CN103412296B - 无序激光点云数据中自动提取电力塔方法 - Google Patents

无序激光点云数据中自动提取电力塔方法 Download PDF

Info

Publication number
CN103412296B
CN103412296B CN201310268380.2A CN201310268380A CN103412296B CN 103412296 B CN103412296 B CN 103412296B CN 201310268380 A CN201310268380 A CN 201310268380A CN 103412296 B CN103412296 B CN 103412296B
Authority
CN
China
Prior art keywords
atural object
power
power tower
image
cloud data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310268380.2A
Other languages
English (en)
Other versions
CN103412296A (zh
Inventor
王柯
陈驰
麦晓明
赵刚
徐晓刚
杨必胜
彭向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
Wuhan University WHU
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University WHU, Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical Wuhan University WHU
Priority to CN201310268380.2A priority Critical patent/CN103412296B/zh
Publication of CN103412296A publication Critical patent/CN103412296A/zh
Application granted granted Critical
Publication of CN103412296B publication Critical patent/CN103412296B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了无序激光点云数据中自动提取电力塔方法,包括:采用机载激光雷达航拍电力巡线,获得电力巡线的激光点云数据,将获得的激光点云数据网格化,生成电力巡线的高程值影像,所述的电力巡线包括电力塔、电力线以及潜在危险地物;高程值影像的二值化;对高程值影像的腐蚀、膨胀,然后扫描获得的影像,对所有黑点进行K均值聚类,得到不同地物的聚类,这里的地物包括潜在危险地物和不危险地物,K的取值通过目视判断电力塔和地物个数的方法由人工输入;最后对步骤五获得的聚类结果进行影像点的点数进行统计,若点数大于阈值,则相应的影像视为电力塔,反之则视为潜在危险地物,从而实现电力塔的自动提取。

Description

无序激光点云数据中自动提取电力塔方法
技术领域
本发明属于电力巡线领域中电力设备的提取方法,具体是指无序激光点云数据中自动提取电力塔方法。
背景技术
电力塔是高压输电、变电的重要装置,用于实现电力资源的大范围与远距离供给,是国家经济建设中的重要基础设备。要保证高效电力传输和安全的能源供给,必须实时和准确地掌握、监控电力塔线设施的当前状况,建立完备的预警和应急响应机制。因此,电力塔的检测和建模成为解决此问题的重要保障。在此基础上,开展电力设施周边的场景分析,如:其他类别人工设施的检测,高、低矮植被的分布分析,周围情况的地形、地貌分析等,其结果也会对电力安全传输、传输线路设计、架设地址选取等问题的解决产生决定性的作用。然而,在电力塔线检测、建模问题上,传统的摄影测量与遥感手段需要消耗大量的人力和财力;制作周期很长,制作过程单调,得到的效果不够理想。近年来,随着数据采集技术的发展,特别是机载激光雷达系统(lightdetectionandrangingsystem,简称LiDAR)的发展,为新的经济、高效、准确的地物检测及建模方法提供了重要支持。
机载LiDAR作为一种新型的主动式传感器,集激光雷达、POS系统与控制系统于一体,可快速获取高密度和高精度的点云数据,能够直接通过点云生成高精度的数字表面模型。机载LiDAR系统较传统数据获取手段具有诸多优点,为电力塔的提取和建模提供了可能。但针对机载LiDAR数据进行电力塔提取和建模的研究成果还十分有限。韩文军提出了一种基于机载LiDAR点云数据的电力塔建模方法。该方法在提取电力线的基础上,通过对电力线对间连接点的提取来定位电力塔,然后在电力塔数据空间内建立二值化的三维格网结构,利用三维线跟踪算法重建三维电力塔结构。
激光雷达系统在国外电网维护中已经得到了广泛的应用,在国内电力线路设计中已有应用,用于电网维护尚处于探索阶段。随着LiDAR技术的不断发展和在国内的普及。采用LiDAR技术进行电力巡线将逐步在这一领域发挥重要作用。研究LiDAR点云数据中电力塔提取技术,对于电力巡线工作有着极其重要的现实意义,如何从大量无序的激光点云数据中提取电力塔是解决电力巡线的一项关键工作。
发明内容
本发明的目的是提供无序激光点云数据中自动提取电力塔方法,该方法能够提取电力塔。
本发明的上述目的通过如下技术方案来实现的:无序激光点云数据中自动提取电力塔方法,该方法包括如下步骤:
一、采用机载激光雷达航拍电力巡线,获得电力巡线的激光点云数据,将获得的激光点云数据网格化,生成电力巡线的高程值影像,所述的电力巡线包括电力塔、电力线以及潜在危险地物;
二、高程值影像的二值化:逐点扫描步骤一获得的高程值影像,若该点灰度不为零,则为黑色,若该点灰度为零,则为白色;
三、腐蚀:对步骤二获得的影像进行多次腐蚀运算,直至电力线完全消除;
四、膨胀:对步骤三获得的影像进行多次膨胀运算,直到恢复电力塔和潜在危险地物的边界;
五、扫描步骤四获得的影像,对所有黑点进行K均值聚类,得到不同地物的聚类,这里的地物包括潜在危险地物和不危险地物,K的取值通过目视判断电力塔和地物个数的方法由人工输入;
六、对步骤五获得的聚类结果进行影像点的点数进行统计,若点数大于设定阈值范围80~120点,则相应的影像视为电力塔,反之则视为潜在危险地物,从而实现电力塔的自动提取。
本发明中,所述步骤三中利用结构原色对步骤二获得的影像进行多次腐蚀运算
本发明针对激光点云电力塔提取,设计出一种提取算法,该算法首先将点云数据规格格网化,生成类似数字图像的高程影像图,然后通过腐蚀运算消除电力线,再用膨胀运算得到连通区域,然后用K均值聚类得到各连通区域的点群,最后通过面积大小来区分电塔和潜在危险地物。
附图说明
下面结合附图和具体实施方式对本发明作进一步详细说明。
图1为本发明的流程图;
图2为本发明腐蚀结构元素;
图3为本发明膨胀结构元素;
图4为本发明电力塔提取结果。
具体实施方式
本发明的无序激光点云数据中自动提取电力塔方法,首先将激光点云数据规格格网化,生成类似数字图像的高程影像图。高程值影像上电力线对应的线段一般只有几个像素宽,而电塔和潜在危险地物为聚集点群,数学形态学中的腐蚀运算具有消除物体边界的作用,因此可以先通过腐蚀运算消除电力线,再用膨胀运算得到连通区域,然后用K均值聚类得到各连通区域的点群,最后通过面积大小来区分电塔和潜在危险地物。具体流程如图1所示。
高程值影像上电力线对应的线段一般只有几个像素宽,而电塔和潜在危险地物为聚集点群,数学形态学中的腐蚀运算具有消除物体边界的作用,因此可以先通过腐蚀运算消除电力线,再用膨胀运算得到连通区域,然后用K均值聚类得到各连通区域的点群,最后通过面积大小来区分电塔和潜在危险地物。
本发明的无序激光点云数据中自动提取电力塔方法,该方法包括如下步骤:
一、采用机载激光雷达航拍电力巡线,获得电力巡线的激光点云数据,将此激光点云数据输入处理系统,将获得的激光点云数据网格化,生成电力巡线的高程值影像,所述的电力巡线包括电力塔、电力线以及潜在危险地物;
二、高程值影像的二值化:逐点扫描步骤一获得的高程值影像,若该点灰度不为零,则为黑色,若该点灰度为零,则为白色;
三、腐蚀:利用结构原色对步骤二获得的影像进行多次腐蚀运算,直至电力线完全消除;如图2所示,对步骤二中得到的二值化影像采用结构元素大小为3×3的模板进行形态学腐蚀运算。由于一次腐蚀并不能完全消除电力线,故需对二值化影像进行多次腐蚀运算,直至电力线完全消除。
四、膨胀:对步骤三获得的影像进行多次膨胀运算,直到恢复电力塔和潜在危险地物的边界;如图3所示,对步骤三的基础上采用结构元素大小为3×3的模板进行形态学膨胀运算。由于一次膨胀并不能完全恢复电塔和潜在危险地物的边界,故需对二值化影像多次膨胀运算,直到基本恢复电塔和潜在危险地物的边界。
五、扫描步骤四获得的影像,对所有黑点进行K均值聚类,得到不同地物的聚类,这里的地物包括潜在危险地物和不危险地物,K的取值通过目视判断电力塔和地物个数的方法由人工输入;
六、对步骤五获得的聚类结果进行影像点的点数进行统计,若点数大于设定阈值范围80~120点,则相应的影像视为电力塔,反之则视为潜在危险地物,从而实现电力塔的自动提取。结果如图4所示。
本发明的上述实施例并不是对本发明保护范围的限定,本发明的实施方式不限于此,凡此种种根据本发明的上述内容,按照本领域的普通技术知识和惯用手段,在不脱离本发明上述基本技术思想前提下,对本发明上述结构做出的其它多种形式的修改、替换或变更,均应落在本发明的保护范围之内。

Claims (2)

1.无序激光点云数据中自动提取电力塔方法,该方法包括如下步骤:
一、采用机载激光雷达航拍电力巡线,获得电力巡线的激光点云数据,将获得的激光点云数据网格化,生成电力巡线的高程值影像,所述的电力巡线包括电力塔、电力线以及潜在危险地物;
二、高程值影像的二值化:逐点扫描步骤一获得的高程值影像,若该点灰度不为零,则为黑色,若该点灰度为零,则为白色;
三、腐蚀:对步骤二获得的影像进行多次腐蚀运算,直至电力线完全消除;
四、膨胀:对步骤三获得的影像进行多次膨胀运算,直到恢复电力塔和潜在危险地物的边界;
五、扫描步骤四获得的影像,对所有黑点进行K均值聚类,得到不同地物的聚类,这里的地物包括潜在危险地物和不危险地物,K的取值通过目视判断电力塔和地物个数的方法由人工输入;
六、对步骤五获得的聚类结果进行影像点的点数进行统计,若点数大于设定阈值范围80~120点,则相应的影像视为电力塔,反之则视为潜在危险地物,从而实现电力塔的自动提取。
2.根据权利要求1所述的无序激光点云数据中自动提取电力塔方法,其特征在于:所述步骤三中利用结构元素对步骤二获得的影像进行多次腐蚀运算。
CN201310268380.2A 2013-06-28 2013-06-28 无序激光点云数据中自动提取电力塔方法 Active CN103412296B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310268380.2A CN103412296B (zh) 2013-06-28 2013-06-28 无序激光点云数据中自动提取电力塔方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310268380.2A CN103412296B (zh) 2013-06-28 2013-06-28 无序激光点云数据中自动提取电力塔方法

Publications (2)

Publication Number Publication Date
CN103412296A CN103412296A (zh) 2013-11-27
CN103412296B true CN103412296B (zh) 2015-11-18

Family

ID=49605323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310268380.2A Active CN103412296B (zh) 2013-06-28 2013-06-28 无序激光点云数据中自动提取电力塔方法

Country Status (1)

Country Link
CN (1) CN103412296B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105184250B (zh) * 2015-08-31 2018-06-22 哈尔滨工业大学 一种电力走廊机载LiDAR点云数据的地物分类方法
CN106022694B (zh) * 2016-05-30 2019-06-25 燕山大学 一种基于点云数据处理技术的散杂货场堆取料机定位方法及实现所述方法的系统
CN106709946B (zh) * 2016-12-16 2020-03-10 武汉大学 基于LiDAR点云的多分裂导线自动提取与精细建模方法
CN107273902B (zh) * 2017-05-19 2019-10-18 中国科学院遥感与数字地球研究所 一种从机载LiDAR数据自动提取电塔点云的方法
CN108230336B (zh) * 2017-12-29 2021-09-24 国网通用航空有限公司 一种点云杆塔提取方法及装置
CN109344282A (zh) * 2018-09-26 2019-02-15 国网电力科学研究院武汉南瑞有限责任公司 一种无人机电力巡检照片的自动命名方法
CN110674763B (zh) * 2019-09-27 2022-02-11 国网四川省电力公司电力科学研究院 一种基于对称检验的输电通道杆塔图像识别方法及系统
CN112033414A (zh) * 2020-09-11 2020-12-04 浙江华云清洁能源有限公司 一种无人机巡检航线生成方法、装置、设备及介质

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102590823A (zh) * 2012-01-06 2012-07-18 中国测绘科学研究院 一种机载lidar数据电力线快速提取及重构方法
CN102831393A (zh) * 2012-07-19 2012-12-19 安徽工业大学 电力杆塔轮廓的快速图像识别方法
CN102831295A (zh) * 2012-07-19 2012-12-19 华北电力大学 基于纹理聚类的电力塔杆图像描述方法
CN103017739A (zh) * 2012-11-20 2013-04-03 武汉大学 基于激光雷达点云与航空影像的真正射影像的制作方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102590823A (zh) * 2012-01-06 2012-07-18 中国测绘科学研究院 一种机载lidar数据电力线快速提取及重构方法
CN102831393A (zh) * 2012-07-19 2012-12-19 安徽工业大学 电力杆塔轮廓的快速图像识别方法
CN102831295A (zh) * 2012-07-19 2012-12-19 华北电力大学 基于纹理聚类的电力塔杆图像描述方法
CN103017739A (zh) * 2012-11-20 2013-04-03 武汉大学 基于激光雷达点云与航空影像的真正射影像的制作方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
LIDAR数据滤波和影像辅助提取建筑物;罗伊萍;《中国博士学位论文全文数据库信息科技辑》;20110715;第4页第7段、第39页第4段、第42页第4段、第43页第4段 *
机载LiDAR数据的电力塔建模方法研究;韩文军;《长江科学院院报》;20121031;第122页左栏第2段到第123页左栏第2段 *

Also Published As

Publication number Publication date
CN103412296A (zh) 2013-11-27

Similar Documents

Publication Publication Date Title
CN103412296B (zh) 无序激光点云数据中自动提取电力塔方法
CN109376605B (zh) 一种电力巡检图像防鸟刺故障检测方法
CN102590823B (zh) 一种机载lidar数据电力线快速提取及重构方法
CN103085084B (zh) 一种用于高压带电作业机器人的视觉系统及工作方法
CN105263000A (zh) 基于无人机载双相机的大型光伏电站巡检装置
CN103968799B (zh) 一种输电线路杆塔形变三维监测方法
CN102955940B (zh) 一种输电线路物体检测系统及方法
CN109146836A (zh) 一种基于点云数据进行输电塔及线路检测的系统及方法
CN103400117B (zh) 一种基于计算机视觉的井下人员定位跟踪方法
CN104484882A (zh) 一种基于机载LiDAR数据的城市区域电力线检测方法
CN105023014A (zh) 一种无人机巡检输电线路图像内的杆塔目标提取方法
CN106355140B (zh) 车辆检测的方法及装置
CN103886616A (zh) 一种基于全天空成像数据的光伏发电功率超短期预测方法
CN107194827A (zh) 一种电力网络管理方法
CN103425959A (zh) 一种识别火灾的火焰视频检测方法
CN102750359A (zh) 基于输电线路三维模型的空间信息提取与格式转换方法
CN109147044A (zh) 一种基于点云数据进行输电塔及线路检测的系统
CN106650746B (zh) 基于角度步长的变电站指针式仪表识别方法
CN107844897A (zh) 一种基于分治法的电网山火监测告警杆塔计算方法
CN107369291A (zh) 基于深度学习的高压线路防外力破坏预警系统及方法
CN102946069A (zh) 特高压输电线路三维可视化智能监控系统
CN203031618U (zh) 一种用于高压带电作业机器人的视觉系统
CN109472220A (zh) 一种基于Faster R-CNN的变电站工人安全帽检测方法及其系统
Sha et al. Design of patrol monitoring and control system for hot spot of solar photovoltaic module
Fang et al. A framework of power pylon detection for UAV-based power line inspection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE, GUANGDONG POWER GRID CO., LTD.

Patentee after: Wuhan University

Address before: 510080 Dongfeng East Road, Guangdong, Guangzhou, water, Kong Kong, No. 8

Patentee before: Electrical Power Research Institute of Guangdong Power Grid Corporation

Patentee before: Wuhan University

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210414

Address after: 510080 dongdongdong Road, dongdongdong Road, Guangzhou, Guangdong Province, No. 8

Patentee after: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd.

Address before: 510080 water Donggang 8, Dongfeng East Road, Yuexiu District, Guangzhou, Guangdong.

Patentee before: Electric Power Research Institute of Guangdong Power Grid Co.,Ltd.

Patentee before: WUHAN University