CN103486880A - Header thermal fluid flow passage tube cavity water-storage and pressure-bearing heat exchanger and manufacture process thereof - Google Patents

Header thermal fluid flow passage tube cavity water-storage and pressure-bearing heat exchanger and manufacture process thereof Download PDF

Info

Publication number
CN103486880A
CN103486880A CN201310432572.2A CN201310432572A CN103486880A CN 103486880 A CN103486880 A CN 103486880A CN 201310432572 A CN201310432572 A CN 201310432572A CN 103486880 A CN103486880 A CN 103486880A
Authority
CN
China
Prior art keywords
cold water
pipe
header
plate
heating installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310432572.2A
Other languages
Chinese (zh)
Inventor
张伟
张冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=49827303&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN103486880(A) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Individual filed Critical Individual
Priority to CN201310432572.2A priority Critical patent/CN103486880A/en
Priority to CN201310747402.3A priority patent/CN103673686B/en
Publication of CN103486880A publication Critical patent/CN103486880A/en
Priority to CN201410045641.9A priority patent/CN103727821B/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/26Arrangements for connecting different sections of heat-exchange elements, e.g. of radiators
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28DHEAT-EXCHANGE APPARATUS, NOT PROVIDED FOR IN ANOTHER SUBCLASS, IN WHICH THE HEAT-EXCHANGE MEDIA DO NOT COME INTO DIRECT CONTACT
    • F28D7/00Heat-exchange apparatus having stationary tubular conduit assemblies for both heat-exchange media, the media being in contact with different sides of a conduit wall
    • F28D7/16Heat-exchange apparatus having stationary tubular conduit assemblies for both heat-exchange media, the media being in contact with different sides of a conduit wall the conduits being arranged in parallel spaced relation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

A header thermal fluid flow passage tube cavity water-storage and pressure-bearing heat exchanger comprises header bodies. Each of the header bodies comprises a header plate, a header pore plate and end cover plates. The header plate is in sealed connection with the header pore plate, the end cover plates are in sealed connection with two ends of the header bodies respectively, and spaces defined by the header plates, the header pore plates and the end cover plates are header inner cavities. Two or more cold water round tubes are welded between the header bodies, two end ports of the cold water round tubes are in sealed connection with block plates, heating air round tube connection holes and/or cold water inflow and outflow tube connection holes are formed in the block plates, heating air round tubes are in sealed connection between the heating air round tube connection holes of the block plates at two ends and are disposed in cold water round tube cavities, the heating air round tubes are communicated with inner cavities of the header bodies, and a cold water connection round tube is welded in series between every adjacent cold water round tubes. Cold water inflow tubes and cold water heat exchange outflow tubes are welded and communicated with the cold water inflow and outflow tube connection holes in the block plates and are communicated with and circulate with inner cavities of the cold water round tubes. Tube in and out connection ports are formed in the heater plates and/or the end cover plates.

Description

Header zone of heat liberation tube chamber water storage bearing heat exchanger and manufacture craft thereof
Technical field
The present invention relates to a kind of heat exchanger and manufacture craft thereof, relate in particular to a kind of header zone of heat liberation tube chamber water storage bearing heat exchanger and manufacture craft thereof.
Background technology
Applicant has submitted on February 4th, 2007 patent application that the patent No. is 200720018426.5, and denomination of invention is antiscaling heat exchanger, and Granted publication number is CN201003913Y.
Above-mentioned " antiscaling heat exchanger " found through using, the thinner bend pipe of running water communicating pipe makes and is easy to fouling and stops up in the connection of header inner chamber, after cleaning dirt with acid, row is not out, dirt accumulates in pipe bent position, running water communicating pipe is communicated with in header, once after leaking, can not weld maintenance in the heat exchanger outside or scrap, the cost that the dissection header is keeped in repair is too high again, and, the difficulty that bend pipe is communicated with welding, make bend pipe than large, the amount of labour used is many, the making of bend pipe takes material than straight tube, causes the heat exchanger cost high.This antiscaling heat exchanger is eliminated by market.
On June 10th, 2008, applicant has been submitted again the patent application that the patent No. is 200820024167.1, and denomination of invention is header shunting heat storage adverse current type heat exchanger, and authorizes on June 3rd, 2009, and Granted publication number is CN201251383Y.
On July 10th, 2011, applicant has been submitted the patent application that the patent No. is 201120255532.1 again, and denomination of invention is header bearing type heat exchanger, and Granted publication number is CN202177324U.
In above-mentioned " header shunting heat storage adverse current type heat exchanger " and " header bearing type heat exchanger ", the header cavity is greater than cold water pipe cavity, the welding of all weld seams of heat exchanger all concentrates on header end cap, orifice plate and on the header vertical masonry joint, the distortion of cold water expanded by heating back header plate is large, because stress is easy to greatly cause the header weld cracking, leaks.
In addition, through retrieval, grandson's patentee great waves have submitted on March 2nd, 2004 patent application that the patent No. is 200420038753.3, and denomination of invention is central heating type double pipe heat exchanger, and Granted publication number is CN2684129Y.
Be somebody's turn to do " heating installation thimble tube heat exchanger " complex structure, manufacture welding difficulty is large, the amount of labour used is large, cost is high.Water jacket closure plate and jacket pipe, heating installation standpipe externally are welded to connect, and the welding capacity of weld seam increases, and are easy to leak.The heat of heating installation standpipe and water jacket closure plate pipeline section is underused, and the cold fluid endotherm area reduces, and heat transfer effect is poor.Product never appearred in this central heating type double pipe heat exchanger on market.
In addition, in daily life, use existing water storage type heat exchanger to have a bath in process, during beginning, in heat exchanger, have by the water after heat conduction (being cold water) before, also needing to convert cold water while now having a bath uses, because the water yield of heat exchanger internal memory is too little, in having a bath on the way, just can run out, be not enough to the whole process of having a bath normally, therefore after needing the cold water waiting for newly advancing in heat exchanger by heat conduction, re-use, the situation to be heated that repeatedly waits appears taking turns sometimes, making that have a bath can not continuous wave output with hot water, impact is had a bath.
The hot water continuous wave output that q.s can be arranged in order to have a bath, heat exchanger manufacturer generally takes the method that increases cold water pipe quantity to increase moisture storage capacity at present, so both increased manufacturing cost, the waste raw material, also increased small product size, taken up room during installation large, the more important thing is that the heat of the water at heating installation pipe center is not easy to be absorbed by the cold fluid exchange, and most of the loss, thereby heat transfer effect is poor.
Summary of the invention
The purpose of this invention is to provide a kind of tube chamber water storage, good effect of heat exchange, be difficult for the header zone of heat liberation tube chamber water storage bearing heat exchanger in crack, this heat exchanger structure is simple, reasonably increase by 35% one 100% heat transfer areas in the cold water tube chamber, volume is little, cost is low, the convenient dirt that cleans, and the hot water of continuous wave output can be provided while having a bath.
For achieving the above object, the technical solution used in the present invention is:
A kind of header zone of heat liberation tube chamber water storage bearing heat exchanger, comprise the header body, the header body comprises header plate, header orifice plate and termination cover plate, header plate is connected with the header orifice plate is airtight, the termination cover plate is the airtight header two ends that are connected to respectively, header plate, the space that header orifice plate and termination cover plate surround is the header inner chamber, it is characterized in that: be welded with two and above branched cold water pipe between the header body, cold water pipe two-port is the airtight closure plate that is connected with respectively, have heating installation pipe connecting hole and/or cold water turnover connecting hole on closure plate, the airtight heating installation pipe that is connected with between the heating installation pipe connecting hole of two ends closure plate, the heating installation pipe is positioned at cold water pipe tube chamber, the heating installation pipe communicates with the header inner chamber, between adjacent cold water pipe, welding is connected with cold water connection pipe, cold water inlet/outlet pipe connecting hole welding UNICOM on cold water inlet and cold water heat exchange outlet pipe and closure plate, circulation communicates with cold water pipe inner chamber, have pipeline turnover connector on header plate and/or termination cover plate, cold water inlet and the welding of cold water heat exchange outlet pipe are connected in pipeline turnover connector place, airtight heating installation outlet pipe and the heater inlet pipe of being communicated with of header plate and/or termination cover plate outer wall, the circulation that all communicates with the header inner chamber of heating installation outlet pipe and heater inlet pipe, heating installation pipe quantity in heating installation water outlet pipe end cold water pipe is no less than the heating installation pipe quantity in heater inlet pipe end cold water pipe.
According to described header zone of heat liberation tube chamber water storage bearing heat exchanger, it is characterized in that: the quantity of the described heating installation pipe arranged in described cold water pipe increases progressively or the several times increase by propping up successively from the heater inlet pipe end to heating installation water outlet pipe end, near the hot fluid in the heating installation pipe of heating installation water outlet pipe end and header inner chamber, is the multichannel circulation.
According to described header zone of heat liberation tube chamber water storage bearing heat exchanger, it is characterized in that: the cross sectional shape of described header body is D font or tubular; Described D font header plate is C shape plate, and the header orifice plate is grooved orifice plate or rectangular dull and stereotyped orifice plate, and described tubular header plate is the semi arch plate, and the header orifice plate is the semi arch orifice plate; Have pipeline turnover connector on header plate, have cold water pipe connector on the header orifice plate; Connector is airtight is connected for described heater inlet pipe, heating installation outlet pipe and/or cold water inlet, cold water heat exchange outlet pipe and described pipeline turnover; Described cold water pipe connector is circle flat mouth or oval mouth, and the described cold water pipe mouth of pipe cuts into flat mouth or the shape of a saddle and airtight connection of cold water pipe connector, but cold water pipe and the welding of header orifice plate are connected not connected.
According to described header zone of heat liberation tube chamber water storage bearing heat exchanger, it is characterized in that: described D word shape header body, header orifice plate grooved orifice plate or rectangular dull and stereotyped orifice plate, have cold water pipe connector circle flat mouth on the header orifice plate in groove or the straight wall flat mouth of header plate direction flange, the described cold water pipe mouth of pipe cuts into flat mouth and inserts in the cold water pipe connector circle flat mouth on the header orifice plate, and closure plate embeds three unit interface slotted wall unification place welding in the cold water pipe mouth of pipe and is connected; Described round tube shape header body, the header orifice plate is the semi arch orifice plate, having cold water pipe connector on the header orifice plate is that oval mouthful connector is to circular arc in-flanges Cheng Zhibi saddle port, the described cold water pipe mouth of pipe cuts into the shape of a saddle, through in the cold water pipe connector saddle port on the header orifice plate, closure plate embeds three unit interface slotted wall unification place welding in the cold water pipe mouth of pipe and is connected successively; Cold fluid does not communicate with the header inner chamber.
According to described header zone of heat liberation tube chamber water storage bearing heat exchanger, it is characterized in that: the quantity of described cold water pipe is that even number props up, and described heater inlet pipe and described heating installation outlet pipe are welded on the circulation that communicates with the header inner chamber of the described header plate pipeline of homonymy turnover upper end, connector place, lower end or right-hand, left; Described cold water inlet and described cold water heat exchange outlet pipe are welded on heating installation and import and export bottom, top or opposite side header plate pipeline turnover connector place lower end import, upper end outlet or the right import of described termination, the same side cover plate, left outlet, cold water inlet and cold water heat exchange outlet pipe and the circulation of cold water pipe inner chamber UNICOM.
Described cold water pipe design quantity is that even number props up or odd number props up, and described cold water is communicated with in the header inner chamber of pipe respective side and flow distribution plate is set or flow distribution plate is not set, and forms header inner chamber hot fluid and cold water pipe inner chamber cold fluid is reverse-flow or the mixed-flow circulation canal.
According to described header zone of heat liberation tube chamber water storage bearing heat exchanger, it is characterized in that: the quantity of described cold water pipe is that odd number props up, described heater inlet pipe and described heating installation outlet pipe are welded on that the top, described header plate pipeline turnover connector place of the described header body of heterodoxy is advanced, below goes out or right import, left outlet, with the header inner chamber, communicates; Described cold water heat exchange outlet pipe is welded on cover plate upper end, described termination or the other end header plate pipeline turnover top, connector place of the header body of heater inlet pipe place end, with cold water pipe inner chamber, communicate, described cold water inlet is welded on cover plate lower end, termination or the other end header plate pipeline turnover bottom, connector place of the header body of heating installation outlet pipe place end, and circulation communicates with cold water pipe inner chamber.
Described cold water pipe design composition even number props up or odd number props up, described header body is laterally or is vertical, and the heater inlet pipe on header plate or termination cover plate, heating installation titting water outlet and/or cold water heat exchange outlet pipe, cold water inlet joint all can be installed flexibly with household heating two-way pipe network or single channel pipe network.
According to described header zone of heat liberation tube chamber water storage bearing heat exchanger, it is characterized in that: adjacent described cold water is communicated with that pipe is external at described header, UNICOM is crisscross arranged between the cold water pipe.
According to described header zone of heat liberation tube chamber water storage bearing heat exchanger, it is characterized in that: only have on outermost described closure plate and offer described cold water pipe turnover connecting hole, described cold water inlet and described cold water heat exchange outlet pipe are successively through cold water inlet/outlet pipe connecting hole and closure plate welding and cold water pipe inner chamber UNICOM.
According to described header zone of heat liberation tube chamber water storage bearing heat exchanger, it is characterized in that: described heating installation pipe, cold water pipe, termination cover plate, header plate, header orifice plate, cold water heat exchange outlet pipe, closure plate, cold water are communicated with pipe, cold water inlet, heating installation outlet pipe, heater inlet pipe, flow distribution plate, welding wire material etc., select material stainless steel of the same race " 304 " material material to be easy to welding production and form.
A kind of header zone of heat liberation tube chamber water storage bearing heat exchanger manufacture craft, is characterized in that: comprise the steps:
The making of A, described D font header; Described D font header body adopts the thin-wall stainless steel board making, first stainless steel materials is cut into to rectangular slab, then two of C formboards that are pressed into corner angle with forcing press are header plate; The header plate two ends stamp out pipeline turnover connector;
Stainless steel materials is cut into to the rectangle strip plate, is the header orifice plate with forcing press compacting channel steel shape plate or rectangular dull and stereotyped two of not suppressing; The header orifice plate, according to described cold water pipe quantity, caliber size, stays tube pitch to divide some pipes to stamp out cold water pipe connector connector for the circle flat mouth at channel steel shape plate or strip plate center, and the circle flat mouth is in groove or the straight wall flat mouth of header plate direction flange;
Described cold water pipe arc-shaped surface stamps out oval connector, described cold water is communicated with in the oval connector of pipe insertion cold water pipe, welding serial connection is communicated with adjacent cold water pipe, and cold water is communicated with that pipe is external at header, UNICOM's circulation is crisscross arranged between the cold water circular pipe pipe;
B, described cold water pipe two ends plain end inserts in the cold water pipe connector circle flat mouth of header orifice plate, described heating installation pipe on average arranges one in the cold water pipe, two branched or tower settings of unequal step as required, in the cold water pipe of heater inlet pipe respective side, the heating installation pipe is set, since one, heating installation pipe quantity is set in turn by increasing progressively or several times increase to heating installation outlet pipe place side in its adjacent cold water pipe, in heating installation outlet pipe pipeline section, heating installation pipe and above heating installation pipe and header inner chamber are the multichannel circulation, increase heat exchange area, strengthening conducts heat improves heat transfer effect,
C, the heating installation pipe one end mouth of pipe insert welding in the described cold water inlet/outlet pipe connecting hole of described closure plate and are connected, and the heating installation pipe other end inserts in the cold water pipe connector of cold water pipe, header orifice plate, is connected with the cold water inlet/outlet pipe connecting hole welding of opposite side closure plate;
Header orifice plate, cold water pipe and closure plate three unit interfaces stitchings bead are neat, at the header inner chamber, adopt the welding of downhand welding method to be connected; The cold water inlet/outlet pipe connecting hole welding of cold water heat exchange outlet pipe, cold water inlet and closure plate is connected;
The corner angle of the edges of boards card upper header orifice plate of described header plate or edges of boards welding are connected, termination cover plate shutoff header end of body, be provided with pipeline turnover connector on the cover plate of termination, heating installation outlet pipe and heater inlet pipe and/or cold water heat exchange outlet pipe, the cold water pipe joint is welded on header plate and/or the termination cover plate on, circulation communicates with the header body, the cold fluid circulation that communicates with cold water pipe inner chamber, form header hot fluid, tube chamber cold fluid water storage bearing heat exchanger, alleviate the bearing capacity of header, header weld seam antileaking;
D, described cold water pipe arrange and form that even number props up or odd number props up, described header body is laterally or is vertical, heater inlet pipe heating installation titting water outlet and cold water heat exchange outlet pipe, cold water inlet all can be installed flexibly with user's heating pipe network, solving prior art scheme storage-type heat exchanger with collected boxes can only be vertical installation by header, and header is the technological deficiency that laterally can not install.
E, described tubular header system are done; The semi arch plate merges and forms round tube shape header body, and cold water pipe and semi arch orifice plate connect and compose reduced pipe UNICOM, and it is oval mouthful that the reducing pipe is connected to the arc surface upper shed;
Adopt thin-wall stainless steel sheet shearing rectangularity plate, with forcing press, be pressed into four blocks of semi arch plates that diameter is 89mm, two blocks of semi arch plates wherein are header plate, and the punching press of header plate two ends has pipeline turnover connector;
By another two fast semi arch plates, be the header orifice plate, the header orifice plate, according to cold water pipe number, caliber size, stays tube pitch to divide some pipe punching press cold water pipe connector connectors for oval mouthful at semi arch orifice plate center, and oval mouthful to the straight wall saddle port of arc in-flanges;
Described cold water pipe arc-shaped surface stamps out the connector of oval mouthful, and described cold water is communicated with in the oval mouthful connector of pipe insertion cold water pipe, the adjacent cold water pipe of welding serial connection connection; Cold water is communicated with that pipe is external at header, parallel circulation is crisscross arranged between the cold water circular pipe pipe;
F, the described cold water pipe mouth of pipe cuts into the shape of a saddle, insert in the cold water pipe connector saddle port of header orifice plate semi arch orifice plate, described heating installation pipe is average in the cold water pipe installs one, two branched or tower settings of unequal step as required, the quantity that the heating installation pipe is set in the cold water pipe increases progressively or increases at double tower setting from the heater inlet pipe end to heating installation water outlet pipe end by pursuing in turn to prop up, reach above heating installation pipe and header inner chamber in heating installation outlet pipe pipeline section and be the multichannel circulation, increase by 35% one 100% heat transfer areas, thereby the heat of fluid is rationally utilized, strengthening conducts heat improves heat transfer effect,
The interior welding of cold water inlet/outlet pipe connecting hole that G, the described heating installation pipe one end mouth of pipe insert closure plate is connected, and the heating installation pipe other end inserts in the cold water pipe connector of cold water pipe, header orifice plate, with the cold water inlet/outlet pipe connecting hole welding of opposite side closure plate, is connected;
Header orifice plate, cold water pipe and closure plate three unit interfaces stitchings bead are neat, at the header inner chamber, adopt the welding of downhand welding method to be connected, and the cold water inlet/outlet pipe connecting hole welding of cold water heat exchange outlet pipe, cold water inlet and closure plate is connected;
The semi arch edges of boards of header plate and the semi arch edges of boards of header orifice plate merge welding and are connected, termination cover plate shutoff header end of body, be provided with pipeline turnover connector on the cover plate of termination, heating installation outlet pipe and heater inlet pipe and/or cold water heat exchange outlet pipe cold water inlet joint be welded on header plate and/or the termination cover plate on, the hot fluid circulation that communicates with the header body, the cold fluid circulation that communicates with cold water pipe inner chamber, form header hot fluid, tube chamber cold fluid water storage bearing heat exchanger;
H, described cold water pipe arrange and form that even number props up or odd number props up, described header body is laterally or is vertical, heater inlet pipe heating installation titting water outlet and cold water heat exchange outlet pipe, cold water inlet all can be installed flexibly with household heating two-way pipe network or single channel pipe network, solving prior art scheme water storage type heat exchanger can only be vertical installation by header, can not header be the technological deficiency of horizontal installation.
Can arrange flexibly one in cold water pipe tube chamber in the present invention, two or branched heating installation pipe, the heating installation pipe on average is arranged in the cold water pipe, or the heating installation pipe quantity of arranging in the cold water pipe from the heating outlet end to the heating installation entrance point increases setting by propping up, to increase heat exchange area, good effect of heat exchange, header is zone of heat liberation tube chamber pressure-bearing, steady quality is reliable, cold water pipe and heating installation pipe are pipe, pipe cavity voltage endurance capability is strong, weld seam is easy to crack leaking not, in the situation that low temperature heating can effectively utilize heat energy, change out the hot water of q.s for the use of having a bath.
The present invention is simple in structure, volume is little, cost is low, after fouling, can conveniently with acid, clean, dirt after cleaning can conveniently be discharged or pour out, solved the header weld seam technical problem that easy crack leaks because swelling stress is out of shape in the prior art, also solved that heat exchange area is little, the hydro-thermal at heating installation pipe center measures the technical problem that causes heat transfer effect poor less than taking full advantage of.
The accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the plan structure schematic diagram of Fig. 1;
Fig. 3 is the A-A cross-sectional view of Fig. 1;
Fig. 4 is the assembly structure schematic diagram of heating installation pipe in the present invention, cold water pipe and cold water heat exchange outlet pipe:
Fig. 5 is the assembly structure schematic diagram that heating installation pipe in the present invention, cold water pipe and cold water are communicated with pipe;
Fig. 6 is the structural representation of closure plate in the present invention;
Fig. 7 is the left TV structure schematic diagram of Fig. 6;
Fig. 8 is another structural representation of closure plate in the present invention;
Fig. 9 is the left TV structure schematic diagram of Fig. 8;
Figure 10 is the structural representation of an embodiment of the present invention;
Figure 11 is the plan structure schematic diagram of Figure 10;
Figure 12 is the structural representation of the header plate of D font header in Figure 11;
Figure 13 is the B-B sectional structure schematic diagram of Figure 12;
Figure 14 is another structural representation of the header plate of D font header in Figure 11;
Figure 15 is the structural representation of the header orifice plate of D font header in Figure 11;
Figure 16 is the structural representation of the another kind of embodiment of the present invention;
Figure 17 is the plan structure schematic diagram of Figure 16;
Figure 18 is the structural representation of the another kind of embodiment of the present invention;
Figure 19 is the plan structure schematic diagram of Figure 18;
Figure 20 is another structural representation of closure plate in the present invention;
Figure 21 is the structural representation of cutting open of Figure 20;
Figure 22 is that another of Figure 20 cut structural representation open;
Figure 23 is the left TV structure schematic diagram of Figure 21;
Figure 24 is another left TV structure schematic diagram of Figure 21;
Figure 25 is the structural representation of the header orifice plate of circular header in the present invention;
Figure 26 is the C-C sectional structure schematic diagram of Figure 25;
Figure 27 is the structural representation of the header plate of circular header in the present invention;
Figure 28 is another structural representation of the header plate of circular header in the present invention;
Figure 29 is the structural representation of the another kind of embodiment of the present invention;
Figure 30 is the D section structure for amplifying schematic diagram of Figure 29.
In accompanying drawing:
1, heating installation pipe; 2, cold water pipe; 3, termination cover plate; 4, header; 5, cold water heat exchange outlet pipe; 6, closure plate; 7, cold water is communicated with pipe; 8, cold water inlet; 9, heating installation outlet pipe; 10, heater inlet pipe; 11, flow distribution plate; 12, header inner chamber.
41, header plate (C shape plate or semi arch plate); 42, cold water pipe connector (circle flat mouth or oval mouth); 43, pipeline turnover connector; 44, header orifice plate (grooved, rectangular dull and stereotyped plate or semi arch orifice plate).
61, heating installation pipe connecting hole; 62, cold water inlet/outlet pipe connecting hole.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the invention will be further described:
A kind of header zone of heat liberation tube chamber water storage bearing heat exchanger, as shown in Fig. 1 to Figure 24, comprise header body 4, header body 4 comprises header plate 41, header orifice plate 44 and termination cover plate 3, header plate 41 is connected with header orifice plate 44 is airtight, termination cover plate 3 is airtight header 4 two ends that are connected to respectively, header plate 41, the space that header orifice plate 44 and termination cover plate 3 surround is header inner chamber 12, be welded with two and above branched cold water pipe 2 between header body 4, cold water pipe 2 two-port are the airtight closure plate 6 that is connected with respectively, have heating installation pipe connecting hole 61 and/or cold water turnover connecting hole 62 on closure plate 6, the airtight heating installation pipe 1 that is connected with between the heating installation pipe connecting hole 61 of two ends closure plate 6, heating installation pipe 1 is positioned at cold water pipe 2 tube chambers, heating installation pipe 1 communicates with header inner chamber 12, between adjacent cold water pipe 2, welding is connected with cold water connection pipe 7, cold water inlet 8 and cold water heat exchange outlet pipe 5 weld UNICOMs with the cold water inlet/outlet pipe connecting hole 62 on closure plate 62, and circulation communicates with cold water pipe 2 inner chambers, have pipeline turnover connector 43 on header plate 41 and/or termination cover plate 3, cold water inlet 8 and 5 welding of cold water heat exchange outlet pipe are connected in pipeline turnover connector 43 places, airtight heating installation outlet pipe 9 and the heater inlet pipe 10 of being communicated with of header plate 41 and/or termination cover plate 3 outer walls, the circulation that all communicates with header inner chamber 12 of heating installation outlet pipe 9 and heater inlet pipe 10, heating installation pipe 1 quantity in heating installation outlet pipe 9 end cold water pipes 2 is no less than heating installation pipe 1 quantity in heater inlet pipe 10 end cold water pipes 2.
In the present embodiment, the quantity of the described heating installation pipe 1 of described cold water pipe 2 interior settings increases progressively or the several times increase by propping up successively from heater inlet pipe 10 ends to heating installation outlet pipe 9 ends, near the hot fluid in the heating installation pipe 1 of heating installation outlet pipe 9 ends and header inner chamber 12, is the multichannel circulation.
In the present embodiment, the cross sectional shape of described header body 4 is D font or tubular; Described D font header plate 41 is C shape plate, and header orifice plate 44 is grooved orifice plate or rectangular dull and stereotyped orifice plate, and described tubular header plate 41 is the semi arch plate, and header orifice plate 44 is the semi arch orifice plate; Have pipeline turnover connector 43 on header plate 41, have cold water pipe connector 42 on header orifice plate 44; Connector 43 is airtight is connected for described heater inlet pipe 10, heating installation outlet pipe 9 and/or cold water inlet 8, cold water heat exchange outlet pipe 5 and described pipeline turnover; Described cold water pipe connector 42 is circle flat mouth or oval mouth, and described cold water pipe 2 mouths of pipe cut into flat mouth or the shape of a saddle and 42 airtight connections of cold water pipe connector, but cold water pipe 2 is connected not connected with the welding of header orifice plate.
In the present embodiment, described D word shape header body, header orifice plate 44 grooved orifice plates or rectangular dull and stereotyped orifice plate, have cold water pipe connector 42 circle flat mouthes on header orifice plate 44 in groove or the straight wall flat mouth of header plate direction flange, described cold water pipe 2 mouths of pipe cut into flat mouth and insert in the cold water pipe connector 42 circle flat mouthes on header orifice plate 44, and closure plate 6 embeds three unit interface slotted wall unification place welding in cold water pipe 2 mouths of pipe and is connected; Described round tube shape header body, header orifice plate 44 is the semi arch orifice plate, having cold water pipe connector 42 on header orifice plate 44 is that oval mouthful connector is to circular arc in-flanges Cheng Zhibi saddle port, described cold water pipe 2 mouths of pipe cut into the shape of a saddle, through in cold water pipe connector 42 saddle ports on header orifice plate 44, closure plate 6 embeds three unit interface slotted wall unification place welding in cold water pipe 2 mouths of pipe and is connected successively; Cold fluid does not communicate with header inner chamber 12.
In the present embodiment, the quantity of described cold water pipe 2 is that even number props up, and described heater inlet pipe 10 and described heating installation outlet pipe 9 are welded on the circulation that communicates with header inner chamber 12 of the described header plate of homonymy 41 pipelines turnover connector 43 upper ends, place, lower end or right-hand, left; Described cold water inlet 8 and described cold water heat exchange outlet pipe 5 are welded on heating installation and import and export bottom, top or 41 pipeline turnover connector 43 lower end, the place imports of opposite side header plate, upper end outlet or the right import of described termination, the same side cover plate 3, left outlet, cold water inlet 8 and cold water heat exchange outlet pipe 5 and the circulation of cold water pipe 2 inner chamber UNICOMs.
Described cold water pipe 2 design quantity are that even number props up or odd number props up, described cold water is communicated with that the header inner chamber 12 of pipe 7 respective side is interior to be arranged flow distribution plate 11 or flow distribution plate 11 is not set, and forms header inner chamber hot fluid and cold water pipe inner chamber cold fluid is reverse-flow or the mixed-flow circulation canal.
In the present embodiment, the quantity of described cold water pipe 1 is that odd number props up, described heater inlet pipe 10 and described heating installation outlet pipe 9 are welded on that described header plate 41 pipelines turnover connector 43 tops, places of the described header body 4 of heterodoxy are advanced, below goes out or right import, left outlet, with header inner chamber 12, communicates; Described cold water heat exchange outlet pipe 5 is welded on cover plate 3 upper ends, described termination or other end header plate 41 pipeline turnover connector 43 tops, place of the header body 4 of heater inlet pipe 10 place ends, with cold water pipe 1 inner chamber, communicate, described cold water inlet 8 is welded on termination cover plate 3 lower ends or other end header plate 41 pipeline turnover connector 43 bottoms, place of the header body 4 of heating installation outlet pipe 9 place ends, and circulation communicates with cold water pipe 1 inner chamber;
Described cold water pipe 2 design composition even numbers prop up or odd number props up, described header body 4 is laterally or is vertical, and the heater inlet pipe 10 on header plate 41 or termination cover plate 3, heating installation outlet pipe 9 joints and/or cold water heat exchange outlet pipe 5, cold water inlet 8 joints all can be installed flexibly with household heating two-way pipe network or single channel pipe network.
In the present embodiment, adjacent described cold water be communicated with pipe 7 outside described header body 4,2 UNICOMs that are crisscross arranged of cold water pipe.
In the present embodiment, only have on outermost described closure plate 6 and offer described cold water pipe turnover connecting hole 62, described cold water inlet 8 and described cold water heat exchange outlet pipe 5 are successively through cold water inlet/outlet pipe connecting hole 62 and closure plate 6 welding and cold water pipe 2 inner chamber UNICOMs.
In the present embodiment, described heating installation pipe 1, cold water pipe 2, termination cover plate 3, header plate 41 header orifice plate 44 cold water heat exchange outlet pipes 5, closure plate 6, cold water are communicated with pipe 7, cold water inlet 8, heating installation outlet pipe 9, heater inlet pipe 10, flow distribution plate 11, welding wire material etc., select material stainless steel of the same race " 304 " material material to be easy to welding production and form.
A kind of header zone of heat liberation tube chamber water storage bearing heat exchanger manufacture craft, comprise the steps:
The making of A, described D font header; Described D font header body 4 adopts the thin-wall stainless steel board making, first stainless steel materials is cut into to rectangular slab, then two of C formboards that are pressed into corner angle with forcing press are header plate 41; Header plate 41 two ends stamp out pipeline turnover connector 43;
Stainless steel materials is cut into to the rectangle strip plate, is header orifice plate 44 with forcing press compacting channel steel shape plate or rectangular dull and stereotyped two of not suppressing; Header orifice plate 44, according to described cold water pipe 2 quantity, caliber size, stays tube pitch to divide some pipes to stamp out cold water pipe connector 42 connectors for the circle flat mouth at channel steel shape plate or strip plate center, and the circle flat mouth is in groove or the straight wall flat mouth of header plate direction flange;
Described cold water pipe 2 arc-shaped surface stamp out oval connector, described cold water is communicated with pipe 7 and inserts in the oval connector of cold water pipe 2, welding serial connection is communicated with adjacent cold water pipe 2, and cold water is communicated with pipe 7 UNICOM that is crisscross arranged header body 4 outside, between cold water pipe 2 pipes and circulates;
B, described cold water pipe 2 two ends plain ends insert in the cold water pipe connector 42 circle flat mouthes of header orifice plate 44, described heating installation pipe 1 on average arranges one cold water pipe 2 is interior, two branched or tower settings of unequal step as required, from the interior heating installation pipe 1 that arranges of the cold water pipe 2 of heater inlet pipe 10 respective side, since one, heating installation pipe 1 quantity is set in turn by increasing progressively or several times increase to heating installation outlet pipe 9 place sides in its adjacent cold water pipe 2, in heating installation outlet pipe 9 pipeline sections, heating installation pipe 1 and above heating installation pipe 1 are the multichannel circulation with header inner chamber 12, increase heat exchange area, strengthening conducts heat improves heat transfer effect,
The described cold water inlet/outlet pipe connecting hole 62 interior welding that C, the heating installation pipe 1 one end mouths of pipe insert described closure plate 6 are connected, and heating installation pipe 1 other end inserts in the cold water pipe connector 42 of cold water pipe 2, header orifice plate 44, is connected with cold water inlet/outlet pipe connecting hole 62 welding of opposite side closure plate 6;
Header orifice plate 44, cold water pipe 2 and closure plate 6 three unit interfaces stitchings bead are neat, at header inner chamber 12, adopt the welding of downhand welding methods to be connected; Cold water heat exchange outlet pipe 5, cold water inlet 8 are connected with cold water inlet/outlet pipe connecting hole 62 welding of closure plate 6;
The corner angle of the edges of boards card upper header orifice plate 44 of described header plate 41 or edges of boards welding are connected, termination cover plate 3 shutoff header body 4 ends, be provided with pipeline turnover connector 43 on termination cover plate 3, heating installation outlet pipe 9 and heater inlet pipe 10 and/or cold water heat exchange outlet pipe 5, cold water pipe 8 joints are welded on header plate 41 and/or on termination cover plate 3, circulation communicates with header body 4, the cold fluid circulation that communicates with cold water pipe 2 inner chambers, form header hot fluid, tube chamber cold fluid water storage bearing heat exchanger, alleviate the bearing capacity of header, header weld seam antileaking;
D, described cold water pipe 2 arrange and form that even number props up or odd number props up, described header body 4 is laterally or is vertical, heater inlet pipe 10 heating installation outlet pipe 9 joints and cold water heat exchange outlet pipe 5, cold water inlet 8 all can be installed flexibly with user's heating pipe network, solving prior art scheme storage-type heat exchanger with collected boxes can only be vertical installation by header, and header is the technological deficiency that laterally can not install.
E, described tubular header body 4 are made; The semi arch plate merges and forms round tube shape header body, and cold water pipe and semi arch orifice plate connect and compose reduced pipe UNICOM, and it is oval mouthful that the reducing pipe is connected to the arc surface upper shed;
Adopt thin-wall stainless steel sheet shearing rectangularity plate, with forcing press, be pressed into four blocks of semi arch plates that diameter is 89mm, two blocks of semi arch plates wherein are header plate 41, and header plate 41 two ends punching presses have pipeline turnover connector 43;
By another two fast semi arch plates, it is header orifice plate 44, header orifice plate 44 is according to cold water pipe 2 numbers, caliber size, at semi arch orifice plate center, stay tube pitch to divide some pipe punching press cold water pipe connectors 42 connectors for oval mouthful, oval mouthful to the straight wall saddle port of arc in-flanges;
Described cold water pipe 2 arc-shaped surface stamp out the connector of oval mouthful, and described cold water is communicated with in the oval mouthful connector of pipe 7 insertion cold water pipes 2, the adjacent cold water pipe 2 of welding serial connection connection; Cold water is communicated with the pipe 7 parallel circulation that is crisscross arranged outside header body 4, between cold water pipe 2 pipes;
F, described cold water pipe 2 mouths of pipe cut into the shape of a saddle, insert in cold water pipe connector 42 saddle ports of header orifice plate 44 semi arch orifice plates, described heating installation pipe 1 is one of the interior average installation of cold water pipe 2, two branched or tower settings of unequal step as required, the interior quantity that heating installation pipe 1 is set of cold water pipe 2 increases progressively or increases at double tower setting from heater inlet pipe 10 ends to heating installation outlet pipe 9 ends by pursuing in turn to prop up, reach above heating installation pipe 1 in heating installation outlet pipe 9 pipeline sections and be the multichannel circulation with header inner chamber 12, increase by 35% one 100% heat transfer areas, thereby the heat of fluid is rationally utilized, strengthening conducts heat improves heat transfer effect,
The cold water inlet/outlet pipe connecting hole 62 interior welding that G, the described heating installation pipe 1 one end mouths of pipe insert closure plate 6 are connected, heating installation pipe 1 other end inserts in the cold water pipe connector 42 of cold water pipe 2, header orifice plate 44, with cold water inlet/outlet pipe connecting hole 62 welding of opposite side closure plate 6, is connected;
Header orifice plate 44, cold water pipe 2 and closure plate 6 three unit interfaces stitchings bead are neat, at header inner chamber 12, adopt the welding of downhand welding methods to be connected, and the cold water inlet/outlet pipe connecting hole 62 of cold water heat exchange outlet pipe 5, cold water inlet 8 and closure plate 6 welds and is connected;
The semi arch edges of boards of header plate 41 and the semi arch edges of boards of header orifice plate 44 merge welding and are connected, termination cover plate 3 shutoff header body 4 ends, be provided with pipeline turnover connector 43 on termination cover plate 3, heating installation outlet pipe 9 and heater inlet pipe 10 and/or cold water heat exchange outlet pipe 5 cold water inlet 8 joints are welded on header plate 41 and/or on termination cover plate 3, the hot fluid circulation that communicates with header body 4, the cold fluid circulation that communicates with cold water pipe 2 inner chambers, form header hot fluid, tube chamber cold fluid water storage bearing heat exchanger;
H, described cold water pipe 2 arrange and form that even number props up or odd number props up, described header body 4 is laterally or is vertical, heater inlet pipe 10 heating installation outlet pipe 9 joints and cold water heat exchange outlet pipe 5, cold water inlet 8 all can be installed flexibly with household heating two-way pipe network or single channel pipe network, solving prior art scheme water storage type heat exchanger can only be vertical installation by header, can not header be the technological deficiency of horizontal installation.
Embodiment recited above is described the preferred embodiment of the present invention; not the spirit and scope of the present invention are limited; under the prerequisite that does not break away from design concept of the present invention; various modification and improvement that in this area, common engineers and technicians make technical scheme of the present invention; all should fall into protection scope of the present invention; the technology contents that the present invention asks for protection, all be documented in claims.
What the solid arrow in accompanying drawing meaned is the flow direction of cold water in heat transfer process, and what dotted arrow meaned is the direction of heating installation current.
The present invention adopts stainless steel to make, can install and use on family's heating network, but not only heating but also interchangeable hot water taking, with the daily water consumption such as carry out bathing, scrub.
Cold water pipe in the present invention is at least more than two, be communicated with pipe by cold water between the cold water pipe and weld in turn connection, be provided with closure plate in the mouth of pipe of cold water pipe, the closure plate upper punch is pressed with at least one heating installation pipe connecting hole, go back punching press on some closure plates cold water inlet/outlet pipe connecting hole is arranged, have at least a heating installation pipe to be connected and to be communicated with the heating installation pipe connecting hole welding of termination closure plate through the tube chamber of cold water pipe, the hot fluid in the heating installation pipe and the inner chamber of header form circulation.In this structure, the heating installation pipe connects without bend pipe, fluid resistance is little, cold water pipe and cold water are communicated with pipe in the outside connection of the casing of header, cold water pipe and cold water be communicated with pipe select different tube diameters, compression resistance strong, bear the thin-wall stainless steel pipe of internal pressure, strong with respect to the bearing capacity of header.
Select the stainless steel thin-wall pipe can save material, the corrosion resistance of stainless pipe is strong, produces incrustation scale and is easy to clean, and the water after heat exchange is pure clear, pollution-free, can be used as domestic water, also can have a bath.The stainless steel tube heat conduction of thin-walled is fast, with the tubing of same outer diameter as, compares, and cavity volume is large, stored hot water is many.Cold water pipe and cold water are communicated with pipe and are straight tube, directly outside exposed, once leak, also are easy to the welding maintenance, after the incrustation scale of heating installation circular tube external wall absorption cleans with acid, are communicated with pipe by direct-cooled water and are easy to discharge (or pouring out).
The present invention in use, the heating supply pipe network is supplied with water circulating pump, belong to closed cycle, the header inner chamber is the hot fluid circulation passage, the pressure born is the mechanical pressure that water circulating pump is supplied with, and is constant pressure, before heat exchanger dispatches from the factory, employing takes advantage of the coefficient pressure of 1.5 times to be detected it with the constant pressure of water circulating pump, can dispatch from the factory after qualified.Facts have proved, the weld seam of header zone of heat liberation is leakiness not, and steady quality is reliable.The water stored in the tube chamber of cold water pipe can produce thermal expansion stresses, and the ability that the cold water pipe meets with stresses can be made as 2 times of header voltage endurance capability.The bearing capacity of cold water circular pipe communicated can resist, eliminate the impact of thermal expansion shrinkage internal stress fully.Cold water pipe in the present invention and heating installation pipe all adopt stainless pipe to make, and the connection water storage between pipe has been eliminated the expansive force of header body cool water heating with respect to traditional heat exchangers, reduced stress deformation, has alleviated the bearing capacity of header inner chamber.Therefore, the advantage that the circular pipe communicated water storage is not easy to leak is more than traditional heat exchanger header body.
Steam heating pipe list branch pipe(tube) on average arranges that layout is unreasonable, heat exchange area is little, can not form amount of turbulence, rate of heat transfer is slow in the cold water tube chamber of the water storage type heat exchanger in the state of the art scheme.Cold fluid in heat exchanger under inactive state the intraluminal cold water temperature of cold water circle and heating installation to justify intraluminal hot fluid temperature identical, the cold water simultaneously entered when heat exchanger output hot water starts heating, because single the little cold water heat conduction be introduced into of steam heating pipe heat transfer area is not connected with the hot water of output and has occurred that hot water flow interruption heat transfer effect is poor slowly, moreover single Zhi Nuanqi pipe central hot measures and is lost less than effectively utilizing, therefore heat transfer effect is poor, and hot water can not continuous wave output.
The present invention adopts this technical measures, the branched thinner heating installation pipe of installation in adjacent cold water pipe is divided in the heat exchanger exit end, form the tower setting of step, increase heat transfer area 35% one 100% than prior art scheme, improve rate of heat transfer, divide the hot fluid of heating installation pipe branched thinner pipeline to change flow regime, increase flow velocity, improve the turbulence pulsation degree, effectively impel the heat at heating installation pipe center to be fully utilized to strengthen and conduct heat, add strong disturbance to change fluidised form, hot fluid is the heat transfer coefficient that the turbulence state increase is larger.Impel the cold water that is introduced into heat exchanger to contact fully and absorbed heat with the hot fluid wall at retention areas, the heat that heat exchanger output hot water is drained and the cold water simultaneously entered absorb heating installation pipe liberated heat and are directly proportional in retaining state is flowed through process.Cause the temperature that the very first time enters the heat exchanger cold fluid to improve constantly along heat-transfer area, the temperature of hot fluid descends along heat-transfer area is disconnected, and cold fluid flow absorbs heat and is circulated to heat exchanger and approaches the heater inlet pipe place and entered the basic identical heat transfer of thermal balance pipeline section temperature and stop in process.Therefore reduce the quantity of heating installation pipe in heating installation import pipeline section cold water pipe, namely fluid circulation channel of a heating installation pipe is installed in the cold water pipe of steam heating pipe import, not only save material but also improve heat transfer effect.
Therefore, the number that increases the heating installation pipe at heat exchanger heating outlet pipeline section makes up the disappearance that heating installation pipe Yin Wendu reduction causes the required temperature of cold water, the number that reasonably increases the heating installation pipe in cold water pipe chamber cold fluid obtains the heat output of maximum possible, thereby the heat energy of fluid is rationally utilized, effectively prevent the discontinuity of prior art heat exchanger output hot water.Technical solution of the present invention reaches fully effectively utilizes heat energy, and its intensity is enough, heat transfer property is reliable, reasonable in economy, assurance meet needed hot water flow in the process of having a bath, and it is uninterrupted continuously that its technique effect obtains best hot water flow.
In the present embodiment, the header orifice plate of described D font header is converted into the channel steel type strip plate, during the punching stretching round mouth, can reduce the inside contraction distortion in the horizontal phase of edges of boards edge, edges of boards uneven, be not easy to merge or butt-welded defect, rectangular flat board is converted into the intensity that channel steel shape can increase orifice plate, the channel steel type orifice plate can increase the ability of orifice plate opposing stress deformation, reduce in welding process and be subject to thermal stress deformation, effectively prevent that four weld seams of header from leaking.
In the present embodiment, the merging of semi arch plate forms the round tube shape header, and the cold water pipe engages the anti-planted agent's ability of formation reduced pipe UNICOM with the semi arch orifice plate strong, and effectively opposing or the minimizing of elimination welding deformation are leaked.
The above-mentioned design of the present invention, set positions is imported and exported in arranging according to the flow process of heating installation pipe network closed cycle of heating installation pipe, in heat exchanger heating installation water outlet pipe end cold water pipe, step is tower arranges branched thinner heating installation pipe, thinner heating installation pipe center heat is easy to by the cold fluid favorable for absorption, thereby the heat of fluid is fully changed.The cold fluid that makes the very first time enter heat exchanger in the delay process by Fast Heating, thereby when specific heat is definite value, the variation of fluid temperature (F.T.) is directly proportional to the heat of absorption (or heat release), enters cold water in the time of heat exchanger output hot water and absorbs heat to heater inlet pipe mouth in the process of flowing through substantially to reach temperature equal.Therefore, good effect of heat exchange of the present invention, solved the technical problem that prior art scheme water storage type heat exchanger can not provide the hot water continuous wave output.
In the present invention, be provided with one on closure plate, the steam heating pipe connecting hole of two or more connection heating installation pipes and cold water inlet/outlet pipe connecting hole, closure plate is arranged in the mouth of pipe of cold water pipe, shutoff cold water channel and zone of heat liberation can not communicate, form the bulbs of pressure that tube chamber bears cold fluid, header bears the water pump circulating pressure of hot fluid, therefore, the all weld seam antileakings of header, the mouth of pipe of cold water pipe is positioned at the header inner chamber and is connected with the header orifice plate, but in the header inner chamber, be not communicated with, the circulation that communicates with the header inner chamber of heating installation pipe, cold water inlet/outlet pipe connecting hole welding on cold water inlet and cold water heat exchange outlet pipe and closure plate, and with the parallel circulation of cold water circular pipe communicated.
In the present invention, cold water pipe end arc-shaped surface upper wall and the arc-shaped surface lower wall local positioning punching press of corresponding termination have connector, in the connector of cold water connection pipe insertion cold water pipe, welded, all cold water pipes is logical in succession the header guest performer, reduce the weld length of cold fluid pass weld seam, effectively Leakage prevention.A wherein end mouth of pipe of heating installation pipe inserts in the heating installation pipe connecting hole on closure plate, and welding is connected with it, the heating installation pipe passes through in the cold water pipe, the other end of heating installation pipe inserts in the heating installation pipe connecting hole on the opposite side closure plate, and welding is connected with it, the mouth of pipe at cold water pipe two ends inserts in the header orifice plate, cold water pipe and closure plate, header orifice plate interface seam, at the header inner chamber, adopt the welding of downhand welding method to be connected, termination cover plate shutoff header, heater inlet pipe, heating installation outlet pipe and the welding of header plate pipeline turnover connector are connected, form the parallel circulation canal of header hot fluid.Therefore, zone of heat liberation water pump circulation machinery pressure producer is easy to detect the voltage endurance capability of header weld seam, effectively solves the problem that the header weld seam leaks.
Cold water pipe quantity in the present invention can be made as even number and prop up, heater inlet pipe and heating installation outlet pipe are welded in the homonymy header upper and lower of outside header plate or the right and the left side and communicate with the header inner chamber, cold water inlet and cold water heat exchange outlet pipe are welded on the cover plate place, termination of lower end and upper end or the right and the left side in the homonymy header, with cold water pipe intracavity inter-connection.This kind of structure can be adapted to the needs that current household heating twin flue pipe network is installed in parallel, and convenient the installation is communicated with, and reduces the connection of turning round as far as possible, realized saving the purpose of mounting material, and heat exchanger takes up room little, with the pipe network layout, coordinates attractive in appearance.Cold water is communicated with welding flow distribution plate in header corresponding to pipe place side, can form header and the parallel circulation canal of tube chamber fluid.In addition, the present invention can also be welded on heater inlet pipe and heating installation outlet pipe upper and lower or the right and the left side of one of them header, cold water inlet and cold water heat exchange outlet pipe are welded on to bottom and top or the right and the left side of another header, do not weld flow distribution plate in the chamber of header body, so form the mixed-flow circulation canal.
Cold water pipe quantity in the present invention also can be made as odd number and prop up, heater inlet pipe and heating installation outlet pipe are welded on respectively the upper and lower of heteropleural header plate or the right and the left side and communicate with header, cold water heat exchange outlet pipe is welded on the termination cover plate of the side upper end, header plate place that heater inlet pipe connects and communicates with cold water pipe inner chamber, on the termination cover plate of the side lower end, header plate place that cold water inlet welding heating installation outlet pipe connects, with cold water pipe inner chamber, communicate, weld again flow distribution plate in the header chamber, form reverse-flow circulation canal.This kind of structure can be adapted to the needs that current household heating one-pipe pipe network is installed in series, and the inlet/outlet pipe joint of heat exchanger and pipe network layout are coordinated attractive in appearance, do not take too many space, has advantages of that convenient the installation is communicated with and the saving mounting material.
The present invention all adopts 304 stainless steels to make, and the solder wire material of welding use is identical with stainless steel pipe, and it is many that same material is easy to the advantage that welding manufactures, and can reduce the various metals material in conjunction with manufacturing technique while welding select materials program complexity, drawback that the amount of labour used is large.Material stack pile of the same race, in conjunction with being easy to welding, can reduce the program of selecting materials, and reduces the recruitment cost, is easy to pickling, passivation, cleaning welding bead and protects welding bead, and exchange hot water is pure clear, pollution-free.Metal material of the same type is because density of material is identical, mechanical property is identical, thus each parts junction can simultaneous adaptation thermal stress, the variation of temperature difference pressure, produce that internal stress is identical, pulling-out force is balanced.
The present invention selects metal material material of the same race in conjunction with manufacture, select thinner stainless pipe, sheet material, can reduce costs, pipe, plate are easy to punching, flange, equidirectional embedding and pinch limit, be easy to welding, can strengthen weld strength, the ability of resistance to deformation or destruction is strong, metal material material of the same race, can avoid that in use procedure, (electrode of the metal of unlike material is due to the current potential difference because electrochemical corrosion is leaked, and form the galvanic corrosion that the galvanic couple battery produces, affect product quality, the life-span is short, use cost is high).Stainless steel inside pipe wall is smooth, and fluid resistance is little, and incrustation scale is difficult to absorption, even stainless steel produces incrustation scale, also is easy to acid filling and cleans.
Should be understood that: above-mentioned embodiment is just to explanation of the present invention, rather than limitation of the present invention, and any innovation and creation that do not exceed the present invention's spirit scope, all fall into protection scope of the present invention.

Claims (10)

1. a header zone of heat liberation tube chamber water storage bearing heat exchanger, comprise header body (4), header body (4) comprises header plate (41), header orifice plate (44) and termination cover plate (3), header plate (41) and airtight connection of header orifice plate (44), termination cover plate (3) is airtight header (4) two ends that are connected to respectively, header plate (41), the space that header orifice plate (44) and termination cover plate (3) surround is header inner chamber (12), it is characterized in that: be welded with two and above branched cold water pipe (2) between header body (4), cold water pipe (2) two-port is the airtight closure plate (6) that is connected with respectively, have heating installation pipe connecting hole (61) and/or cold water turnover connecting hole (62) on closure plate (6), the airtight heating installation pipe (1) that is connected with between the heating installation pipe connecting hole (61) of two ends closure plate (6), heating installation pipe (1) is positioned at cold water pipe (2) tube chamber, heating installation pipe (1) communicates with header inner chamber (12), between adjacent cold water pipe (2), welding is connected with cold water connection pipe (7), cold water inlet (8) and cold water heat exchange outlet pipe (5) weld UNICOM with the cold water inlet/outlet pipe connecting hole (62) on closure plate (62), and circulation communicates with cold water pipe (2) inner chamber, have pipeline turnover connector (43) on header plate (41) and/or termination cover plate (3), cold water inlet (8) and cold water heat exchange outlet pipe (5) welding are connected in pipeline turnover connector (43) and locate, airtight heating installation outlet pipe (9) and the heater inlet pipe (10) of being communicated with of header plate (41) and/or termination cover plate (3) outer wall, the circulation that all communicates with header inner chamber (12) of heating installation outlet pipe (9) and heater inlet pipe (10), heating installation pipe (1) quantity in heating installation outlet pipe (9) end cold water pipe (2) is no less than heating installation pipe (1) quantity in heater inlet pipe (10) end cold water pipe (2).
2. header zone of heat liberation tube chamber water storage bearing heat exchanger according to claim 1, it is characterized in that: the quantity of the described heating installation pipe (1) of the interior setting of described cold water pipe (2) is held from heater inlet pipe (10) end to heating installation outlet pipe (9) successively and is increased progressively or the several times increase by propping up, and the hot fluid in the heating installation pipe (1) of holding near heating installation outlet pipe (9) and header inner chamber (12) are multichannel and circulate.
3. header zone of heat liberation tube chamber water storage bearing heat exchanger according to claim 2, it is characterized in that: the cross sectional shape of described header body (4) is D font or tubular; Described D font header plate (41) is C shape plate, and header orifice plate (44) is grooved orifice plate or rectangular dull and stereotyped orifice plate, and described tubular header plate (41) is the semi arch plate, and header orifice plate (44) is the semi arch orifice plate; Have pipeline turnover connector (43) on header plate (41), have cold water pipe connector (42) on header orifice plate (44); Described heater inlet pipe (10), heating installation outlet pipe (9) and/or cold water inlet (8), cold water heat exchange outlet pipe (5) and described pipeline turnover airtight connection of connector (43); Described cold water pipe connector (42) is circle flat mouth or oval mouth, described cold water pipe (2) mouth of pipe cuts into flat mouth or the shape of a saddle and airtight connection of cold water pipe connector (42), but cold water pipe (2) is connected not connected with the welding of header orifice plate.
4. according to the described header zone of heat liberation of claim 1 or 3 tube chamber water storage bearing heat exchanger, it is characterized in that: described D word shape header body, header orifice plate (44) grooved orifice plate or rectangular dull and stereotyped orifice plate, have cold water pipe connector (42) circle flat mouth on header orifice plate (44) in groove or the straight wall flat mouth of header plate direction flange, described cold water pipe (2) mouth of pipe cuts into flat mouth and inserts in cold water pipe connector (42) the circle flat mouth on header orifice plate (44), and closure plate (6) embeds three unit interface slotted wall unification place welding in cold water pipe (2) mouth of pipe and is connected; Described round tube shape header body, header orifice plate (44) is the semi arch orifice plate, having cold water pipe connector (42) on header orifice plate (44) is that oval mouthful connector is to circular arc in-flanges Cheng Zhibi saddle port, described cold water pipe (2) mouth of pipe cuts into the shape of a saddle, through in cold water pipe connector (42) saddle port on header orifice plate (44), closure plate (6) embeds three unit interface slotted wall unification place welding in cold water pipe (2) mouth of pipe and is connected successively; Cold fluid does not communicate with header inner chamber (12).
5. header zone of heat liberation tube chamber water storage bearing heat exchanger according to claim 1, it is characterized in that: the quantity of described cold water pipe (2) is that even number props up, and described heater inlet pipe (10) and described heating installation outlet pipe (9) are welded on the described header plate of homonymy (41) pipeline turnover connector (43) and locate the circulation that communicates with header inner chamber (12) of upper end, lower end or right-hand, left; Described cold water inlet (8) and described cold water heat exchange outlet pipe (5) are welded on bottom, top or opposite side header plate (41) the pipeline turnover connector (43) of heating installation import and export described termination, the same side cover plates (3) and locate lower end import, upper end outlet or right import, left outlet, cold water inlet (8) and cold water heat exchange outlet pipe (5) and the circulation of cold water pipe (2) inner chamber UNICOM;
Described cold water pipe (2) design quantity is that even number props up or odd number props up, described cold water is communicated with in the header inner chamber (12) of pipe (7) respective side and flow distribution plate (11) is set or flow distribution plate (11) is not set, and forms header inner chamber hot fluid and cold water pipe inner chamber cold fluid is reverse-flow or the mixed-flow circulation canal.
6. header zone of heat liberation tube chamber water storage bearing heat exchanger according to claim 4, it is characterized in that: the quantity of described cold water pipe (1) is that odd number props up, described header plate (41) the pipeline turnover connector (43) that described heater inlet pipe (10) and described heating installation outlet pipe (9) are welded on the described header body of heterodoxy (4) locates that top is advanced, below goes out or right import, left outlet, with header inner chamber (12), communicates; Described cold water heat exchange outlet pipe (5) is welded on cover plate (3) upper end, described termination or other end header plate (41) the pipeline turnover connector (43) of the header body (4) of heater inlet pipe (10) place end and locates top, with cold water pipe (1) inner chamber, communicate, described cold water inlet (8) is welded on termination cover plate (3) lower end or other end header plate (41) the pipeline turnover connector (43) of the header body (4) of heating installation outlet pipe (9) place end and locates bottom, and circulation communicates with cold water pipe (1) inner chamber;
Described cold water pipe (2) design composition even number props up or odd number props up, described header body (4) is laterally or is vertical, and the heater inlet pipe (10) on header plate (41) or termination cover plate (3), heating installation outlet pipe (9) joint and/or cold water heat exchange outlet pipe (5), cold water inlet (8) joint all can be installed flexibly with household heating two-way pipe network or single channel pipe network.
7. header zone of heat liberation tube chamber water storage bearing heat exchanger according to claim 5 is characterized in that: adjacent described cold water is communicated with pipe (7) UNICOM that is crisscross arranged outside described header body (4), between cold water pipe (2).
8. header zone of heat liberation tube chamber water storage bearing heat exchanger according to claim 6, it is characterized in that: only have on outermost described closure plate (6) and offer described cold water pipe turnover connecting hole (62), described cold water inlet (8) and described cold water heat exchange outlet pipe (5) are successively through cold water inlet/outlet pipe connecting hole (62) and closure plate (6) welding and cold water pipe (2) inner chamber UNICOM.
9. header zone of heat liberation tube chamber water storage bearing heat exchanger according to claim 1, it is characterized in that: described heating installation pipe (1), cold water pipe (2), termination cover plate (3), header plate (41) header orifice plate (44) cold water heat exchange outlet pipe (5), closure plate (6), cold water are communicated with pipe (7), cold water inlet (8), heating installation outlet pipe (9), heater inlet pipe (10), flow distribution plate (11), welding wire material etc., select material stainless steel of the same race " 304 " material material to be easy to welding production and form.
10. a header zone of heat liberation tube chamber water storage bearing heat exchanger manufacture craft, is characterized in that: comprise the steps:
The making of A, described D font header; Described D font header body (4) adopts the thin-wall stainless steel board making, first stainless steel materials is cut into to rectangular slab, then two of C formboards that are pressed into corner angle with forcing press are header plate (41); Header plate (41) two ends stamp out pipeline turnover connector (43);
Stainless steel materials is cut into to the rectangle strip plate, is header orifice plate (44) with forcing press compacting channel steel shape plate or rectangular dull and stereotyped two of not suppressing; Header orifice plate (44) is according to described cold water pipe (2) quantity, caliber size, at channel steel shape plate or strip plate center, stay tube pitch to divide some pipes to stamp out cold water pipe connector (42) connector for the circle flat mouth, the circle flat mouth is in groove or the straight wall flat mouth of header plate direction flange;
Described cold water pipe (2) arc-shaped surface stamps out oval connector, described cold water is communicated with in the oval connector of pipe (7) insertion cold water pipe (2), welding serial connection is communicated with adjacent cold water pipe (2), and cold water is communicated with pipe (7) UNICOM that is crisscross arranged header body (4) outside, between cold water pipe (2) pipe and circulates;
B, described cold water pipe (2) two ends plain end inserts in cold water pipe connector (42) the circle flat mouth of header orifice plate (44), described heating installation pipe (1) on average arranges one in cold water pipe (2), two branched or tower settings of unequal step as required, in the cold water pipe (2) of heater inlet pipe (10) respective side, heating installation pipe (1) is set, since one, heating installation pipe (1) quantity is set in turn by increasing progressively or several times increase to heating installation outlet pipe (9) place side in its adjacent cold water pipe (2), in heating installation outlet pipe (9) pipeline section, heating installation pipe (1) and above heating installation pipe (1) are the multichannel circulation with header inner chamber (12), increase heat exchange area, strengthening conducts heat improves heat transfer effect,
C, heating installation pipe (1) the one end mouth of pipe insert welding in the described cold water inlet/outlet pipe connecting hole (62) of described closure plate (6) and are connected, and heating installation pipe (1) other end inserts in the cold water pipe connector (42) of cold water pipe (2), header orifice plate (44), is connected with cold water inlet/outlet pipe connecting hole (62) welding of opposite side closure plate (6);
Header orifice plate (44), cold water pipe (2) and closure plate (6) three unit interfaces stitchings bead are neat, at header inner chamber (12), adopt the welding of downhand welding method to be connected; Cold water heat exchange outlet pipe (5), cold water inlet (8) are connected with cold water inlet/outlet pipe connecting hole (62) welding of closure plate (6);
The corner angle of the edges of boards card upper header orifice plate (44) of described header plate (41) or edges of boards welding are connected, termination cover plate (3) shutoff header body (4) end, be provided with pipeline turnover connector (43) on termination cover plate (3), heating installation outlet pipe (9) and heater inlet pipe (10) and/or cold water heat exchange outlet pipe (5), cold water pipe (8) joint is welded on the upper and/or termination cover plate (3) of header plate (41), circulation communicates with header body (4), the cold fluid circulation that communicates with cold water pipe (2) inner chamber, form the header hot fluid, tube chamber cold fluid water storage bearing heat exchanger, alleviate the bearing capacity of header, header weld seam antileaking,
D, described cold water pipe (2) arrange and form that even number props up or odd number props up, described header body (4) is laterally or is vertical, heater inlet pipe (10) heating installation outlet pipe (9) joint and cold water heat exchange outlet pipe (5), cold water inlet (8) all can be installed flexibly with user's heating pipe network, solving prior art scheme storage-type heat exchanger with collected boxes can only be vertical installation by header, and header is the technological deficiency that laterally can not install;
E, described tubular header body (4) are made; The semi arch plate merges and forms round tube shape header body, and cold water pipe and semi arch orifice plate connect and compose reduced pipe UNICOM, and it is oval mouthful that the reducing pipe is connected to the arc surface upper shed;
Adopt thin-wall stainless steel sheet shearing rectangularity plate, with forcing press, be pressed into four blocks of semi arch plates that diameter is 89mm, two blocks of semi arch plates wherein are header plate (41), and header plate (41) two ends punching press has pipeline turnover connector (43);
By another two fast semi arch plates, be header orifice plate (44), header orifice plate (44) is according to cold water pipe (2) number, caliber size, at semi arch orifice plate center, stay tube pitch to divide some pipe punching press cold water pipe connectors (42) connector for oval mouthful, oval mouthful to the straight wall saddle port of arc in-flanges;
Described cold water pipe (2) arc-shaped surface stamps out the connector of oval mouthful, and described cold water is communicated with in the oval mouthful connector of pipe (7) insertion cold water pipe (2), welding serial connection connection adjacent cold water pipe (2); Cold water is communicated with pipe (7) the parallel circulation that is crisscross arranged outside header body (4), between cold water pipe (2) pipe;
F, described cold water pipe (2) mouth of pipe cuts into the shape of a saddle, insert in cold water pipe connector (42) saddle port of header orifice plate (44) semi arch orifice plate, described heating installation pipe (1) is average in cold water pipe (2) installs one, two branched or tower settings of unequal step as required, the quantity that heating installation pipe (1) is set in cold water pipe (2) is held to heating installation outlet pipe (9) end by increasing progressively or increase at double tower setting by propping up in turn from heater inlet pipe (10), reach above heating installation pipe (1) in heating installation outlet pipe (9) pipeline section and be the multichannel circulation with header inner chamber (12), increase by 35% one 100% heat transfer areas, thereby the heat of fluid is rationally utilized, strengthening conducts heat improves heat transfer effect,
The interior welding of cold water inlet/outlet pipe connecting hole (62) that G, described heating installation pipe (1) the one end mouth of pipe insert closure plate (6) is connected, heating installation pipe (1) other end inserts in the cold water pipe connector (42) of cold water pipe (2), header orifice plate (44), with cold water inlet/outlet pipe connecting hole (62) welding of opposite side closure plate (6), is connected;
Header orifice plate (44), cold water pipe (2) and closure plate (6) three unit interfaces stitchings bead are neat, at header inner chamber (12), adopt the welding of downhand welding method to be connected, cold water heat exchange outlet pipe (5), cold water inlet (8) are connected with cold water inlet/outlet pipe connecting hole (62) welding of closure plate (6);
The semi arch edges of boards of the semi arch edges of boards of header plate (41) and header orifice plate (44) merge welding and are connected, termination cover plate (3) shutoff header body (4) end, be provided with pipeline turnover connector (43) on termination cover plate (3), heating installation outlet pipe (9) and heater inlet pipe (10) and/or cold water heat exchange outlet pipe (5) cold water inlet (8) joint are welded on the upper and/or termination cover plate (3) of header plate (41), the hot fluid circulation that communicates with header body (4), the cold fluid circulation that communicates with cold water pipe (2) inner chamber, form the header hot fluid, tube chamber cold fluid water storage bearing heat exchanger,
H, described cold water pipe (2) arrange and form that even number props up or odd number props up, described header body (4) is laterally or is vertical, heater inlet pipe (10) heating installation outlet pipe (9) joint and cold water heat exchange outlet pipe (5), cold water inlet (8) all can be installed flexibly with household heating two-way pipe network or single channel pipe network, solving prior art scheme water storage type heat exchanger can only be vertical installation by header, can not header be the technological deficiency of horizontal installation.
CN201310432572.2A 2013-09-18 2013-09-18 Header thermal fluid flow passage tube cavity water-storage and pressure-bearing heat exchanger and manufacture process thereof Pending CN103486880A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201310432572.2A CN103486880A (en) 2013-09-18 2013-09-18 Header thermal fluid flow passage tube cavity water-storage and pressure-bearing heat exchanger and manufacture process thereof
CN201310747402.3A CN103673686B (en) 2013-09-18 2013-12-31 Package water storage Multi-tube heating header hot fluid heat exchanger and manufacture craft thereof
CN201410045641.9A CN103727821B (en) 2013-09-18 2014-02-08 Circle header package water storage heating installation multitube heat-conductive heat-exchanger and manufacture craft thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310432572.2A CN103486880A (en) 2013-09-18 2013-09-18 Header thermal fluid flow passage tube cavity water-storage and pressure-bearing heat exchanger and manufacture process thereof

Publications (1)

Publication Number Publication Date
CN103486880A true CN103486880A (en) 2014-01-01

Family

ID=49827303

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201310432572.2A Pending CN103486880A (en) 2013-09-18 2013-09-18 Header thermal fluid flow passage tube cavity water-storage and pressure-bearing heat exchanger and manufacture process thereof
CN201310747402.3A Active CN103673686B (en) 2013-09-18 2013-12-31 Package water storage Multi-tube heating header hot fluid heat exchanger and manufacture craft thereof
CN201410045641.9A Active CN103727821B (en) 2013-09-18 2014-02-08 Circle header package water storage heating installation multitube heat-conductive heat-exchanger and manufacture craft thereof

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201310747402.3A Active CN103673686B (en) 2013-09-18 2013-12-31 Package water storage Multi-tube heating header hot fluid heat exchanger and manufacture craft thereof
CN201410045641.9A Active CN103727821B (en) 2013-09-18 2014-02-08 Circle header package water storage heating installation multitube heat-conductive heat-exchanger and manufacture craft thereof

Country Status (1)

Country Link
CN (3) CN103486880A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107479306A (en) * 2016-06-07 2017-12-15 深圳市光峰光电技术有限公司 Color wheel device
CN113323739A (en) * 2021-07-09 2021-08-31 天津大学 Controllable engine lubricating oil cooling system and control method
CN115520397A (en) * 2022-10-13 2022-12-27 北京航空航天大学 Pressure-resistant thin-wall structure base for fixing heat exchange tube bank
CN116892844A (en) * 2020-10-09 2023-10-17 黄强初 Stainless steel quick heat exchange device

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103983130B (en) * 2014-06-03 2016-03-23 枣庄利能热水器厂 Multi-tube heating interchanger and manufacture craft thereof in header package water storage
CN105588459A (en) * 2016-03-08 2016-05-18 枣庄利能热水器厂 Instant-heating heat exchanger for pipe cavity water storage thin pipes of communication part of header bodies and shell pipes
CN105841521B (en) * 2016-05-07 2017-09-22 山东利能换热器有限公司 Tubular header body and the connected luminal part water storage instant heat exchanger of package
CN106482539B (en) * 2016-11-30 2018-11-23 山东利能换热器有限公司 Header body and package connection water storage instant heat exchanger
CN110262579A (en) * 2019-05-31 2019-09-20 西安交通大学 A kind of temprature control method
JP2021055893A (en) * 2019-09-30 2021-04-08 前澤リビング・ソリューションズ株式会社 Hot water mat for floor heating
CN112254194B (en) * 2020-10-13 2021-12-03 嘉兴尚坤科技有限公司 Floor warms up with hot-water heating heat supply formula
CN115631928B (en) * 2022-12-20 2023-03-10 江西国翔电力设备有限公司 Transformer capable of accelerating oil circulation of transformer

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5632769Y2 (en) * 1975-06-11 1981-08-04
JPH0436598A (en) * 1990-05-31 1992-02-06 Mitsubishi Electric Corp Heat exchanger
CN2351726Y (en) * 1999-02-05 1999-12-01 何世恒 Multi-purpose radiator
CN2563543Y (en) * 2002-01-11 2003-07-30 佘金山 Heat exchanging radiator
CN101013004A (en) * 2007-02-04 2007-08-08 张伟 Antiscaling heat exchanger
CN102297613A (en) * 2011-07-10 2011-12-28 张伟 Header pressure-bearing heat exchanger
CN102538514B (en) * 2012-02-12 2014-03-12 张伟 Header and heating pipe dual-channel heat-transferring heat exchanger and process for manufacturing same
CN203704730U (en) * 2013-09-18 2014-07-09 张伟 Shell and tube water storage multi-tube heating header hot fluid heat exchanger

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107479306A (en) * 2016-06-07 2017-12-15 深圳市光峰光电技术有限公司 Color wheel device
CN116892844A (en) * 2020-10-09 2023-10-17 黄强初 Stainless steel quick heat exchange device
CN113323739A (en) * 2021-07-09 2021-08-31 天津大学 Controllable engine lubricating oil cooling system and control method
CN115520397A (en) * 2022-10-13 2022-12-27 北京航空航天大学 Pressure-resistant thin-wall structure base for fixing heat exchange tube bank

Also Published As

Publication number Publication date
CN103727821B (en) 2016-01-13
CN103673686B (en) 2015-11-04
CN103673686A (en) 2014-03-26
CN103727821A (en) 2014-04-16

Similar Documents

Publication Publication Date Title
CN103486880A (en) Header thermal fluid flow passage tube cavity water-storage and pressure-bearing heat exchanger and manufacture process thereof
CN203704730U (en) Shell and tube water storage multi-tube heating header hot fluid heat exchanger
CN102878834B (en) Header binary channels cold water pipe opened type is communicated with heat absorbing heat exchanger and manufacture craft thereof
CN102914187B (en) Heat exchanger with open-type, communicated and heat-absorbing cooling water pipe
CN102322754A (en) Pipe communication splice welding pressure-bearing type heat exchanger
CN203810978U (en) Multi-tube heat conduction shell-tube water storage pressure-bearing heat exchanger of heating apparatus
CN202956007U (en) Header two-channel heat absorption heat exchanger with opening type communicated cold water pipes
CN103791738B (en) Cross over pipe pressure-bearing Multi-tube heating water storage type heat exchanger and manufacture craft thereof
CN104930884B (en) A kind of box-type heat exchanger of plurality of plates permutation and combination
CN103542745B (en) Header package water storage heating installation multitube heat-conductive heat-exchanger and manufacture craft thereof
CN103438737B (en) Shell-water-storage warm-air-pipe-bypassing-and-heat-conduction heat exchanger
CN103851936B (en) Heating installation multitube heat conduction package water storage bearing heat exchanger and manufacture craft thereof
CN104501631A (en) Header body pressure-bearing type water storage type heat exchanger
CN103542746B (en) Circle header package water storage heating installation multitube heat-conductive heat-exchanger and manufacture craft thereof
CN203605766U (en) Header shell-and-tube water storage central heating multi-tube heat conduction heat exchanger
CN105423777B (en) Header body package UNICOM directional bearing heat interchanger
CN203605765U (en) Circle header package water storage pipeline heating multiple-pipeline heat exchanger
CN203479093U (en) Shell water storage heating pipe shunting and heat conductive heat exchanger
CN201021876Y (en) Dirty prevention backwash discharge pipe heat exchanger
CN204757763U (en) Box heat exchanger of polylith board permutation and combination
CN204478882U (en) Header body pressure-bearing water storage type heat exchanger
CN203857845U (en) Internal water storage multi-pipe heating exchanger of header shell pipe
CN203810977U (en) Communication pipe pressure bearing multi-pipe heating water storage type heat exchanger
CN203810981U (en) Circular tube shaped header shell-and-tube water storage type internal multitube heating exchanger
CN102927604B (en) Header cold water pipe open communication heat absorption heat exchanger and manufacturing process thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140101