CN103410333B - The irregular Construction of Steel Structure method of abnormity - Google Patents

The irregular Construction of Steel Structure method of abnormity Download PDF

Info

Publication number
CN103410333B
CN103410333B CN201310357124.0A CN201310357124A CN103410333B CN 103410333 B CN103410333 B CN 103410333B CN 201310357124 A CN201310357124 A CN 201310357124A CN 103410333 B CN103410333 B CN 103410333B
Authority
CN
China
Prior art keywords
arc
compound beam
irregular
longerons
support columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310357124.0A
Other languages
Chinese (zh)
Other versions
CN103410333A (en
Inventor
陈勇辉
许小金
戈祥林
陶暑生
冯龙
贺亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201310357124.0A priority Critical patent/CN103410333B/en
Publication of CN103410333A publication Critical patent/CN103410333A/en
Application granted granted Critical
Publication of CN103410333B publication Critical patent/CN103410333B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of special-shaped irregular Construction of Steel Structure method, comprise the following steps: 1) by the compound beam that irregular for abnormity steel work segmentation is divided into two arc longerons and is connected between two arc longerons by design drawing; 2) steel plate setting-out, cutting, assembling, processing obtains described compound beam and arc longeron; 3) first respectively two arc longeron liftings are put in place, and temporary support columns is set below two arc longerons; 4) again by between compound beam lifting to two arc longerons, compound beam and two arc longitudinal beam weldings are fixed; 5) described temporary support columns is unloaded, complete the installation of special-shaped irregular steel work.Construction method reasonable of the present invention, convenient operation, successfully solves the processing of Complex Different Shape steel work and the difficult problem lifted.Adopt the lifting mode of " burst lifts, and combines " in the air, reduce the task difficulty of operating personnel, the mechanically actuated cost of minimizing, improves operating efficiency, ensure that construction quality and safety, shortens the duration.

Description

The irregular Construction of Steel Structure method of abnormity
Technical field
The present invention, about a kind of Construction of Steel Structure method, refers in particular to a kind of special-shaped irregular Construction of Steel Structure method.
Background technology
Along with the strength development of China's building trade grows, appearance of city generation acute variation in all parts of the country, new building emerges in an endless stream as emerged rapidly in large numbersBamboo shoots after a spring rain.Nowadays, desirable in conjunction with modern popular architectural aesthetic, designer consummate craftsmanship, has broken through thought binding in the past, and a collection of modern design of design-build is unique, the day by day diversified building of style, reflects strong times flavour.Particularly the moulding of curved-surface building is more and more applied in many domestic and international architectural images.In these buildings, use the irregular steel work of a large amount of abnormity, and these special-shaped irregular steel work are in the past just as the individual monomers in architectural image, be applied on a large scale in whole architectural image now, because the construction weight of irregular steel work is large, moulding is complicated, by transport capacity and install the restriction of crane, cause the produce in factory of component and lifting construction difficulty large, conventional hanging method cannot be adopted to install.
Summary of the invention
Because the problems referred to above, the invention provides a kind of special-shaped irregular Construction of Steel Structure method, comprise the following steps:
1) by the compound beam that irregular for abnormity steel work segmentation is divided into two arc longerons and is connected between two arc longerons by design drawing;
2) steel plate setting-out, cutting, assembling, processing obtains described compound beam and arc longeron;
3) first respectively two arc longeron liftings are put in place, and temporary support columns is set below two arc longerons;
4) again by between compound beam lifting to two arc longerons, compound beam and two arc longitudinal beam weldings are fixed;
5) described temporary support columns is unloaded, complete the installation of special-shaped irregular steel work.
Further improvement of the present invention is, after described temporary support columns unloading, arranges full hall scaffold as support further below the irregular steel work of described abnormity.
Further improvement of the present invention is, described temporary support columns is unloaded by jack.
Further improvement of the present invention is, after compound beam lifting being put in place, below compound beam, arranges temporary support columns.
Abnormity of the present invention irregular Construction of Steel Structure method reasonable, convenient operation, successfully solves the processing of Complex Different Shape steel work and the difficult problem lifted.Adopt the lifting mode of " burst lifts, and combines " in the air, reduce the task difficulty of operating personnel, the mechanically actuated cost of minimizing, improves operating efficiency, ensure that construction quality and safety, shortens the duration.
Accompanying drawing explanation
Fig. 1 is the irregular Construction of Steel Structure method flow diagram of abnormity of the present invention.
Fig. 2 is the exploded view of the irregular steel work of abnormity of the present invention.
Fig. 3 is that the present invention lifts the schematic diagram installing arc longeron.
Fig. 4 is that the present invention lifts the schematic diagram installing compound beam.
Fig. 5 is the schematic diagram that the irregular Steel Structure Installation of the present invention's abnormity completes.
Detailed description of the invention
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
Coordinate referring to shown in Fig. 1, the step of abnormity of the present invention irregular Construction of Steel Structure method is as follows:
Shown in S1 composition graphs 2, by using the measuring apparatuss such as high precision total station, the softwares such as BIM and AutoCAD are utilized to carry out modeling, the measurements and calculations method of employing science, the compound beam 102 segmentation of irregular for abnormity steel work 10 being divided into two arc longerons 101 and being connected between two arc longerons 101 by design drawing; Preferably resolve the difficult problem that Complex Different Shape irregular steel work surveying setting-out work amount of calculation is large, testing required precision is high, also solve the difficult problem that tilt axis controls simultaneously, to the surveying setting-out technology of the irregular steel work of Complex Different Shape, there is higher directive significance.
The setting-out of S2 steel plate, cutting, assembling, processing obtains described compound beam 102 and arc longeron 101; The setting-out of steel plate cutting mainly adopts computer programming setting-out, and by full-automatic numerical control cutting stock, small part part adopts plate shearing machine for blanking, guarantees the correctness of disparate modules setting-out size, overcomes the error that artificial setting-out produces.
Shown in S3 composition graphs 3, first respectively two arc longeron 101 liftings are put in place, and temporary support columns 20 is set in the below of two arc longeron 101 cambered top end; The top of temporary support columns 20 is provided with jack 201.
Shown in S4 composition graphs 4, then compound beam 102 is lifted between two arc longerons 101, after compound beam 102 lifting puts in place, temporary support columns 20 is also set below compound beam 102, compound beam 102 and two arc longerons 101 are welded and fixed.
Shown in S5 composition graphs 5, described temporary support columns 20 is unloaded by jack 201, complete the installation of special-shaped irregular steel work 10.After temporary support columns 20 has unloaded, in the below of described abnormity irregular steel work 10, full hall scaffold 30 is set as support further.
The flower-shaped steel structural roof of loudspeaker of the irregular curve that Nanning planning museum is made up of seven arc-shaped steel rod structures, construction method of the present invention has been applied in the work progress of roofing, below in conjunction with the constructure scheme of Nanning planning museum, the present invention will be further described.The constructure scheme of Nanning planning museum comprises the following steps:
1) by design drawing, the crossbeam that the irregular steel structural roof segmentation of museum is divided into plural Pin arc steel structure and is connected between each arc steel structure is planned in Nanning, then by compound beam 102 that the segmentation of every Pin arc steel structure is divided into two arc longerons 101 and is connected between two arc longerons;
2) steel plate setting-out, cutting, assembling, processing obtains described compound beam 102, arc longeron 101 and crossbeam;
3) first lifted the installation of a Pin arc steel structure, comprised the following steps:
A. first respectively two arc longeron 101 liftings are put in place, and temporary support columns 20 is set in the below of two arc longeron 101 cambered top end;
B. again compound beam 102 is lifted between two arc longerons 101, and temporary support columns 20 is set below compound beam 101;
C. compound beam 102 is welded and fixed with two arc longerons 101 respectively, after having welded, described temporary support columns 20 is unloaded, complete the installation of a Pin arc steel structure;
4) plural Pin arc steel structure is all completed installation by step 3);
5) between each arc steel structure, lift welding beam, and between each arc steel structure and crossbeam, roofing checkered steel plate is installed, complete the construction of the irregular steel structural roof of Nanning planning museum.
The above is only preferred embodiment of the present invention, not any pro forma restriction is done to the present invention, although the present invention discloses as above with preferred embodiment, but and be not used to limit the present invention, any those skilled in the art, not departing from the scope of technical solution of the present invention, make a little change when the technology contents of above-mentioned announcement can be utilized or be modified to the Equivalent embodiments of equivalent variations, in every case be the content not departing from technical solution of the present invention, according to any simple modification that technical spirit of the present invention is done above embodiment, equivalent variations and modification, all still belong in the scope of technical solution of the present invention.

Claims (1)

1. the irregular Construction of Steel Structure method of abnormity, is characterized in that comprising the following steps:
1) by the compound beam that irregular for abnormity steel work segmentation is divided into two arc longerons and is connected between two arc longerons by design drawing;
2) steel plate setting-out, cutting, assembling, processing obtains described compound beam and arc longeron;
3) first respectively two arc longeron liftings are put in place, and temporary support columns is set below two arc longerons, jack is set on the top of described temporary support columns;
4) again by between compound beam lifting to two arc longerons, temporary support columns is set below compound beam, compound beam and two arc longitudinal beam weldings are fixed;
5) described temporary support columns is passed through described lifting jack unloading, complete the installation of special-shaped irregular steel work; After described temporary support columns unloading, below the irregular steel work of described abnormity, full hall scaffold is set as support.
CN201310357124.0A 2013-08-16 2013-08-16 The irregular Construction of Steel Structure method of abnormity Active CN103410333B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310357124.0A CN103410333B (en) 2013-08-16 2013-08-16 The irregular Construction of Steel Structure method of abnormity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310357124.0A CN103410333B (en) 2013-08-16 2013-08-16 The irregular Construction of Steel Structure method of abnormity

Publications (2)

Publication Number Publication Date
CN103410333A CN103410333A (en) 2013-11-27
CN103410333B true CN103410333B (en) 2015-12-02

Family

ID=49603370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310357124.0A Active CN103410333B (en) 2013-08-16 2013-08-16 The irregular Construction of Steel Structure method of abnormity

Country Status (1)

Country Link
CN (1) CN103410333B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032966A (en) * 2014-06-27 2014-09-10 中国十九冶集团(防城港)设备结构有限公司 Partitioning, hoisting, overhead closing and mounting method for arc-shaped double-layer net racks
CN104264781B (en) * 2014-10-31 2016-05-18 中国建筑第二工程局有限公司 Latticed cylinder Steel Shell and construction method thereof
CN107188039B (en) * 2017-06-02 2019-02-19 中国航发南方工业有限公司 Overhead trolley combined hanging method
CN111127656B (en) * 2020-01-09 2020-11-24 中建一局集团第二建筑有限公司 Special-shaped roof lofting construction method based on BIM model
CN112749430A (en) * 2020-12-22 2021-05-04 中国华冶科工集团有限公司 Method for manufacturing special-shaped cone
CN113587910B (en) * 2021-07-02 2023-12-29 中铁建设集团中南建设有限公司 Construction measurement method for multi-circle-center arc-shaped special-shaped structure

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101524804B (en) * 2009-03-27 2011-03-23 中建钢构有限公司 Steel member manufacturing method
CN101899904B (en) * 2010-07-23 2011-06-29 中冶建工有限公司 Method for two-way hoisting construction of converter tower steel structure
CN102505860B (en) * 2011-10-21 2013-01-02 温州建设集团有限公司 Novel Lifting method for irregularly-shaped steel structure member

Also Published As

Publication number Publication date
CN103410333A (en) 2013-11-27

Similar Documents

Publication Publication Date Title
CN103410333B (en) The irregular Construction of Steel Structure method of abnormity
CN102635209B (en) Cornice steel skeleton and bracket steel skeleton for large-span big roof of pseudo-classic architecture and construction method of cornice steel skeleton and bracket steel skeleton
CN104612307B (en) Ceiling system and its construction method
CN104358410B (en) Anti-arc wall form space orientation control method
CN103556836B (en) Spherical reticulated shells assembling and construction method under restricted clearance condition
CN101852019B (en) Lifting mounting method for inclined steel roof
CN107366356A (en) Assembled architecture agent structure
CN104343214A (en) Bracket prefabricated reinforcement framework of pseudo-classic building, fabrication method of reinforcement framework, and construction method of reinforced concrete bracket of pseudo-classic building
CN204418469U (en) ceiling system
CN102953554A (en) Method for installing large-span honeycomb-shaped dual-layer net shell structure
CN203863813U (en) Die special for housing industrialization pre-cast concrete component stair
CN102003078A (en) Assembling method of net rack
CN111997191B (en) Method for installing special-shaped steel structure and method for installing steel net frame structure
CN105480002A (en) Single-layer steel structure decoration tree and mounting method thereof
CN105587058A (en) Perforated aluminum plate curtain wall of external wall
CN103276909B (en) The assembled moulding bed of rack of arch-shaped space truss assembling method and use thereof
CN102926547B (en) Installation method of curved-surface net rack of roof
CN205296398U (en) Large -span individual layer net shell steel construction roofing
CN115653168A (en) Double-curved-surface honeycomb aluminum plate structure and mounting method thereof
CN113323153A (en) Bending-twisting aluminum alloy structure in existing complex space and construction method
CN205292077U (en) Tree is decorated to individual layer steel construction
CN204174848U (en) A kind of precast reinforced skeleton of sets of brackets on top of the columns of building in the style of the ancients
CN202577767U (en) Supporting spacer for reinforcing steel bars of shear wall
CN104389348A (en) Installing method of arch structure with skin
CN102953547A (en) Honeycomb reticulated shell triangular prism unit assembling method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant