CN103456700A - 一种晶闸管快换冷却固定装置 - Google Patents

一种晶闸管快换冷却固定装置 Download PDF

Info

Publication number
CN103456700A
CN103456700A CN2013101516431A CN201310151643A CN103456700A CN 103456700 A CN103456700 A CN 103456700A CN 2013101516431 A CN2013101516431 A CN 2013101516431A CN 201310151643 A CN201310151643 A CN 201310151643A CN 103456700 A CN103456700 A CN 103456700A
Authority
CN
China
Prior art keywords
thyristor
copper plate
cooling
thyristors
refrigerating seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101516431A
Other languages
English (en)
Other versions
CN103456700B (zh
Inventor
阙伯勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KUNSHAN LIANGXIN ENVIRONMENTAL PROTECTION ENERGY-SAVING Co Ltd
Original Assignee
KUNSHAN LIANGXIN ENVIRONMENTAL PROTECTION ENERGY-SAVING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KUNSHAN LIANGXIN ENVIRONMENTAL PROTECTION ENERGY-SAVING Co Ltd filed Critical KUNSHAN LIANGXIN ENVIRONMENTAL PROTECTION ENERGY-SAVING Co Ltd
Priority to CN201310151643.1A priority Critical patent/CN103456700B/zh
Publication of CN103456700A publication Critical patent/CN103456700A/zh
Priority to PCT/CN2014/075708 priority patent/WO2014173255A1/zh
Application granted granted Critical
Publication of CN103456700B publication Critical patent/CN103456700B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种晶闸管快换冷却固定装置,包括冷却座、导电铜板、晶闸管、压力调整装置和连接装置,其特征在于:所述连接装置依次将上冷却座、上导电铜板、下导电铜板和下冷却座固定连接,在上导电铜板和下导电铜板之间夹持有两个晶闸管,在两个晶闸管之间设置有中冷却座,在上冷却座上设置有位于晶闸管中心顶端的压力调整装置,所述冷却座采用具有导电性和导热性的材料制成。本发明解决了晶闸管安装不紧凑以及散热不好而导致的晶闸管烧坏,从而导致设备生产中断的问题,提供了一种结构简单、维护方便、散热效果强、占用空间小的晶闸管快换冷却固定装置。

Description

一种晶闸管快换冷却固定装置
技术领域
本发明涉及一种晶闸管快换冷却固定装置,属于机械技术领域。
背景技术
变频装置是一种普遍的电源供应装置,而对于大功率的变频装置,采用的晶闸管也就要通过相对大的电压和电流,需要冷却才能保证正常工作。市场上也有许多形式的晶闸管固定架,晶闸管安装不紧凑以及散热不好而导致的晶闸管烧坏,从而导致设备生产中断,损失大量的时间和人工成本。还有就是市场上的晶闸管固定架占用体积大,更换不方便。
发明内容
为了克服现有技术中存在的不足,本发明提供了一种结构简单、维护方便、散热效果强、占用空间小的晶闸管快换冷却固定装置。
为解决上述技术问题,本发明采用的技术方案为:
一种晶闸管快换冷却固定装置,包括压力调整装置和连接装置,其特征在于:所述连接装置依次将上冷却座、上导电铜板、下导电铜板和下冷却座固定连接,在上导电铜板和下导电铜板之间夹持有两个晶闸管,在两个晶闸管之间设置有中冷却座,在上冷却座上设置有位于晶闸管中心顶端的压力调整装置,所述冷却座采用具有导电性和导热性的材料制成。
前述的一种晶闸管快换冷却固定装置,其特征在于:还包括中心固定装置,在晶闸管上设置有使晶闸管处于冷却座中心位置的中心固定装置。
前述的一种晶闸管快换冷却固定装置,其特征在于:还包括压板,在上冷却座与压力调整装置之间设置有压板,所述压板采用非导磁性材料制成。
前述的一种晶闸管快换冷却固定装置,其特征在于:所述冷却座上设置有进水口和出水口。
前述的一种晶闸管快换冷却固定装置,其特征在于:所述连接装置采用固定螺杆,所述固定螺杆依次穿过上冷却座、上导电铜板、下导电铜板和下冷却座并用螺母固定连接,所述固定螺杆采用非导磁性材料制成。
前述的一种晶闸管快换冷却固定装置,其特征在于:在固定螺杆外表面套设有绝缘套管。
前述的一种晶闸管快换冷却固定装置,其特征在于:所述导电铜板为L型导电铜板。
本发明的有益效果是:本发明晶闸管快换冷却固定装置的导电铜板既充当导电体又充当结构体起支撑作用,简化了结构。而冷却座既作为导体,有作为晶闸管的冷却体,进一步简化了结构,同时散热效果也较好。在晶闸管拆卸时,将压力调整装置将压力调整到最小,然后将中心固定装置和晶闸管一起用手取出,再取出中心固定装置,得到晶闸管;装晶闸管时,先将中心固定装置装到晶闸管上,然后一起放进固定装置内,最后通过压力调整装置将压力调整到合适压力即完成更换,更换快速,维修十分方便。
附图说明
图1为本发明晶闸管快换冷却固定装置晶闸管组合结构示意图。
图2为本发明晶闸管快换冷却固定装置晶闸管拆卸结构示意图。
具体实施方式
下面结合附图对本发明作进一步的描述。
如图1-2所示,一种晶闸管快换冷却固定装置,包括连接装置1、压力调整装置2、上冷却座3、中冷却座4、下冷却座5、上导电铜板6、下导电铜板7、上晶闸管8、下晶闸管9、中心固定装置10和压板11。冷却座采用具有导电性和导热性的材料制成,冷却座上设置有进水口和出水口,用于对晶闸管进行水冷。连接装置1可采用固定螺杆,固定螺杆依次穿过上冷却座3、上导电铜板6、下导电铜板7和下冷却座5并用螺母固定连接,固定螺杆采用非导磁性材料制成,在固定螺杆外表面套设有绝缘套管。
在上导电铜板6和下导电铜板6之间夹持有上晶闸管8、下晶闸管9,在上晶闸管8、下晶闸管9之间设置有中冷却座4,在上冷却座3上设置有位于晶闸管中心顶端的压力调整装置2。在上冷却座3与压力调整装置2之间设置有压板11,所述压板11采用非导磁性材料制成。在晶闸管上设置有使晶闸管处于冷却座中心位置的中心固定装置10。设计时可将上导电铜板6、下导电铜板7设计为L型导电铜板,且上导电铜板6、下导电铜板7安装开口方向相反。
晶闸管拆卸时,将压力调整装置2将压力调整到最小,然后将中心固定装置10和晶闸管一起用手取出,再将晶闸管从中心固定装置10上取出即完成拆卸;晶闸管安装时,先将中心固定装置10装到晶闸管上,然后一起放进固定装置内,再通过压力调整装置2将压力调整到合适压力即完成装配;以上拆装即完成一个更换的过程,安装拆卸速度快,维修十分方便。
本发明晶闸管快换冷却固定装置的导电铜板既充当导电体又充当结构体起支撑作用,简化了结构。而冷却座既作为导体,有作为晶闸管的冷却体,进一步简化了结构,同时散热效果也较好。
以上显示和描述了本发明的基本原理、主要特征及优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (7)

1.一种晶闸管快换冷却固定装置,包括压力调整装置和连接装置,其特征在于:所述连接装置依次将上冷却座、上导电铜板、下导电铜板和下冷却座固定连接,在上导电铜板和下导电铜板之间夹持有两个晶闸管,在两个晶闸管之间设置有中冷却座,在上冷却座上设置有位于晶闸管中心顶端的压力调整装置,所述冷却座采用具有导电性和导热性的材料制成。
2.根据权利要求1所述的一种晶闸管快换冷却固定装置,其特征在于:还包括中心固定装置,在晶闸管上设置有使晶闸管处于冷却座中心位置的中心固定装置。
3.根据权利要求2所述的一种晶闸管快换冷却固定装置,其特征在于:还包括压板,在上冷却座与压力调整装置之间设置有压板,所述压板采用非导磁性材料制成。
4.根据权利要求3所述的一种晶闸管快换冷却固定装置,其特征在于:所述冷却座上设置有进水口和出水口。
5.根据权利要求4所述的一种晶闸管快换冷却固定装置,其特征在于:所述连接装置采用固定螺杆,所述固定螺杆依次穿过上冷却座、上导电铜板、下导电铜板和下冷却座并用螺母固定连接,所述固定螺杆采用非导磁性材料制成。
6.根据权利要求5所述的一种晶闸管快换冷却固定装置,其特征在于:在固定螺杆外表面套设有绝缘套管。
7.根据权利要求6所述的一种晶闸管快换冷却固定装置,其特征在于:所述导电铜板为L型导电铜板。
CN201310151643.1A 2013-04-22 2013-04-27 一种晶闸管快换冷却固定装置 Expired - Fee Related CN103456700B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201310151643.1A CN103456700B (zh) 2013-04-27 2013-04-27 一种晶闸管快换冷却固定装置
PCT/CN2014/075708 WO2014173255A1 (zh) 2013-04-22 2014-04-18 一种晶闸管快换冷却固定装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310151643.1A CN103456700B (zh) 2013-04-27 2013-04-27 一种晶闸管快换冷却固定装置

Publications (2)

Publication Number Publication Date
CN103456700A true CN103456700A (zh) 2013-12-18
CN103456700B CN103456700B (zh) 2016-04-06

Family

ID=49738918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310151643.1A Expired - Fee Related CN103456700B (zh) 2013-04-22 2013-04-27 一种晶闸管快换冷却固定装置

Country Status (1)

Country Link
CN (1) CN103456700B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014173255A1 (zh) * 2013-04-22 2014-10-30 五力机电科技(昆山)有限公司 一种晶闸管快换冷却固定装置

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4097036A (en) * 1977-05-04 1978-06-27 Bbc Brown, Boveri & Company, Limited Clamping device for a thermally and electrically pressure-contacted semiconductor component in disk-cell construction
CN2648605Y (zh) * 2003-08-22 2004-10-13 北京金自天正智能控制股份有限公司 水冷平板型电力电子半导体器件组件
CN2648597Y (zh) * 2003-08-22 2004-10-13 北京金自天正智能控制股份有限公司 平板型电力电子半导体器件组件
CN2745331Y (zh) * 2004-06-01 2005-12-07 宝山钢铁股份有限公司 大容量晶闸管辅助安装工具
CN1753181A (zh) * 2005-09-13 2006-03-29 中国电力科学研究院 串联晶闸管阀组定压机构
CN2809871Y (zh) * 2005-04-20 2006-08-23 中国电力科学研究院 晶闸管安装的碟簧压紧机构
CN101290931A (zh) * 2008-05-30 2008-10-22 中国电力科学研究院 一种大功率自冷式晶闸管阀及其安装用车
JP2009200128A (ja) * 2008-02-20 2009-09-03 Jfe Steel Corp サイリスタスタック
CN201663554U (zh) * 2009-09-21 2010-12-01 Abb瑞士有限公司 高功率整流器
CN102027593A (zh) * 2008-04-29 2011-04-20 西门子公司 具有两个并排布置的半导体元件的冷却装置
CN202796914U (zh) * 2012-09-14 2013-03-13 大力电工襄阳股份有限公司 一种晶闸管串联的装配组件
CN203398098U (zh) * 2013-04-27 2014-01-15 昆山良昕环保节能有限公司 一种晶闸管快换冷却固定装置

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4097036A (en) * 1977-05-04 1978-06-27 Bbc Brown, Boveri & Company, Limited Clamping device for a thermally and electrically pressure-contacted semiconductor component in disk-cell construction
CN2648605Y (zh) * 2003-08-22 2004-10-13 北京金自天正智能控制股份有限公司 水冷平板型电力电子半导体器件组件
CN2648597Y (zh) * 2003-08-22 2004-10-13 北京金自天正智能控制股份有限公司 平板型电力电子半导体器件组件
CN2745331Y (zh) * 2004-06-01 2005-12-07 宝山钢铁股份有限公司 大容量晶闸管辅助安装工具
CN2809871Y (zh) * 2005-04-20 2006-08-23 中国电力科学研究院 晶闸管安装的碟簧压紧机构
CN1753181A (zh) * 2005-09-13 2006-03-29 中国电力科学研究院 串联晶闸管阀组定压机构
JP2009200128A (ja) * 2008-02-20 2009-09-03 Jfe Steel Corp サイリスタスタック
CN102027593A (zh) * 2008-04-29 2011-04-20 西门子公司 具有两个并排布置的半导体元件的冷却装置
CN101290931A (zh) * 2008-05-30 2008-10-22 中国电力科学研究院 一种大功率自冷式晶闸管阀及其安装用车
CN201663554U (zh) * 2009-09-21 2010-12-01 Abb瑞士有限公司 高功率整流器
CN202796914U (zh) * 2012-09-14 2013-03-13 大力电工襄阳股份有限公司 一种晶闸管串联的装配组件
CN203398098U (zh) * 2013-04-27 2014-01-15 昆山良昕环保节能有限公司 一种晶闸管快换冷却固定装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014173255A1 (zh) * 2013-04-22 2014-10-30 五力机电科技(昆山)有限公司 一种晶闸管快换冷却固定装置

Also Published As

Publication number Publication date
CN103456700B (zh) 2016-04-06

Similar Documents

Publication Publication Date Title
CN105376876B (zh) 一种石英灯辐射加热器及其设计方法
CN203398098U (zh) 一种晶闸管快换冷却固定装置
CN202254474U (zh) 一种半导体制冷或制热模块
CN103456700A (zh) 一种晶闸管快换冷却固定装置
CN207098243U (zh) 一种电加热旋转窑的电输入装置
CN202406318U (zh) 一种聚能板
CN201986171U (zh) 节能恒温电热取暖装置集成发热体
CN208328103U (zh) 运行稳定的mocvd加热器
CN103151624A (zh) 配电变压器套管引线螺杆与线路导线连接线夹
CN203247182U (zh) 一种三相硅碳棒
CN103924051B (zh) 一种汽车稳定杆加热机电极夹具组件
CN207026402U (zh) 汽车门板热铆装置
CN203118519U (zh) 一种大面积自散热铜母线
CN205304620U (zh) 一种双面轴式压装结构的碳化硅用整流器
CN209013762U (zh) 一种移动式水冷导电铜板
CN104122293A (zh) 超热导地暖管升温一致性检测装置
CN203853740U (zh) 加热装辊装置
CN209390392U (zh) 一种可防止过热损坏的加热管
CN204665630U (zh) 液体电阻电加热器及其功率调节装置
CN219267423U (zh) 具有改进结构的电子变压器
CN208562591U (zh) 单晶硅加热器
CN203218082U (zh) 变压器导电杆线夹
CN203464752U (zh) 刚玉冶炼炉双接头电极水冷把持器
CN208332670U (zh) 电加热气体加热器
CN202610269U (zh) 双工位切换装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406

Termination date: 20170427