CN103471537B - 一种无底柱分段崩落采矿崩落体体积的测定方法 - Google Patents

一种无底柱分段崩落采矿崩落体体积的测定方法 Download PDF

Info

Publication number
CN103471537B
CN103471537B CN201310425788.6A CN201310425788A CN103471537B CN 103471537 B CN103471537 B CN 103471537B CN 201310425788 A CN201310425788 A CN 201310425788A CN 103471537 B CN103471537 B CN 103471537B
Authority
CN
China
Prior art keywords
ore
ore body
caved
volume
coefficient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310425788.6A
Other languages
English (en)
Other versions
CN103471537A (zh
Inventor
张国建
孙明磊
薛海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Science and Technology Liaoning USTL
Original Assignee
University of Science and Technology Liaoning USTL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Science and Technology Liaoning USTL filed Critical University of Science and Technology Liaoning USTL
Priority to CN201310425788.6A priority Critical patent/CN103471537B/zh
Publication of CN103471537A publication Critical patent/CN103471537A/zh
Application granted granted Critical
Publication of CN103471537B publication Critical patent/CN103471537B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开提供了一种无底柱分段崩落采矿崩落体体积的测定定方法,根据被爆矿体体积和一次松散系数确定崩落体体积。该方法首先分别测量分段高度、进路间距、崩矿步距、巷道截面宽和高,由采场结构参数求出被爆矿体的体积。其次,分别进行现场测量和实验室测量,确定出放出矿石散体的容重和被爆矿体的容重,求出放出矿石散体的极限松散系数。再根据放矿学理论,将崩落体内矿石的二次松散系数取经验值,结合放出矿石散体的极限松散系数确定出崩落体的一次松散系数。最后,由一次松散系数和被爆破矿体的体积确定出崩落体的体积。本发明对进一步地研究崩落体形态、优化结构参数、降低采准工作量、充分回收矿石资源具有重要意义。

Description

一种无底柱分段崩落采矿崩落体体积的测定方法
技术领域
本发明涉及地下金属矿山无底柱分段崩落法采矿领域,特别是一种无底柱分段崩落采矿崩落体体积的测定方法。
背景技术
无底柱分段崩落法在地下金属矿山应用广泛,其特征是在松散覆盖层岩石的覆盖下进行回采工作,用该方法采出的铁矿石量占地下采出铁矿石总量的80%左右。
崩落体是被爆矿体爆破后形成的矿石堆体,是无底柱分段崩落采矿法放矿的对象,其形态对矿石的损失贫化有很大影响。崩落体体积是崩落体形态的一个重要参量,其大小与爆破参数、结构参数、矿体性质等有关,是评价爆破效果和设计回采参数的重要参量。由于崩落体处在松散覆盖层岩石的包围中,确定其体积一直是个难题,至今还没有测定崩落体体积的方法。测定出崩落体体积,将丰富崩落体理论,对进一步地研究崩落体形态、优化结构参数、降低采准工作量、充分回收矿石资源有重要意义。
发明内容
本发明根据放出矿石散体性质和放矿学理论,提供了一种无底柱分段崩落采矿崩落体体积的测定方法。
本发明是根据被爆矿体体积和一次松散系数确定崩落体体积。首先,由采场结构参数求出被爆矿体的体积。其次,分别进行现场测量和实验室测量,计算出放出矿石散体的容重和被爆矿体的容重,求出放出矿石散体的极限松散系数。再根据放矿学理论,将崩落体内矿石的二次松散系数取一经验值,结合放出矿石散体的极限松散系数计算出崩落体的一次松散系数。最后,由一次松散系数和被爆破矿体的体积计算出崩落体的体积。
本发明包括以下步骤:
一.测量结构参数,计算被爆矿体的体积。在无底柱分段崩落采矿现场分别测量分段高度、进路间距、崩矿步距、巷道截面宽和高,设分段高度为H、进路间距为L、崩矿步距为B、巷道截面宽为b、巷道截面高为h、被爆矿体的体积为V矿体,由下式求出被爆矿体的体积:
V矿体=B·(H·L-b·h)
二.计算放出矿石散体的极限松散系数,出矿时,用铲运机铲出一满铲矿石,用台称称出矿石散体的重量W散矿,铲斗斗容为放出矿石散体的体积V散矿,放出矿石散体的容重γ散矿为:
现场取岩样,在实验室测定被爆破矿体的容重γ矿体,利用下式求出放出矿石散体的极限松散系数KjX
三.确定崩落体内矿石的二次松散系数,崩落体内矿石的二次松散系数为Kss取经验值Kss=1.066~1.100
四.计算崩落体的一次松散系数Ks。极限松散系数、二次松散系数、一次松散系数之间特定关系如下:
K S = K JX K SS
五.计算无底柱分段崩落采矿崩落体的体积V崩落体,由被爆矿体的体积与崩落体的一次松散系数求出:
V崩落体=V矿体Ks
本发明的有益效果体现在:
提供了一种无底柱分段崩落采矿崩落体体积的测定方法,填补了确定崩落体体积的空白,丰富了崩落体理论,对进一步地研究崩落体形态、优化结构参数、降低采准工作量、充分回收矿石资源具有重要意义。
附图说明
图1是无底柱分段崩落采矿工作面正面示意图;
图2是无底柱分段崩落采矿工作面侧面示意图。
图1中:1.矿体;2.覆盖层;3.回采巷道;4.被爆破矿体;5.崩落体;6.放出的矿石;7.电动铲运机;B为崩矿步距。
图2中:H为分段高度;L为进路间距;b为巷道宽度;h为巷道高度。
具体的实施方式
下面结合附图,用实施例具体描述本发明。
如图1、图2所示,某铁矿应用无底柱分段崩落法采矿工作面,工作面上分布矿体1、覆盖层2、回采巷道3、被爆破矿体4、崩落体5、放出的矿石6和电动铲运机7。测量-33m水平的结构参数为:分段高度H为18m,进路间距L为20m,崩矿步距B为2.0m,巷道截面的宽b为5.0m,高h为4.4m。电动铲运机7斗容为2m3
计算被爆矿体的体积为:
V矿体=B·(H·L-b·h)=2.0×(18×20-5.0×4.4)=676.0m3
出矿时,用电动铲动机7铲三满斗放出的矿石6,用台称称量放出矿石6的总重量为:
W散矿=6032.3+6185.7+6107.6=18325.6Kg
将铲斗斗容近似为放出矿石6的体积:V散矿=3×2=6m3
放出的矿石6的容重:
实验室测量被爆矿体4的容重为:γ矿体=4083.6Kg/,m3放出的矿石6的极限松散系数:
K JX = 4083.6 3054.3 = 1.337
二次松散系数取一经验值,KSS=1.080,
一次松散系数为:
K s = 1.337 1.080 = 1.238
最后计算无底柱分段崩落采矿崩落体5的体积为:
V崩落体=676.0×1.238=836.89m3

Claims (1)

1.一种无底柱分段崩落采矿崩落体体积的测定方法,其特征是该方法包括以下步骤:
一.测量结构参数,计算被爆破矿体的体积,在无底柱分段崩落采矿现场分别测量分段高度、进路间距、崩矿步距、巷道截面宽和高,设分段高度为H、进路间距为L、崩矿步距为B、巷道截面宽为b、巷道截面高为h、被爆破矿体的体积为V矿体,由下式求出被爆破矿体的体积:
V矿体=B·(H·L-b·h);
二.测定放出矿石的极限松散系数,出矿时,用铲运机铲出一满铲矿石,用台称称出矿石的重量W散矿,铲斗斗容为放出矿石散体的体积V散矿,放出矿石散体的容重γ散矿为:
现场取岩样,在实验室测定被爆破矿体的容重γ矿体,利用下式求出放出矿石散体的极限松散系数KJX
三.确定崩落体内矿石的二次松散系数,崩落体内矿石的二次松散系数为Kss,取经验值Kss=1.066~1.100;
四.计算崩落体的一次松散系数Ks,极限松散系数、二次松散系数、一次松散系数之间特定关系如下:
K s = K JX K ss ;
五.计算无底柱分段崩落采矿崩落体的体积由被爆破矿体的体积与崩落体的一次松散系数按下式求出:
CN201310425788.6A 2013-09-17 2013-09-17 一种无底柱分段崩落采矿崩落体体积的测定方法 Active CN103471537B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310425788.6A CN103471537B (zh) 2013-09-17 2013-09-17 一种无底柱分段崩落采矿崩落体体积的测定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310425788.6A CN103471537B (zh) 2013-09-17 2013-09-17 一种无底柱分段崩落采矿崩落体体积的测定方法

Publications (2)

Publication Number Publication Date
CN103471537A CN103471537A (zh) 2013-12-25
CN103471537B true CN103471537B (zh) 2015-11-25

Family

ID=49796491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310425788.6A Active CN103471537B (zh) 2013-09-17 2013-09-17 一种无底柱分段崩落采矿崩落体体积的测定方法

Country Status (1)

Country Link
CN (1) CN103471537B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106246183B (zh) * 2016-07-25 2018-03-30 辽宁科技大学 一种确定无底柱分段崩落法崩落体形态的方法
CN108385644A (zh) * 2018-01-31 2018-08-10 北京城建勘测设计研究院有限责任公司 一种岩土松散系数测试方法
CN110031604A (zh) * 2019-03-16 2019-07-19 驿涛建工股份有限公司 一种岩土高效采样装置及其采样方法
CN113076507B (zh) * 2021-04-01 2024-02-13 东北大学 一种测定无底柱分段崩落法爆破距离的装置及方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4216998A (en) * 1979-05-31 1980-08-12 Bowen Ray J Method of underground mining by pillar extraction
CN1776361A (zh) * 2005-11-18 2006-05-24 宝钢集团上海梅山有限公司 不规则形状大块矿岩体积估计方法
CN102419139A (zh) * 2011-08-15 2012-04-18 辽宁科技大学 一种带钢混结构人工假顶的无底柱分段崩落法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4216998A (en) * 1979-05-31 1980-08-12 Bowen Ray J Method of underground mining by pillar extraction
CN1776361A (zh) * 2005-11-18 2006-05-24 宝钢集团上海梅山有限公司 不规则形状大块矿岩体积估计方法
CN102419139A (zh) * 2011-08-15 2012-04-18 辽宁科技大学 一种带钢混结构人工假顶的无底柱分段崩落法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Block geometry and rockmass characterization for prediction of dilution potential into sub-level cave mine voids;Katherine S. et al.;《International Journal of Rock Mechanics & Mining Sciences》;20071126;第929-940页 *
无底柱分段崩落法放出体、松动体、崩落体三者关系模型;张国建 等;《中国矿业》;20100331;第19卷(第3期);第69-71页 *

Also Published As

Publication number Publication date
CN103471537A (zh) 2013-12-25

Similar Documents

Publication Publication Date Title
CN105092816B (zh) 一种三维多煤层开采相似材料模型实验系统
CN103471537B (zh) 一种无底柱分段崩落采矿崩落体体积的测定方法
CN103513281A (zh) 固体充填采煤覆岩导水裂隙带发育高度预计方法
CN103902780A (zh) 固体充填采煤地表变形预计方法
CN102678118A (zh) 采场垮落带高度的确定方法
CN104240133B (zh) 地采转露采矿山采空区崩落爆破处理效果验收方法
CN105464700A (zh) 综采-充填混合开采工作面充填段长度确定方法
CN106246183A (zh) 一种确定无底柱分段崩落法崩落体形态的方法
CN108776065A (zh) 一种采动诱导采空区侧向硬顶失稳产生的动载预测方法
CN105673014A (zh) 坚硬顶板跳采工作面冲击地压控制方法
CN207379424U (zh) 一种下向炮孔深度测量装置
Wang et al. Calculation and management for mining loss and dilution under 3D visualization technical condition
Luo et al. Safe roof thickness and span of stope under complex filling body
CN105971630A (zh) 一种近距离煤层巷道顶板冒落防治方法
CN106815445A (zh) 一种浅埋煤层区段煤柱载荷计算模型及其计算方法
Zhao et al. Stability of boundary pillars in transition from open pit to underground mining
Xia et al. Numerical-modeling-based assessment of the impact of two-end-type cable support on failure characteristics of yield pillars
Liu et al. Characteristics analysis of roof overburden fracture in thick coal seam in deep mining and engineering application of super high water material in backfill mining
GUO et al. Relationship between surface subsidence factor and mining depth of strip pillar mining
CN114017103A (zh) 一种长壁逐巷胶结充填采煤工作面参数设计方法
Li et al. Skewed Pressure Characteristics of Equivalent Load in Double-Arch Tunnel.
CN103382841B (zh) 覆盖岩层下低贫化放矿定量控制方法
Day et al. Validation of Composite Geological Strength Index for healed rockmass structure in deep mine access and production tunnels
CN111008758B (zh) 基于双指标权重法的特厚煤层沿空煤巷开掘时间设计方法
CN211623426U (zh) 基于脉外采准探采结合的隐伏破碎残矿安全高效开采结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant