CN103423820A - Air conditioner - Google Patents
Air conditioner Download PDFInfo
- Publication number
- CN103423820A CN103423820A CN2013103423997A CN201310342399A CN103423820A CN 103423820 A CN103423820 A CN 103423820A CN 2013103423997 A CN2013103423997 A CN 2013103423997A CN 201310342399 A CN201310342399 A CN 201310342399A CN 103423820 A CN103423820 A CN 103423820A
- Authority
- CN
- China
- Prior art keywords
- premises station
- outdoor unit
- cupboard
- wall
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention relates to the field of household appliances, in particular to an air conditioner. The air conditioner comprises an indoor unit, an outdoor unit and an outdoor unit mounting assembly embedded in a wall body. The mounting assembly mainly comprises an outdoor unit cabinet, wherein the outdoor unit cabinet is provided with a mounting bolt and an embedded hole; moreover, the outdoor unit is of a split structure which is assembled on site and can be assembled inside the outdoor unit cabinet at the time of installation; or, a door can be formed indoors to be communicated with the outdoor unit cabinet, and therefore the outdoor unit can be placed into the outdoor unit cabinet through the door for installation after being assembled indoors. By using the air conditioner, outdoor hoisting is not needed, a support does not need mounting, hole drilling is not needed either, the installation can be completed even indoors, and therefore the air conditioner is easy to install and high in safety factor, and saves time and labor.
Description
(1) technical field
The present invention relates to field of household appliances, particularly a kind of air-conditioning.
(2) background technology
At present, the utilization rate of air-conditioning is quite high, and almost every household has.Air-conditioning generally is divided into indoor set and off-premises station, the installation ratio of indoor set is easier to, the installation of off-premises station is cumbersome: off-premises station need to be lifted, mounting bracket more on the wall, these work can only be carried out outdoor, install cumbersome, and the erector is at outdoor work, there is potential safety hazard, also need to punch on the wall simultaneously, not only dirty but also produce noise.
(3) summary of the invention
The present invention, in order to make up the defect of prior art, provides a kind of easy for installation, safe air-conditioning.
The present invention is achieved through the following technical solutions:
A kind of air-conditioning, comprise indoor set and off-premises station, it is characterized in that: also comprise the off-premises station installed part be embedded in body of wall, the body of wall at off-premises station installed part place is provided with and the indoor embedded hole communicated.
Described off-premises station installed part comprise be preset on body of wall, opening off-premises station cupboard outwardly, described off-premises station cupboard wide and high is greater than respectively the wide and high of off-premises station, there is supporting plate the bottom surface of described off-premises station cupboard to the body of wall extension, described embedded hole is positioned on the body of wall of off-premises station cupboard back, on described off-premises station cupboard He on supporting plate, is embedded with construction bolt.
That described supporting plate is provided with is dismountable, with the protective cover of diffusion hole.
Described off-premises station cupboard is provided with and leads to indoor hermatic door.
Described supporting plate is provided with the protective cover with diffusion hole.
The field-installed Split type structure of each parts when described off-premises station is installation.
The invention has the beneficial effects as follows: the present invention when mounted can Assembling, need not lift, need not show mounting bracket, erector's operation time is short, safety coefficient is high, in the second embodiment, indoor, just can carry out the installation of off-premises station, safety coefficient is higher, has realized the integrated of air-conditioning and building.
(4) accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further illustrated.
Fig. 1 is the sectional structure schematic diagram after the first embodiment of the present invention is installed;
The left TV structure schematic diagram that Fig. 2 is off-premises station installed part in Fig. 1;
The cross section schematic top plan view that Fig. 3 is off-premises station installed part in Fig. 1;
Fig. 4 is the sectional structure schematic diagram after the second embodiment of the present invention is installed;
The left TV structure schematic diagram that Fig. 5 is off-premises station installed part in Fig. 3;
The cross section schematic top plan view that Fig. 6 is off-premises station installed part in Fig. 3.
In figure, 1 body of wall, 2 indoor sets, 3 off-premises stations, 4 off-premises station cupboards, 5 embedded holes, 6 construction bolts, 7 hermatic doors, 8 protective covers, 9 diffusion holes, 10 supporting plates.
(5) specific embodiment
Accompanying drawing is specific embodiments of the invention.Be the schematic diagram of the first embodiment as shown in Figure 1 to Figure 3, this kind of air-conditioning, comprise indoor set 2, off-premises station 3 and be embedded in the off-premises station installed part in body of wall 1.This off-premises station installed part comprises and being preset on body of wall 1, opening off-premises station cupboard 4 outwardly, there is supporting plate 10 bottom surface of off-premises station cupboard 4 to body of wall 1 extension, the bottom surface of the upper surface of supporting plate 10 and off-premises station cupboard 4 is on same plane, supporting plate 10 is provided with the protective cover 8 with diffusion hole 9, protective cover 8 seals, dismountable, its periphery all can be fixed on body of wall 1, off-premises station cupboard 4 wide and high is greater than respectively the wide and high of off-premises station 3, supporting plate 10 outsides are greater than the thickness of off-premises station 3 to the distance of off-premises station cupboard 4 inboards, reserve enough spaces to off-premises station 3, be convenient to the discharge of hot gas or cold air, on the body of wall 1 of off-premises station cupboard 4 back, be preset with and the indoor embedded hole communicated 5, be embedded with construction bolt 6 on the bottom surface of off-premises station cupboard 4 He on supporting plate 10.In addition, for easy for installation, each parts of off-premises station 3 are Split type structure, each parts Assembling during installation.
Fig. 4 to Fig. 6 has provided the schematic diagram of the second embodiment, wherein with respect to the first embodiment, the off-premises station installed part has been done to following change: be provided with and lead to indoor hermatic door 7 on off-premises station cupboard 4, a breach is arranged on one of them angle in the outside of hermatic door 7, embedded hole 5 just is located on the body of wall 1 of indentation, there, the protective cover with diffusion hole 98 on supporting plate 10 both can be embedded on body of wall 1, can be also the demountable structure of installing afterwards.
In the first embodiment, install and still carry out outdoor, but omitted the part of original lifting, mounting bracket and perforating, only off-premises station 3 each parts are assembled in off-premises station cupboard 4, fix by construction bolt 6, then protective cover 8 is installed and gets final product, convenient, time saving and energy saving.
In the second embodiment, install and all to carry out indoor, hermatic door 7 is opened, off-premises station 3 each parts are assembled indoor, fill in off-premises station cupboard 4, fix by construction bolt 6, shut hermatic door 7 and get final product, not only facilitated but also safety.
Except the described technical characterictic of specification, all the other technical characterictics are those skilled in the art's known technology.
Claims (6)
1. an air-conditioning, comprise indoor set (2) and off-premises station (3), it is characterized in that: also comprise the off-premises station installed part be embedded in body of wall (1), the body of wall (1) at off-premises station installed part place is provided with and the indoor embedded hole communicated (5).
2. air-conditioning according to claim 1, it is characterized in that, described off-premises station installed part comprises and is preset in that body of wall (1) is upper, opening off-premises station cupboard (4) outwardly, wide and the height of described off-premises station cupboard (4) is greater than respectively the wide and high of off-premises station (3), there is supporting plate (10) bottom surface of described off-premises station cupboard (4) to body of wall (1) extension, described embedded hole (5) is positioned on the body of wall (1) of off-premises station cupboard (4) back, on described off-premises station cupboard (4) and supporting plate (10), is embedded with construction bolt (6).
3. air-conditioning according to claim 2, is characterized in that, that described supporting plate (10) is provided with is dismountable, the protective cover (8) of band diffusion hole (9).
4. air-conditioning according to claim 2, is characterized in that, described off-premises station cupboard (4) is provided with and leads to indoor hermatic door (7).
5. air-conditioning according to claim 4, is characterized in that, described supporting plate (10) is provided with the protective cover (8) of band diffusion hole (9).
6. according to the described air-conditioning of claim 1 to 5 any one, it is characterized in that the field-installed Split type structure of each parts when described off-premises station (3) is installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103423997A CN103423820A (en) | 2013-08-08 | 2013-08-08 | Air conditioner |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013103423997A CN103423820A (en) | 2013-08-08 | 2013-08-08 | Air conditioner |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103423820A true CN103423820A (en) | 2013-12-04 |
Family
ID=49648949
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013103423997A Pending CN103423820A (en) | 2013-08-08 | 2013-08-08 | Air conditioner |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103423820A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106918092A (en) * | 2017-02-21 | 2017-07-04 | 东莞市鹏翼自动化科技有限公司 | A kind of construction of the air-out type air-conditioning under exterior wall installation |
CN107940616A (en) * | 2017-12-04 | 2018-04-20 | 天津天禄通建材科技有限公司 | Green building air condensing units support |
CN111102657A (en) * | 2019-12-19 | 2020-05-05 | 安徽美博智能科技有限公司 | Installation device for shared air conditioner |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11287480A (en) * | 1998-03-31 | 1999-10-19 | Sanyo Electric Co Ltd | Separate-type air conditioner and installation equipment for installing such conditioner |
CN1273345A (en) * | 1999-05-08 | 2000-11-15 | 三星电子株式会社 | Window-type air conditioner |
JP2003106574A (en) * | 2001-10-01 | 2003-04-09 | Nagawa:Kk | A split type air conditioning unit |
CN1417532A (en) * | 2001-11-09 | 2003-05-14 | 珠海格力电器股份有限公司 | Wall air conditioner and its installation process |
CN202709333U (en) * | 2012-07-02 | 2013-01-30 | 晋春平 | Anti-theft cleaning overhaul protection frame of air conditioner outdoor machine |
CN203628877U (en) * | 2013-08-08 | 2014-06-04 | 王冬 | Air conditioner |
-
2013
- 2013-08-08 CN CN2013103423997A patent/CN103423820A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11287480A (en) * | 1998-03-31 | 1999-10-19 | Sanyo Electric Co Ltd | Separate-type air conditioner and installation equipment for installing such conditioner |
CN1273345A (en) * | 1999-05-08 | 2000-11-15 | 三星电子株式会社 | Window-type air conditioner |
JP2003106574A (en) * | 2001-10-01 | 2003-04-09 | Nagawa:Kk | A split type air conditioning unit |
CN1417532A (en) * | 2001-11-09 | 2003-05-14 | 珠海格力电器股份有限公司 | Wall air conditioner and its installation process |
CN202709333U (en) * | 2012-07-02 | 2013-01-30 | 晋春平 | Anti-theft cleaning overhaul protection frame of air conditioner outdoor machine |
CN203628877U (en) * | 2013-08-08 | 2014-06-04 | 王冬 | Air conditioner |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106918092A (en) * | 2017-02-21 | 2017-07-04 | 东莞市鹏翼自动化科技有限公司 | A kind of construction of the air-out type air-conditioning under exterior wall installation |
CN107940616A (en) * | 2017-12-04 | 2018-04-20 | 天津天禄通建材科技有限公司 | Green building air condensing units support |
CN111102657A (en) * | 2019-12-19 | 2020-05-05 | 安徽美博智能科技有限公司 | Installation device for shared air conditioner |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103423820A (en) | Air conditioner | |
CN109256700A (en) | Box-type substation cooling system | |
CN203628877U (en) | Air conditioner | |
CN205385675U (en) | A multi -functional rain -proof electric appliance cabinet for it is outdoor | |
KR101636239B1 (en) | A panel structure for ceiling | |
CN204190198U (en) | Intelligent substation integral structure prefabricated cabin | |
CN106395594A (en) | External type main control cabinet | |
CN207179853U (en) | One kind lifting outdoor air conditioner support | |
CN212105642U (en) | Sound insulation door | |
CN202300077U (en) | High-temperature-resistant special-type sound-insulation door | |
CN212614406U (en) | Effectual heat dissipation window gives sound insulation | |
CN206069182U (en) | External control cabinet | |
CN206490332U (en) | A kind of distribution box | |
CN202333549U (en) | High-low-voltage fire-resisting pre-installed box-type substation | |
CN201278444Y (en) | Cable branching box | |
CN205235244U (en) | Based on thing networking fire hydrant accuse water installation | |
CN203517925U (en) | Embedded microwave oven decorative frame and embedded microwave oven | |
CN204482193U (en) | A kind of Automatic-temperature electric power equipment cabinet | |
CN204482189U (en) | A kind of wall-hung type provisional communication rack | |
CN203008436U (en) | Roots motor sound insulation room | |
CN204282672U (en) | Roof boarding | |
CN202121890U (en) | Conveniently assembled power saving cabinet | |
CN208608546U (en) | A kind of prefabricated outdoor integrated cabinet | |
CN211629629U (en) | Rainproof outdoor distribution box | |
CN102616641A (en) | Elevator door plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20131204 |