CN103485519A - Floor structure - Google Patents
Floor structure Download PDFInfo
- Publication number
- CN103485519A CN103485519A CN201310227329.7A CN201310227329A CN103485519A CN 103485519 A CN103485519 A CN 103485519A CN 201310227329 A CN201310227329 A CN 201310227329A CN 103485519 A CN103485519 A CN 103485519A
- Authority
- CN
- China
- Prior art keywords
- ground
- notch part
- floor
- parts
- skirting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Sink And Installation For Waste Water (AREA)
- Residential Or Office Buildings (AREA)
- Building Environments (AREA)
Abstract
Disclosed is a floor structure having a floor provided with a gap part used for receiving a column with high strength and good waterproof performance. The floor (2) provided with the gap part (4) used for receiving the column of a house is adjacent to the floor (2) receiving the last column. the structure includes a reinforcing frame (8) fixed to the lower surface of the floor (2) along an end edge (6) of the gap part (4); an adjusting bolt (10) assembled to the reinforcing frame (8); a skirting line component (12) fixed on the upper surface of the floor (2) along the end edge (6); and a skirting line cover (14) installed on the floor (2) in a manner of covering the skirting line component (12).
Description
Technical field
The present invention relates to for the technology on ground is set at house.
Background technology
Ground as the ground for integral bathroom is set arranges structure, in TOHKEMY 2003-278207 communique etc., has proposed by the technology of adjusting bolt etc. and improve construction operation.
Summary of the invention
Above-mentioned existing ground arranges structure and does not have the notch part for the pillar through house.If on existing ground, notch part is set, be difficult to, with high intensity and water proofing property, ground is set.
The present invention makes in view of foregoing problems, and its problem is, proposes a kind of ground structure is set, and can have the ground for the notch part through pillar with high intensity and water proofing property setting.
In order to solve foregoing problems, the present invention is that the ground that possesses following formation arranges structure.
The present invention is that a kind of ground arranges structure, uses the ground had for the notch part of the pillar through house, in abutting connection with described pillar, described ground is set, it is characterized in that, this ground arranges structure to be possessed: reinforced bulkhead is fixed to the soffit on described ground along the ora terminalis of described notch part; Adjust bolt, be mounted to described reinforced bulkhead; The skirting parts, be fixed to the upper surface on described ground along described ora terminalis; And the skirt irdome, be mounted to described ground with the state that covers described skirting parts.
In the present invention, be preferably, aforementioned ground is to excise afterwards the ground of machining gap section in shaping.
In the present invention, be preferably, between aforementioned skirting parts and aforementioned ground, clamped waterproof gasket.
The present invention plays following effect: with high intensity and water proofing property setting, have the ground for the notch part through pillar.
The accompanying drawing explanation
Fig. 1 means that the ground of one embodiment of the present invention arranges the stereogram of the major part of structure.
Fig. 2 means that the same ground arranges the sectional view of the major part of structure.
Fig. 3 roughly means that the same ground arranges the plan view of structure.
The specific embodiment
Based on embodiment explanation the present invention shown in the drawings.In Fig. 1, Fig. 2, mean that the ground of an embodiment of the invention arranges the major part of structure.Fig. 3 is for roughly meaning to arrange by this plan view of ground 2 integral body of structure installation.
The ground 2 arranged in the present embodiment, have notch part 4 in its corner portions located.As in Fig. 3 with as shown in imaginary line, the ground 2 of present embodiment has and overlooks tetragonal profile when using mould (diagram is omitted) moulding.
The ground 2 of present embodiment is processed into the pillar shape by the cutting after being shaped by its corner portions located excision, thereby forms notch part 4.Notch part 4 after excision processing is formed with overlooks L shaped ora terminalis 6(with reference to Fig. 1, Fig. 3).
In addition, in the present embodiment, after the use mould is shaped ground 2, imposes excision processing and form notch part 4, but also can when the use mould carries out the shaping on ground 2, form notch part 4.The ground 2 of in the case, using the particular manufacturing craft corresponding with the pillar of house will have notch part 4 is shaped.
For the ground 2 with notch part 4 is set, in the ground of present embodiment arranges structure, use metal reinforced bulkhead 8, adjust bolt 10, skirting parts 12, skirt irdome 14, waterproof gasket 16 etc.
Reinforced bulkhead 8 is (along the excision faces of 2 processing on ground) L shaped size shape, hollow frames made of iron of being arranged to along the ora terminalis 6 of notch part 4.Reinforced bulkhead 8 on ground 2 soffit in abutting connection with notch part 4, fix.Reinforced bulkhead 8 is 2 fixedly use bonding agent 18 and hold-down screw earthward.
Adjust the adjustment nut 22 that bolt 10 is mounted to the soffit that is welded in reinforced bulkhead 8.Adjust bolt 10 with respect to the position adjustment of adjusting nut 22 above-below directions freely.Adjust bolt 10 2 outstanding from ground downwards, by the aforementioned location adjustment, adjust bolt 10 overhang adjustment downwards freely.
Adjust the angle part that nut 22 is soldered to the central authorities of the two end portions of overlooking L shaped reinforced bulkhead 8 and this reinforced bulkhead 8.Be installed on the adjustment bolt 10 of this adjustment nut 22 as shown in Figure 3, support securely along ground the fixing metal reinforced bulkhead 8 in edge of 2 notch part 4 at three points.
That is, in the present embodiment, on ground, the peripheral part of 2 notch part 4 is with the state that clamps up and down this peripheral part fixedly reinforced bulkhead 8 and skirting parts 12, and the reinforced bulkhead 8 that is positioned at downside supports by adjusting bolt 10 at a plurality of positions.Thus, in ground 2, because of near the position notch part 4 of excision processing strength decreased, also by simple construction operation, effectively strengthened.
In addition, in the present embodiment, waterproof gasket 16 and silicones 24 are clipped between ground 2 and skirting parts 12, improve water proofing property.Hold-down screw 20 connects waterproof gasket 16.That is,, by this hold-down screw 20, reinforced bulkhead 8, ground 2, waterproof gasket 16 and skirting parts 12 are fixed integratedly.
Skirt irdome 14 is the L shaped parts of overlooking that cover the upper surface of skirting parts 12 and medial surface.Skirt irdome 14 has upper lid 26, side part cover 28, lower flange 30 and upper flange part 32.
While installing when making skirt irdome 14 cover skirting parts 12, the panel mounting surface 38(that the upper surface of the upper lid 26 that skirt irdome 14 has and ground 2 have at circumference is with reference to Fig. 1) become the same face.
The Wall board 42(of integral bathroom is with reference to Fig. 2) load the upper surface of the upper lid 26 that the 2 panel mounting surfaces 38 that have and skirt irdome 14 have in ground.
While installing when making skirt irdome 14 cover skirting parts 12, the rising wood that erects sheet 40 44 that upper flange part 32 and the ground 2 that skirt irdome 14 has has is continuous in the horizontal direction.Rising wood 44 is parts that the ora terminalis from panel mounting surface 38 extends upward.
The Wall board 42 that loads in ground 2 panel mounting surface 38 with this erect sheet 40 rising wood 44 contacts side surfaces and locate, and with the contacts side surfaces of the upper flange part 32 of skirt irdome 14 and locate.
As mentioned above, the ground of present embodiment arranges structure and uses the ground 2 had for the notch part 4 through the house pillar, be with aforementioned pillar in abutting connection with and for the ground that ground 2 is set, structure is set, possess: reinforced bulkhead 8 is fixed to the soffit on ground 2 along the ora terminalis 6 of notch part 4; Adjust bolt 10, be assemblied in reinforced bulkhead 8; Skirting parts 12, be fixed to the upper surface on ground 2 along ora terminalis 6; And skirt irdome 14, be mounted to ground 2 with the state that covers skirting parts 12.
According to this structure, structure that can be corresponding by the pillar of the house with wanting to arrange integral bathroom arranges ground 2 with high intensity and water proofing property.
In addition, in the ground of present embodiment arranges structure, ground 2 forms notch part 4 by impose excision processing after shaping.
According to this structure, at first use a plurality of ground 2 of common mould molding, respectively the ground 2 after being shaped is imposed to excision processing, thereby can form the ground 2 with multiple notch part 4.Therefore, the mould that does not need each ground 2 of manufacturing for having notch part 4 to be shaped, can arrange ground 2 by the corresponding specialized purpose-build of feature of the house with wanting to arrange integral bathroom.And, can obtain high intensity and water proofing property by the structure that ground 2 is set with low cost like this.
In addition, in the ground of present embodiment arranges structure, waterproof gasket 34 is clipped between skirting parts 12 and ground 2.By this structure, can make near notch part 4 water proofing properties further improve.
Above, based on embodiment shown in the drawings, the present invention has been described, but has the invention is not restricted to aforementioned embodiments, if in the scope of the intent of the present invention, can carry out suitable design alteration.
Symbol description:
2 ground; 4 notch parts; 6 ora terminalis; 8 reinforced bulkheads; 10 adjust bolt; 12 skirting parts; 14 skirt irdomes; 16 waterproof gaskets.
Claims (3)
1. a ground arranges structure, uses the ground had for the notch part of the pillar through house, in abutting connection with described pillar, described ground is set, and it is characterized in that, this ground arranges structure to be possessed:
Reinforced bulkhead, be fixed to the soffit on described ground along the ora terminalis of described notch part;
Adjust bolt, be mounted to described reinforced bulkhead;
The skirting parts, be fixed to the upper surface on described ground along described ora terminalis; And
The skirt irdome, be mounted to described ground with the state that covers described skirting parts.
2. ground according to claim 1 arranges structure, it is characterized in that,
Described ground forms described notch part by impose excision processing after shaping.
3. ground according to claim 1 and 2 arranges structure, it is characterized in that,
Clamped waterproof gasket between described skirting parts and described ground.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012-133643 | 2012-06-13 | ||
JP2012133643A JP5914796B2 (en) | 2012-06-13 | 2012-06-13 | Floor pan installation structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103485519A true CN103485519A (en) | 2014-01-01 |
CN103485519B CN103485519B (en) | 2015-11-04 |
Family
ID=49826072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310227329.7A Active CN103485519B (en) | 2012-06-13 | 2013-06-08 | Floor structure |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP5914796B2 (en) |
CN (1) | CN103485519B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237518A (en) * | 2017-08-09 | 2017-10-10 | 广州市海帕智能家居有限公司 | The wall bottom attachment structure node of modular assembly formula sanitary unit |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0687476U (en) * | 1993-02-02 | 1994-12-22 | 日本総合住生活株式会社 | A stand for installing a waterproof pan on the bathroom floor |
JPH074004A (en) * | 1993-06-16 | 1995-01-10 | Inax Corp | Leveling of waterproof pan |
JPH094004A (en) * | 1995-06-19 | 1997-01-07 | Bridgestone Corp | Waterproof pan installation support base |
JP2949231B1 (en) * | 1998-09-11 | 1999-09-13 | 工業技術院長 | Floor pan fixing structure |
CN2479126Y (en) * | 2001-04-29 | 2002-02-27 | 李茂连 | Skirting board |
JP2002088848A (en) * | 2000-09-21 | 2002-03-27 | Toto Ltd | Installation structure of spandrel wall counter |
JP2003278207A (en) * | 2002-03-26 | 2003-10-02 | Matsushita Electric Works Ltd | Floor pan |
CN200961345Y (en) * | 2006-06-22 | 2007-10-17 | 肖文求 | Combined skirting |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60172903U (en) * | 1984-04-25 | 1985-11-15 | 松下電工株式会社 | Drainage structure for the bath floor body and wall panels |
JPH0428945Y2 (en) * | 1987-09-12 | 1992-07-14 | ||
JP2006299776A (en) * | 2005-04-22 | 2006-11-02 | Matsushita Denko Bath & Life Kk | Water cut-off structure of unit room |
-
2012
- 2012-06-13 JP JP2012133643A patent/JP5914796B2/en active Active
-
2013
- 2013-06-08 CN CN201310227329.7A patent/CN103485519B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0687476U (en) * | 1993-02-02 | 1994-12-22 | 日本総合住生活株式会社 | A stand for installing a waterproof pan on the bathroom floor |
JPH074004A (en) * | 1993-06-16 | 1995-01-10 | Inax Corp | Leveling of waterproof pan |
JPH094004A (en) * | 1995-06-19 | 1997-01-07 | Bridgestone Corp | Waterproof pan installation support base |
JP2949231B1 (en) * | 1998-09-11 | 1999-09-13 | 工業技術院長 | Floor pan fixing structure |
JP2002088848A (en) * | 2000-09-21 | 2002-03-27 | Toto Ltd | Installation structure of spandrel wall counter |
CN2479126Y (en) * | 2001-04-29 | 2002-02-27 | 李茂连 | Skirting board |
JP2003278207A (en) * | 2002-03-26 | 2003-10-02 | Matsushita Electric Works Ltd | Floor pan |
CN200961345Y (en) * | 2006-06-22 | 2007-10-17 | 肖文求 | Combined skirting |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107237518A (en) * | 2017-08-09 | 2017-10-10 | 广州市海帕智能家居有限公司 | The wall bottom attachment structure node of modular assembly formula sanitary unit |
Also Published As
Publication number | Publication date |
---|---|
CN103485519B (en) | 2015-11-04 |
JP2013256814A (en) | 2013-12-26 |
JP5914796B2 (en) | 2016-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103597683A (en) | Grommet | |
JP5912865B2 (en) | Outer wall plate mounting bracket and outer wall plate mounting structure | |
JP6326956B2 (en) | Solar panel float | |
CN103485519A (en) | Floor structure | |
CN104249756A (en) | Cast socket structure, assemblies including the same, and methods of making and using the same | |
JP4448190B2 (en) | Fixing member for solar cell module | |
KR200475755Y1 (en) | fixing bracket | |
CN204629996U (en) | The housing assembly of air-cooled ducted air conditioner and there is its air-cooled ducted air conditioner | |
JP2017172241A (en) | Floor pan and floor pan unit | |
CN204063598U (en) | Ceiling mounting type water heater and shell thereof | |
CN216894106U (en) | Composite assembly type corner aluminum profile | |
CN204290105U (en) | A kind of distribution box mounting base | |
JP5418432B2 (en) | Ceiling panel connection structure | |
JP2015177561A (en) | housing | |
CN210276841U (en) | Electric rice cooker | |
CN203627494U (en) | Waterproof fixing structure used for bottom of vehicle | |
CN218149798U (en) | Iron angle aluminum for building aluminum template | |
CN215290544U (en) | Integral bathroom floor drain structure | |
CN201443184U (en) | Wallboard reinforcing steel | |
CN203869216U (en) | Air conditioner outdoor unit and right side module thereof | |
CN210234874U (en) | Be applied to blanking cover of backplate under B post | |
CN202966586U (en) | Sidewall type scupper | |
CN214204804U (en) | Wiring frame and mounting structure thereof | |
CN102107693A (en) | Adjustable nut plate component for bodywork | |
CN206274504U (en) | A kind of miniature circuit breaker |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160223 Address after: Osaka Japan Patentee after: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT Co.,Ltd. Address before: Osaka Japan Patentee before: Matsushita Electric Industrial Co.,Ltd. |