CN103434888B - A kind of steel bead wire waste silk bundle winding apparatus and method of work - Google Patents

A kind of steel bead wire waste silk bundle winding apparatus and method of work Download PDF

Info

Publication number
CN103434888B
CN103434888B CN201310396396.1A CN201310396396A CN103434888B CN 103434888 B CN103434888 B CN 103434888B CN 201310396396 A CN201310396396 A CN 201310396396A CN 103434888 B CN103434888 B CN 103434888B
Authority
CN
China
Prior art keywords
waste silk
winding
base station
roller
bundle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310396396.1A
Other languages
Chinese (zh)
Other versions
CN103434888A (en
Inventor
徐一铭
陆海
周黄山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Shengda Technology Co., Ltd.
Original Assignee
JIANGSU SHENGDA TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU SHENGDA TECHNOLOGY Co Ltd filed Critical JIANGSU SHENGDA TECHNOLOGY Co Ltd
Priority to CN201310396396.1A priority Critical patent/CN103434888B/en
Publication of CN103434888A publication Critical patent/CN103434888A/en
Application granted granted Critical
Publication of CN103434888B publication Critical patent/CN103434888B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Basic Packing Technique (AREA)
  • Winding Filamentary Materials (AREA)

Abstract

The invention discloses a kind of steel bead wire waste silk bundle winding apparatus and method of work, comprise base station, locations, pressure roller, screw rod, retarding power device, pin and arc lower inclined plane, described retarding power device is connected with base station by screw rod, described pin two ends are fixed on inside base station, the both sides on base station top are fixed at described pressure roller two ends, and described locations is arranged at the side of base station; This steel bead wire waste silk bundle winding apparatus, by the winding of waste silk, decreases the area occupied of waste silk, and in winding process, utilizes the two-way function of retarding power device and pressure roller, have simple for structure, efficiently, reduce labour intensity, avoid the advantage of the danger operated.

Description

A kind of steel bead wire waste silk bundle winding apparatus and method of work
Technical field
The present invention relates to a kind of steel bead wire waste silk bundle winding apparatus and method of work.
Background technology
Preparing in steel bead wire process, because the reasons such as wire rod Central Carbon Segregation, nonmetal inclusion or breakdown of equipment can cause steel wire fracture of wire.Due to after steel wire fracture of wire in irregular, therefore pile up at random, need to take larger area, in waste silk postorder disposal process, cannot high-efficiency operation be carried out.In addition, adopt Traditional Man to carry out steel wire bundling, not only labour intensity is large, inefficiency, and steel wire easily ejects in the process of tying up, and causes personal injury.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of simple for structure, efficient, can solve existing employing Traditional Man and tie up the number of drawbacks and not enough steel bead wire waste silk bundle winding apparatus that exist in waste silk process.
For solving the problems of the technologies described above, the present invention adopts following technical scheme: comprise base station, locations, pressure roller, screw rod, retarding power device, pin and arc lower inclined plane, described retarding power device is connected with base station by screw rod, described pin two ends are fixed on inside base station, the both sides on base station top are fixed at described pressure roller two ends, and described locations is arranged at the side of base station.
Further, described pressure roller both sides are set to groove, and described pressure roller is circular solids pressure roller, described screw rod and base station coupling end are provided with winding-roller, described winding-roller top is provided with filament clamping slot, and described filament clamping slot is cross, and described screw rod and winding-roller are two sections, front and back unitary design.
Further, described retarding power device includes drive motor and speed reduction gearing.
Further, described winding-roller parallels with locations, and described arc lower inclined plane is arranged in base station, and described arc lower inclined plane is arranged at below winding-roller.
Another technical matters that the present invention will solve is to provide a kind of simple and efficient to handle, efficiently, can solve the method for work that existing employing Traditional Man ties up number of drawbacks and the not enough steel bead wire waste silk bundle winding apparatus existed in waste silk process.
For solving the problems of the technologies described above, the present invention adopts following technical scheme: comprise the following steps:
1), " cross " filament clamping slot snapped in by discarded steel wire in base station is fixed;
2), start retarding power device, retarding power device is moved to locations direction by drive screw, until filament clamping slot stops after heading into locations;
3), circular solids pressure roller walks around the enough downforce of Cheng Zhongyou in bundle, is convenient to waste silk bundle winding forming;
4), when tying around waste silk, winding-roller rotates, and waste silk can be wound on winding-roller, along with bundle walks around Cheng Jinhang, tie around waste silk coil diameter can become large gradually, waste silk twists in bundle and walks around Cheng Zhonghui and contact with pressure roller, pressure roller is rotated, ensure bundle around after waste silk be cylindric;
5), at 30 ° of angles, winding-roller front place be provided with pin, when tie around after waste silk volume contact with pin time, namely show that this bundle is around completing, pin is positioned at this device institute energy load maximum waste silk and rolls up on outer track;
6), when waste silk bundle is after completing, retarding power device controls screw rod and moves to locations opposite side, and waste silk is separated with winding-roller, and waste silk volume, due to deadweight, completes blanking by charge level under arc.
The beneficial effect of steel bead wire waste silk bundle winding apparatus of the present invention and method of work: this steel bead wire waste silk bundle winding apparatus is by the winding of waste silk, decrease the area occupied of waste silk, and in winding process, utilize the two-way function of retarding power device and pressure roller, have simple for structure, efficiently, reduce labour intensity, avoid the advantage of the danger operated.
Accompanying drawing explanation
Fig. 1 is the structural representation of steel bead wire waste silk of the present invention bundle winding apparatus;
Fig. 2 is the construction profile schematic diagram of steel bead wire waste silk of the present invention bundle winding apparatus.
Detailed description of the invention
In the present embodiment, shown in Fig. 2, steel bead wire waste silk bundle winding apparatus, comprise base station 1, locations 2, pressure roller 3, screw rod 4, retarding power device 5, pin 6 and arc lower inclined plane 7, described retarding power device 5 is connected with base station 1 by screw rod 4, described pin 6 two ends are fixed on inside base station 1, and the both sides on base station 1 top are fixed at described pressure roller 3 two ends, and described locations 2 is arranged at the side of base station.
Described pressure roller 3 both sides are set to groove, described pressure roller 3 is circular solids pressure roller, and described screw rod 4 is provided with winding-roller 9 with base station 1 coupling end, and described winding-roller 9 top is provided with filament clamping slot 8, described filament clamping slot 8 is cross, and described screw rod 4 is two sections, front and back unitary design with winding-roller 9.
Described retarding power device 5 includes drive motor (not shown) and speed reduction gearing (not shown).
Described winding-roller 9 parallels with locations 2, and described arc lower inclined plane 7 is arranged in base station 1, and described arc lower inclined plane 7 is arranged at below winding-roller 9.
The method of work of this steel bead wire waste silk bundle winding apparatus, comprises the following steps:
1), " cross " filament clamping slot 8 snapped in by discarded steel wire in base station 1 is fixed;
2), start retarding power device 5, retarding power device 5 is moved to locations 2 direction by drive screw 4, until filament clamping slot 8 stops after heading into locations 2;
3), circular solids pressure roller 3 walks around the enough downforce of Cheng Zhongyou in bundle, is convenient to waste silk bundle winding forming;
4), when tying around waste silk, winding-roller 9 rotates, and waste silk can be wound on winding-roller 9, along with bundle walks around Cheng Jinhang, tie around waste silk coil diameter can become large gradually, waste silk twists in bundle and walks around Cheng Zhonghui and contact with pressure roller 3, pressure roller 3 is rotated, ensure bundle around after waste silk be cylindric;
5), at 30 ° of angles place, winding-roller 9 front be provided with pin 6, when tie around after waste silk volume contact with pin 6 time, namely show that this bundle is around completing, pin 6 is positioned at this device institute and can a load maximum waste silk rolls up on outer track;
6), when waste silk bundle is after completing, retarding power device 5 controls screw rod 4 and moves to locations 2 opposite side, and waste silk is separated with winding-roller 9, and waste silk volume, due to deadweight, completes blanking by charge level under arc 7.
The beneficial effect of steel bead wire waste silk bundle winding apparatus of the present invention and method of work: this steel bead wire waste silk bundle winding apparatus is by the winding of waste silk, decrease the area occupied of waste silk, and in winding process, utilize the two-way function of retarding power device and pressure roller, have simple for structure, efficiently, reduce labour intensity, avoid the advantage of the danger operated.
Above-described embodiment, just an example of the present invention, be not for limiting enforcement of the present invention and interest field, all technical schemes identical or equivalent with content described in the claims in the present invention, all should be included in scope.

Claims (5)

1. a steel bead wire waste silk bundle winding apparatus, it is characterized in that: comprise base station, locations, pressure roller, screw rod, retarding power device, pin and arc lower inclined plane, described retarding power device is connected with base station by screw rod, described pin two ends are fixed on inside base station, the both sides on base station top are fixed at described pressure roller two ends, described locations is arranged at the side of base station, described screw rod and base station coupling end are provided with winding-roller, described winding-roller top is provided with filament clamping slot, and described filament clamping slot is cross.
2. steel bead wire waste silk bundle winding apparatus according to claim 1, it is characterized in that: the top of the base station of described pressure roller both sides is provided with groove, the two ends of described pressure roller are positioned in the grooves on two sides on described base station top, described pressure roller is circular solids pressure roller, and described screw rod and winding-roller are two sections, front and back unitary design.
3. steel bead wire waste silk bundle winding apparatus according to claim 1, is characterized in that: described retarding power device includes drive motor and speed reduction gearing.
4. steel bead wire waste silk bundle winding apparatus according to claim 1, it is characterized in that: described winding-roller parallels with locations, described arc lower inclined plane is arranged in base station, and described arc lower inclined plane is arranged at below winding-roller.
5. a method of work for steel bead wire waste silk bundle winding apparatus as claimed in claim 1, is characterized in that, comprise the following steps:
1), " cross " filament clamping slot snapped in by discarded steel wire in base station is fixed;
2), start retarding power device, retarding power device is moved to locations direction by drive screw, until filament clamping slot stops after heading into locations;
3), circular solids pressure roller walks around the enough downforce of Cheng Zhongyou in bundle, is convenient to waste silk bundle winding forming;
4), when tying around waste silk, winding-roller rotates, and waste silk can be wound on winding-roller, along with bundle walks around Cheng Jinhang, tie around waste silk coil diameter can become large gradually, waste silk twists in bundle and walks around Cheng Zhonghui and contact with pressure roller, pressure roller is rotated, ensure bundle around after waste silk be cylindric;
5), at 30 ° of angles, winding-roller front place be provided with pin, when tie around after waste silk volume contact with pin time, namely show that this bundle is around completing, pin is positioned at this device institute energy load maximum waste silk and rolls up on outer track;
6), when waste silk bundle is after completing, retarding power device controls screw rod and moves to locations opposite side, and waste silk is separated with winding-roller, and waste silk volume, due to deadweight, completes blanking by charge level under arc.
CN201310396396.1A 2013-09-03 2013-09-03 A kind of steel bead wire waste silk bundle winding apparatus and method of work Active CN103434888B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310396396.1A CN103434888B (en) 2013-09-03 2013-09-03 A kind of steel bead wire waste silk bundle winding apparatus and method of work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310396396.1A CN103434888B (en) 2013-09-03 2013-09-03 A kind of steel bead wire waste silk bundle winding apparatus and method of work

Publications (2)

Publication Number Publication Date
CN103434888A CN103434888A (en) 2013-12-11
CN103434888B true CN103434888B (en) 2015-12-23

Family

ID=49688642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310396396.1A Active CN103434888B (en) 2013-09-03 2013-09-03 A kind of steel bead wire waste silk bundle winding apparatus and method of work

Country Status (1)

Country Link
CN (1) CN103434888B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104787618A (en) * 2015-04-20 2015-07-22 江苏胜达科技有限公司 Waste wire processing device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0694497A1 (en) * 1994-07-29 1996-01-31 Aepli, Roman Device for winding and unwinding a cable on a drum
DE19606978A1 (en) * 1996-02-24 1997-09-11 Mtd Magnettechnik Deutschland Wear-free automatic regulation of winding tension in bands, fibres and wires
JP2002222726A (en) * 2001-01-24 2002-08-09 Kyosan Denki Co Ltd Winding machine
CN101879947A (en) * 2010-07-01 2010-11-10 诸城市大业金属制品有限责任公司 Waste steel wire bander
CN202369193U (en) * 2011-12-12 2012-08-08 广东金联宇电缆实业有限公司 Full-automatic wire rewinding machine in superconductive wire core regular reaming center
CN102701004A (en) * 2012-05-14 2012-10-03 无锡平盛科技有限公司 Bobbin-equipped wire take-up machine
CN203127905U (en) * 2013-01-29 2013-08-14 烟台中集来福士海洋工程有限公司 Steel wire rope winding machine

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0694497A1 (en) * 1994-07-29 1996-01-31 Aepli, Roman Device for winding and unwinding a cable on a drum
DE19606978A1 (en) * 1996-02-24 1997-09-11 Mtd Magnettechnik Deutschland Wear-free automatic regulation of winding tension in bands, fibres and wires
JP2002222726A (en) * 2001-01-24 2002-08-09 Kyosan Denki Co Ltd Winding machine
CN101879947A (en) * 2010-07-01 2010-11-10 诸城市大业金属制品有限责任公司 Waste steel wire bander
CN202369193U (en) * 2011-12-12 2012-08-08 广东金联宇电缆实业有限公司 Full-automatic wire rewinding machine in superconductive wire core regular reaming center
CN102701004A (en) * 2012-05-14 2012-10-03 无锡平盛科技有限公司 Bobbin-equipped wire take-up machine
CN203127905U (en) * 2013-01-29 2013-08-14 烟台中集来福士海洋工程有限公司 Steel wire rope winding machine

Also Published As

Publication number Publication date
CN103434888A (en) 2013-12-11

Similar Documents

Publication Publication Date Title
CN204975154U (en) Staple cutting device
CN203740777U (en) Power line winding and straightening device
CN103434888B (en) A kind of steel bead wire waste silk bundle winding apparatus and method of work
CN203382302U (en) Automatic insulating cord coiling device
CN203071496U (en) Multifunctional grounding resistance test auxiliary device
CN203807013U (en) Cable fixing device of tower crane
CN203282420U (en) Double conductor tension indicating wire grip
CN106986231A (en) A kind of copper-clad aluminum conductor spooling equipment
CN207061482U (en) A kind of copper-clad aluminum conductor spooling equipment
CN203528869U (en) Hydraulic manual packing machine device
CN203396826U (en) Portable induced-electricity electricity-testing device
CN203255798U (en) Automatic wire winding and binding machine
CN207656871U (en) A kind of broken bamboo device
CN204706836U (en) A kind of novel electric power many wires bracing frame
CN203187733U (en) Feeding device of aluminum profile aging furnace
CN204714210U (en) Waste silk processing equipment
CN201907879U (en) Automatic take-up device for water tank
CN206278858U (en) A kind of adjustable electric hoist conductor rope device
CN203975707U (en) A kind of cable disk is passed steering hardware
CN205114255U (en) Metal armor cabinet transport mobile device
CN203728466U (en) Well drilling rope guider
CN202935609U (en) Movable binding machine
CN102897342B (en) Mobile strapping machine
CN203326470U (en) Wire-lashing device
CN207010101U (en) Wire stripper action bars

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: JIANGSU SHENGDA TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: ZHANGJIAGANG SHENGDA STEEL WIRE ROPE CO., LTD.

Effective date: 20150605

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150605

Address after: Hua Shi Zhen Shu new road 214420 Jiangyin city in Jiangsu province Wuxi City, No. 1 Jiangsu Shengda Technology Co., Ltd.

Applicant after: Jiangsu Shengda Technology Co., Ltd.

Address before: 215638 Jiangsu city of Changzhou province Zhangjiagang Yang Si gate lushengda Steel Co. Ltd.

Applicant before: Zhangjiagang Shengda Steel Rope Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant