CN103453216A - Trenchless construction method of multi-pore high-density polyethylene pipeline - Google Patents

Trenchless construction method of multi-pore high-density polyethylene pipeline Download PDF

Info

Publication number
CN103453216A
CN103453216A CN2013103632757A CN201310363275A CN103453216A CN 103453216 A CN103453216 A CN 103453216A CN 2013103632757 A CN2013103632757 A CN 2013103632757A CN 201310363275 A CN201310363275 A CN 201310363275A CN 103453216 A CN103453216 A CN 103453216A
Authority
CN
China
Prior art keywords
pipeline
hauling pipe
boring
construction method
pore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103632757A
Other languages
Chinese (zh)
Other versions
CN103453216B (en
Inventor
赵自亮
成志辉
苏剑良
张海钊
李慧莹
邓迎芳
刘功勋
刘建斌
赵炬辉
刘炎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Hengsheng Construction Engineering Co Ltd
Original Assignee
Guangzhou Hengsheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hengsheng Construction Engineering Co Ltd filed Critical Guangzhou Hengsheng Construction Engineering Co Ltd
Priority to CN201310363275.7A priority Critical patent/CN103453216B/en
Publication of CN103453216A publication Critical patent/CN103453216A/en
Application granted granted Critical
Publication of CN103453216B publication Critical patent/CN103453216B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a trenchless construction method of a multi-pore high-density polyethylene pipeline. Through utilizing one drill hole, pipelines to be laid can be dragged in the drill hole for many times through a horizontal directional drilling machine, when the pipelines are dragged at each time, one pull level is synchronously dragged along with the pipelines, the pull level is used for dragging the pipelines for the next time, and so forth, all pipelines are laid. According to a method of laying the pipeline provided by the invention, multi-pore pipeline laying can be carried out under the conditions of limited construction field and insufficient pull strength of the device, so that independence of construction on equipment performance is reduced, an application range of small and middle devices is greatly expanded, and the method has practical significance. The trenchless construction method is applied to a power communication project, a project of laying the multi-pore high-density polyethylene pipeline (HDPE pipeline) by adopting the small and middle devices, and is particularly applied to a project with only one boring construction position under the condition of limited construction field.

Description

The non-excavating construction method of a kind of multitube hole high-density polytene pipeline
Technical field
The present invention relates to a kind of method of construction in the Construction Technology research field, particularly relate to a kind of non-excavation horizontal directional drilling method of construction that limited, equipment pull-back force lays multitube hole high-density polytene pipeline when not enough on construction ground.
Background technique
While for high density polyethylene (HDPE) pipelines such as electric power, communications, adopting non-excavation horizontal directional drilling to be laid, usually need to lay multitube hole (several holes, tens holes are tens holes even) pipeline simultaneously.In general, according to the size of the capacity of equipment (mainly referring to pull-back force) of horizontal directional drilling machine, will intend channelling and be divided into two groups, three groups or many groups, every group of pilot hole of construction separately, carry out pilot hole, reaming and the hauling pipe of pulling back.For assuring success, the pull-back force of every group of pipeline all must be controlled in the limit of power of equipment.Simultaneously, between each pilot hole, will keep certain safe distance, pipeline suffers damage when avoiding constructing.Traditional form of construction work speed of application of the many pilot holes of this grouping is slower, has also taken a large amount of Underground Space Resources.
Because urban underground space resource is limited, many times construction site is comparatively narrow, does not have a plurality of pilot hole execution conditions, the pilot hole of often can only constructing; And in such cases, multitube returns the practical capacity of dragging and may exceed equipment simultaneously, locking or lock of tool drilling easily appear in hauling pipe, thereby cause project failure.Therefore, for above-mentioned execution conditions, find the method for construction of a kind of " can overcome the technology barrier of middle-size and small-size equipment pull-back force deficiency, carry out the pipe laying of multitube hole ", there is realistic meaning.
Summary of the invention
Purpose of the present invention, be to provide a kind of non-excavation horizontal directional drilling method of construction that limited, equipment pull-back force lays multitube hole high-density polytene pipeline when not enough on construction ground.
The solution that the present invention solves its technical problem is: the non-excavating construction method of a kind of multitube hole high-density polytene pipeline, by utilizing same boring, with horizontal directional drilling machine, by the pipeline of intending laying, pull into successively in boring several times, during each hauling pipe, synchronously pull a drawbar into together with pipeline, this drawbar is as hauling pipe is used next time, so repeated multiple times, until all pipe laying is complete.
As further improvement in the technical proposal, comprise the following steps,
1) press construction requirement construction guidance hole in precalculated position;
2) classification is carried out repeatedly reaming to pilot hole, until bore diameter meets the hauling pipe requirement of multitube hole;
3) utilize the drilling rod of last reaming to carry out hauling pipe for the first time, the part of pore number for all intending laying the pore number, in hauling pipe, pull a drawbar into together with pipeline;
4) utilize this drawbar, in boring, carry out hauling pipe for the second time, in hauling pipe, together with pipeline, again pull a drawbar into;
5) repeating step 4), until the tubine road that remains is pulled in boring;
6) detect the state of the boring interior conduit that is laid in.
As further improvement in the technical proposal, in step 2) in, the final diameter of described boring is 1.2 ~ 1.5 times of external envelope diameters of all intending channelling.
As further improvement in the technical proposal, in step 3), the pore number of hauling pipe is generally the 4-8 pore for the first time.
As further improvement in the technical proposal, in step 4) and 5) in, the pore number of hauling pipe is generally 1 ~ 2 pore again.
As further improvement in the technical proposal, in step 6), the flat tube detected is carried out to the expand tube processing.
The invention has the beneficial effects as follows: the method for the channelling that the present invention puts down in writing, limited, equipment pull-back force also can carry out the pipe laying of multitube hole when not enough on construction ground, thereby reduced the dependence of construction to equipment performance, greatly widen the using scope of middle-size and small-size equipment, there is realistic meaning.The present invention is applicable: in electric power, communication engineering, adopt middle-size and small-size equipment to lay high-density polytene pipeline (HDPE pipeline) engineering in multitube hole, be particularly useful for construction site restricted, as only have in the engineering of a drilling construction position.
The accompanying drawing explanation
Below in conjunction with accompanying drawing and example, the present invention is further illustrated.
Fig. 1 is the boring schematic diagram expanded in the present invention;
Fig. 2 is the schematic diagram of hauling pipe for the first time in the present invention, and synchronously pulls a drawbar when hauling pipe into;
Fig. 3 carries out hauling pipe schematic diagram for the second time in the present invention in pilot hole, in hauling pipe, together with pipeline, again pulls a drawbar into.
Embodiment
Below in conjunction with accompanying drawing, describe application of the present invention in detail.
With reference to Fig. 1~Fig. 3, the non-excavating construction method of a kind of multitube hole high-density polytene pipeline, by utilizing same boring 2, with horizontal directional drilling machine 1, several times the pipeline 3 of intending laying is pulled in boring 2 successively, during each hauling pipe, together with pipeline 3, synchronously pull a drawbar 5 into, this drawbar 5 is as hauling pipe is used next time, so repeated multiple times, until all pipeline 3 lays complete.
Be further used as preferred embodiment, comprise the following steps,
1) press construction requirement construction guidance hole in precalculated position;
2) classification is carried out repeatedly reaming to pilot hole, until 2 diameters of holing meet the hauling pipe requirement of multitube hole;
3) according to the ability of horizontal directional drilling machine 1, utilize the drilling rod 4 of last reaming to carry out hauling pipe for the first time, the part of pore number for all intending laying the pore number, in hauling pipe, pull a drawbar 5 into together with pipeline 3, connection between drilling rod 4 and pipeline 3 and drawbar 5 adopts back enlarging aiguille 6 and pulling head 7, wherein, drawbar 5 adopts the drilling rod of original equipment, like this, can not add new equipment or part, reduce construction cost;
4) utilize this drawbar 5, carry out hauling pipe for the second time in boring 2, in hauling pipe, again pull a drawbar 5 into together with pipeline 3, being connected between drawbar 5 and pipeline 3 and drawbar 5 adopts pulling head 7, not taking back enlarging aiguille 6, is mainly that the pipelines 3 of having pulled in boring 2 for fear of time 6 pairs of enlarging aiguilles cause damage;
5) repeating step 4), until the institute tubine road that remains 3 is pulled in boring 2;
6) detect the state of boring 2 interior conduits 3 that are laid in.
Be further used as preferred embodiment, in step 2) in, 2 the final diameter of holing is 1.2 ~ 1.5 times of external envelope diameters of all intending channellings 3.Banketing, the loose soft soil layer such as mud gets the small value, 2 the final diameter of holing is 1.2 times of external envelope diameters of all intending channellings 3; Get large value at hard soil layers such as closely knit sands, 2 the final diameter of holing is 1.5 times of external envelope diameters of all intending channellings 3.
Be further used as preferred embodiment, in step 3), the pore number of hauling pipe is generally the 4-8 pore for the first time.Specifically should consider geological condition and traverse distance, in the horizontal directional drilling machine limit of power and leave safety margin, but should not be very little, too many and bring construction risk to avoid the hauling pipe number of times.
Be further used as preferred embodiment, in step 4) and 5) in, the pore number of hauling pipe is generally 1 ~ 2 pore again.The pore number of hauling pipe is generally a pore again, while constructing in the weak soil shorter at traverse distance, that pull-back force is less, can consider to drag two pores.
Be further used as preferred embodiment, in step 6), the flat tube detected carried out to the expand tube processing.For some towing tension, the large or partially soft engineering of tubing, occur " flat tube ", thereby cause engineering to scrap, reform.Therefore, detect the state of the hole interior conduit that is laid in step 6) after, flat tube is wherein carried out to the expand tube processing.Expand tube is processed and is referred to, and at the end of drilling rod, the tube expander that its external diameter is slightly less than internal diameter of the pipeline is installed, and under the pulling force effect of borer drill rod, tube expander advances and, by the flat tube distending, makes it to restore to the original state in flat tube, thereby reaches the purpose of accident treatment.Tube expander be shaped as spheroid shape or sphere-like, its external diameter should be less than internal diameter of the pipeline 5-10mm, best results.
More than that better embodiment of the present invention is illustrated, but the invention is not limited to described embodiment, those of ordinary skill in the art also can make all equivalent modifications or replacement under the prerequisite without prejudice to spirit of the present invention, and the modification that these are equal to or replacement all are included in the application's claim limited range.

Claims (6)

1. the non-excavating construction method of a multitube hole high-density polytene pipeline, it is characterized in that: by utilizing same boring, with horizontal directional drilling machine, by the pipeline of intending laying, pull into successively in boring several times, during each hauling pipe, synchronously pull a drawbar into together with pipeline, this drawbar is as hauling pipe is used next time, so repeated multiple times, until all pipe laying is complete.
2. the non-excavating construction method of multitube according to claim 1 hole high-density polytene pipeline is characterized in that: comprises the following steps,
1) press construction requirement construction guidance hole in precalculated position;
2) classification is carried out repeatedly reaming to pilot hole, until bore diameter meets the hauling pipe requirement of multitube hole;
3) utilize the drilling rod of last reaming to carry out hauling pipe for the first time, the part of pore number for all intending laying the pore number, in hauling pipe, pull a drawbar into together with pipeline;
4) utilize this drawbar, in boring, carry out hauling pipe for the second time, in hauling pipe, together with pipeline, again pull a drawbar into;
5) repeating step 4), until the tubine road that remains is pulled in boring;
6) detect the state of the boring interior conduit that is laid in.
3. the non-excavating construction method of multitube according to claim 2 hole high-density polytene pipeline, is characterized in that: in step 2) in, the final diameter of described boring is 1.2 ~ 1.5 times of external envelope diameters of all intending channelling.
4. the non-excavating construction method of the multitube hole high-density polytene pipeline that drag more in a hole according to claim 2 is characterized in that: in step 3), the pore number of hauling pipe is generally the 4-8 pore for the first time.
5. the non-excavating construction method of multitube according to claim 2 hole high-density polytene pipeline, is characterized in that: in step 4) and 5) in, the pore number of hauling pipe is generally 1 ~ 2 pore again.
6. the non-excavating construction method of multitube according to claim 2 hole high-density polytene pipeline, is characterized in that: in step 6), the flat tube detected is carried out to the expand tube processing.
CN201310363275.7A 2013-08-19 2013-08-19 Trenchless construction method of multi-pore high-density polyethylene pipeline Active CN103453216B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310363275.7A CN103453216B (en) 2013-08-19 2013-08-19 Trenchless construction method of multi-pore high-density polyethylene pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310363275.7A CN103453216B (en) 2013-08-19 2013-08-19 Trenchless construction method of multi-pore high-density polyethylene pipeline

Publications (2)

Publication Number Publication Date
CN103453216A true CN103453216A (en) 2013-12-18
CN103453216B CN103453216B (en) 2015-06-17

Family

ID=49735899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310363275.7A Active CN103453216B (en) 2013-08-19 2013-08-19 Trenchless construction method of multi-pore high-density polyethylene pipeline

Country Status (1)

Country Link
CN (1) CN103453216B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351274A (en) * 2016-09-30 2017-01-25 中国冶集团有限公司 Hollow hole backfilling device and method for non-excavated directional drilling pipeline
CN106870819A (en) * 2017-03-24 2017-06-20 广州市恒盛建设工程有限公司 A kind of high density polyethylene (HDPE) non-pressure pipe horizontal directional drilling construction method
CN107083966A (en) * 2017-05-23 2017-08-22 梁美欣 Pipe with small pipe diameter hidden digging structure and tunneling method
CN108952570A (en) * 2018-05-31 2018-12-07 广州市电力工程有限公司 The compound non-excavating construction method of technology is bored based on accurate pointing
CN110274088A (en) * 2019-05-31 2019-09-24 武汉市武昌市政建设(集团)有限公司 A kind of road construction non-excavation type inspection shaft pipeline construction method
CN110529657A (en) * 2019-08-28 2019-12-03 六安市东城供水有限公司 Application method and pipeline locking device of the plain cast iron pipe in non-excavating construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1107643A (en) * 1993-04-22 1995-08-30 弗洛特克斯水平凿岩机组有限公司及两合公司 Process and tool for laying underground collector mains for liquids and gases
RU2117846C1 (en) * 1996-10-30 1998-08-20 Валерий Николаевич Вершинин Method of pipeline laying in swampy locality
CN101457853A (en) * 2008-11-20 2009-06-17 江苏广宇建设集团有限公司 Non-digging tube-pulling construction method
CN102147033A (en) * 2010-02-09 2011-08-10 中国机械工业建设总公司 Non-excavation directional traversing construction method for thermal power pipeline
WO2011095324A1 (en) * 2010-02-03 2011-08-11 Herrenknecht Ag Method for the trenchless laying of pipelines
CN102522723A (en) * 2011-12-15 2012-06-27 绍兴电力局 Power cable crossing method without excavating ground surface

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1107643A (en) * 1993-04-22 1995-08-30 弗洛特克斯水平凿岩机组有限公司及两合公司 Process and tool for laying underground collector mains for liquids and gases
RU2117846C1 (en) * 1996-10-30 1998-08-20 Валерий Николаевич Вершинин Method of pipeline laying in swampy locality
CN101457853A (en) * 2008-11-20 2009-06-17 江苏广宇建设集团有限公司 Non-digging tube-pulling construction method
WO2011095324A1 (en) * 2010-02-03 2011-08-11 Herrenknecht Ag Method for the trenchless laying of pipelines
CN102147033A (en) * 2010-02-09 2011-08-10 中国机械工业建设总公司 Non-excavation directional traversing construction method for thermal power pipeline
CN102522723A (en) * 2011-12-15 2012-06-27 绍兴电力局 Power cable crossing method without excavating ground surface

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
温俊涛等: "《非开挖顶管施工技术在给排水管道中的应用》", 《非开挖技术》 *
熊勃等: "《某通信工程中的非开挖水平定向钻进技术应用探讨》", 《探矿工程(岩土钻掘工程)》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351274A (en) * 2016-09-30 2017-01-25 中国冶集团有限公司 Hollow hole backfilling device and method for non-excavated directional drilling pipeline
CN106351274B (en) * 2016-09-30 2019-01-15 中国一冶集团有限公司 Hollow hole backfilling apparatus and its earth-filling method for no-dig technique directional drilling pipeline
CN106870819A (en) * 2017-03-24 2017-06-20 广州市恒盛建设工程有限公司 A kind of high density polyethylene (HDPE) non-pressure pipe horizontal directional drilling construction method
CN106870819B (en) * 2017-03-24 2017-12-26 广州市恒盛建设工程有限公司 A kind of high density polyethylene (HDPE) non-pressure pipe horizontal directional drilling construction method
CN107083966A (en) * 2017-05-23 2017-08-22 梁美欣 Pipe with small pipe diameter hidden digging structure and tunneling method
CN108952570A (en) * 2018-05-31 2018-12-07 广州市电力工程有限公司 The compound non-excavating construction method of technology is bored based on accurate pointing
CN110274088A (en) * 2019-05-31 2019-09-24 武汉市武昌市政建设(集团)有限公司 A kind of road construction non-excavation type inspection shaft pipeline construction method
CN110529657A (en) * 2019-08-28 2019-12-03 六安市东城供水有限公司 Application method and pipeline locking device of the plain cast iron pipe in non-excavating construction

Also Published As

Publication number Publication date
CN103453216B (en) 2015-06-17

Similar Documents

Publication Publication Date Title
CN103453216B (en) Trenchless construction method of multi-pore high-density polyethylene pipeline
CN103398215A (en) Minimally-invasive non-excavation pipe jacking and pull technology
CN105673934A (en) Non-excavation cable laying and pipe arranging method
CN103234076B (en) Device for exchanging underground pipelines without trenching and application method thereof
CN103486331B (en) Stuck pipe handling method in trenchless pipe construction
CN101158270B (en) Prime hole reverse pushing construction method in horizontal orienting drilling and prime hole reverse pushing device
CN105715867B (en) One kind drags top to combine ductile iron pipeline laying method
CN203188207U (en) Anchor rod with end portions capable of being expanded
CN106351274B (en) Hollow hole backfilling apparatus and its earth-filling method for no-dig technique directional drilling pipeline
CN205349232U (en) Cascaded enlarger
CN105386724A (en) Method for optimization design of hydraulic parameters used for duct tripping-in injection
CN206626283U (en) A kind of new concrete push pipe
CN207320525U (en) A kind of drilling machine plug-in type cable connection assembly
CN104235498B (en) The fixing adapter of a kind of solid-wall pipe stringing
CN104165024A (en) Engineering drilling device
CN107859784A (en) A kind of pipeline splits pipe device and its construction method
CN204511345U (en) A kind of clip spring seat for core drill and interior pipe connecting structure
CN203347689U (en) Variable-diameter barrel drill and rotary drilling rig
CN105443042A (en) Multifunctional reamer
CN102644285A (en) Anti-collapse hole construction method for anchor drilling
CN103321579B (en) Multi-claw drill suitable for loosening earth surface soil texture formed holes
CN204256235U (en) Optical cable and oil pipe pipeline same-hole back-dragging traversing device
CN204942755U (en) Combined structure for optical cable and oil pipeline back-dragging in same hole
CN205231678U (en) Non - excavation trombone slide of power cable
CN201095956Y (en) Hole reverse pushing device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhao Ziliang

Inventor after: Jiang Yongxin

Inventor after: Su Jianliang

Inventor after: Zhang Haizhao

Inventor after: Li Huiying

Inventor after: Liu Gongxun

Inventor after: Liu Jianbin

Inventor after: Zhao Juhui

Inventor after: Liu Yan

Inventor before: Zhao Ziliang

Inventor before: Liu Yan

Inventor before: Cheng Zhihui

Inventor before: Su Jianliang

Inventor before: Zhang Haizhao

Inventor before: Li Huiying

Inventor before: Deng Yingfang

Inventor before: Liu Gongxun

Inventor before: Liu Jianbin

Inventor before: Zhao Juhui

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHAO ZILIANG CHENG ZHIHUI SU JIANLIANG ZHANG HAIZHAO LI HUIYING DENG YINGFANG LIU GONGXUN LIU JIANBIN ZHAO JUHUI LIU YAN TO: ZHAO ZILIANG JIANG YONGXIN SU JIANLIANG ZHANG HAIZHAO LI HUIYING LIU GONGXUN LIU JIANBIN ZHAO JUHUI LIU YAN

GR01 Patent grant