CN103741726A - 一种沉井沉降量测量方法 - Google Patents

一种沉井沉降量测量方法 Download PDF

Info

Publication number
CN103741726A
CN103741726A CN201410000746.2A CN201410000746A CN103741726A CN 103741726 A CN103741726 A CN 103741726A CN 201410000746 A CN201410000746 A CN 201410000746A CN 103741726 A CN103741726 A CN 103741726A
Authority
CN
China
Prior art keywords
open caisson
construction
well body
settling
angles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410000746.2A
Other languages
English (en)
Other versions
CN103741726B (zh
Inventor
刘钟骏
高建民
王林义
马强
李东
王健
郅振荣
金将将
张姣
王建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Second Construction Group Co Ltd
Original Assignee
Shanxi No2 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi No2 Construction Co Ltd filed Critical Shanxi No2 Construction Co Ltd
Priority to CN201410000746.2A priority Critical patent/CN103741726B/zh
Publication of CN103741726A publication Critical patent/CN103741726A/zh
Application granted granted Critical
Publication of CN103741726B publication Critical patent/CN103741726B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Optical Radar Systems And Details Thereof (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

一种沉井沉降量测量方法,在沉井施工前分别在井体四周距离井体一定位置(水平距离大于沉井沉降深度)制作四个混凝土支墩,每个混凝土支墩的高度比地面高出100mm;每个混凝土支墩上均安装一个水平激光仪,并在井体四个角的井壁上设置刻度标线;沉井沉降过程中,开启激光仪,对沉井沉降过程中位置及标高进行实时监控。本发明方便施工技术人员及时进行沉井纠偏,保证沉井施工质量。同时简化测量程序,减少测量过程中人为误差的发生。加快施工进度。本措施可广泛应用于沉井施工结构沉降质量控制施工中。

Description

一种沉井沉降量测量方法
技术领域
本发明属于建筑施工领域,具体涉及一种沉井沉降量测量方法。
背景技术
施工中有些建筑物埋设深度很大,土壤中含水量很大,地下水位很高,采用大开挖后施工解决排水问题困难大,成本增加很多;有些建筑施工场地狭小,附近有建筑物影响不适宜大开挖施工。在以上情况下,沉井法施工是一种较好的施工方法。
目前沉井施工已经是成熟的施工工艺,被广泛用于深坑、地下室、水泵房、设备深基础、桥墩、码头等工程,但是沉井施工中由于地基土承载力不匀以及地下水影响,使得沉井施工中在井体下沉时对井体垂直度以及位置的控制难度加大。要及时采取纠偏措施,测量沉降量就是重中之重。
传统的沉降量测量都需要测量人员定时不间断测量,这样在控制过程中人为因素影响较大。
发明内容
本实用措施是解决目前沉井施工中对于井体下沉过程中,井体标高及位置控制的难点。
为实现上述目的,本发明在沉井施工前分别在井体四周距离井体一定位置(水平距离大于沉井沉降深度)制作四个混凝土支墩,每个混凝土支墩上均安装一个水平激光仪,并在井体的井壁上设置刻度标线,刻度标线设置在与水平激光仪的激光光线相对应的位置。
支墩大小为500mm×500mm×500mm立方体,混凝土支墩的高度比地面高出100mm;
沉井沉降过程中,开启激光仪,分别观察四个红外激光与井体四个角的井壁标刻度标线的相对位置,就可以确定井体四个角的下沉量,通过对四个角的下沉量进行比较,就可以确定井体是否偏移或同步,当有偏移或者下沉不同步时及时采取纠偏措施。
通过上述设备装置安装以后,在井体下沉过程中就可以直观的观察沉井井体的位移及标高变化,并且不受白天黑夜光线的影响,由此就便于施工技术人员快速做出相应的应对措施。便于沉井施工的质量控制。
本发明直观准确,能第一时间检测到沉井下沉的具体情况,便于施工技术人员第一时间做出应对措施,从而提升对沉井的质量控制,同时也简化了测量过程,缩短施工工期,节约成本。
附图说明
图1是本发明实施例的混凝土支墩位置的示意图。
图中,1、混凝土支墩,2、沉井井体,3、井体的控制轴线。
具体实施方式
实施例:沉井施工前在沉井定位放线过程中将井体的控制轴线3延伸出来,并且在延伸出的轴线上制作四个混凝土支墩1,混凝土支墩离井体水平距离大于沉井沉降深度,既要便于观察,又要做到不受沉井施工影响,支墩大小为500mm×500mm×500mm立方体,埋地深度400mm,支墩顶标高保持一致,然后在支墩上安装水平激光仪,或者激光手电。如图1,激光仪安装在同一轴线,且在同一标高。周围要做好维护,防止设备损坏。
井体施工完后准备下沉前要在井壁外侧红外控制轴线位置刻画竖向标尺线。
井体下沉施工时,通过观察红外激光与井壁标尺线的相对位置,观察标尺读数,确定井体四角的下沉量,当有偏移或者下沉不同步时及时采取纠偏措施,对现场施工进行控制。

Claims (1)

1.一种沉井沉降量测量方法,在沉井施工前分别在井体四周距离井体水平距离大于沉井沉降深度的位置制作四个混凝土支墩,每个混凝土支墩的高度比地面高出100mm;每个混凝土支墩上均安装一个水平激光仪,并在井体四个角的井壁上设置刻度标线,刻度标线设置在与水平激光仪的激光光线相对应的位置;沉井沉降过程中,开启激光仪,分别观察四个红外激光与井体四个角的井壁标刻度标线的相对位置,就可以确定井体四个角的下沉量,通过对四个角的下沉量进行比较,就可以确定井体是否偏移或同步,当有偏移或者下沉不同步时及时采取纠偏措施。
CN201410000746.2A 2014-01-02 2014-01-02 一种沉井沉降量测量方法 Active CN103741726B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410000746.2A CN103741726B (zh) 2014-01-02 2014-01-02 一种沉井沉降量测量方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410000746.2A CN103741726B (zh) 2014-01-02 2014-01-02 一种沉井沉降量测量方法

Publications (2)

Publication Number Publication Date
CN103741726A true CN103741726A (zh) 2014-04-23
CN103741726B CN103741726B (zh) 2015-08-12

Family

ID=50498785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410000746.2A Active CN103741726B (zh) 2014-01-02 2014-01-02 一种沉井沉降量测量方法

Country Status (1)

Country Link
CN (1) CN103741726B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104931014A (zh) * 2015-04-02 2015-09-23 中建三局第二建设工程有限责任公司 用于结构沉降或在高层结构自重下的压缩变形观测的装置及方法
CN106088127A (zh) * 2016-07-02 2016-11-09 天鸿建设集团有限公司 沉井施工方法
CN108413880A (zh) * 2018-01-31 2018-08-17 乐清市建设监理有限公司 一种基坑位移自动监测系统及其方法
CN109000625A (zh) * 2018-05-24 2018-12-14 上海市基础工程集团有限公司 用于圆形沉井下沉姿态自动测量系统及方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101016733A (zh) * 2007-01-08 2007-08-15 中铁西北科学研究院有限公司 多点沉降观测方法及装置
CN101684669A (zh) * 2008-09-27 2010-03-31 吴纪东 沉管式检查井及其施工方法
JP4493691B2 (ja) * 2007-12-12 2010-06-30 大豊建設株式会社 ニューマチックケーソン
CN202519713U (zh) * 2012-03-08 2012-11-07 天津第四市政建筑工程有限公司 一种可调式沉井下沉用标高监测装置
CN103205978A (zh) * 2013-04-18 2013-07-17 成军 高渗透层水位下电梯基坑沉井胎模施工方法
CN103266635A (zh) * 2013-04-26 2013-08-28 合肥工业大学 一种地锚式桩基静载试验装置及试验方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101016733A (zh) * 2007-01-08 2007-08-15 中铁西北科学研究院有限公司 多点沉降观测方法及装置
JP4493691B2 (ja) * 2007-12-12 2010-06-30 大豊建設株式会社 ニューマチックケーソン
CN101684669A (zh) * 2008-09-27 2010-03-31 吴纪东 沉管式检查井及其施工方法
CN202519713U (zh) * 2012-03-08 2012-11-07 天津第四市政建筑工程有限公司 一种可调式沉井下沉用标高监测装置
CN103205978A (zh) * 2013-04-18 2013-07-17 成军 高渗透层水位下电梯基坑沉井胎模施工方法
CN103266635A (zh) * 2013-04-26 2013-08-28 合肥工业大学 一种地锚式桩基静载试验装置及试验方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104931014A (zh) * 2015-04-02 2015-09-23 中建三局第二建设工程有限责任公司 用于结构沉降或在高层结构自重下的压缩变形观测的装置及方法
CN106088127A (zh) * 2016-07-02 2016-11-09 天鸿建设集团有限公司 沉井施工方法
CN108413880A (zh) * 2018-01-31 2018-08-17 乐清市建设监理有限公司 一种基坑位移自动监测系统及其方法
CN109000625A (zh) * 2018-05-24 2018-12-14 上海市基础工程集团有限公司 用于圆形沉井下沉姿态自动测量系统及方法

Also Published As

Publication number Publication date
CN103741726B (zh) 2015-08-12

Similar Documents

Publication Publication Date Title
CN104296721B (zh) 利用基于卫星定位与静力水准测量的分层沉降监测系统进行分层沉降监测的方法
CN103940394B (zh) 隧道管棚施工法模拟开挖装置的监测系统及方法
CN204177381U (zh) 一种光纤光栅测斜仪器
CN103913145A (zh) 一种裂缝开口双向变形监测结构及测量方法
CN103741726B (zh) 一种沉井沉降量测量方法
CN105043343A (zh) 基于激光位移传感器的自动化测量隧道拱顶沉降的方法
CN202793533U (zh) 一种河道水位尺
CN203364831U (zh) 一种减少温差效应的全球导航卫星系统观测墩
CN104631459A (zh) 静力压桩施工中桩体垂直度及桩顶标高的控制方法
CN102269578A (zh) 空间结构竖向变形测量装置
CN105092795A (zh) 一种坡面水量平衡场观测装置及应用该装置的观测方法
CN115637743A (zh) 一种深大基坑施工智能监测变形的方法
CN209279955U (zh) 一体化远程沉降观测站
CN209512835U (zh) 一种静力水准仪大量程多级串联系统
CN103994753B (zh) 用于黄土填料高填方路堤的分层沉降装置及测量方法
CN105509710A (zh) 一种地表沉降的检测方法
CN106759542A (zh) 深基坑的变形监测及变形预测的方法
CN201876257U (zh) 超大量程大坝坝基沉降仪
CN203881339U (zh) 可拆卸式监测墩
CN104596477A (zh) 一种变电站地基沉降监测方法
CN205015318U (zh) 一种坡面水量平衡场观测装置
CN104153353B (zh) 一种利用激光投线仪确定钻孔灌注桩标高的方法
CN107816933B (zh) Gnss参考站位移检校方法和检校装置
CN209028213U (zh) 一种明挖法深基坑内衬混凝土侧墙一体化自动监测装置
CN103410135B (zh) 一种基于网格钎探的河床标高测量方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 030013 No.1, Donghuamen, Xinghualing District, Taiyuan City, Shanxi Province

Patentee after: SHANXI SECOND CONSTRUCTION GROUP Co.,Ltd.

Address before: 030013 No.1, Donghuamen, Xinghualing District, Taiyuan City, Shanxi Province

Patentee before: SHANXI NO. 2 CONSTRUCTION ENGINEERING CO.

CP01 Change in the name or title of a patent holder