科学研究院有限责任公司 一种高压直流系统的换相状态检测方法、装置和设备

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0715959A (ja) * 1993-06-30 1995-01-17 Toshiba Corp サイクロコンバータの制御方法および装置
CN101701996A (zh) * 2009-11-26 2010-05-05 华南理工大学 一种高压直流系统换相失败的判别方法及装置
CN102136807A (zh) * 2011-03-08 2011-07-27 中国电力科学研究院 一种新型换流阀阻尼参数设计方法
CN102353874A (zh) * 2011-07-11 2012-02-15 四川大学 基于换相电流时间面积指标的换相失败检测方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0715959A (ja) * 1993-06-30 1995-01-17 Toshiba Corp サイクロコンバータの制御方法および装置
CN101701996A (zh) * 2009-11-26 2010-05-05 华南理工大学 一种高压直流系统换相失败的判别方法及装置
CN102136807A (zh) * 2011-03-08 2011-07-27 中国电力科学研究院 一种新型换流阀阻尼参数设计方法
CN102353874A (zh) * 2011-07-11 2012-02-15 四川大学 基于换相电流时间面积指标的换相失败检测方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
汪隆君 等: "交流系统故障诱发多直流馈入系统换相失败风险评估", 《电力系统自动化》 *
王钢 等: "HVDC输电系统换相失败的故障合闸角影响机理", 《电力系统自动化》 *
许加柱 等: "采用新型换流变压器及其滤波系统对换相失败的影响", 《电力自动化设备》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104965172A (zh) * 2015-07-28 2015-10-07 南京南瑞继保电气有限公司 换流阀运行试验换相角调整装置及方法
CN104965172B (zh) * 2015-07-28 2017-10-20 南京南瑞继保电气有限公司 换流阀运行试验换相角调整装置及方法
CN105743115A (zh) * 2016-02-29 2016-07-06 全球能源互联网研究院 用于直流输电换相失败故障的并联防御及修复装置和方法
CN105743115B (zh) * 2016-02-29 2024-03-22 全球能源互联网研究院 用于直流输电换相失败故障的并联防御及修复装置和方法
CN108491656A (zh) * 2018-03-31 2018-09-04 华南理工大学 一种自动快速逼近换相失败临界阻抗方法
CN110323773B (zh) * 2019-07-03 2021-12-17 中国电力科学研究院有限公司 一种考虑多因素影响的换相失败预测方法及系统
CN110323773A (zh) * 2019-07-03 2019-10-11 中国电力科学研究院有限公司 一种考虑多因素影响的换相失败预测方法及系统
CN111157827B (zh) * 2020-01-21 2021-06-08 华南理工大学 一种基于端口电流时序特征的直流换流阀状态检测方法
CN111157827A (zh) * 2020-01-21 2020-05-15 华南理工大学 一种基于端口电流时序特征的直流换流阀状态检测方法
US11959976B2 (en) 2020-01-21 2024-04-16 South China University Of Technology DC converter valve state detection method based on temporal features of converter terminal currents
CN111555640A (zh) * 2020-03-31 2020-08-18 清华大学 一种高压直流输电混合换流器的控制方法
CN113484578A (zh) * 2021-07-14 2021-10-08 南方电网科学研究院有限责任公司 一种高压直流系统的换相状态检测方法、装置和设备
CN113484578B (zh) * 2021-07-14 2024-01-23 南方电网科学研究院有限责任公司 一种高压直流系统的换相状态检测方法、装置和设备

Similar Documents

Publication Publication Date Title
CN103488883A (zh) 一种高压直流输电换流阀换相失败监测方法
CN103762581B (zh) 一种同塔双回直流输电系统周期性换相失败的防御方法
CN103268117B (zh) 基于rtds的mmc柔性直流控制装置试验系统及方法
CN108808718A (zh) 交流故障时高压直流输电系统直流电流运行范围确定方法
CN109510230A (zh) 一种用于高压直流输电系统的连续换相失败抑制方法
CN104134997B (zh) 利用谐振型电子开关的统一电能质量控制器及其方法
CN105490258A (zh) 多端柔性直流输电系统的直流故障判断方法及控制方法
CN109873443A (zh) 基于临界电压的电网故障下直流连续换相失败预测方法
CN103746401A (zh) 一种提高多馈入直流输电系统抵御换相失败的能力的方法
CN103257582A (zh) 一种基于rtds的直流控制保护仿真装置
CN109256756B (zh) 向无源网络供电的mmc-hvdc交流自适应重合闸方法
CN105552947A (zh) 一种柔性直流输电系统直流单极接地故障检测方法
CN103066621A (zh) 一种应用于微电网与公共电网连接的静态开关及控制方法
CN103675539A (zh) 一种级联式储能变流器检测平台及其控制方法
CN104614640A (zh) 一种高压直流输电系统换相失败检测方法
CN104882890A (zh) 一种限流型动态电压恢复器及其不间断供电方法
CN107181276A (zh) 混合直流输电系统换相失败恢复的方法及装置
CN106655750A (zh) 用于电压源变流器自带线路故障检测功能的预充装置
CN112234641A (zh) 一种直流换相失败阻断与预防控制方法
CN203101860U (zh) 一种基于rtds的直流控制保护仿真装置
CN104407195A (zh) 一种交直流混联系统的不对称故障短路电流检测方法
CN109787266A (zh) 特高压直流复杂故障在线分析决策方法及系统
CN104734172A (zh) 一种提高hvdc系统抑制换相失败能力的自适应pi控制方法
CN105958835B (zh) 一种基于瞬时功率控制的高压变频器失电跨越方法
CN104167716A (zh) 功率因数校正电路的保护控制方法和系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: INSTITUTE OF STATE GRID INTELLIGENT ELECTRIC GRIDS

Free format text: FORMER OWNER: INSTITUTE OF STATE GRID INTELLIGENT ELECTRIC GRIDS C-EPRI ELECTRIC POWER ENGINEERING CO., LTD.

Effective date: 20150106

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150106

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: State Grid Smart Grid Institute

Applicant after: China-EPRI Electric Power Engineering Co., Ltd.

Applicant after: Electric Power Research Institute of State Grid Shandong Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: State Grid Smart Grid Institute

Applicant before: China-EPRI Electric Power Engineering Co., Ltd.

C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Zehong

Inventor after: Tang Guangfu

Inventor after: Jing Yugang

Inventor after: Xu Weihua

Inventor after: Zhang Guohui

Inventor before: Liu Zehong

Inventor before: Tang Guangfu

Inventor before: Xu Weihua

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU ZEHONG TANG GUANGFU XU WEIHUA TO: LIU ZEHONG TANG GUANGFU JING YUGANG XU WEIHUA ZHANG GUOHUI

TA01 Transfer of patent application right

Effective date of registration: 20170608

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: China-EPRI Electric Power Engineering Co., Ltd.

Applicant after: Electric Power Research Institute of State Grid Shandong Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant before: State Grid Corporation of China

Applicant before: State Grid Smart Grid Institute

Applicant before: China-EPRI Electric Power Engineering Co., Ltd.

Applicant before: Electric Power Research Institute of State Grid Shandong Electric Power Company

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20140101

RJ01 Rejection of invention patent application after publication