CN103452564B - Shield duct piece fastening devices - Google Patents

Shield duct piece fastening devices Download PDF

Info

Publication number
CN103452564B
CN103452564B CN201310358497.XA CN201310358497A CN103452564B CN 103452564 B CN103452564 B CN 103452564B CN 201310358497 A CN201310358497 A CN 201310358497A CN 103452564 B CN103452564 B CN 103452564B
Authority
CN
China
Prior art keywords
duct piece
shield duct
tunnel
outer ring
inner ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310358497.XA
Other languages
Chinese (zh)
Other versions
CN103452564A (en
Inventor
蒋华梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi fast deer Metro steel structure manufacturing Co., Ltd.
Original Assignee
Wuxi Xishan Bashi Chemical Special Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Xishan Bashi Chemical Special Equipment Co Ltd filed Critical Wuxi Xishan Bashi Chemical Special Equipment Co Ltd
Priority to CN201310358497.XA priority Critical patent/CN103452564B/en
Publication of CN103452564A publication Critical patent/CN103452564A/en
Application granted granted Critical
Publication of CN103452564B publication Critical patent/CN103452564B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to the tunnel tightening device used in subway work process, specifically a kind of shield duct piece fastening devices, comprise a circular steelframe body, described steelframe body comprises outer ring and inner ring, and described outer ring is connected by some support bars with between inner ring, between described outer ring and inner ring, be provided with guide strip in pairs, between every a pair guide strip, all leave hole for hoist.For in prior art, when constructing tunnel, the shield duct piece ring in stretching tunnel, lean on the mutual pressure of each shield duct piece joint to reach the stretching object of shield duct piece completely, what the invention provides a kind of shield duct piece holds out against bracing or strutting arrangement, and this apparatus structure is rationally ingenious, cheap, for bracing reinforcement tunnel shield duct piece effect but clearly, use this device can the shield duct piece of effective Strengthening Tunnel, eliminate safe hidden trouble.

Description

Shield duct piece fastening devices
Technical field
The present invention relates to the tunnel tightening device used in subway work process, specifically a kind of shield duct piece fastening devices.
Background technology
Shield duct piece is the main mounting structure of shield-tunneling construction, is the outermost layer barrier in tunnel, carries the effect of opposing earth pressure, groundwater pressure and some special loads.Shield duct piece is the permanent lining, secondary lining structure of shield tunnel, and the quality of shield duct piece is directly connected to total quality and the safety in tunnel, affects water resistance and the endurance quality in tunnel.The production of shield duct piece adopts high-strength water-tight concrete usually, and to guarantee reliable load and water resistance, Commercial cultivation production tube die is namely plastic after sealing placing of concrete.
At present, in constructing tunnel process, after the cutter head of shield machine leading section has excavated tunnel, directly by the section of jurisdiction supply system of shield machine and section of jurisdiction automatic assembling device, shield duct piece is become circular and be arranged in tunnel, played a supporting role; This support undertaken by shield duct piece is convenient and swift, carry stressed by adjacent two shield duct piece joints completely between each shield duct piece in each annulus, although the splicing structure work progress of this shield duct piece is convenient and swift, but the circular braced structures entirety be assembled into lacks bracing or strutting arrangement, cause tunnel perimeter have significantly surface vibration time, there is shield duct piece and come off and the danger causing Tunnel Landslide.
Summary of the invention
The present invention is directed to the problems referred to above, a kind of shield duct piece fastening devices is provided, adopt this device can effective reinforcing shield section of jurisdiction, avoid the risk of Tunnel Landslide.
According to technical scheme of the present invention: a kind of shield duct piece fastening devices, it is characterized in that: comprise a circular steelframe body, described steelframe body comprises outer ring and inner ring, and described outer ring is connected by some support bars with between inner ring, between described outer ring and inner ring, be provided with guide strip in pairs, between every a pair guide strip, all leave hole for hoist.
As a further improvement on the present invention, the extended line of support bar described in every root is all by the center of circle of steelframe body.
As a further improvement on the present invention, the length of described support bar is equal with the radical length of shield duct piece, and the axial width of steelframe body is equal with the thickness of shield duct piece.
Technique effect of the present invention is: in prior art, when constructing tunnel, the shield duct piece ring in stretching tunnel, lean on the mutual pressure of each shield duct piece joint to reach the stretching object of shield duct piece completely, what the invention provides a kind of shield duct piece holds out against bracing or strutting arrangement, and this apparatus structure is rationally ingenious, cheap, for bracing reinforcement tunnel shield duct piece effect but clearly, use this device can the shield duct piece of effective Strengthening Tunnel, eliminate safe hidden trouble.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is further described.
In Fig. 1, comprise steelframe body 1, hole for hoist 2, outer ring 3, inner ring 4, support bar 5 etc.
As shown in Figure 1, the present invention is a kind of shield duct piece fastening devices, comprise a circular steelframe body 1, described steelframe body 1 comprises outer ring 3 and inner ring 4, and described outer ring 3 is connected by some support bars 5 with between inner ring 4, for effectively strengthening the stability of steelframe body 1, in the manufacture process of steelframe body 1, usually the extended line of support bar 5 described in every root is all by the center of circle of steelframe body 1, guide strip is provided with in pairs between described outer ring 3 and inner ring 4, hole for hoist 2 is all left between every a pair guide strip, not only make steelframe body 1 to reserve the hole for hoist 2 for facilitating steelframe body 1 to lift by the guide strip added, also further enhance the stability between steelframe body 1 outer ring 3 and inner ring 4.
In order to effectively fix the shield duct piece in tunnel, steelframe body 1 also needs to meet following condition further: the length of support bar 5 is equal with the radical length of shield duct piece, and the axial width of steelframe body 1 is equal with the thickness of shield duct piece, the inner ring 4 of steelframe body 1 can be the steelframe of annular also can be annular steel plate structure, outer ring 3 comprises two annular steel rings, and two annular steel rings are fixedly connected on the end of the support bar 5 at steelframe body 1 through-thickness two ends respectively, this structure makes the middle part of the outer ring 3 of steelframe body 1 be annular hollow structure, namely, form an annular groove, when being supported in when steelframe body 1 on the shield duct piece in tunnel, the support bar 5 of steelframe body 1 both sides protects and is loaded on shield duct piece two ends, the inner ring 3 of steelframe body 1 holds out against on the inwall of shield duct piece, reach the effect of stretching tunnel inner wall.
For in prior art, when constructing tunnel, the shield duct piece ring in stretching tunnel, lean on the mutual pressure of each shield duct piece joint to reach the stretching object of shield duct piece completely, what the invention provides a kind of shield duct piece holds out against bracing or strutting arrangement, and this apparatus structure is rationally ingenious, cheap, for bracing reinforcement tunnel shield duct piece effect but clearly, use this device can the shield duct piece of effective Strengthening Tunnel, eliminate safe hidden trouble.

Claims (1)

1. a shield duct piece fastening devices, it is characterized in that: comprise a circular steelframe body (1), described steelframe body (1) comprises outer ring (3) and inner ring (4), and be connected by some support bars (5) between described outer ring (3) with inner ring (4), between described outer ring (3) and inner ring (4), be provided with guide strip in pairs, between every a pair guide strip, all leave hole for hoist (2);
Described in every root, the extended line of support bar (5) is all by the center of circle of steelframe body (1);
The length of described support bar (5) is equal with the radical length of shield duct piece, and the axial width of steelframe body (1) is equal with the thickness of shield duct piece.
CN201310358497.XA 2013-08-16 2013-08-16 Shield duct piece fastening devices Active CN103452564B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310358497.XA CN103452564B (en) 2013-08-16 2013-08-16 Shield duct piece fastening devices

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310358497.XA CN103452564B (en) 2013-08-16 2013-08-16 Shield duct piece fastening devices

Publications (2)

Publication Number Publication Date
CN103452564A CN103452564A (en) 2013-12-18
CN103452564B true CN103452564B (en) 2016-03-16

Family

ID=49735347

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310358497.XA Active CN103452564B (en) 2013-08-16 2013-08-16 Shield duct piece fastening devices

Country Status (1)

Country Link
CN (1) CN103452564B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758532B (en) * 2014-01-28 2016-01-06 华南理工大学 A kind of short-term active enforcement method of metro shield tunnel pipe piece joint

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1908362A (en) * 2006-08-07 2007-02-07 上海市隧道工程轨道交通设计研究院 Large deformation lining ring structure for constructing tunnel
CN102155242A (en) * 2011-05-25 2011-08-17 江苏牧羊集团有限公司 Shield segment mold
CN102251784A (en) * 2011-05-30 2011-11-23 中铁第四勘察设计院集团有限公司 Double-layer lining shield tunnel duct piece and lining superposed structure
CN103206230A (en) * 2012-01-13 2013-07-17 上海市政工程设计研究总院(集团)有限公司 Waterproof structure of shield tunnel segment
CN203441499U (en) * 2013-08-16 2014-02-19 无锡市锡山八士化工专用设备有限公司 Shield segment fixing device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0893389A (en) * 1994-09-22 1996-04-09 Kajima Corp Cutting-off method for shielding work

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1908362A (en) * 2006-08-07 2007-02-07 上海市隧道工程轨道交通设计研究院 Large deformation lining ring structure for constructing tunnel
CN102155242A (en) * 2011-05-25 2011-08-17 江苏牧羊集团有限公司 Shield segment mold
CN102251784A (en) * 2011-05-30 2011-11-23 中铁第四勘察设计院集团有限公司 Double-layer lining shield tunnel duct piece and lining superposed structure
CN103206230A (en) * 2012-01-13 2013-07-17 上海市政工程设计研究总院(集团)有限公司 Waterproof structure of shield tunnel segment
CN203441499U (en) * 2013-08-16 2014-02-19 无锡市锡山八士化工专用设备有限公司 Shield segment fixing device

Also Published As

Publication number Publication date
CN103452564A (en) 2013-12-18

Similar Documents

Publication Publication Date Title
CN104405041B (en) The prefabricated floor connector of steel building and mounting method thereof
CN205000974U (en) A tire formula automatic rising equipment rack for tunnel excavation construction
CN204782031U (en) Interior climbing tower hangs entrance to a cave from promoting safety protection platform
CN103362523B (en) Suspended formwork lining method for cover arch outside tunnel portal with weak surrounding rocks
CN104947681A (en) Super large super deep basement ground pit construction method
CN210289780U (en) Shield constructs quick-witted reaction frame
CN104018505B (en) The embedding series of rocks system of pre-manufactured steel cage guiding and using method
CN103452564B (en) Shield duct piece fastening devices
CN204371384U (en) Anchor Agent boost motor
CN203441499U (en) Shield segment fixing device
CN204139413U (en) A kind of cast-in-place hollow slab of zonal cooling formula anti-floating
CN204754945U (en) Mine method tunnel preliminary bracing lining cutting grid steel support make
CN204386617U (en) Consolidation grouting structure of low waterhead diversion tunnel
CN204139622U (en) Adjustable segmented column steel bar positioning fixture
CN203514323U (en) Connection component
CN103470275B (en) A kind of large-span underground chamber usual friendship junctions excavation supporting method
CN201873949U (en) Bride prestress stretch-draw trolley
CN204646267U (en) A kind of corrugated steel Tunnel structure
CN204126094U (en) A kind of cast-in-place hollow slab of segmentation dislocation type anti-floating
CN203891008U (en) Miniature isolation pile
CN211341679U (en) Cantilever scaffold puts up wall bolt pre-buried device
CN203795824U (en) Suspension type fastener scaffold erecting device
CN204941571U (en) A kind of railway tunnel supporting and protection structure of improvement
CN203487567U (en) Hole detector of drilled grouting pile
CN204098024U (en) A kind of secondary grouting concrete pipe pile construction device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20181101

Address after: 214192 Xishan District, Wuxi City, Jiangsu province Beizhen eight village

Patentee after: Wuxi fast deer Metro steel structure manufacturing Co., Ltd.

Address before: 214192 Xishan District, Wuxi City, Jiangsu province Beizhen eight village

Patentee before: Wuxi Xishan Bashi Chemical Special Equipment Co., Ltd.

TR01 Transfer of patent right