CN103442257A - Method, device and system for achieving flow resource management - Google Patents
Method, device and system for achieving flow resource management Download PDFInfo
- Publication number
- CN103442257A CN103442257A CN2013103557703A CN201310355770A CN103442257A CN 103442257 A CN103442257 A CN 103442257A CN 2013103557703 A CN2013103557703 A CN 2013103557703A CN 201310355770 A CN201310355770 A CN 201310355770A CN 103442257 A CN103442257 A CN 103442257A
- Authority
- CN
- China
- Prior art keywords
- stream
- service
- service equipment
- equipment
- described stream
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Computer And Data Communications (AREA)
Abstract
The invention discloses a method, device and system for achieving flow resource management. The method comprises the steps that a flow resource on-demand message of a session management device is received by a flow resource management device and the flow resource on-demand message comprises a requested bandwidth; according to the current load of all flow service devices, one flow service device with the smallest current load and the normal service state is selected by the flow resource management device; whether the sum of the current load of the flow service device with the smallest current load and the normal service state and the requested bandwidth in the flow resource on-demand message is larger than the largest load of the flow service device is judged by the flow resource management device; if the answer is positive, the flow resource on-demand message sent by the session management device is refused by the flow resource management device; if the answer is negative, a flow resource distribution result is returned to the session management device by the flow resource management device. According to the method, device and system for achieving flow resource management, avoidance of over load of the currently-selected flow service device is guaranteed, and therefore the stability of operation of the system is guaranteed.
Description
Technical field
The present invention relates to Next generation broadcasting network (Next Generation Broadcasting Network NGB) video request program field, especially relate to a kind of implementation method, equipment and system that flows resource management.
Background technology
Along with broadcasting and TV integration of three networks scale propelling and the day by day strong program request demand as required of the public; the Next generation broadcasting network video on-demand system need to meet towards the multi-screen terminal; support extensive, distributed deployment; the unified frequency resource management; high quality-of-service QoS(Quality of Service) ensure; can run manageable Operational requirements.
The NGB video on-demand system at least comprises stream service equipment (Streaming Server, SS), session management equipment (Session Manager, SM), video flowing asset management device (Video stream Resource Management, VRM can be called again the stream asset management device).Wherein, the stream service equipment is realized the stream service function, completes to terminal and pushes user-selected program or stream, and the stream service equipment need be supported content coded format, encapsulation format, the transformat of this norm-setting; Session management equipment completes the conversation mechanism between terminal and service end, realizes that the request processing of all kinds of interactive VODs and session keep function; The stream asset management device is realized the management function of program request stream Service Source, comprises the management of flow service ability and the management of network capacity, and the stream service request of processing other system, flowed service distribution.
The implementation method of the existing stream resource management based on the NGB standard comprises:
SS periodically sends load to VRM and reports request, and load reports in request carries load capacity; VRM reports the load capacity of carrying in request to upgrade the load capacity of this SS preserved according to this load, and reports response to SS transmission load;
SS periodically sends heartbeat to VRM and reports request, and this heartbeat reports request to carry service status information; VRM upgrades the service state of current SS, and sends the response of service state to SS;
SM sends application program request stream message related to resources to VRM; VRM, according to present load amount and the service state of all SS, selects the SS that the current service state is normal and load capacity is minimum; VRM returns to the stream resource allocation result to SM, and this stream resource allocation result comprises Internet protocol (Internet Protocol, the IP) address of the SS that service state is normal and load capacity is minimum and the information of port (port).
Prior art has just been selected the SS of the normal and least-loaded of current service state, but selected SS may transship, and can't provide resource for SM.
Summary of the invention
The purpose of the embodiment of the present invention is to provide a kind of implementation method, equipment and system that flows resource management, in order to guarantee the SS selected, can not transship.
The embodiment of the present invention provides a kind of implementation method that flows resource management, and the method comprises:
The stream asset management device receives the stream resource points broadcast message of session management equipment, and this stream resource points broadcast message comprises bandwidth on demand;
Above-mentioned stream asset management device, according to the present load amount of all stream service equipments, selects present load amount minimum and service state to flow normally service equipment, and the present load amount of this stream service equipment is the load capacity reported above-mentioned stream service equipment the last time;
Judge above-mentioned stream asset management device this current load capacity minimum and service state flow the ultimate load whether bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message is greater than this stream service equipment normally;
If above-mentioned present load amount minimum and service state flow the ultimate load that bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message is greater than this stream service equipment normally, above-mentioned stream asset management device is refused the stream resource points broadcast message that above-mentioned session management equipment sends;
If above-mentioned present load amount minimum and service state flow the ultimate load that bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message is not more than this stream service equipment normally, above-mentioned stream asset management device returns to the stream resource allocation result to above-mentioned session management equipment, and this stream resource allocation result comprises that above-mentioned present load amount minimum and service state flow the address information of service equipment normally.
Said method compares with the ultimate load that the stream service management apparatus, service management can bear the loading condition of current selection least-loaded and the normal stream of service service equipment, the stream service equipment that can guarantee so current selection can not transship, thereby has guaranteed the stability of system operation.
The ultimate load stream service equipment of stream service equipment reports.Preferably, the preservation of the ultimate load of this stream service equipment or update mode can but be not limited only to be:
Above-mentioned stream asset management device receives the ultimate load of this stream service equipment of stream service equipment transmission; Judge whether to preserve the ultimate load of this stream service equipment; If so, upgrade the ultimate load of this stream service equipment of preserving; If not, preserve the ultimate load of this stream service equipment.
In the stream resource management system, the stream service equipment also can periodically report loading condition information, and so, the method that the embodiment of the present invention provides can also comprise:
Above-mentioned stream asset management device receives the loading condition information that above-mentioned stream service equipment periodically sends, and this loading condition information comprises load capacity or means the abnormal sign of service state;
If the loading condition information that above-mentioned stream service equipment sends comprises load capacity, above-mentioned stream asset management device determines that this stream service equipment service state is normal, and upgrades the current load capacity reported of this stream service equipment;
If the loading condition information that the stream service equipment sends comprises the sign that service state is abnormal, above-mentioned stream asset management device determines that this stream service equipment service is abnormal.
In prior art, the stream service equipment periodically reports loading condition information and heartbeat to report request respectively, and the inventor finds in realizing process of the present invention, and the loading condition information that the stream service equipment reports also can reflect the service state of this stream resource apparatus.Concrete, if this loading condition information is carried load capacity, mean that so this stream service equipment service state is normal, if this loading condition information is carried the sign that service state is abnormal, mean that so this stream service equipment service state is abnormal.Therefore, do not need to report heartbeat request, only need to report loading condition information, thereby reach the purpose of saving resource.
The embodiment of the present invention also provides a kind of stream asset management device, and this equipment comprises:
Receiving element, for receiving session management equipment stream resource points broadcast message, this stream resource points broadcast message comprises bandwidth on demand.
Selected cell, for the present load amount according to all stream service equipments, select present load amount minimum and service state to flow normally service equipment, and the present load amount of this stream service equipment is the load capacity reported stream service equipment the last time.
Judging unit, flow the present load amount of service equipment and the ultimate load whether above-mentioned stream resource points broadcast message bandwidth on demand sum is greater than this stream service equipment normally for judging above-mentioned present load amount minimum and service state;
If judge that above-mentioned present load amount minimum and service state flow the ultimate load that bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message is greater than this stream service equipment normally, transmitting element is used for, the stream resource points broadcast message that refusal session management equipment sends;
If judge that above-mentioned present load amount minimum and service state flow the ultimate load that bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message is not more than this stream service equipment normally, above-mentioned transmitting element also for, return to the stream resource allocation result to above-mentioned session management equipment, this stream resource allocation result comprises that above-mentioned load capacity minimum and service state flow the address information of service equipment normally.
Said method is that current selection least-loaded and the normal loading condition that flows service equipment of service are compared with the ultimate load that the stream service management apparatus, service management can bear, the stream service equipment that can guarantee so current selection can not transship, thereby has guaranteed the stability of system operation.
On the basis of above-mentioned any embodiment, preferably, above-mentioned receiving element, the loading condition information also periodically sent for receiving the stream service equipment, this loading condition information comprises load capacity or means the abnormal sign of service state.The said equipment can also comprise the service state determining unit;
If, when the loading condition information that above-mentioned stream service equipment sends comprises load capacity, above-mentioned service state determining unit is used for, and determines that above-mentioned stream service equipment service state is normal, above-mentioned updating block is used for, and upgrades the load capacity of above-mentioned stream service equipment;
When the loading condition information sent when above-mentioned stream service equipment comprises the abnormal sign of service state, above-mentioned service state determining unit is used for, and determines that the service of above-mentioned stream service equipment is abnormal.
In prior art, the stream service equipment periodically reports loading condition information and heartbeat to report request respectively, and the inventor finds in realizing process of the present invention, and the loading condition information that the stream service equipment reports also can reflect the service state of this stream resource apparatus.Concrete, if this loading condition information is carried load capacity, mean that so this stream service equipment service state is normal, if this loading condition information is carried the sign that service state is abnormal, mean that so this stream service equipment service state is abnormal.Therefore, do not need to report heartbeat request, only need to report loading condition information, thereby reach the purpose of saving resource.
On the basis of above-mentioned any embodiment, preferably,
The receiving element of the said equipment, the ultimate load of this stream service equipment also sent for above-mentioned stream service equipment;
The said equipment can also comprise the ultimate load maintenance unit, for judging whether to preserve the ultimate load of described stream service equipment; If so, upgrade the ultimate load of the described stream service equipment of preserving; If not, preserve the ultimate load of described stream service equipment.
The embodiment of the present invention also provides a kind of stream resource management system, and this system comprises:
Stream asset management device, session management equipment and stream service equipment.
This session management equipment, for send stream resource points broadcast message to above-mentioned stream asset management device, this stream resource points broadcast message comprises bandwidth on demand.
Above-mentioned stream asset management device, for present load amount and the service state according to all stream service equipments, select present load minimum and service state to flow normally service equipment, the present load amount of above-mentioned stream service equipment is the load capacity reported above-mentioned stream service equipment the last time, when judgement above-mentioned present load amount minimum and service state flow in the present load amount of service equipment and above-mentioned stream resource points broadcast message that the bandwidth on demand sum is greater than the ultimate load of above-mentioned stream service equipment normally, refuse the stream resource points broadcast message that above-mentioned session management equipment sends, when judgement above-mentioned present load amount minimum and service state flow in the present load amount of service equipment and above-mentioned stream resource points broadcast message that the bandwidth on demand sum is not more than the ultimate load of above-mentioned stream service equipment normally, return to the stream resource allocation result to above-mentioned session management equipment, this stream resource allocation result comprises that above-mentioned present load amount minimum and service state flow the address information of service equipment normally.
Above-mentioned load capacity minimum and service state flow service equipment normally, for the request according to described session management equipment, to above-mentioned session management equipment, send the stream resource.
The said equipment compares with the ultimate load that the stream service management apparatus, service management can bear the loading condition of current selection least-loaded and the normal stream of service service equipment, the stream service equipment that can guarantee so current selection can not transship, thereby has guaranteed the stability of system operation.
The accompanying drawing explanation
The method schematic diagram that Fig. 1 is the embodiment of the present invention one;
The equipment schematic diagram that Fig. 2 is the embodiment of the present invention two;
The system schematic that Fig. 3 is the embodiment of the present invention three, four.
Embodiment
The embodiment of the present invention has proposed a kind of implementation that flows resource management.In this scheme, loading condition to current selection least-loaded and the normal stream of service service equipment compares with the ultimate load that the stream service management apparatus, service management can bear, the stream service equipment that can guarantee so current selection can not transship, thereby has guaranteed the stability of system operation.
Below in conjunction with accompanying drawing, the technical scheme that the embodiment of the present invention is provided is elaborated.
As shown in Figure 1, provide a kind of implementation method that flows resource management in the embodiment of the present invention one, the method mainly comprises the steps:
Wherein, above-mentioned stream resource points broadcast message comprises bandwidth on demand etc.;
Wherein, the present load amount of above-mentioned stream service equipment is the load capacity reported above-mentioned stream service equipment the last time;
Above-mentioned stream resource allocation result comprises that above-mentioned present load amount minimum and service state flow the address information of service equipment normally.
Wherein, the address information of above-mentioned stream service equipment is specifically as follows: IP address and port port information, or IP address information.
Said method compares with the ultimate load that the stream service management apparatus, service management can bear the loading condition of current selection least-loaded and the normal stream of service service equipment, the stream service equipment that can guarantee so current selection can not transship, thereby has guaranteed the stability of system operation.
The ultimate load stream service equipment of stream service equipment reports.The preservation of the ultimate load of convection current service equipment and the implementation of renewal can but be not limited only to be:
Above-mentioned stream asset management device receives the ultimate load of this stream service equipment of stream service equipment transmission; Judge whether to preserve the ultimate load of this stream service equipment; If so, upgrade the ultimate load of this stream service equipment of preserving; If not, preserve the ultimate load of this stream service equipment.
In the stream resource management system, the stream service equipment also can periodically report loading condition information, so, on the basis of any one implementation of the embodiment of the present invention one, can also comprise:
Above-mentioned stream asset management device receives the loading condition information that above-mentioned stream service equipment periodically sends, and above-mentioned loading condition information comprises load capacity or means the abnormal sign of service state.
If the loading condition information that above-mentioned stream service equipment sends comprises load capacity, above-mentioned stream asset management device determines that above-mentioned stream service equipment service state is normal, and upgrades the load capacity of above-mentioned stream service equipment; Comprise if above-mentioned stream service equipment sends loading condition information the sign that service state is abnormal, above-mentioned stream asset management device determines that the service of above-mentioned stream service equipment is abnormal.
In prior art, the stream service equipment periodically reports loading condition information and heartbeat to report request respectively, and the inventor finds in realizing process of the present invention, and the loading condition information that the stream service equipment reports also can reflect the service state of this stream resource apparatus.Concrete, if this loading condition information is carried load capacity, mean that so this stream service equipment service state is normal, if this loading condition information is carried the sign that service state is abnormal, mean that so this stream service equipment service state is abnormal.Therefore, do not need to report heartbeat request, only need to report loading condition information, thereby reach the purpose of saving resource.
Inventive concept based on same with above-described embodiment one method, the embodiment of the present invention two provides a kind of stream asset management device, and as shown in Figure 2, this equipment comprises:
Receiving element 201, for receiving session management equipment stream resource points broadcast message, above-mentioned stream resource points broadcast message comprises bandwidth on demand.
Selected cell 202, for the present load amount according to all stream service equipments, select present load amount minimum and service state to flow normally service equipment, and the present load amount of above-mentioned stream service equipment is the load capacity reported stream service equipment the last time.
Judging unit 203, flow the present load amount of service equipment and the ultimate load whether above-mentioned stream resource points broadcast message bandwidth on demand sum is greater than the above-mentioned stream service equipment of stream service equipment transmission normally for judging above-mentioned present load amount minimum and service state.
If above-mentioned present load amount minimum and service state flow the ultimate load that bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message is greater than above-mentioned stream service equipment normally, transmitting element 204 for, refuse the stream resource points broadcast message that above-mentioned session management equipment sends;
If judge, above-mentioned present load amount minimum and service state flow the ultimate load that bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message is not more than above-mentioned stream service equipment normally, transmitting element 204 for, return to the stream resource allocation result to above-mentioned session management equipment, this stream resource allocation result comprises that above-mentioned load capacity minimum and service state flow the address information of service equipment normally.
The said equipment is that current selection least-loaded and the normal loading condition that flows service equipment of service are compared with the ultimate load that the stream service management apparatus, service management can bear, the stream service equipment that can guarantee so current selection can not transship, thereby has guaranteed the stability of system operation.
Optionally, above-mentioned receiving element 201, the loading condition information that can also periodically send for receiving the stream service equipment, this loading condition information comprises load capacity or means the abnormal sign of service state; The said equipment can also comprise updating block and service status determining unit;
If the loading condition information that above-mentioned stream service equipment sends comprises load capacity, above-mentioned service state determining unit is used for, and determines that above-mentioned stream service equipment service state is normal, and above-mentioned updating block is used for, and upgrades the load capacity of above-mentioned stream service equipment;
If the loading condition information that above-mentioned stream service equipment sends comprises the sign that service state is abnormal, above-mentioned service state is used for, and determining unit determines that above-mentioned stream service equipment service state is abnormal.
In prior art, the stream service equipment periodically reports loading condition information and heartbeat to report request respectively, and the inventor finds in realizing process of the present invention, and the loading condition information that the stream service equipment reports also can reflect the service state of this stream resource apparatus.Concrete, if this loading condition information is carried load capacity, mean that so this stream service equipment service state is normal, if this loading condition information is carried the sign that service state is abnormal, mean that so this stream service equipment service state is abnormal.Therefore, do not need to report heartbeat request, only need to report loading condition information, thereby reach the purpose of saving resource.
On the basis of above-described embodiment two any one implementations, preferably, the receiving element of the said equipment, also for receiving the ultimate load of this stream service equipment that flows the service equipment transmission;
The said equipment also comprises the ultimate load maintenance unit, for judging whether to preserve the ultimate load of described stream service equipment; If so, upgrade the ultimate load of the described stream service equipment of preserving; If not, preserve the ultimate load of described stream service equipment.
Inventive concept based on same with embodiment mono-method, the embodiment of the present invention three provides a kind of stream resource management system, and as shown in Figure 3, this system comprises:
Stream asset management device 301, session management equipment 302 and stream service equipment 303a, 303b, 303c.
It should be pointed out that Fig. 3 is only a kind of example, the quantity of not convection current service equipment is limited
This session management equipment 302, for send stream resource points broadcast message to above-mentioned stream asset management device, this stream resource points broadcast message comprises bandwidth on demand.
Above-mentioned stream asset management device 301, for present load amount and the service state according to all stream service equipments, select present load minimum and service state to flow normally service equipment, the present load amount of above-mentioned stream service equipment is the load capacity reported above-mentioned stream service equipment the last time, according to the bandwidth on demand in above-mentioned stream resource points broadcast message, upgrades the load capacity that above-mentioned present load amount minimum and service state flow service equipment normally, when judgement above-mentioned present load amount minimum and service state flow bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message while being greater than the ultimate load of the above-mentioned stream service equipment that above-mentioned stream asset management device receives normally, refuse the stream resource points broadcast message that above-mentioned session management equipment sends, when judgement above-mentioned present load amount minimum and service state flow bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message while being not more than the ultimate load of the above-mentioned stream service equipment that above-mentioned stream asset management device receives normally, return to the stream resource allocation result to above-mentioned session management equipment, this stream resource allocation result comprises that above-mentioned present load amount minimum and service state flow the address information of service equipment normally.
Above-mentioned load capacity minimum and service state flow service equipment normally, for the request according to described session management equipment, to above-mentioned session management equipment, send the stream resource.
The system of above-described embodiment three is that current selection least-loaded and the normal loading condition that flows service equipment of service are compared with the ultimate load that the stream service management apparatus, service management can bear, the stream service equipment that can guarantee so current selection can not transship, thereby has guaranteed the stability of system operation.
Below in conjunction with concrete application scenarios, the technical scheme that the embodiment of the present invention is provided is elaborated.
Embodiment tetra-:
As shown in Figure 3, the stream resource management system includes stream asset management device 301, session management equipment 303 and stream service equipment 303a, 303b and 303c.
The realization of stream resource management can be divided into and reports the process that manages maintenance and the process of carrying out the resource distribution according to the request of session management equipment according to the stream service equipment.
Wherein, according to stream service equipment report the process that manages maintenance specific as follows:
The every flow service equipment periodically reports loading condition information.Loading condition information comprises load capacity information and stream service equipment state.The message format that sends loading condition is as shown in table 1, NEload means to flow the service load situation, be load capacity information, wherein load capacity information is certain numeric representation utilized between 0-100,0-100 means that load capacity accounts for the percentage of stream service equipment ultimate load, the present load amount of the load capacity information updating that following basis reports is the result of calculating according to the ultimate load of stream service equipment.NEStatus means the streaming server equipment state, wherein, in_service means that service is normal, and it is abnormal that out_of_service and ioslation mean to flow now the service equipment service state, and above-mentioned two parameters are the above-mentioned abnormal sign of expression stream service state.
Table 1
Item | Connotation |
Version | Protocol version |
NEID | The streaming server sign |
NEStatus | Streaming server equipment state " in_service ", " out_of_service ", " isolation " |
NELoad | The streaming server loading condition |
MediaPort | The media port object |
IPVersion | IP address class type " IPV4 ", " IPV6 " |
IPAddr | The IP address, send the setup request for SM to SS |
Port | Port numbers, send the setup request for SM to SS |
ServerAttr | The media port attribute |
Status | Media port state " in_service ", " out_of_service ", " isolation " |
MaxInBW | Media port enters total amount of bandwidth |
MaxOutBW | Media port goes out total amount of bandwidth |
UsedInBW | Media port is used into total amount of bandwidth |
UsedOutBW | Media port is used out total amount of bandwidth |
InBWOverloadIndication | Media port enters the overload indication |
InBWOverloadIndication | Media port enters the overload indication |
CapabilitySet | The agreement [HTTP|RTSP] that media port is supported |
The loading condition information that stream asset management device 301 reports according to each stream service equipment, whether the service state of judgement stream service equipment is normal.
Concrete, if the loading condition information that the stream service equipment sends comprises load capacity, the stream asset management device can not need to check stream service equipment state, the stream asset management device determines that above-mentioned stream service equipment service state is normal; If the loading condition information that the stream service equipment sends comprises the sign that service state is abnormal, stream asset management device 301 determines that above-mentioned stream service equipment service state is abnormal.For example, if stream service equipment 303a present load amount is 50M, mean that so stream service equipment 303a service state is normal; The current service state of stream service equipment 303b is out_of_service, means stream service equipment 303b current service abnormal state.
In addition, if the loading condition information that the stream service equipment sends comprises load capacity, the stream asset management device also upgrades the load capacity of this stream service equipment according to this load capacity.
For example, stream service equipment 303a is at report cycle T
nthe loading condition information reported comprises load capacity (300M), flow the load capacity that asset management device 301 will flow service equipment 303a and be updated to 300M, and the service state of judgement stream service equipment 303a is normal.Stream service equipment 303a is at report cycle T
n+1the loading condition information reported comprises out_of_service, and the service state that flows asset management device 301 this stream service equipment of judgement 303a is abnormal, and the service state of this stream service equipment 303a is updated to abnormality.
In the stream asset management device, the homogeneous turbulence service equipment is not distinguished with address information.The associated preservation of address information, load capacity and service status information of stream service equipment.
Optionally, can also safeguard the ultimate load of stream service equipment.So, above-mentioned stream asset management device 301 receives the ultimate load of this stream service equipment that the stream service equipments send; Judge whether to preserve the ultimate load of this stream service equipment; If so, upgrade the ultimate load of this stream service equipment of preserving; If not, preserve the ultimate load of this stream service equipment.For example, stream service equipment 303a, the 303b that stream asset management device 301 is preserved and the ultimate load of 303c are respectively 500M, 400M and 350M.
The process of carrying out the resource distribution according to the request of session management equipment specifically describes as follows:
When session management equipment is arranged to stream asset management device application stream resource points broadcast message, the stream asset management device flows service equipment according to the present load amount of all stream service equipments normally with service condition selecting present load amount minimum and service state.The present load amount can be the load capacity reported stream service equipment the last time.The current service state of stream service equipment 303a is abnormal, and the current service state of stream service equipment 303b and 303c is normal.The load capacity that stream service equipment 303b the last time reports is 300M, and the load capacity that stream service equipment 303c the last time reports is 240M.So, the current load capacity of stream service equipment 303c is 240M, is less than the present load amount of stream service equipment 303b, therefore selects stream service equipment 303c.
Selecting after load capacity minimum and service state flow service equipment normally, judging that above-mentioned present load amount minimum and service state flow the ultimate load whether bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message is greater than above-mentioned stream service equipment normally.
If above-mentioned present load amount minimum and service state flow the ultimate load that bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message is greater than above-mentioned stream service equipment, the stream resource points broadcast message that above-mentioned stream asset management device refusal session management equipment sends normally;
Be not more than the ultimate load of above-mentioned stream service equipment if above-mentioned present load amount minimum and service state flow bandwidth on demand sum in the present load amount of service equipment and above-mentioned stream resource points broadcast message normally, and return to the stream resource allocation result to above-mentioned session management equipment.
For example, present load amount minimum and the normal stream of service service equipment be stream service equipment 303b, and the current load capacity of stream service equipment 303b is 300M, bandwidth on demand in stream resource points broadcast message is 50M, so, (300+50) M is not more than the ultimate load 400M of stream service equipment 303b, so the stream asset management device returns to the stream resource allocation result to session management equipment.
In enforcement, the corresponding a plurality of stream service equipments of IP address possibility, so, each stream service equipment is distinguished by different ports.In this case, address information comprises IP address and port information; Suppose that the present load amount of selecting is minimum and serve normal stream service equipment is stream service equipment 303b, the address information of the associated stream service equipment 303b preserved is 10.0.64.2 and 200, and what flow that asset management device returns to session management equipment is 10.0.64.2 and 200.Wherein, 10.0.64.2 is the IP address of stream service equipment 303b, the 200th, and the port information of stream service equipment 303b.
An IP address also may corresponding 1 stream service equipment.In this case, address information only includes the IP address.The address information of supposing the associated stream service equipment 303b preserved is 10.0.64.2, and that flow that asset management device returns to session management equipment is 10.0.64.2.
Those skilled in the art should understand, embodiments of the invention can be provided as method, system or computer program.Therefore, the present invention can adopt complete hardware implementation example, implement software example or in conjunction with the form of the embodiment of software and hardware aspect fully.And the present invention can adopt the form that wherein includes the upper computer program of implementing of computer-usable storage medium (including but not limited to magnetic disc store, CD-ROM, optical memory etc.) of computer usable program code one or more.
The present invention describes with reference to flow chart and/or the block diagram of method, equipment (system) and computer program according to the embodiment of the present invention.Should understand can be in computer program instructions realization flow figure and/or block diagram each flow process and/or the flow process in square frame and flow chart and/or block diagram and/or the combination of square frame.Can provide these computer program instructions to the processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing device to produce a machine, make the instruction of carrying out by the processor of computer or other programmable data processing device produce for realizing the device in the function of flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame appointments.
These computer program instructions also can be stored in energy vectoring computer or the computer-readable memory of other programmable data processing device with ad hoc fashion work, make the instruction be stored in this computer-readable memory produce the manufacture that comprises command device, this command device is realized the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame.
These computer program instructions also can be loaded on computer or other programmable data processing device, make and carry out the sequence of operations step to produce computer implemented processing on computer or other programmable devices, thereby the instruction of carrying out on computer or other programmable devices is provided for realizing the step of the function of appointment in flow process of flow chart or a plurality of flow process and/or square frame of block diagram or a plurality of square frame.
Although described the preferred embodiments of the present invention, once those skilled in the art obtain the basic creative concept of cicada, can make other change and modification to these embodiment.So claims are intended to all changes and the modification that are interpreted as comprising preferred embodiment and fall into the scope of the invention.
Obviously, those skilled in the art can carry out various changes and modification and not break away from the spirit and scope of the present invention the present invention.Like this, if within of the present invention these are revised and modification belongs to the scope of the claims in the present invention and equivalent technologies thereof, the present invention also is intended to comprise these changes and modification interior.
Claims (7)
1. an implementation method that flows resource management, is characterized in that, comprising:
The stream asset management device receives the stream resource points broadcast message of session management equipment, and described stream resource points broadcast message comprises bandwidth on demand;
Described stream asset management device is according to the present load amount of all stream service equipments, select present load amount minimum and service state to flow normally service equipment, the present load amount of described stream service equipment is the load capacity reported described stream service equipment the last time;
Judge described stream asset management device described present load amount minimum and service state flow the ultimate load whether bandwidth on demand sum in the present load amount of service equipment and described stream resource points broadcast message is greater than described stream service equipment normally;
If described present load amount minimum and service state flow the ultimate load that bandwidth on demand sum in the present load amount of service equipment and described stream resource points broadcast message is greater than described stream service equipment normally, described stream asset management device is refused the stream resource points broadcast message that described session management equipment sends;
If described present load amount minimum and service state flow the ultimate load that bandwidth on demand sum in the present load amount of service equipment and described stream resource points broadcast message is not more than described stream service equipment normally, described stream asset management device returns to the stream resource allocation result to described session management equipment, and described stream resource allocation result comprises that described present load amount minimum and service state flow the address information of service equipment normally.
2. the method for claim 1, is characterized in that, also comprises:
Described stream asset management device receives the loading condition information that described stream service equipment periodically sends, and described loading condition information comprises load capacity or means the abnormal sign of service state;
If the loading condition information that the stream service equipment sends comprises load capacity, described stream asset management device determines that described stream service equipment service state is normal, and upgrades the load capacity of described stream service equipment;
If the loading condition information that the stream service equipment sends comprises the sign that service state is abnormal, described stream asset management device determines that described stream service equipment service state is abnormal.
3. method as claimed in claim 1 or 2, is characterized in that, also comprises:
Described stream asset management device receives the ultimate load of the described stream service equipment of stream service equipment transmission;
Judge whether to preserve the ultimate load of described stream service equipment;
If so, upgrade the ultimate load of the described stream service equipment of preserving;
If not, preserve the ultimate load of described stream service equipment.
4. a stream asset management device, is characterized in that, comprising:
Receiving element, for receiving session management equipment stream resource points broadcast message, described stream resource points broadcast message comprises bandwidth on demand;
Selected cell, for the present load amount according to all stream service equipments, select present load amount minimum and service state to flow normally service equipment, and the present load amount of described stream service equipment is the load capacity reported stream service equipment the last time;
Judging unit, flow the present load amount of service equipment and the ultimate load whether described stream resource points broadcast message bandwidth on demand sum is greater than described stream service equipment normally for judging described present load amount minimum and service state;
Transmitting element, if described present load amount minimum and service state flow the ultimate load that bandwidth on demand sum in the present load amount of service equipment and described stream resource points broadcast message is greater than described stream service equipment normally, described transmitting element is used for, and refuses the stream resource points broadcast message that described session management equipment sends;
If described present load amount minimum and service state flow the ultimate load that bandwidth on demand sum in the present load amount of service equipment and described stream resource points broadcast message is not more than described stream service equipment normally, described transmitting element is used for, return to the stream resource allocation result to described session management equipment, described stream resource allocation result comprises that described present load amount minimum and service state flow the address information of service equipment normally.
5. equipment as claimed in claim 4, is characterized in that, also comprises updating block and service status determining unit:
Described receiving element, the loading condition information also periodically sent for receiving the stream service equipment, described loading condition information comprises load capacity or means the abnormal sign of service state;
If the loading condition information that described stream service equipment sends comprises load capacity, described service state determining unit is used for, and determines that described stream service equipment service state is normal, and described updating block is used for, and upgrades the load capacity of described stream service equipment;
If the loading condition information that described stream service equipment sends comprises the sign that service state is abnormal, described service state determining unit is used for, and determines that described stream service equipment service state is abnormal.
6. equipment as described as claim 4 or 5, is characterized in that, also comprises the ultimate load maintenance unit:
Described receiving element, also for receiving the ultimate load of the described stream service equipment that flows the service equipment transmission;
Described ultimate load maintenance unit, for judging whether to preserve the ultimate load of described stream service equipment; If so, upgrade the ultimate load of the described stream service equipment of preserving; If not, preserve the ultimate load of described stream service equipment.
7. a stream resource management system, is characterized in that, comprises stream asset management device, session management equipment and stream service equipment:
Described session management equipment, for send stream resource points broadcast message to described stream asset management device, described stream resource points broadcast message comprises bandwidth on demand;
Described stream asset management device, for present load amount and the service state according to all stream service equipments, select present load minimum and service state to flow normally service equipment, the present load amount of described stream service equipment is the load capacity reported above-mentioned stream service equipment the last time, according to the bandwidth on demand in described stream resource points broadcast message, upgrades the load capacity that above-mentioned present load amount minimum and service state flow service equipment normally; When the bandwidth on demand sum is greater than the ultimate load of the described stream service equipment that described stream service equipment sends in present load amount that judgement described present load amount minimum and service state flow service equipment normally and described stream resource points broadcast message, refuse the stream resource points broadcast message of described session management equipment transmission; When judgement described present load amount minimum and service state flow in the present load amount of service equipment and described stream resource points broadcast message that the bandwidth on demand sum is not more than the ultimate load of described stream service equipment normally, to described session management equipment, return to the stream resource allocation result;
Described load capacity minimum and service state flow service equipment normally, for the request according to described session management equipment, to described session management equipment, send the stream resource.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103557703A CN103442257A (en) | 2013-08-15 | 2013-08-15 | Method, device and system for achieving flow resource management |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103557703A CN103442257A (en) | 2013-08-15 | 2013-08-15 | Method, device and system for achieving flow resource management |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103442257A true CN103442257A (en) | 2013-12-11 |
Family
ID=49695915
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013103557703A Pending CN103442257A (en) | 2013-08-15 | 2013-08-15 | Method, device and system for achieving flow resource management |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103442257A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105917325A (en) * | 2014-12-24 | 2016-08-31 | 华为技术有限公司 | Multicast control method, apparatus and system based on DOCSIS protocol |
CN106126339A (en) * | 2016-06-21 | 2016-11-16 | 青岛海信传媒网络技术有限公司 | resource adjusting method and device |
CN107580033A (en) * | 2017-08-24 | 2018-01-12 | 阿里巴巴集团控股有限公司 | Load information treating method and apparatus, message treatment method and device, server |
CN114629947A (en) * | 2022-01-26 | 2022-06-14 | 浙江大华技术股份有限公司 | Method for accessing equipment to platform and related equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101212647A (en) * | 2007-07-18 | 2008-07-02 | 中国科学技术大学 | Two-way HFC network based stream media service implementation method and device |
CN101217484A (en) * | 2008-01-21 | 2008-07-09 | 中兴通讯股份有限公司 | Resource distributing method and system |
CN101365103A (en) * | 2007-08-06 | 2009-02-11 | 中国科学院声学研究所 | Interactive service management method for cable television network |
CN102447954A (en) * | 2011-10-31 | 2012-05-09 | 青岛海信传媒网络技术有限公司 | Method for managing channel number resource in network television system and device |
CN102916927A (en) * | 2012-09-21 | 2013-02-06 | 青岛海信传媒网络技术有限公司 | Method and system for distributing resources, edge resource manager and session manager |
-
2013
- 2013-08-15 CN CN2013103557703A patent/CN103442257A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101212647A (en) * | 2007-07-18 | 2008-07-02 | 中国科学技术大学 | Two-way HFC network based stream media service implementation method and device |
CN101365103A (en) * | 2007-08-06 | 2009-02-11 | 中国科学院声学研究所 | Interactive service management method for cable television network |
CN101217484A (en) * | 2008-01-21 | 2008-07-09 | 中兴通讯股份有限公司 | Resource distributing method and system |
CN102447954A (en) * | 2011-10-31 | 2012-05-09 | 青岛海信传媒网络技术有限公司 | Method for managing channel number resource in network television system and device |
CN102916927A (en) * | 2012-09-21 | 2013-02-06 | 青岛海信传媒网络技术有限公司 | Method and system for distributing resources, edge resource manager and session manager |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105917325A (en) * | 2014-12-24 | 2016-08-31 | 华为技术有限公司 | Multicast control method, apparatus and system based on DOCSIS protocol |
CN106126339A (en) * | 2016-06-21 | 2016-11-16 | 青岛海信传媒网络技术有限公司 | resource adjusting method and device |
CN106126339B (en) * | 2016-06-21 | 2019-07-30 | 青岛海信传媒网络技术有限公司 | Resource adjusting method and device |
CN107580033A (en) * | 2017-08-24 | 2018-01-12 | 阿里巴巴集团控股有限公司 | Load information treating method and apparatus, message treatment method and device, server |
CN107580033B (en) * | 2017-08-24 | 2020-12-25 | 创新先进技术有限公司 | Load information processing method and device, message processing method and device, and server |
CN114629947A (en) * | 2022-01-26 | 2022-06-14 | 浙江大华技术股份有限公司 | Method for accessing equipment to platform and related equipment |
CN114629947B (en) * | 2022-01-26 | 2024-04-12 | 浙江大华技术股份有限公司 | Method for accessing equipment to platform and related equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11909649B2 (en) | Efficiently managing network traffic | |
US9369390B2 (en) | Methods, systems, and computer readable media for providing a thinking diameter network architecture | |
US10034222B2 (en) | System and method for mapping a service-level topology to a service-specific data plane logical topology | |
US8972519B2 (en) | Optimization of multimedia service over an IMS network | |
CN105553870B (en) | Service request distribution method and device | |
CN108848530B (en) | Method and device for acquiring network resources and scheduling server | |
CN103581245A (en) | Content delivery method and system of content delivery network | |
CN103053146B (en) | Data migration method and device | |
CN102868935A (en) | Scheduling method for responding multiple sources in content distribution network (CDN) | |
CN108055309B (en) | Data transmission system and method | |
US8699336B2 (en) | Method and system for implementing relay channel, and edge node | |
CN103023928A (en) | P2P (peer-to-peer) node matching system and method | |
WO2024104284A1 (en) | Nwdaf-based management and decision-making method for computing resources | |
US20130148596A1 (en) | Resource management system and method of centralized base station in mobile communication network | |
US11025490B2 (en) | Method for dynamically managing a network service in a communication network | |
CN104580016A (en) | Node distribution method, device and system | |
CN103442257A (en) | Method, device and system for achieving flow resource management | |
CN109962961A (en) | A kind of reorientation method and system of content distribution network CDN service node | |
CN102420868A (en) | Service providing method, device and system | |
CN102780710A (en) | Node scheduling method based on content distribution network | |
WO2010109952A1 (en) | Resource allocation request device, resource allocation device, resource allocation request method, and resource allocation method | |
CN105656978A (en) | Resource sharing method and device | |
CN106790354B (en) | Communication method and device for preventing data congestion | |
CN112714146B (en) | Resource scheduling method, device, equipment and computer readable storage medium | |
CN103442258A (en) | Method, device and system for achieving flow resource management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20131211 |
|
RJ01 | Rejection of invention patent application after publication |