CN103444129A CN2011800021036A CN201180002103A CN103444129A CN 103444129 A CN103444129 A CN 103444129A CN 2011800021036 A CN2011800021036 A CN 2011800021036A CN 201180002103 A CN201180002103 A CN 201180002103A CN 103444129 A CN103444129 A CN 103444129A
Authority
CN
China
Prior art keywords
server
electric
time delay
port numbers
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011800021036A
Other languages
Chinese (zh)
Inventor
任鹏
许圣祥
宋铜铃
史鹏
谢明旭
王江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huawei Technologies Co Ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of CN103444129A publication Critical patent/CN103444129A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/02Details
    • H04L12/10Current supply arrangements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks
    • Y02D30/50Reducing energy consumption in communication networks in wire-line communication networks, e.g. low power modes or reduced link rate

Abstract

Provided is a server power-on method, comprising: acquiring port numbers of at least two servers (S101); grouping the port numbers, and configuring different power-on delays for different groups (S102); and delivering the power-on delays to the servers, so that after receiving a power-on triggering signal, the servers are powered on after being delayed by periods of time corresponding to the power-on delays (S103). Also provided are a server power-on management device, servers and a communication system. Therefore, the problem of superposition of current peak values caused by simultaneous power-on of multiple servers is solved, thereby improving the reliability of server power-on.

Description

Electric method, apparatus and system on a kind of server
The present embodiments relate to a kind of method electric on communication technical field, more particularly to server, apparatus and system for electric method, apparatus and system technical field on a kind of server.
Background technology
Electricity can be the soft electric control up and down of the hard electric control up and down and the onboard management module control device mainboard power-on and power-off built in service device of pluggable server power line respectively using two ways control on server.Because equipment mainboard power consumption accounts for the overwhelming majority of server total power consumption, the electric control up and down to mainboard can be controlled to equipment overall power.At present mostly using it is soft up and down electrically.
Server is in power up, it is necessary to numerous chips progress initial configuration in equipment, cause electric current peak value occur.If equipment machine refuses interior Servers-all while upper electricity, current peak superposition, easily produce impact to air switch even prime power supply unit, cause failure.
In the prior art, general that multiple servers are carried out with upper electric control using electric management equipment on a server, electric management equipment issues power on signal to multiple servers on server, and server receives after the signal just upper electricity.Prior art is to Servers-all while upper electricity, current peak superposition easily occurs and produce impact to communication equipment, break down.
The content of the invention
The present invention proposes a kind of method electric on server, apparatus and system, and solving multiple servers, upper conductance causes the problem of current peak is superimposed simultaneously.
The embodiment of the present invention provides a kind of method electric on server, including:
Obtain the port numbers of at least two servers; The port numbers are grouped, different upper electric time delays are put in different assembling;The server is extended down to when issuing described electric, so as to after the server triggers power on signal, prolong on described in Slow after the electricity time delay corresponding time, it is electric in progress.
The embodiment of the present invention also provides electric management equipment on a kind of server, including:
Acquiring unit, the port numbers for obtaining at least two servers;
Processing unit, for being grouped to the port numbers that the acquiring unit is got, and puts according to different assembling different upper electric time delays;
Transmitting element, for send processing unit configuration it is described electric when be extended down to the server so that after the server triggers power on signal, prolong after the corresponding time of upper electricity time delay described in Slow, electricity in progresss.
The embodiment of the present invention also provides a kind of server, including:
Receiving unit, the upper electric time delay that electric management equipment is issued in the reception server;
Upper electric unit, it is electric in progress after the upper electric time delay corresponding time for prolonging that receiving unit described in Slow receives for triggering after power on signal.
The embodiment of the present invention also provides a kind of communication system, including electric management equipment and server on server,
Electric management equipment on the server, the port numbers for obtaining the server are grouped to the port numbers and configure different upper electric time delays, server is extended down to when issuing described electric;The server, for receiving on the server the upper electric time delay that electric management equipment is issued, and after triggering power on signal, prolongs after the corresponding time of upper electricity time delay described in Slow, electricity in progresss.
By method provided in an embodiment of the present invention, apparatus and system, electric management equipment issues electric time delay to server on server, is carried out so that server prolongs on Slow after the electric time delay corresponding time Electricity, solves multiple servers while the problem of upper conductance cause current peak is superimposed, improves reliability electric on server.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, one will be made to the required accompanying drawing used in embodiment or description of the prior art below singly to introduce, apparently, drawings in the following description are some embodiments of the present invention, for those of ordinary skill in the art, on the premise of not paying creative work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the method flow diagram of the embodiment of the present invention one;
Fig. 2 is the method flow diagram of the embodiment of the present invention two;
Fig. 3 is fulgurite reason equipment structure chart on the server of the embodiment of the present invention three;
Fig. 4 is the server architecture figure of the embodiment of the present invention four;
Fig. 5 is the system construction drawing of the embodiment of the present invention five.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the accompanying drawing in the embodiment of the present invention, technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is a part of embodiment of the invention, rather than whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art are obtained on the premise of creative work is not made belongs to the scope of protection of the invention.
The embodiment of the present invention one
Fig. 1 is the flow chart of an embodiment of the method electric on server of the present invention, as shown in figure 1, this method can include:
S 1 01, the port numbers for obtaining at least two servers; 5102nd, the port numbers are grouped, different upper electric time delays are put in different assembling;Port number is grouped, and can be divided into one group of one group of odd-numbered port number and even port number, and is configured to 0 to one of which time delay, and another group of time delay configuration is more than 0.
The server is extended down to when the 5103rd, issuing described electric, so as to after the server triggers power on signal, prolong on described in Slow after the electricity time delay corresponding time, it is electric in progress.
Wherein, power on signal is produced by the onboard control circuit for receiving the server of upper electric time delay.Electric method on the server that the present embodiment is provided, pass through the upper electric time delay that electric management equipment is issued on server, server, which prolongs, carries out upper electricity after the electric time delay corresponding time on Slow, multiple servers are solved while the problem of upper conductance cause current peak is superimposed, improves reliability electric on server.The embodiment of the present invention two
In the present embodiment, the flow of server time-sharing power is as follows:
5201st, server sends and includes server end slogan information in electric management equipment, the packet on Query Information bag to server;
Here, send Query Information server can be multiple, i.e., at least two.
5202nd, tube apparatus receives Query Information bag, obtains server end slogan;
5203rd, electric management equipment is grouped to server end slogan on server, and different upper electric time delays are put to different assembling;
It should be noted that, one server end slogan one server of correspondence, electric management equipment is got after server end slogan on server, and it is grouped, server end slogan can be divided into odd-numbered port number it is corresponding one group and even port number it is corresponding one group.The different upper electric time delay of different group correspondences, meets:The upper electric time delay of one of which is 0.Port numbers can also be divided into 3 groups, satisfaction:Electric time delay is that electric time delay is more than 0 on 0, another group in one of which, and different groups is corresponding Time delay is different.It is of course also possible to which server end slogan to be divided into the group of more than 3, the embodiment of the present invention is not restricted.
5204th, server is extended down to when electric management equipment sends upper electricity on server;
5205th, server triggers power on signal;
Onboard control circuit built in server produces power on signal, rather than electric management equipment issues power on signal to multiple servers on server.So, even if electric management equipment or communication link fails on server, server can also normal upper electricity.
5206th, server prolonged after the upper electricity time delay corresponding time described in Slow, electric in progress.
After onboard control circuit triggering power on signal built in server, prolong after the time described in Slow corresponding to upper electricity time delay, send power on signal to the mainboard of server, mainboard carries out upper electricity.For example:When in S203 points of odd even group, it is specifically as follows:If it is 0 to be grouped a corresponding electric time delay, the corresponding server of odd-numbered port number then prolongs Slow 0 second, i.e., at once upper electric;If it is 30 seconds to be grouped two corresponding electric time delays, prolong Slow 30 seconds.For electric time delay in others, all same is operated, the scope that the embodiment of the present invention is protected is belonged to.
Electric method on the server that the present embodiment is provided, pass through the upper electric time delay that electric management equipment is issued on server, server, which prolongs, carries out upper electricity after the electric time delay corresponding time on Slow, solve electric management equipment or communication link fails on server and electricity can not be gone up, and upper conductance causes the problem of current peak is superimposed to multiple servers simultaneously, improves reliability electric on server.
The embodiment of the present invention three
Electric management equipment on a kind of server is provided in the present embodiment, as shown in figure 3, including:Acquiring unit 301, the port numbers for obtaining at least two servers;
After onboard control power on circuitry built in server, electricity on Query Information bag to server is sent Server port information is included in management equipment, the packet.The acquiring unit 301 of electric management equipment gets the port numbers of server according to the packet on server.Here, send Query Information server can be multiple, i.e., at least two.
Processing unit 302, for being grouped to the port numbers that the acquiring unit 301 is got, and puts according to different assembling different upper electric time delays;
The port numbers that acquiring unit 301 is got are divided into one group of one group of odd-numbered port number and even port number by processing unit 302, can also be divided into the group of other modes.Different upper electric time delays are put in different assembling, and the upper electric time delay of one of which is 0.
Transmitting element 303, for send that the processing unit 302 configures it is described electric when be extended down to the server so that after the server triggers power on signal, prolong after the corresponding time of upper electricity time delay described in Slow, electricity in progresss.
Electric management equipment on the server that the present embodiment is provided, by obtaining server end slogan, server end slogan is grouped and corresponding electric time delay is configured, server is extended down to when electric in transmission so that server carries out time-sharing power, multiple servers are solved while the problem of upper conductance cause current peak is superimposed, improves reliability electric on server.
The embodiment of the present invention four
The embodiment of the present invention provides a kind of server, as shown in figure 4, including:
Receiving unit 401, the upper electric time delay that electric management equipment is issued in the reception server;In the reception of server receiving unit before electric time delay, the built-in onboard circuit of server first send Query Information bag to server electric management equipment, the upper electric unit 402 of server end slogan letter is included in described information bag, for delaying triggering power on signal when receiving unit 401 receives electricity And after the upper electric time delay corresponding time for prolonging that receiving unit 401 described in Slow receives, it is electric in progress.Wherein, upper electric unit 402 produces power on signal and carries out upper electricity, rather than electric management equipment issues power on signal to multiple servers on server.So, even if electric management equipment or communication link fails on server, server can also normal upper electricity.
The server that the present embodiment is provided, by the upper electric delay time signal that electric management equipment is sent in the reception server, after triggering power on signal, upper electricity is carried out after the upper electric time delay corresponding time for prolonging that receiving unit described in Slow receives.Solve electric management equipment or communication link fails on server and electricity can not be gone up, and upper conductance causes the problem of current peak is superimposed to multiple servers simultaneously, improves reliability electric on server.
The embodiment of the present invention five
The embodiment of the present invention also provides a kind of communication system, as shown in figure 5, including:
Electric management equipment 501 on server, the port numbers for obtaining at least two servers, port number is grouped and configures different upper electric time delays, and server is extended down to when issuing electric;
After onboard control power on circuitry built in server, transmission carries electric management equipment on Query Information bag to the server of server end slogan information.Here, server can be multiple, i.e., at least two.After electric management equipment gets server end slogan on server, port numbers are divided into one group of one group of odd-numbered port number and even port number, the group of other modes can also be divided into.Different upper electric time delays are put in different assembling, and it is 0 to meet the upper electric time delay of one of which.
Server 502, the upper electric time delay that electric management equipment 501 is issued in the reception server triggers power on signal, and on Slow is prolonged after the electricity time delay corresponding time, it is electric in progress.
The system that the present embodiment is provided, electric management equipment sends upper electric delay time signal to server on server, after server triggers power on signal, is carried out after the upper electric time delay corresponding time for prolonging that Slow receives Electricity.The present embodiment solves electric management equipment or communication link fails on server and can not go up electricity, and upper conductance causes the problem of current peak is superimposed to multiple servers simultaneously, improves reliability electric on server.
It is apparent to those skilled in the art that, the system of foregoing description clean for the convenience and cylinder of description, the specific work process of equipment and unit may be referred to the corresponding process in preceding method embodiment, no longer praise state herein.
One of ordinary skill in the art will appreciate that:Accompanying drawing is necessary to unit or flow in the schematic diagram of one embodiment, accompanying drawing not necessarily implements the present invention.
In several embodiments provided herein, it should be understood that disclosed system, apparatus and method can be realized by another way.For example, apparatus embodiments described above are only schematical, for example, the division of the unit, it is only a kind of division of logic function, there can be other dividing mode when actually realizing, such as multiple units or component can combine or be desirably integrated into another system, or some features can be ignored, or do not perform.Another, it, by some interfaces, the INDIRECT COUPLING or communication connection of equipment or unit, can be electrical, machinery or other forms that shown or discussed coupling or direct-coupling or communication connection each other, which can be,.The part shown as unit can be or may not be physical location, you can with positioned at a place, or can also be distributed on multiple NEs.Some or all of unit therein can be selected to realize the purpose of this embodiment scheme according to the actual needs.
In addition, each functional unit in each of the invention embodiment can be integrated in a processing unit or unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated unit can both be realized in the form of hardware, it would however also be possible to employ hard Part adds the form of SFU software functional unit to realize.
The above-mentioned integrated unit realized in the form of SFU software functional unit, can be stored in a computer read/write memory medium.Above-mentioned SFU software functional unit is stored in a storage medium, including some instructions are to cause a computer equipment(Can be personal computer, server, or network equipment etc.)Perform the part steps of each embodiment methods described of the invention.And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage(Read-Only Memory, cylinder claims ROM), random access memory(Random Access Memory, cylinder claims RAM), magnetic disc or CD etc. are various can be with the medium of store program codes.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although the present invention is described in detail with reference to the foregoing embodiments, it will be understood by those within the art that:It can still modify to the technical scheme described in foregoing embodiments, or carry out equivalent substitution to which part technical characteristic;And these modifications or replacement, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (9)

  1. Claim
    1st, a kind of method electric on server, it is characterised in that including:
    Obtain the port numbers of at least two servers;
    The port numbers are grouped, different upper electric time delays are put in different assembling;
    The server is extended down to when issuing described electric, so as to after the server triggers power on signal, prolong on described in Slow after the electricity time delay corresponding time, it is electric in progress.
    2nd, the method according to claim 1, it is characterised in that the port numbers are grouped, including:
    The port numbers are divided into corresponding group of odd-numbered port number and corresponding group of even port number.
    3rd, the method according to claim 2, it is characterised in that different upper electric time delays are put in different the assembling, including:
    The upper electric time delay of one of which is configured to 0.
    4th, the method according to claim 1, it is characterised in that the power on signal is produced by the onboard control circuit for receiving the server of upper electric time delay.
    5th, electric management equipment on electric server on a kind of server, it is characterised in that including:Acquiring unit, the port numbers for obtaining at least two servers;
    Processing unit, for being grouped to the port numbers that the acquiring unit is got, and puts according to different assembling different upper electric time delays;
    Transmitting element, for send processing unit configuration it is described electric when be extended down to the server so that after the server triggers power on signal, prolong after the corresponding time of upper electricity time delay described in Slow, electricity in progresss.
    6th, electric management equipment on the server according to claim 5, it is characterised in that described Processing unit is grouped to the port numbers that the acquiring unit is got, including:The processing unit is divided into corresponding group of odd-numbered port number and corresponding group of even port number to the port numbers.
    7th, electric management equipment on the server according to claim 5, it is characterised in that different upper electric time delays are put in different the assembling, including:
    The upper electric time delay of one of which is configured to 0, another group of upper electric time delay is more than 0.
    8th, a kind of server, it is characterised in that including:
    Receiving unit, the upper electric time delay that electric management equipment is issued in the reception server;
    Upper electric unit, it is electric in progress after the upper electric time delay corresponding time for prolonging that receiving unit described in Slow receives for triggering after power on signal.
    9th, a kind of communication system, including electric management equipment and server on server, it is characterized in that, electric management equipment on the server, port numbers for obtaining the server, the port numbers are grouped and different upper electric time delays are configured, server is extended down to when issuing described electric;
    The server, for receiving on the server the upper electric time delay that electric management equipment is issued, and after triggering power on signal, prolongs after the corresponding time of upper electricity time delay described in Slow, electricity in progresss.
CN2011800021036A 2011-10-27 2011-10-27 Server power-on method, device and system Pending CN103444129A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2011/081444 WO2012163026A1 (en) 2011-10-27 2011-10-27 Server power-on method, device and system

Publications (1)

Publication Number Publication Date
CN103444129A true CN103444129A (en) 2013-12-11

Family

ID=47258332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011800021036A Pending CN103444129A (en) 2011-10-27 2011-10-27 Server power-on method, device and system

Country Status (2)

Country Link
CN (1) CN103444129A (en)
WO (1) WO2012163026A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108345562A (en) * 2014-12-16 2018-07-31 华为技术有限公司 Multipath server and its signal processing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101252458A (en) * 2008-01-30 2008-08-27 深圳市共进电子有限公司 Firmware batch upgrading method
CN101266468A (en) * 2008-04-17 2008-09-17 中国铁路通信信号上海工程有限公司 On-off system automatic control system and control method
CN101286855A (en) * 2008-05-26 2008-10-15 张扬 Network data transmission server, detecting system constituted thereby and power saving method
CN101599840A (en) * 2009-07-07 2009-12-09 浪潮电子信息产业股份有限公司 The method of server time-sharing power in a kind of large-scale cluster

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101252458A (en) * 2008-01-30 2008-08-27 深圳市共进电子有限公司 Firmware batch upgrading method
CN101266468A (en) * 2008-04-17 2008-09-17 中国铁路通信信号上海工程有限公司 On-off system automatic control system and control method
CN101286855A (en) * 2008-05-26 2008-10-15 张扬 Network data transmission server, detecting system constituted thereby and power saving method
CN101599840A (en) * 2009-07-07 2009-12-09 浪潮电子信息产业股份有限公司 The method of server time-sharing power in a kind of large-scale cluster

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108345562A (en) * 2014-12-16 2018-07-31 华为技术有限公司 Multipath server and its signal processing method

Also Published As

Publication number Publication date
WO2012163026A1 (en) 2012-12-06

Similar Documents

Publication Publication Date Title
CN106874237B (en) Method of data synchronization and system based on two lines bus
CN102081585B (en) RS485 dual-bus communication method used for test satellite
CN105759937A (en) Method for lowering terminal power consumption and terminal
CN102567227B (en) Double-controller memory system and method for sharing cache equipment
CN103107960A (en) Reducing impact of a switch failure in a switch fabric via switch cards
CN101924699B (en) Message forwarding method, system and provider edge equipment
CN104980416A (en) Data access method, device and system in content distribution network
CN103067277A (en) Method of building control channel, forwarding point (FP) and controller
CN105095037A (en) Wire card, backboard of wire card and wire card test method
CN104301130A (en) Method and system of collecting monitoring data as well as task distribution server and collection device
CN203786636U (en) Cloud storageserver structure
CN106131241A (en) A kind of method for connecting network, device and mobile terminal
CN102870374A (en) Load-sharing method and apparatus, and veneer,
CN105450494A (en) Virtual network and method for implementing same
CN105991315A (en) Link protection method applied to SDN (software defined network), switching device and network controller
CN102801598A (en) Method and device for constructing virtual switching system, and switching devices
CN104536926B (en) The control method and device of serial equipment
CN112491592B (en) Storage resource grouping method, system, terminal and storage medium
CN103444129A (en) Server power-on method, device and system
CN104219061B (en) Request the method and device of power consumption state variation
CN105159605A (en) Storage server architecture
CN102983984B (en) Method and system for solution of aging of multicast entries
CN103620558A (en) A method for achieving correspondence of physical resource and virtual resource and a basic input output system
CN107408071A (en) A kind of memory pool access method, device and system
CN206317552U (en) Regeneration chip

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20131211

RJ01 Rejection of invention patent application after publication