CN103440412A - 一种电力隧道顶管下穿越施工地面沉降曲线预测方法 - Google Patents

一种电力隧道顶管下穿越施工地面沉降曲线预测方法 Download PDF

Info

Publication number
CN103440412A
CN103440412A CN2013103651476A CN201310365147A CN103440412A CN 103440412 A CN103440412 A CN 103440412A CN 2013103651476 A CN2013103651476 A CN 2013103651476A CN 201310365147 A CN201310365147 A CN 201310365147A CN 103440412 A CN103440412 A CN 103440412A
Authority
CN
China
Prior art keywords
electric power
power tunnel
polynomial
construction
land subsidence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103651476A
Other languages
English (en)
Inventor
蔡钧
杨文威
陆小龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd
State Grid Corp of China SGCC
State Grid Shanghai Electric Power Co Ltd
Original Assignee
SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd
State Grid Corp of China SGCC
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd, State Grid Corp of China SGCC, State Grid Shanghai Electric Power Co Ltd filed Critical SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd
Priority to CN2013103651476A priority Critical patent/CN103440412A/zh
Publication of CN103440412A publication Critical patent/CN103440412A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明涉及一种电力隧道顶管下穿越施工地面沉降曲线预测方法,该方法包括以下步骤:1)采集顶管施工的前期实测数据,并根据施工要求获得最终沉降量;2)对步骤1)中获得的数据进行多项式拟合;3)根据步骤2)拟合得到的多项式生成预测的地面沉降曲线。与现有技术相比,本发明通过对前期实测曲线和地面最终沉降值进行拟合,从而预测分析沉降过程中的曲线形态,为施工监测提供依据,且具有预测精确高、方法简单的优点。

Description

一种电力隧道顶管下穿越施工地面沉降曲线预测方法
技术领域
本发明涉及一种电力隧道施工控制技术,尤其是涉及一种电力隧道顶管下穿越施工地面沉降曲线预测方法。
背景技术
对于软土地区,一般认为地面沉降可分为瞬时沉降、固结沉降和次固结沉降,其中,固结沉降最大。所谓工后沉降一般是指工程施工结束后产生的沉降,包含了相当大部分的固结沉降和次固结沉降。
为解决城市日益紧张的交通问题,不影响市区内交通以及满足场地有限等因素,许多城市采用盾构法新建或扩建地铁。盾构法施工期间的沉降问题己有不少专家和学者用很多方法进行研究,但很少有人对盾构施工引起的工后沉降问题进行研究。土体的变形是随时间长期增长的过程,施工结束后,土体仍存在潜在的变形即工后沉降,准确估算工后沉降对保护既有建筑物和基础设施非常重要,故对地面工后(长期)沉降的预测,即对土体扰动的时间效应分析有着重大的现实意义。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种预测精确高、方法简单的电力隧道顶管下穿越施工地面沉降曲线预测方法
本发明的目的可以通过以下技术方案来实现:
一种电力隧道顶管下穿越施工地面沉降曲线预测方法,该方法包括以下步骤:
1)采集顶管施工的前期实测数据,并根据施工要求获得最终沉降量;
2)对步骤1)中获得的数据进行多项式拟合;
3)根据步骤2)拟合得到的多项式生成预测的地面沉降曲线。
所述的前期实测数据指地面变形从最大隆起值进入沉降阶段这个时间点开始,后7天的沉降实测数据。
所述的最终沉降量指相关保护对象所要求的最终沉降限值。
所述的最终沉降量小于或等于10mm。
所述的多项式拟合包括三次多项式拟合或二次多项式拟合。
所述的多项式拟合的方法包括最小二乘法。
与现有技术相比,本发明通过对前期实测曲线和地面最终沉降值进行拟合,从而预测分析沉降过程中的曲线形态,为施工监测提供依据,且具有预测精确高、方法简单的优点。
具体实施方式
下面结合具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。
一种电力隧道顶管下穿越施工地面沉降曲线预测方法,该方法包括以下步骤:
1)采集顶管施工的前期实测数据,并根据施工要求获得最终沉降量。
所述的前期实测数据指地面变形从最大隆起值进入沉降阶段这个时间点开始,后7天的沉降实测数据。所述的最终沉降量指相关保护对象所要求的最终沉降限值,一般小于或等于10mm。
2)对步骤1)中获得的数据进行多项式拟合。三次多项式和二次多项式拟合结果极为接近,从简单实用角度考虑,用二次多项式拟合即可完全满足精度要求,可采用最小二乘法进行二次曲线拟合。
3)根据步骤2)拟合得到的多项式生成预测的地面沉降曲线,从而预测分析沉降过程中的曲线形态,为施工监测提供依据,预测曲线的时间范围是25-30天。
在顶管施工过程中,可实时采集实际沉降值,并将其与预测的地面沉降曲线进行比较,当实测值大于预测值2mm及以上时,如果发现有进一步发展的趋势,可及时采取有效措施进行控制,从而达到沉降控制目标。

Claims (6)

1.一种电力隧道顶管下穿越施工地面沉降曲线预测方法,其特征在于,该方法包括以下步骤:
1)采集顶管施工的前期实测数据,并根据施工要求获得最终沉降量;
2)对步骤1)中获得的数据进行多项式拟合;
3)根据步骤2)拟合得到的多项式生成预测的地面沉降曲线。
2.根据权利要求1所述的一种电力隧道顶管下穿越施工地面沉降曲线预测方法,其特征在于,所述的前期实测数据指地面变形从最大隆起值进入沉降阶段这个时间点开始,后7天的沉降实测数据。
3.根据权利要求1所述的一种电力隧道顶管下穿越施工地面沉降曲线预测方法,其特征在于,所述的最终沉降量指相关保护对象所要求的最终沉降限值。
4.根据权利要求3所述的一种电力隧道顶管下穿越施工地面沉降曲线预测方法,其特征在于,所述的最终沉降量小于或等于10mm。
5.根据权利要求1所述的一种电力隧道顶管下穿越施工地面沉降曲线预测方法,其特征在于,所述的多项式拟合包括三次多项式拟合或二次多项式拟合。
6.根据权利要求1所述的一种电力隧道顶管下穿越施工地面沉降曲线预测方法,其特征在于,所述的多项式拟合的方法包括最小二乘法。
CN2013103651476A 2013-08-20 2013-08-20 一种电力隧道顶管下穿越施工地面沉降曲线预测方法 Pending CN103440412A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103651476A CN103440412A (zh) 2013-08-20 2013-08-20 一种电力隧道顶管下穿越施工地面沉降曲线预测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103651476A CN103440412A (zh) 2013-08-20 2013-08-20 一种电力隧道顶管下穿越施工地面沉降曲线预测方法

Publications (1)

Publication Number Publication Date
CN103440412A true CN103440412A (zh) 2013-12-11

Family

ID=49694105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103651476A Pending CN103440412A (zh) 2013-08-20 2013-08-20 一种电力隧道顶管下穿越施工地面沉降曲线预测方法

Country Status (1)

Country Link
CN (1) CN103440412A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104295304A (zh) * 2014-08-13 2015-01-21 北京城建集团有限责任公司 一种实现不同沉降分布保证率的地铁隧道沉降槽生成方法
CN106649912A (zh) * 2016-09-06 2017-05-10 中铁十六局集团北京轨道交通工程建设有限公司 一种地铁隧道盾构下穿既有铁路设施的沉降预测方法
CN107016350A (zh) * 2017-04-26 2017-08-04 中科唯实科技(北京)有限公司 一种基于深度相机的老人跌倒检测方法
CN114150718A (zh) * 2022-02-07 2022-03-08 山东建筑大学 一种用于地下结构非均匀沉降病害的预警治理与检测工艺
CN114608468A (zh) * 2022-03-25 2022-06-10 长安大学 一种顶管穿越时道路表面变形监测装置及监测方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120278026A1 (en) * 2005-03-18 2012-11-01 Swanson Brian G Predictive emissions monitoring system and method
CN102880786A (zh) * 2012-08-10 2013-01-16 河海大学 一种基于模拟退火法的Kriging地面沉降时域监控方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120278026A1 (en) * 2005-03-18 2012-11-01 Swanson Brian G Predictive emissions monitoring system and method
CN102880786A (zh) * 2012-08-10 2013-01-16 河海大学 一种基于模拟退火法的Kriging地面沉降时域监控方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘加才等: "竖向排水井地基工后沉降预测", 《岩土力学》 *
袁森林等: "世博会电力隧道顶管穿越防汛墙扰动影响分析", 《地下空间与工程学报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104295304A (zh) * 2014-08-13 2015-01-21 北京城建集团有限责任公司 一种实现不同沉降分布保证率的地铁隧道沉降槽生成方法
CN106649912A (zh) * 2016-09-06 2017-05-10 中铁十六局集团北京轨道交通工程建设有限公司 一种地铁隧道盾构下穿既有铁路设施的沉降预测方法
CN107016350A (zh) * 2017-04-26 2017-08-04 中科唯实科技(北京)有限公司 一种基于深度相机的老人跌倒检测方法
CN114150718A (zh) * 2022-02-07 2022-03-08 山东建筑大学 一种用于地下结构非均匀沉降病害的预警治理与检测工艺
CN114150718B (zh) * 2022-02-07 2022-05-24 山东建筑大学 一种用于地下结构非均匀沉降病害的预警治理与检测工艺
CN114608468A (zh) * 2022-03-25 2022-06-10 长安大学 一种顶管穿越时道路表面变形监测装置及监测方法

Similar Documents

Publication Publication Date Title
CN103440412A (zh) 一种电力隧道顶管下穿越施工地面沉降曲线预测方法
CN102590215B (zh) 便携式多功能隧道病害信息采集仪
CN104697495A (zh) 一种用于建筑物施工及运营期沉降和收敛的在线监测方法
CN103886152A (zh) 基于城市下凹式立交桥区dem的流域汇水范围制作方法
CN203364831U (zh) 一种减少温差效应的全球导航卫星系统观测墩
CN106096796A (zh) 一种基于坐标复合指数映射的软土地基沉降过程预测方法
CN103425054A (zh) 一种基于数字化的电力隧道施工控制方法
CN105321122A (zh) 一种污区分布图的现场验证方法
CN101246157A (zh) 沥青混凝土路面应力应变检测方法及检测系统
CN104123434A (zh) 一种顶管隧道穿越高速公路的地面沉降实时主动控制方法
CN103699774A (zh) 一种流变性地层基坑开挖长时位移预测评价方法
CN203420265U (zh) 一种基坑边缘变形的监测系统
CN102622656A (zh) 一种沙漠边缘扩展速度的预测方法
CN204515127U (zh) 一种基于cors基站的地面沉降监测系统
CN203949840U (zh) 淤泥流动性测试装置
CN209085710U (zh) 一种排水管网液位在线远程监测系统
CN103741726A (zh) 一种沉井沉降量测量方法
CN107220219B (zh) 铁路钢箱梁桥温度梯度模式评价方法
CN205280057U (zh) 一种公路路基沉降观测装置
CN109443523A (zh) 一种35kV户内或地下变电站结构噪声间接测量方法
Zhang et al. The Research Review on Monitoring of Foundation Pit
CN205139949U (zh) 一种强夯施工夯击自动计数系统
CN205844817U (zh) 一种地下管线生存环境监控仪
CN203116744U (zh) 测量用强制归心底盘
CN202304811U (zh) 路基沉降遥测系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20131211

RJ01 Rejection of invention patent application after publication