CN103452564B - Shield duct piece fastening devices - Google Patents
Shield duct piece fastening devices Download PDFInfo
- Publication number
- CN103452564B CN103452564B CN201310358497.XA CN201310358497A CN103452564B CN 103452564 B CN103452564 B CN 103452564B CN 201310358497 A CN201310358497 A CN 201310358497A CN 103452564 B CN103452564 B CN 103452564B
- Authority
- CN
- China
- Prior art keywords
- duct piece
- shield duct
- tunnel
- outer ring
- inner ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The present invention relates to the tunnel tightening device used in subway work process, specifically a kind of shield duct piece fastening devices, comprise a circular steelframe body, described steelframe body comprises outer ring and inner ring, and described outer ring is connected by some support bars with between inner ring, between described outer ring and inner ring, be provided with guide strip in pairs, between every a pair guide strip, all leave hole for hoist.For in prior art, when constructing tunnel, the shield duct piece ring in stretching tunnel, lean on the mutual pressure of each shield duct piece joint to reach the stretching object of shield duct piece completely, what the invention provides a kind of shield duct piece holds out against bracing or strutting arrangement, and this apparatus structure is rationally ingenious, cheap, for bracing reinforcement tunnel shield duct piece effect but clearly, use this device can the shield duct piece of effective Strengthening Tunnel, eliminate safe hidden trouble.
Description
Technical field
The present invention relates to the tunnel tightening device used in subway work process, specifically a kind of shield duct piece fastening devices.
Background technology
Shield duct piece is the main mounting structure of shield-tunneling construction, is the outermost layer barrier in tunnel, carries the effect of opposing earth pressure, groundwater pressure and some special loads.Shield duct piece is the permanent lining, secondary lining structure of shield tunnel, and the quality of shield duct piece is directly connected to total quality and the safety in tunnel, affects water resistance and the endurance quality in tunnel.The production of shield duct piece adopts high-strength water-tight concrete usually, and to guarantee reliable load and water resistance, Commercial cultivation production tube die is namely plastic after sealing placing of concrete.
At present, in constructing tunnel process, after the cutter head of shield machine leading section has excavated tunnel, directly by the section of jurisdiction supply system of shield machine and section of jurisdiction automatic assembling device, shield duct piece is become circular and be arranged in tunnel, played a supporting role; This support undertaken by shield duct piece is convenient and swift, carry stressed by adjacent two shield duct piece joints completely between each shield duct piece in each annulus, although the splicing structure work progress of this shield duct piece is convenient and swift, but the circular braced structures entirety be assembled into lacks bracing or strutting arrangement, cause tunnel perimeter have significantly surface vibration time, there is shield duct piece and come off and the danger causing Tunnel Landslide.
Summary of the invention
The present invention is directed to the problems referred to above, a kind of shield duct piece fastening devices is provided, adopt this device can effective reinforcing shield section of jurisdiction, avoid the risk of Tunnel Landslide.
According to technical scheme of the present invention: a kind of shield duct piece fastening devices, it is characterized in that: comprise a circular steelframe body, described steelframe body comprises outer ring and inner ring, and described outer ring is connected by some support bars with between inner ring, between described outer ring and inner ring, be provided with guide strip in pairs, between every a pair guide strip, all leave hole for hoist.
As a further improvement on the present invention, the extended line of support bar described in every root is all by the center of circle of steelframe body.
As a further improvement on the present invention, the length of described support bar is equal with the radical length of shield duct piece, and the axial width of steelframe body is equal with the thickness of shield duct piece.
Technique effect of the present invention is: in prior art, when constructing tunnel, the shield duct piece ring in stretching tunnel, lean on the mutual pressure of each shield duct piece joint to reach the stretching object of shield duct piece completely, what the invention provides a kind of shield duct piece holds out against bracing or strutting arrangement, and this apparatus structure is rationally ingenious, cheap, for bracing reinforcement tunnel shield duct piece effect but clearly, use this device can the shield duct piece of effective Strengthening Tunnel, eliminate safe hidden trouble.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is further described.
In Fig. 1, comprise steelframe body 1, hole for hoist 2, outer ring 3, inner ring 4, support bar 5 etc.
As shown in Figure 1, the present invention is a kind of shield duct piece fastening devices, comprise a circular steelframe body 1, described steelframe body 1 comprises outer ring 3 and inner ring 4, and described outer ring 3 is connected by some support bars 5 with between inner ring 4, for effectively strengthening the stability of steelframe body 1, in the manufacture process of steelframe body 1, usually the extended line of support bar 5 described in every root is all by the center of circle of steelframe body 1, guide strip is provided with in pairs between described outer ring 3 and inner ring 4, hole for hoist 2 is all left between every a pair guide strip, not only make steelframe body 1 to reserve the hole for hoist 2 for facilitating steelframe body 1 to lift by the guide strip added, also further enhance the stability between steelframe body 1 outer ring 3 and inner ring 4.
In order to effectively fix the shield duct piece in tunnel, steelframe body 1 also needs to meet following condition further: the length of support bar 5 is equal with the radical length of shield duct piece, and the axial width of steelframe body 1 is equal with the thickness of shield duct piece, the inner ring 4 of steelframe body 1 can be the steelframe of annular also can be annular steel plate structure, outer ring 3 comprises two annular steel rings, and two annular steel rings are fixedly connected on the end of the support bar 5 at steelframe body 1 through-thickness two ends respectively, this structure makes the middle part of the outer ring 3 of steelframe body 1 be annular hollow structure, namely, form an annular groove, when being supported in when steelframe body 1 on the shield duct piece in tunnel, the support bar 5 of steelframe body 1 both sides protects and is loaded on shield duct piece two ends, the inner ring 3 of steelframe body 1 holds out against on the inwall of shield duct piece, reach the effect of stretching tunnel inner wall.
For in prior art, when constructing tunnel, the shield duct piece ring in stretching tunnel, lean on the mutual pressure of each shield duct piece joint to reach the stretching object of shield duct piece completely, what the invention provides a kind of shield duct piece holds out against bracing or strutting arrangement, and this apparatus structure is rationally ingenious, cheap, for bracing reinforcement tunnel shield duct piece effect but clearly, use this device can the shield duct piece of effective Strengthening Tunnel, eliminate safe hidden trouble.
Claims (1)
1. a shield duct piece fastening devices, it is characterized in that: comprise a circular steelframe body (1), described steelframe body (1) comprises outer ring (3) and inner ring (4), and be connected by some support bars (5) between described outer ring (3) with inner ring (4), between described outer ring (3) and inner ring (4), be provided with guide strip in pairs, between every a pair guide strip, all leave hole for hoist (2);
Described in every root, the extended line of support bar (5) is all by the center of circle of steelframe body (1);
The length of described support bar (5) is equal with the radical length of shield duct piece, and the axial width of steelframe body (1) is equal with the thickness of shield duct piece.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310358497.XA CN103452564B (en) | 2013-08-16 | 2013-08-16 | Shield duct piece fastening devices |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310358497.XA CN103452564B (en) | 2013-08-16 | 2013-08-16 | Shield duct piece fastening devices |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103452564A CN103452564A (en) | 2013-12-18 |
CN103452564B true CN103452564B (en) | 2016-03-16 |
Family
ID=49735347
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310358497.XA Active CN103452564B (en) | 2013-08-16 | 2013-08-16 | Shield duct piece fastening devices |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103452564B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103758532B (en) * | 2014-01-28 | 2016-01-06 | 华南理工大学 | A kind of short-term active enforcement method of metro shield tunnel pipe piece joint |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1908362A (en) * | 2006-08-07 | 2007-02-07 | 上海市隧道工程轨道交通设计研究院 | Large deformation lining ring structure for constructing tunnel |
CN102155242A (en) * | 2011-05-25 | 2011-08-17 | 江苏牧羊集团有限公司 | Shield segment mold |
CN102251784A (en) * | 2011-05-30 | 2011-11-23 | 中铁第四勘察设计院集团有限公司 | Double-layer lining shield tunnel duct piece and lining superposed structure |
CN103206230A (en) * | 2012-01-13 | 2013-07-17 | 上海市政工程设计研究总院(集团)有限公司 | Waterproof structure of shield tunnel segment |
CN203441499U (en) * | 2013-08-16 | 2014-02-19 | 无锡市锡山八士化工专用设备有限公司 | Shield segment fixing device |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0893389A (en) * | 1994-09-22 | 1996-04-09 | Kajima Corp | Cutting-off method for shielding work |
-
2013
- 2013-08-16 CN CN201310358497.XA patent/CN103452564B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1908362A (en) * | 2006-08-07 | 2007-02-07 | 上海市隧道工程轨道交通设计研究院 | Large deformation lining ring structure for constructing tunnel |
CN102155242A (en) * | 2011-05-25 | 2011-08-17 | 江苏牧羊集团有限公司 | Shield segment mold |
CN102251784A (en) * | 2011-05-30 | 2011-11-23 | 中铁第四勘察设计院集团有限公司 | Double-layer lining shield tunnel duct piece and lining superposed structure |
CN103206230A (en) * | 2012-01-13 | 2013-07-17 | 上海市政工程设计研究总院(集团)有限公司 | Waterproof structure of shield tunnel segment |
CN203441499U (en) * | 2013-08-16 | 2014-02-19 | 无锡市锡山八士化工专用设备有限公司 | Shield segment fixing device |
Also Published As
Publication number | Publication date |
---|---|
CN103452564A (en) | 2013-12-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104405041B (en) | The prefabricated floor connector of steel building and mounting method thereof | |
CN205000974U (en) | A tire formula automatic rising equipment rack for tunnel excavation construction | |
CN204782031U (en) | Interior climbing tower hangs entrance to a cave from promoting safety protection platform | |
CN103362523B (en) | Suspended formwork lining method for cover arch outside tunnel portal with weak surrounding rocks | |
CN104947681A (en) | Super large super deep basement ground pit construction method | |
CN210289780U (en) | Shield constructs quick-witted reaction frame | |
CN104018505B (en) | The embedding series of rocks system of pre-manufactured steel cage guiding and using method | |
CN103452564B (en) | Shield duct piece fastening devices | |
CN204371384U (en) | Anchor Agent boost motor | |
CN203441499U (en) | Shield segment fixing device | |
CN204139413U (en) | A kind of cast-in-place hollow slab of zonal cooling formula anti-floating | |
CN204754945U (en) | Mine method tunnel preliminary bracing lining cutting grid steel support make | |
CN204386617U (en) | Consolidation grouting structure of low waterhead diversion tunnel | |
CN204139622U (en) | Adjustable segmented column steel bar positioning fixture | |
CN203514323U (en) | Connection component | |
CN103470275B (en) | A kind of large-span underground chamber usual friendship junctions excavation supporting method | |
CN201873949U (en) | Bride prestress stretch-draw trolley | |
CN204646267U (en) | A kind of corrugated steel Tunnel structure | |
CN204126094U (en) | A kind of cast-in-place hollow slab of segmentation dislocation type anti-floating | |
CN203891008U (en) | Miniature isolation pile | |
CN211341679U (en) | Cantilever scaffold puts up wall bolt pre-buried device | |
CN203795824U (en) | Suspension type fastener scaffold erecting device | |
CN204941571U (en) | A kind of railway tunnel supporting and protection structure of improvement | |
CN203487567U (en) | Hole detector of drilled grouting pile | |
CN204098024U (en) | A kind of secondary grouting concrete pipe pile construction device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181101 Address after: 214192 Xishan District, Wuxi City, Jiangsu province Beizhen eight village Patentee after: Wuxi fast deer Metro steel structure manufacturing Co., Ltd. Address before: 214192 Xishan District, Wuxi City, Jiangsu province Beizhen eight village Patentee before: Wuxi Xishan Bashi Chemical Special Equipment Co., Ltd. |
|
TR01 | Transfer of patent right |