To intake intelligent stack-press device
Technical field
The present invention relates to municipal public secondary water supply tank transmission & distribution wetting system, be specifically related to a kind of water inlet intelligence stack-press device reducing secondary water-supply equipment water tank water intaking power consumption.
Background technology
City, current down town directly laminates tap water supply system, and city tap-water pipeline network construction caliber is not enough, turns pressure and supplies water, cause equipment operation energy consumption high by water tank buffering zero pressure.Simultaneously owing to adopting in the secondary water-supply process that causes without the complete supply equipment cistern free of negative pressure secondary the municipal ductwork pressure caused of directly fetching water with over-burden during city planting ductwork peak of cutting off the water in short-term because city planting ductwork is abnormal to fall, cause the not enough problem of normal pressure water supply user pressure of supply water, therefore, the problem that during water of resident peak, high, the secondary water-supply equipment of municipal water supplies pressure 24 hours water tank water intaking energy consumptions are high, needs solution badly.
Summary of the invention
The object of the invention is to overcome above-mentioned defect and deficiency, a kind of water inlet intelligence stack-press device of municipal water supplies pressure, water saving tank water intaking energy consumption when reducing resident peak water is provided.
For achieving the above object, the water inlet intelligence stack-press device of the present invention's design, comprise municipal tap water water inlet pipe, the water inlet of water pump group header, water pump group, its special feature is: the pipeline of described water outlet end is disposed with municipal tap water pipe front pressure sensor, full-automatic electric valve and water flow sensor, pipeline between described full-automatic electric valve and water flow sensor is provided with lateral, this lateral joining water box water inlet pipe, the pipeline between described lateral and tank inlet pipe is provided with water tank water intake one way valve.
In technique scheme: described municipal tap water water inlet pipe (1) and tank inlet pipe dynamically feed water.
In technique scheme: also comprise Intelligent control cabinet, described Intelligent control cabinet connects water pump group instrument.
The present invention, by self-regulating water tank water and the feedwater of municipal tap water feed pump group, achieves unnecessary energy waste; Contrast legacy equipment realizes the energy conservation of about 20% from water tank water intaking.
The present invention realizes the Based Intelligent Control of water pump group water inlet by a full automatic electrically operated valve and stop valve in conjunction with flow detection and pressure detecting, water supply tank supply equipment and the shortcoming and defect without negative pressure secondary water supply a complete set of equipment is equipped with for tradition, turn in pressure water supply process at secondary, detected by system intake pressure, water outlet dynamic flow, automatically controlled water pump water inlet pattern; When pattern one, equipment water flow are greater than tap water water inlet pipe normal discharge, system adopts the dynamic moisturizing of water tank.When pattern two, equipment water flow are less than tap water water inlet pipe normal discharge, system adopts tap water directly to laminate into water, solves the problem of normal pressure water supply user pressure of supply water deficiency.
The present invention is detected by equipment water flow and life secondary water-supply process contamination is avoided in municipal ductwork pressure detection realization, can directly connect municipal tap water pipe network simultaneously, core is in whole continuous water supply process, municipal ductwork pressure can not be affected fall and bear with flow, do not affect municipal ductwork pressure during Guarantee item water use peak fall and increase pipe network flow burden, solve city, down town water pollution and the problem laminating supply municipal tap water can not be adopted.
Accompanying drawing explanation
Fig. 1 is present system schematic diagram;
In figure: the water inlet pipe of 1-municipal tap water; 2-front pressure sensor; 3-full-automatic electric valve; 4-tank inlet pipe; 5-water feeding one-way valve; 6-water flow sensor; 7-water pump group water inlet header.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail:
Water inlet intelligence stack-press device as shown in Figure 1, comprise municipal tap water water inlet pipe 1, the water inlet of water pump group header 7, water pump group, Intelligent control cabinet, the pipeline of water outlet end is disposed with municipal tap water pipe front pressure sensor 2, full-automatic electric valve 3 and water flow sensor 6, pipeline between full-automatic electric valve 3 and water flow sensor 6 is provided with lateral, this lateral joining water box water inlet pipe 4, the pipeline between lateral and tank inlet pipe 4 is provided with water tank water intake one way valve 5.Intelligent control cabinet connects water pump group instrument, and municipal tap water water inlet pipe 1 and tank inlet pipe 4 dynamically feed water.
The present invention incorporates tradition and is equipped with water supply tank supply equipment and the shortcoming and defect without negative pressure secondary water supply a complete set of equipment, solve because city tap-water pipeline network construction caliber is not enough, turn pressure by water tank buffering zero pressure to supply water, cause equipment operation energy consumption high problem.Solve in the secondary water-supply process adopting and cause without the complete supply equipment cistern free of negative pressure secondary simultaneously cut off the water in short-term because city planting ductwork is abnormal and city planting ductwork peak time over-burden that the municipal ductwork pressure caused of directly fetching water falls, cause normal pressure water supply user pressure of supply water deficiency problem." the intelligent stack-press device of intaking " of our company's invention turns in pressure water supply process at secondary, is detected by system intake pressure, water outlet dynamic flow, automatically controlled water pump water inlet pattern; When pattern one, equipment water flow are greater than tap water water inlet pipe normal discharge, system adopts the dynamic moisturizing of water tank.When pattern two, equipment water flow are less than tap water water inlet pipe normal discharge, system adopts tap water directly to laminate into water.
Solve city, down town water pollution and the problem laminating municipal tap water can not be adopted, " the intelligent stack-press device of intaking " of company's invention, detect realization by the detection of equipment water flow and municipal ductwork pressure and avoid life secondary water-supply process contamination, can directly connect municipal tap water pipe network simultaneously, core is in whole continuous water supply process, municipal ductwork pressure can not be affected fall and bear with flow, concrete solution is: detected by equipment water flow and municipal ductwork pressure detection, water pump group selects water tank and city planting ductwork dynamically to feed water by " intelligent stack-press device of intaking ", fall not affect municipal ductwork pressure during this Guarantee item water use peak and increase pipe network flow burden.
The content be not described in detail in this manual belongs to the known prior art of professional and technical personnel in the field.