CN103457871B - Dcn中基于延迟约束的拥塞避免阶段的增窗方法 - Google Patents
Dcn中基于延迟约束的拥塞避免阶段的增窗方法 Download PDFInfo
- Publication number
- CN103457871B CN103457871B CN201310426291.6A CN201310426291A CN103457871B CN 103457871 B CN103457871 B CN 103457871B CN 201310426291 A CN201310426291 A CN 201310426291A CN 103457871 B CN103457871 B CN 103457871B
- Authority
- CN
- China
- Prior art keywords
- window
- current
- data
- network congestion
- size
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 230000005540 biological transmission Effects 0.000 claims description 5
- 238000004364 calculation method Methods 0.000 claims description 4
- 230000007246 mechanism Effects 0.000 claims description 4
- 208000027744 congestion Diseases 0.000 abstract description 12
- 238000004891 communication Methods 0.000 abstract description 9
- 238000010586 diagram Methods 0.000 description 7
- 230000008569 process Effects 0.000 description 7
- 101150011264 setB gene Proteins 0.000 description 6
- 238000002474 experimental method Methods 0.000 description 5
- 230000035945 sensitivity Effects 0.000 description 4
- 230000006872 improvement Effects 0.000 description 3
- 230000004044 response Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000011056 performance test Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000003416 augmentation Effects 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/50—Reducing energy consumption in communication networks in wire-line communication networks, e.g. low power modes or reduced link rate
Landscapes
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310426291.6A CN103457871B (zh) | 2013-09-18 | 2013-09-18 | Dcn中基于延迟约束的拥塞避免阶段的增窗方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310426291.6A CN103457871B (zh) | 2013-09-18 | 2013-09-18 | Dcn中基于延迟约束的拥塞避免阶段的增窗方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103457871A CN103457871A (zh) | 2013-12-18 |
CN103457871B true CN103457871B (zh) | 2016-03-30 |
Family
ID=49739841
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310426291.6A Active CN103457871B (zh) | 2013-09-18 | 2013-09-18 | Dcn中基于延迟约束的拥塞避免阶段的增窗方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103457871B (zh) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104009931B (zh) * | 2014-06-13 | 2017-07-14 | 中南大学 | 数据中心网络中基于通告窗口和多流协同的拥塞控制方法 |
CN104767691B (zh) * | 2015-04-02 | 2017-11-28 | 哈尔滨工程大学 | 一种基于概率转发的Web防火墙拥塞控制方法 |
CN105024946A (zh) * | 2015-06-16 | 2015-11-04 | 清华大学 | 一种基于滑动窗口的带宽分配方法、装置和系统 |
CN105827540B (zh) * | 2016-05-30 | 2018-11-02 | 清华大学深圳研究生院 | 一种基于优先级的数据中心网络传输层数据流传输方法 |
CN106059951B (zh) * | 2016-06-08 | 2019-03-01 | 中南大学 | 一种用于dcn中基于多级拥塞反馈的传输控制方法 |
CN105978822A (zh) * | 2016-07-15 | 2016-09-28 | 福州大学 | 一种数据中心中基于时限敏感和往返时延的拥塞控制方法 |
CN106385376B (zh) * | 2016-08-31 | 2019-06-07 | 孙广路 | 一种基于连续化模型的网络拥塞控制方法 |
CN106302228B (zh) * | 2016-10-18 | 2019-06-04 | 中南大学 | 一种数据中心网络中基于任务感知的传输控制方法 |
CN106911583A (zh) * | 2017-03-14 | 2017-06-30 | 国网四川省电力公司经济技术研究院 | 一种显式反馈拥塞程度滑动平均值的传输层拥塞控制方法 |
CN107770082B (zh) * | 2017-10-19 | 2020-05-12 | 中南大学 | 数据中心网络中一种基于任务流量特性的传输控制方法 |
CN110661723B (zh) * | 2018-06-29 | 2023-08-22 | 华为技术有限公司 | 一种数据传输方法、计算设备、网络设备及数据传输系统 |
CN109067665B (zh) * | 2018-09-25 | 2022-01-11 | 华为技术有限公司 | 拥塞控制方法和网络设备 |
CN113098782B (zh) * | 2021-03-22 | 2022-08-30 | 武汉大学 | 一种网络拥塞的控制方法和计算机设备 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101964755A (zh) * | 2010-11-03 | 2011-02-02 | 中南大学 | 高带宽延时网络中基于带宽估计的显式拥塞控制方法 |
CN103051554A (zh) * | 2013-01-05 | 2013-04-17 | 北京航空航天大学 | 基于吞吐量变化率和ecn机制的tcp拥塞控制方法 |
-
2013
- 2013-09-18 CN CN201310426291.6A patent/CN103457871B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101964755A (zh) * | 2010-11-03 | 2011-02-02 | 中南大学 | 高带宽延时网络中基于带宽估计的显式拥塞控制方法 |
CN103051554A (zh) * | 2013-01-05 | 2013-04-17 | 北京航空航天大学 | 基于吞吐量变化率和ecn机制的tcp拥塞控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103457871A (zh) | 2013-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103457871B (zh) | Dcn中基于延迟约束的拥塞避免阶段的增窗方法 | |
TWI487389B (zh) | 避免網路壅塞的方法及其裝置 | |
Vamanan et al. | Deadline-aware datacenter tcp (d2tcp) | |
Liu et al. | TCP-Illinois: A loss and delay-based congestion control algorithm for high-speed networks | |
CN104954279B (zh) | 一种传输控制方法、装置及系统 | |
CN104185298B (zh) | 基于优先级的网络负载动态自适应参数调整方法 | |
Kim et al. | Network coded tcp (ctcp) | |
KR102478440B1 (ko) | 혼잡 제어 방법 및 네트워크 디바이스 | |
CN101052043B (zh) | 一种基于发送窗口与往返时间的tcp发送方法 | |
CN110445722B (zh) | 拥塞控制方法、装置、设备及存储介质 | |
CN110808884B (zh) | 一种网络拥塞控制方法 | |
CN103795643B (zh) | 数据中心网络中处理同步优先级突发流的方法 | |
CN106533970A (zh) | 面向云计算数据中心网络的差分流传输控制方法及装置 | |
JP2004538719A (ja) | 非線形高スケーラブル増加−減少輻輳制御機構を提供する方法 | |
JPWO2008023656A1 (ja) | 通信装置 | |
Li et al. | Buffer sizing for 802.11-based networks | |
WO2019144802A1 (zh) | 一种数据的传输方法及其相关设备 | |
CN103297346B (zh) | 一种基于ecn机制的tcp友好速率控制方法 | |
CN105376172A (zh) | 一种控制网络拥塞的方法 | |
CN113783785A (zh) | Ecn水线值的配置方法、装置及网络设备 | |
Xia et al. | Active queue management with dual virtual proportional integral queues for TCP uplink/downlink fairness in infrastructure WLANs | |
CN105472655B (zh) | 一种拥塞窗口的调整方法、相关装置和系统 | |
Chen et al. | Improved performance with adaptive Dly-ACK for IEEE 802.15. 3 WPAN over UWB PHY | |
Su et al. | DVPTCP: A delay-driven virtual parallel TCP for high-speed and lossy networks | |
Deng et al. | Mip: Minimizing the idle period of data transmission in data center networks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20161222 Address after: 410000 room 101-107, building No. 586, Dongfanghong Road, Changsha, Hunan, China Patentee after: HUNAN HETT INFORMATION TECHNOLOGY CO.,LTD. Address before: Yuelu District City, Hunan province 410083 Changsha Lushan Road No. 932 Patentee before: Central South University |
|
CB03 | Change of inventor or designer information |
Inventor after: Chen Yafang Inventor after: Li Zhengjun Inventor before: Wang Jianxin Inventor before: Zhang Tao Inventor before: Huang Jiawei |
|
COR | Change of bibliographic data | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170401 Address after: 410000 Changsha Province, Yuhua District, the people of the East Road, No. 46, Ming Cheng Building, No. 2118 Patentee after: HUNAN NEW CLOUDNET TECHNOLOGY Co.,Ltd. Address before: 410000 room 101-107, building No. 586, Dongfanghong Road, Changsha, Hunan, China Patentee before: HUNAN HETT INFORMATION TECHNOLOGY CO.,LTD. |
|
TR01 | Transfer of patent right | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 410000 Yuelu District Yuelu street, Changsha, Hunan Province, 5 left 101 rooms of R & D headquarters of Central South University Science Park. Patentee after: HUNAN NEW CLOUDNET TECHNOLOGY Co.,Ltd. Address before: 410000 No. 2118, Ming Cheng mansion, 46 Renmin East Road, Yuhua District, Changsha, Hunan Patentee before: HUNAN NEW CLOUDNET TECHNOLOGY Co.,Ltd. |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Window increasing method based on deferred constraint at congestion avoidance stage in data communication network (DCN) Effective date of registration: 20200602 Granted publication date: 20160330 Pledgee: Pudong Development Bank of Shanghai Limited by Share Ltd. Changsha branch Pledgor: HUNAN NEW CLOUDNET TECHNOLOGY Co.,Ltd. Registration number: Y2020980002707 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20210915 Granted publication date: 20160330 Pledgee: Pudong Development Bank of Shanghai Limited by Share Ltd. Changsha branch Pledgor: HUNAN NEW CLOUDNET TECHNOLOGY Co.,Ltd. Registration number: Y2020980002707 |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 410000 Yuelu District Yuelu street, Changsha, Hunan Province, 5 left 101 rooms of R & D headquarters of Central South University Science Park. Patentee after: New Cloud Technology Group Co.,Ltd. Country or region after: China Address before: 410000 Yuelu District Yuelu street, Changsha, Hunan Province, 5 left 101 rooms of R & D headquarters of Central South University Science Park. Patentee before: HUNAN NEW CLOUDNET TECHNOLOGY Co.,Ltd. Country or region before: China |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: Window Increasing Method for Congestion Avoidance Stage Based on Delay Constraints in DCN Granted publication date: 20160330 Pledgee: Agricultural Bank of China Limited Changsha Yuhua District sub branch Pledgor: New Cloud Technology Group Co.,Ltd. Registration number: Y2024980048365 |