CN103487657A - 一种利用平均值估算直流输电系统接地极极址电阻的方法 - Google Patents

一种利用平均值估算直流输电系统接地极极址电阻的方法 Download PDF

Info

Publication number
CN103487657A
CN103487657A CN201310398827.8A CN201310398827A CN103487657A CN 103487657 A CN103487657 A CN 103487657A CN 201310398827 A CN201310398827 A CN 201310398827A CN 103487657 A CN103487657 A CN 103487657A
Authority
CN
China
Prior art keywords
measuring end
resistance
mean value
ground electrode
earthing pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310398827.8A
Other languages
English (en)
Other versions
CN103487657B (zh
Inventor
束洪春
蒋彪
田鑫萃
董俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Maintenance and Test Center of Extra High Voltage Power Transmission Co
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201310398827.8A priority Critical patent/CN103487657B/zh
Publication of CN103487657A publication Critical patent/CN103487657A/zh
Application granted granted Critical
Publication of CN103487657B publication Critical patent/CN103487657B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)
  • Locating Faults (AREA)

Abstract

本发明涉及一种利用平均值估算直流输电系统接地极极址电阻的方法,属于电力系统测距技术领域。本发明所述方法首先利用接地极线路故障前的录波数据计算接地极量测端电压的长时窗平均值和接地极量测端两回出线电流的长时窗平均值,然后通过接地极量测端电压的长时窗平均值和接地极量测端两回出线电流的长时窗平均值计算出由量测端视入的总等效电阻值,最后通过由量测端视入的总等效电阻值和接地极线路的电阻值计算出接地极极址电阻值。本发明利用了已有的故障录波数据对接地极极址进行估算,不需要再进行高频率的采样,易于现场实现。

Description

一种利用平均值估算直流输电系统接地极极址电阻的方法
技术领域
本发明涉及一种利用平均值估算直流输电系统接地极极址电阻的方法,属于电力系统测距技术领域。
背景技术
接地极线路是直流输电系统中不可缺少的一部分,实际中接地极极址的选择相对比较困难。为了减少接地极电流对换流站设备的影响,直流系统中接地极的极址一般选择在距离换流站几十到一百多千米的地方,极址与换流站之间通常架设双导线并联的接地极引线。
接地极线路电压较低,经过的地区多为山区,所以发生线路故障的概率较大,接地极线路发生故障时会影响直流双极系统,不仅对直流系统安全运行影响较大,而且对大电网骨干网架的稳定运行影响很大。对于接地极线路的故障精确定位,极址电阻值是一个重要的参数。接地极极址电阻容易受所处环境的影响而变化,若能较精确的获取实时的极址电阻值,对于接地极线路的故障精确定位意义重大。
发明内容
本发明要解决的技术问题是提出一种利用平均值估算直流输电系统接地极极址电阻的方法,以达到能较精确的获取实时的极址电阻值的目的。
本发明的技术方案是:一种利用平均值估算直流输电系统接地极极址电阻的方法,首先利用接地极线路故障前的录波数据计算接地极量测端电压的长时窗平均值和接地极量测端两回出线电流的长时窗平均值,然后通过接地极量测端电压的长时窗平均值和接地极量测端两回出线电流的长时窗平均值计算出由量测端视入的总等效电阻值,最后通过由量测端视入的总等效电阻值和接地极线路的电阻值计算出接地极极址电阻值。
具体步骤如下:
(1)利用接地极线路故障前的录波数据计算接地极量测端电压的长时窗平均值和接地极量测端两回出线电流的长时窗平均值,分别为:
Figure 508074DEST_PATH_IMAGE001
Figure 755515DEST_PATH_IMAGE002
                              (1)
Figure 763923DEST_PATH_IMAGE003
                              (2)
Figure 755012DEST_PATH_IMAGE004
                             (3)
式中: 
Figure 529546DEST_PATH_IMAGE005
为接地极量测端电压的长时窗平均值值,
Figure 10206DEST_PATH_IMAGE006
Figure 505909DEST_PATH_IMAGE007
分别为接地极量测端两回出线电流的长时窗平均值,N为长时窗的数据总个数,
Figure 35110DEST_PATH_IMAGE008
为接地极量测端电压第n个采用点的瞬时值、
Figure 729397DEST_PATH_IMAGE009
(n) 为接地极线路1量测端电流第n个采用点的瞬时值,和
Figure 584221DEST_PATH_IMAGE010
(n) 为接地极线路2量测端电流第n个采用点的瞬时值,为采用点序号;
(2)用接地极线路量测端电压长时窗平均值除以接地极量测端两回出线电流的长时窗平均值之和得到由量测端视入的总等效电阻值;
Figure 696850DEST_PATH_IMAGE012
                           (4)
式中:R为接地极线路和极址的总等效电阻;
(3)用由量测端视入的总等效电阻值减去线路等效电阻值得到接地极线路极址电阻;
Figure 448905DEST_PATH_IMAGE013
                    (5)
式中:R g为接地极极址电阻,r为单位长度线路直流电阻,l为接地极线路全长。
本发明的原理是:高压直流输电系统的接地极极址电阻为纯阻性,利用接地极线路故障前的录波数据的长时窗平均值,可以估算出极址电阻值。接地极线路故障前录波数据的长时窗平均值为量测端电气量的直流分量,接地极线路量测端电压的直流分量除以两回出线电流的直流分量之和等于接地极线路和极址的总等效电阻值,该总等效电阻减去线路等效电阻值即为接地极极址电阻值。
本发明的有益效果是:
(1)本方法利用了已有的故障录波数据对接地极极址进行估算,不需要再进行高频率的采样,易于现场实现。
(2)本方法利用量测端电压和电流的长时窗平均值估算直流接地极极址电阻值,由于极址电阻为纯阻性,所以计算时只考虑线路的直流电阻,计算可靠性更高。
附图说明
图1为本发明中的直流输电系统图:图中,为换流站中性母线电压(接地极量测端电压);
Figure 476084DEST_PATH_IMAGE015
Figure 612668DEST_PATH_IMAGE016
分别为接地极两回出线电流(量测端电流);
图2为本发明实施例1中,接地极量测端电压、电流波形图;t/s表示时间/秒,kV表示千伏,kA表示千安;
图3为本发明实施例2中,接地极量测端电压、电流波形图;t/s表示时间/秒,kV表示千伏,kA表示千安;
图4为本发明实施例3中,接地极量测端电压、电流波形图;t/s表示时间/秒,kV表示千伏,kA表示千安;
具体实施方式
下面结合附图和具体实施方式,对本发明作进一步说明。
一种利用平均值估算直流输电系统接地极极址电阻的方法,首先利用接地极线路故障前的录波数据计算接地极量测端电压的长时窗平均值和接地极量测端两回出线电流的长时窗平均值,然后通过接地极量测端电压的长时窗平均值和接地极量测端两回出线电流的长时窗平均值计算出由量测端视入的总等效电阻值,最后通过由量测端视入的总等效电阻值和接地极线路的电阻值计算出接地极极址电阻值。
具体步骤如下:
(1)利用接地极线路故障前的录波数据计算接地极量测端电压的长时窗平均值和接地极量测端两回出线电流的长时窗平均值,分别为:
Figure 170784DEST_PATH_IMAGE002
                              (1)
Figure 925113DEST_PATH_IMAGE003
                              (2)
Figure 599808DEST_PATH_IMAGE004
                             (3)
式中: 
Figure 60877DEST_PATH_IMAGE005
为接地极量测端电压的长时窗平均值值,
Figure 490721DEST_PATH_IMAGE006
Figure 670030DEST_PATH_IMAGE007
分别为接地极量测端两回出线电流的长时窗平均值,N为长时窗的数据总个数,
Figure 882836DEST_PATH_IMAGE008
为接地极量测端电压第n个采用点的瞬时值、
Figure 526307DEST_PATH_IMAGE009
(n) 为接地极线路1量测端电流第n个采用点的瞬时值,和
Figure 799157DEST_PATH_IMAGE010
(n) 为接地极线路2量测端电流第n个采用点的瞬时值,
Figure 528078DEST_PATH_IMAGE011
为采用点序号;
(2)用接地极线路量测端电压长时窗平均值除以接地极量测端两回出线电流的长时窗平均值之和得到由量测端视入的总等效电阻值;
Figure 544576DEST_PATH_IMAGE012
                           (4)
式中:R为接地极线路和极址的总等效电阻;
(3)用由量测端视入的总等效电阻值减去线路等效电阻值得到接地极线路极址电阻;
                    (5)
式中:R g为接地极极址电阻,r为单位长度线路直流电阻,l为接地极线路全长。
实施例1:800kV直流接地极线路如图1所示。其线路参数如下:线路全长80km,直流电阻为: 0.023165Ω/km,极址电阻为0.3Ω。数据采样率为6.4kHz。
具体步骤如下:
(1)利用故障前录波数据计算接地极线路量测端电压、电流长时窗平均值: 
Figure 637275DEST_PATH_IMAGE002
 =  0.486787 kV.
Figure 457464DEST_PATH_IMAGE003
 = 0.1984289 kA
Figure 747631DEST_PATH_IMAGE004
 = 0.198359 kA
式中: 
Figure 690179DEST_PATH_IMAGE005
为量测端电压的长时窗平均值值,分别为量测端两回出线电流的长时窗平均值,N为长时窗的数据总个数,
Figure 896666DEST_PATH_IMAGE008
为接地极量测端电压第n个采用点的瞬时值、
Figure 947799DEST_PATH_IMAGE009
n) 为接地极线路1量测端电流第n个采用点的瞬时值,和
Figure 873030DEST_PATH_IMAGE010
n) 为接地极线路2量测端电流第n个采用点的瞬时值,
Figure 35021DEST_PATH_IMAGE011
为采用点序号。
 (2) 计算接地极线路和极址的总电阻,总电阻等于地极线路量测端电压长时窗平均值除以两回出线电流长时窗平均值之和。
Figure 31271DEST_PATH_IMAGE012
   = 1.22681854Ω                      
式中:R为接地极线路和极址的总电阻。             
 (3) 计算接地极线路极址电阻,接地极线路和极址的总电阻减去线路电阻便是接地极极址电阻。
Figure 315622DEST_PATH_IMAGE013
 =0.3002185Ω                  
式中:R g为接地极极址电阻,r为单位长度线路电阻,l为接地极线路全长。
实施例2:
Figure 665832DEST_PATH_IMAGE017
800kV直流接地极线路如图1所示。其线路参数如下:线路全长80km,直流电阻为:0.023165Ω/km,极址电阻为0.23Ω。数据采样率为6.4kHz。
具体步骤如下:
(1)利用故障前录波数据计算接地极线路量测端电压、电流长时窗平均值: 
Figure 631514DEST_PATH_IMAGE002
 =0.4591422kV.
Figure 750780DEST_PATH_IMAGE003
 = 0.1985354 kA
Figure 878136DEST_PATH_IMAGE004
 = 0.1984659 kA
式中: 
Figure 777958DEST_PATH_IMAGE005
为量测端电压的长时窗平均值值,
Figure 281752DEST_PATH_IMAGE006
Figure 521104DEST_PATH_IMAGE007
分别为量测端两回出线电流的长时窗平均值,N为长时窗的数据总个数。
 (2) 计算接地极线路和极址的总电阻,总电阻等于地极线路量测端电压长时窗平均值除以两回出线电流长时窗平均值之和。
Figure 881678DEST_PATH_IMAGE012
 = 1.1565257Ω                      
式中:R为接地极线路和极址的总电阻。             
 (3) 计算接地极线路极址电阻,接地极线路和极址的总电阻减去线路电阻便是接地极极址电阻。
Figure 206480DEST_PATH_IMAGE013
 = 0.2299257Ω                  
式中:R g为接地极极址电阻,r为单位长度线路电阻,l为接地极线路全长。
实施例3:800kV直流接地极线路如图1所示。其线路参数如下:线路全长80km,直流电阻为:0.00756Ω/km,极址电阻为0.2Ω。数据采样率为6.4kHz。
具体步骤如下:
(1)利用故障前录波数据计算接地极线路量测端电压、电流长时窗平均值: 
Figure 401630DEST_PATH_IMAGE002
 = 0.197745kV.
 = 0.199146 kA
Figure 682887DEST_PATH_IMAGE004
 = 0.199146 Ka
式中: 
Figure 856380DEST_PATH_IMAGE005
为量测端电压的长时窗平均值值,
Figure 804744DEST_PATH_IMAGE006
分别为量测端两回出线电流的长时窗平均值,N为长时窗的数据总个数,
Figure 806515DEST_PATH_IMAGE008
为接地极量测端电压第n个采用点的瞬时值、
Figure 455802DEST_PATH_IMAGE009
n) 为接地极线路1量测端电流第n个采用点的瞬时值,和
Figure 258673DEST_PATH_IMAGE010
n) 为接地极线路2量测端电流第n个采用点的瞬时值,
Figure 397530DEST_PATH_IMAGE011
为采用点序号。
 (2) 计算接地极线路和极址的总电阻,总电阻等于地极线路量测端电压长时窗平均值除以两回出线电流长时窗平均值之和。
 = 0.4964824Ω                      
式中:R为接地极线路和极址的总电阻。             
 (3) 计算接地极线路极址电阻,接地极线路和极址的总电阻减去线路电阻便是接地极极址电阻。
Figure 168357DEST_PATH_IMAGE013
 = 0.194082Ω                  
式中:R g为接地极极址电阻,r为单位长度线路电阻,l为接地极线路全长。
上面结合附图对本发明的具体实施方式作了详细说明,但是本发明并不限于上述实施方式,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。

Claims (2)

1.一种利用平均值估算直流输电系统接地极极址电阻的方法,其特征在于:首先利用接地极线路故障前的录波数据计算接地极量测端电压的长时窗平均值和接地极量测端两回出线电流的长时窗平均值,然后通过接地极量测端电压的长时窗平均值和接地极量测端两回出线电流的长时窗平均值计算出由量测端视入的总等效电阻值,最后通过由量测端视入的总等效电阻值和接地极线路的电阻值计算出接地极极址电阻值。
2.根据权利要求1所述的利用平均值估算直流输电系统接地极极址电阻的方法,其特征在于具体步骤如下:
(1)利用接地极线路故障前的录波数据计算接地极量测端电压的长时窗平均值和接地极量测端两回出线电流的长时窗平均值,分别为:
Figure 562284DEST_PATH_IMAGE001
Figure 764071DEST_PATH_IMAGE002
                              (1)
Figure 697392DEST_PATH_IMAGE003
                              (2)
Figure 303954DEST_PATH_IMAGE004
                             (3)
式中: 
Figure 562897DEST_PATH_IMAGE005
为接地极量测端电压的长时窗平均值值,
Figure 989330DEST_PATH_IMAGE006
分别为接地极量测端两回出线电流的长时窗平均值,N为长时窗的数据总个数,
Figure 452990DEST_PATH_IMAGE008
为接地极量测端电压第n个采用点的瞬时值、
Figure 554938DEST_PATH_IMAGE009
(n) 为接地极线路1量测端电流第n个采用点的瞬时值,和
Figure 796563DEST_PATH_IMAGE010
(n) 为接地极线路2量测端电流第n个采用点的瞬时值,
Figure 274949DEST_PATH_IMAGE011
为采用点序号;
(2)用接地极线路量测端电压长时窗平均值除以接地极量测端两回出线电流的长时窗平均值之和得到由量测端视入的总等效电阻值;
Figure 652841DEST_PATH_IMAGE012
                           (4)
式中:R为接地极线路和极址的总等效电阻;
(3)用由量测端视入的总等效电阻值减去线路等效电阻值得到接地极线路极址电阻;
Figure 191270DEST_PATH_IMAGE013
                    (5)
式中:R g为接地极极址电阻,r为单位长度线路直流电阻,l为接地极线路全长。
CN201310398827.8A 2013-09-05 2013-09-05 一种利用平均值估算直流输电系统接地极极址电阻的方法 Active CN103487657B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310398827.8A CN103487657B (zh) 2013-09-05 2013-09-05 一种利用平均值估算直流输电系统接地极极址电阻的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310398827.8A CN103487657B (zh) 2013-09-05 2013-09-05 一种利用平均值估算直流输电系统接地极极址电阻的方法

Publications (2)

Publication Number Publication Date
CN103487657A true CN103487657A (zh) 2014-01-01
CN103487657B CN103487657B (zh) 2016-03-30

Family

ID=49828034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310398827.8A Active CN103487657B (zh) 2013-09-05 2013-09-05 一种利用平均值估算直流输电系统接地极极址电阻的方法

Country Status (1)

Country Link
CN (1) CN103487657B (zh)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008232953A (ja) * 2007-03-22 2008-10-02 Nippon Telegraph & Telephone East Corp 接地抵抗測定方法および接地抵抗測定装置
KR20120038046A (ko) * 2010-10-13 2012-04-23 전준형 전류형 접지저항 측정장치
CN102590633A (zh) * 2011-12-07 2012-07-18 中国电力科学研究院 一种地下接地装置间自、互阻抗测量方法
CN103235237A (zh) * 2013-04-03 2013-08-07 昆明理工大学 一种高压直流接地极线路高阻故障的定位方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008232953A (ja) * 2007-03-22 2008-10-02 Nippon Telegraph & Telephone East Corp 接地抵抗測定方法および接地抵抗測定装置
KR20120038046A (ko) * 2010-10-13 2012-04-23 전준형 전류형 접지저항 측정장치
CN102590633A (zh) * 2011-12-07 2012-07-18 中国电力科学研究院 一种地下接地装置间自、互阻抗测量方法
CN103235237A (zh) * 2013-04-03 2013-08-07 昆明理工大学 一种高压直流接地极线路高阻故障的定位方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙帮新 等: "高压直流输电共用接地极技术研究", 《高压电技术》 *
成敬周 等: "直流输电共用接地极线方式的保护特性", 《电力系统自动化》 *

Also Published As

Publication number Publication date
CN103487657B (zh) 2016-03-30

Similar Documents

Publication Publication Date Title
CN101551432B (zh) 配电网故障定位方法
CN106980069B (zh) 基于暂态电流投影系数差值比较的高阻接地故障定位方法
CN103235237B (zh) 一种高压直流接地极线路高阻故障的定位方法
CN104597378A (zh) 基于暂态非工频零序电流的含dg配电网的故障选线方法
CN103424669A (zh) 一种利用故障馈线零序电流矩阵主成分分析第一主成分的选线方法
CN107192883B (zh) 一种谐振接地系统高阻接地故障过渡电阻辨识方法
CN103293448B (zh) 基于半周波能量比的单相接地故障与虚幻接地识别方法
CN109444657B (zh) 一种配电网高阻接地故障区段定位方法
CN108957225B (zh) 一种计及电缆分布电容的直流配电线路单端故障测距方法
CN103760460A (zh) 一种基于贝杰龙模型的高压直流接地极线路时域故障测距方法
CN105842582B (zh) 基于emtr的柔性直流线路故障测距方法
CN103257304A (zh) 一种利用零序电流特征频带内cwt系数rms值的ann故障选线方法
CN103837799A (zh) 一种基于r-l模型的高压直流接地极线路故障测距的频域方法
CN103744001B (zh) 一种基于分布参数模型的高压直流接地极线路故障测距的频域方法
CN104375056A (zh) 基于电压及电流初始行波的变电站电缆出线故障监测方法
CN104122484A (zh) 一种基于零模电流小波系数相关分析的配网故障选线方法
CN103743996B (zh) 一种基于π型等效电路直流接地极线路故障测距方法
CN103592572A (zh) 一种利用直流分量和谐波分量交线定位的直流接地极线路故障测距方法
CN103616609A (zh) 一种利用直流分量的高压直流接地极线路故障测距方法
CN104076246A (zh) 一种配电网单相接地故障预想事故集的确定方法
CN112904233B (zh) 基于地线电流无功分量的接地故障定位方法和装置
CN111123027A (zh) 基于wams系统的多端传输线路故障测距方法
CN112904232B (zh) 基于地线电流有功分量的接地故障定位方法和装置
CN103743995A (zh) 一种基于t型等效模型的高压直流接地极线路故障测距的方法
CN103675599A (zh) 一种基于故障录波数据的高压直流接地极线路的频域故障测距方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Shu Hongchun

Inventor after: Zhang Yining

Inventor after: Jiang Biao

Inventor after: Tian Xincui

Inventor after: Dong Jun

Inventor before: Shu Hongchun

Inventor before: Jiang Biao

Inventor before: Tian Xincui

Inventor before: Dong Jun

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170628

Address after: 650599 Yunnan Province, Kunming city Chenggong District Ming Road No. 727

Co-patentee after: Repair and Test Center, CSG EHV Power Transmission Company

Patentee after: Kunming University of Science and Technology

Address before: 650093 Kunming, Yunnan, Wuhua District Road, No. 253

Patentee before: Kunming University of Science and Technology