CN103487083A - 人工覆冰气候试验室用低速风箱 - Google Patents

人工覆冰气候试验室用低速风箱 Download PDF

Info

Publication number
CN103487083A
CN103487083A CN201310487211.8A CN201310487211A CN103487083A CN 103487083 A CN103487083 A CN 103487083A CN 201310487211 A CN201310487211 A CN 201310487211A CN 103487083 A CN103487083 A CN 103487083A
Authority
CN
China
Prior art keywords
air
wind
tunnel
airduct
low
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310487211.8A
Other languages
English (en)
Other versions
CN103487083B (zh
Inventor
陆佳政
孙利朋
蒋正龙
方针
赵纯
张红先
李波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Hunan Xiangdian Test Research Institute Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Hunan Xiangdian Test Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd, Hunan Xiangdian Test Research Institute Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310487211.8A priority Critical patent/CN103487083B/zh
Publication of CN103487083A publication Critical patent/CN103487083A/zh
Application granted granted Critical
Publication of CN103487083B publication Critical patent/CN103487083B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Abstract

本发明介绍了一种人工覆冰气候试验室用低速风箱,具有矩形箱体(7)。箱体(7)内设一带风管(2)的风洞(3)。风洞(3)另一侧开有回风口(6)。风管(2)内间隔装置有格栅式导风板(5);另一端接一离心风机(1),离心风机(1)与格栅式导风板(5)之间的风管(2)的内装有导流板(4)。一旦启动,箱体7内腔即成为风洞3的回风区,风洞3内腔随即成为设备试验区。风外循环方式输送能满足试验需要的均匀风。本风箱:1)、可在设备试验中心区内形成0~10m/s的均匀风;2)、风速连续均匀度可调,且稳定性好;3)、采用常规离心风机,维修方便。

Description

人工覆冰气候试验室用低速风箱
技术领域
本发明属于电气工程技术领域,涉及一种可为人工覆冰气候试验室提供低速均匀风流的人工覆冰气候试验室用低速风箱。
背景技术
输变电设备覆冰是输电工程中十分严重的自然灾害之一,覆冰事故极大地危害着电网安全运行,对社会经济发展造成重大损失。建立人工覆冰气候试验室,开展人工覆冰试验,可以研究覆冰形成的机理,开发各种防冰减灾技术,减少电力设备遭受冰灾的破坏。目前国内外很多科研机构纷纷建立了多功能人工覆冰气候试验室,可以实现人工覆冰,但均没有风洞和可为风洞提供回风区的风箱,无法实现在均匀风状态下覆冰,也无法研究风对电力设备覆冰的影响。根据对自然覆冰的观测,覆冰与风有很大关系,风会影响电力设备的覆冰速度,覆冰形态等,是研究覆冰的关键参数之一。因此,为了在人工环境下实现均匀风,研究风对电力设备覆冰的影响,当前迫切地需要研制出一种可以在人工覆冰气候试验室内形成均匀风的低速风箱。
发明内容
本发明要解决的技术问题是,针对目前人工覆冰气候试验室风流设施落后的状况,设计一种人工覆冰气候试验室用低速风箱。将该风箱置于人工覆冰气候试验室内,可以产生均匀风以满足模拟防冰减灾试验的需要。
本发明的技术方案是,参见附图1,所设计的人工覆冰气候试验室用低速风箱如图1所示,具有一个封闭的矩形箱体7。在该箱体7的内腔底面上设置一个带风管2的风洞3。该风洞3连接风管2一侧的另一侧开有方便置入实验设备和试验品的回风口6。所述风管2朝向风洞3一端的管腔内同轴线间隔装置有至少二层格栅式导风板5;该风管2朝向风洞3一端的另一端连接一离心风机1,该离心风机1的输出端与所述风管2管口贯通连接。所述离心风机1与所述格栅式导风板5之间的风管2的管腔内还安装有导流板4。
本发明的工作原理是:由此构成的本发明的人工覆冰气候试验室用低速风箱一旦启动,箱体7内腔即成为风洞3的回风区,而风洞3的内腔随即亦成为该风洞3的设备试验区。本风箱的风洞3采用风外循环方式送风,在人工覆冰气候试验室内进行均匀风试验时,由离心风机1输送能满足试验需要的均匀风。该均匀风经过风管2管腔内的导流板4导流和格栅式导风板5导风后,徐徐吹入风洞3内设备试验区,经回风口6进入箱体7内的回风区,然后再重回离心风机1,实现风洞的风流外循环。而单凭离心风机1吹出的风,其均匀度和稳定性是无法满足试验要求的,且其方向与风洞3内的设备试验区的风的方向不一致,因此,在风管2内的导流板4的功能是将离心风机1吹出的风转向,并改善转向之后的风的均匀度。而格栅式导风板5的功能正是去除气流中的湍流,得以进一步提高风的均匀性和稳定性。
本发明的有益效果是:
1)、可在设备试验中心区内形成0~10m/s的均匀风;
2)、风速连续均匀度可调,且稳定性好;
3)、风机采用常规的离心风机,维修方便。
附图说明
图1为本发明人工覆冰气候试验室用低速风箱一个具体实施例的结构示意图,图中标示为:
1—离心风机,
2—风管,
3—风洞,
4—导流板,
5—格栅式导风板,
6—回风口,
7—箱体。
具体实施方式
参见附图1,图1所示为本发明人工覆冰气候试验室用低速风箱的一个实施例,该实施例的箱体7由单块厚度为200mm,宽度为800mm,长度为8m的高密度硬质聚氨酯保温板呈矩形立方体拼接而成。带风管2的风洞3即设置在该箱体7的内腔底面上。该实施例的离心风机1采用中国无锡江南风机厂生产的G4-68型离心风机,功率为90kW,流量为46606-82688m3/h,全压为4276-2903Pa;风管2采用截面规格为2米×3米的市售普通矩形马口铁风管;风管2内的导流板4采用8片片宽为3米的市售普通金属导流板;格栅式导风板5采用2片其尺寸与风管2内腔尺寸匹配的市售普通金属格栅式导风板;而风洞3的回风口6宽3米,高5米。该风洞3开有回风口6一端的另一端贯通连接风管2。2片格栅式导风板5轴向间隔装置在风管2朝向风洞3一端的管腔内;风管2的另一端贯通连接离心风机1的输出端;离心风机1的输出端与风管2管口密封式贯通连接。8片导流板4安装在离心风机1与格栅式导风板5之间的风管2的管腔内。
由此构成的本发明的人工覆冰气候试验室用低速风箱使用时置入人工覆冰气候试验室内即可开展试验,方便、适用,完全符合设计要求。

Claims (1)

1.一种人工覆冰气候试验室用低速风箱,其特征在于,它具有一个封闭的矩形箱体(7),在该箱体(7)的内腔底面上设置一个带风管(2)的风洞(3),该风洞(3)连接风管(2)一侧的另一侧开有方便置入实验设备和试验品的回风口(6),所述风管(2)朝向风洞(3)一端的管腔内同轴线间隔装置有至少二层格栅式导风板(5);该风管(2)朝向风洞(3)一端的另一端连接一离心风机(1),该离心风机(1)的输出端与所述风管(2)管口贯通连接,所述离心风机(1)与所述格栅式导风板(5)之间的风管(2)的管腔内还安装有导流板(4)。
CN201310487211.8A 2013-10-17 2013-10-17 人工覆冰气候试验室用低速风箱 Active CN103487083B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310487211.8A CN103487083B (zh) 2013-10-17 2013-10-17 人工覆冰气候试验室用低速风箱

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310487211.8A CN103487083B (zh) 2013-10-17 2013-10-17 人工覆冰气候试验室用低速风箱

Publications (2)

Publication Number Publication Date
CN103487083A true CN103487083A (zh) 2014-01-01
CN103487083B CN103487083B (zh) 2015-08-19

Family

ID=49827490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310487211.8A Active CN103487083B (zh) 2013-10-17 2013-10-17 人工覆冰气候试验室用低速风箱

Country Status (1)

Country Link
CN (1) CN103487083B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104741155A (zh) * 2015-04-07 2015-07-01 国家电网公司 一种带冰风洞的气候人工模拟室
CN105954001A (zh) * 2016-06-01 2016-09-21 大连理工大学 一种用于海洋工程模型试验的风场模拟装置

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09180045A (ja) * 1995-12-22 1997-07-11 Fuji Electric Co Ltd 自動販売機
US6470740B2 (en) * 2000-12-28 2002-10-29 Industrial Technology Research Institute Low speed wind tunnel with adjustable moving boundary
CN201844639U (zh) * 2010-11-01 2011-05-25 天津市天商冰源科技发展有限公司 一种用于冷库上的末端装置
CN101832619B (zh) * 2009-03-09 2012-05-23 北京航空航天大学 一种新型低温低气压风速环境控制系统
CN102539108A (zh) * 2012-01-06 2012-07-04 合肥通用机械研究院 一种用于焓差法试验装置的节能风洞
CN202382921U (zh) * 2011-12-06 2012-08-15 青岛海纳光电环保有限公司 立式循环风洞
CN102914416A (zh) * 2012-09-20 2013-02-06 同济大学 一种直冷式结冰风洞实现方法及系统
CN203502041U (zh) * 2013-10-17 2014-03-26 国家电网公司 人工覆冰气候试验室用低速风箱

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09180045A (ja) * 1995-12-22 1997-07-11 Fuji Electric Co Ltd 自動販売機
US6470740B2 (en) * 2000-12-28 2002-10-29 Industrial Technology Research Institute Low speed wind tunnel with adjustable moving boundary
CN101832619B (zh) * 2009-03-09 2012-05-23 北京航空航天大学 一种新型低温低气压风速环境控制系统
CN201844639U (zh) * 2010-11-01 2011-05-25 天津市天商冰源科技发展有限公司 一种用于冷库上的末端装置
CN202382921U (zh) * 2011-12-06 2012-08-15 青岛海纳光电环保有限公司 立式循环风洞
CN102539108A (zh) * 2012-01-06 2012-07-04 合肥通用机械研究院 一种用于焓差法试验装置的节能风洞
CN102914416A (zh) * 2012-09-20 2013-02-06 同济大学 一种直冷式结冰风洞实现方法及系统
CN203502041U (zh) * 2013-10-17 2014-03-26 国家电网公司 人工覆冰气候试验室用低速风箱

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104741155A (zh) * 2015-04-07 2015-07-01 国家电网公司 一种带冰风洞的气候人工模拟室
CN105954001A (zh) * 2016-06-01 2016-09-21 大连理工大学 一种用于海洋工程模型试验的风场模拟装置

Also Published As

Publication number Publication date
CN103487083B (zh) 2015-08-19

Similar Documents

Publication Publication Date Title
CN203170337U (zh) 恒温恒湿试验舱风道结构
CN102373727B (zh) 太阳能造水站
CN202329241U (zh) 一种电石显热回收利用装置
CN103487083B (zh) 人工覆冰气候试验室用低速风箱
CN203502041U (zh) 人工覆冰气候试验室用低速风箱
CN205262240U (zh) 采用自然通风的直接空冷系统
CN202157294U (zh) 除雪车融冰烘干设备用高温高压出气管装置
CN101527532B (zh) 大管径高温烟道烟气余热半导体温差发电系统
CN105429593A (zh) 一种被动光伏散热器
CN203983793U (zh) 一种具有良好散热效果的箱式变电站
CN207430816U (zh) 一种球形摄像头加热装置
CN202066072U (zh) 电磁加热烤箱
CN203798242U (zh) 机械通风逆流式冷却塔导流装置
CN109063385B (zh) 一种带电热风除冰风管参数优选方法
CN203248319U (zh) 全天候式风力发电系统
CN202940753U (zh) 新型温差发电装置
CN206772074U (zh) 循环水冷却塔系统
CN203113508U (zh) 一种清洗车加热器保温系统
CN204203614U (zh) 高温摄像装置
CN204628931U (zh) 一种冷却管道
CN103939295A (zh) 风力发电机组变频器的节能冷却降温系统
CN204680950U (zh) 一种预制舱散热结构
CN213937132U (zh) 一种变电站降温装置
CN203339525U (zh) 变电站设备热量综合利用装置
CN109346278A (zh) 基于高温环境下的变压器室温度优化方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant