CN103410305B - Boiler maintenance ash mouth support platform and building method thereof - Google Patents

Boiler maintenance ash mouth support platform and building method thereof Download PDF

Info

Publication number
CN103410305B
CN103410305B CN201310369482.3A CN201310369482A CN103410305B CN 103410305 B CN103410305 B CN 103410305B CN 201310369482 A CN201310369482 A CN 201310369482A CN 103410305 B CN103410305 B CN 103410305B
Authority
CN
China
Prior art keywords
unit
boiler
fastening
ash mouth
support bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310369482.3A
Other languages
Chinese (zh)
Other versions
CN103410305A (en
Inventor
璩晶天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI BLUE OCEAN TECHNOLOGIES LIMITED
Original Assignee
Zhuhai Blue Ocean Technologies Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Blue Ocean Technologies Ltd filed Critical Zhuhai Blue Ocean Technologies Ltd
Priority to CN201310369482.3A priority Critical patent/CN103410305B/en
Publication of CN103410305A publication Critical patent/CN103410305A/en
Application granted granted Critical
Publication of CN103410305B publication Critical patent/CN103410305B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention provides a kind of boiler maintenance ash mouth support platform, it connects to form by overlapping the arrangement of unit bearing component order more, every suit unit bearing component is made up of unit support bracket, unit supports plate and two unit gusseted shoes, unit supports plate is layed in the surface of unit support bracket, and two unit gusseted shoes are arranged at two ends, unit support bracket bottom respectively; The two ends of described unit support bracket and the bottom of described unit gusseted shoe as leg, all for being connected to described boiler water wall ash mouth slope.The present invention adopts constitutionally stable gusseted girder steel overall structure, and solid and reliable, safety is high; Overall structure is smooth, do not jeopardize personal safety and device security gap and cavity; Assembly and disassembly are efficient and convenient; Arbitrarily can combine according to the length of boiler and reach scope of operation length requirement needed for boiler maintenance and customize according to the width that the different type of furnace needs, belong to original creation product of the same trade both at home and abroad.

Description

Boiler maintenance ash mouth support platform and building method thereof
Technical field
The present invention relates to boiler maintenance technical field, be specifically related to a kind of novel boiler maintenance ash mouth support platform, its support works face arranged at Boiler Ash mouth upper position when may be used for boiler of power plant maintenance, for boiler maintenance equipment provides the smooth scope of operation, the various repair apparatus of boiler both can be coordinated to use, also can be used alone; Excellent, boiler maintenance support platform arbitrarily can combine according to the length of boiler and reach scope of operation length requirement needed for boiler maintenance; The width that can also need according to the different type of furnace customizes.The safety of its equipment, convenience, agility and practicality all belong to original creation product of the same trade both at home and abroad.
Background technology
The working platform of existing boiler maintenance, be adopt scaffolding steel pipe to build layer by layer, be finally built into the scope of operation, the boiler maintenance then laying bamboo raft above supports the scope of operation.
Mainly there is following problem and shortcoming in it:
1, easily cause due to reasons in structure work plane to subside in whole or in part, there is higher personal safety and device security hidden danger.
2, the service work face effort using steel pipe scaffold to build: in closed container by diameter less than 500MM manhole transmission, transport the scaffolding of tens tons and build the scaffolding steel pipe of about 600 cubes and fastener enters in stove, one one steel pipe is built and couples together again, build the unsettled work plane more than 6-12 rice height, be one and consume one's strength very much and adventurous work.
3, the grey mouth working platform using steel pipe scaffold to build is consuming time: for 1,000,000 kilowatts of unit boilers, build and dismantle about 660 cubes scaffold steel pipe fastener ash the mouth scaffold support platform minimum needs time of about 3 days, not only effort and also time-consuming.
4, use the steel pipe scaffold grey mouth working platform cost of building too high: because of rising steadily of steel and cost of labor, make the expense that scaffolds erecting also very high, for 1,000,000 kilowatts of boilers, build a grey mouth and support more than scope of operation needs 150,000 RMB, and in the trend risen steadily.
5, the infringement to boiler inner wall in steel pipe scaffold material build process is used: the water caltrop cutting edge of a knife or a sword at steel pipe two ends is strict, because be direct contact with boiler inner wall, so be easy to cause damage to boiler water-wall tube when building.
Build with demolishing process in have unavoidably steel pipe and metal connecting piece falling from high altitude thing occur, not only easily personal injury is caused to field personnel, and the water-cooling wall of boiler and other boiler units are also easily caused damage, if reparation in time can cause heavy losses to power plant.
6, the grey mouth working platform using steel pipe scaffold to build has a lot of potential safety hazard to maintainer and repair apparatus:
1) when building, the work high above the ground risk of building personnel is inherently very large;
2) because the bearing plate at top is bamboo raft, so the weight capacity of veneer is very poor, often there will be the situation of aging bamboo raft fracture, people is easy to be leaked down; Due to top bamboo raft itself not straight in addition between steel pipe irregularity so bamboo raft work plane that top is laid has a lot of larger space (from tens centimeters to tens centimeters not etc.) between bamboo raft and bamboo raft, slightly little article are easy to drop down from gap, easily cause falling object from high altitude to there is very large potential safety hazard to staff below, also have because gap is excessive, out-of-flatness, people walk to be easy to fall in space above and cause personal injury.
3) often can there is the situation of overturning to repair apparatus (especially large-scale repair apparatus) when working mobile, very large potential safety hazard is all existed to the person of maintainer and repair apparatus safety.
7, (grey mouth working platform) the service work face equipment moving using steel pipe scaffold to build is very inconvenient: lay because its work plane is bamboo raft, be uneven, gap is very large, so have no idea when work plane moves large-scale or heavier equipment carry out smooth-going movement above or be easy to be stuck.
8, the grey mouth working platform maintenance using steel pipe scaffold to build is very inconvenient: if because the position contacted with scaffold needs to overhaul the position also needing to readjust scaffold in maintenance process, when the overall sandblasting carried out in stove sprays (when checking leak source in stove), the place contacted with boiler inner wall is needed to remove one by one, very inconvenient.In use, the muscle power consumed when maintainer climbs is very large, have no idea to carry overweight and large-scale repair apparatus for steel pipe scaffold, brings inconvenience to service work.
Summary of the invention
Described in background technology, in boiler maintenance process, there is above-mentioned middle problems and defect in existing mode of building boiler maintenance work plane, therefore steam power station be badly in need of that a safety, weight capacity are strong, surfacing, the product that easy to assemble, convenient transport can substitute the present boiler maintenance scope of operation.
The present invention is achieved through the following technical solutions:
A kind of boiler maintenance ash mouth support platform, it connects to form by overlapping the arrangement of unit bearing component order more, every suit unit bearing component is made up of unit support bracket, unit supports plate and two unit gusseted shoes, described unit supports plate is layed in the surface of described unit support bracket, and described two unit gusseted shoes are arranged at two ends, described unit support bracket bottom respectively; The two ends of described unit support bracket and the bottom of described unit gusseted shoe as leg, all for being connected to described boiler water wall ash mouth slope.
Described unit support bracket comprises as two of crossbeam isometric parallel pipes and is welded in and is connected keel with many of this two beam vertical between this two crossbeam, wherein, two connect keel are welded in two ends of contiguous described two crossbeams respectively position as limit connection keel; Be welded with one respectively at the both ends of described two crossbeams for connecting the bearing tube of the end points of described two crossbeams, it is parallel and adjacent that this bearing tube and described limit are connected keel.
Described gusseted shoe comprises adjuster and stressed adjustment eyelid retractor, and described adjuster comprises the gaily decorated basket and is connected to the regulator body at described gaily decorated basket two ends, and wherein, the end of a regulator body is articulated with the point midway of described limit connection keel; The regulator body that described stressed adjustment eyelid retractor comprises stressed support bar and is connected with one end of this stressed support bar, the other end of described stressed support bar is articulated with the point midway being connected the adjacent connection keel of keel with described limit, end winding support one skidproof supporting leg of the regulator body of described stressed adjustment eyelid retractor.
The adjacent of two often adjacent unit bearing components, be respectively equipped with two plate and connect fastening anti-slip device, it is fastening that the two adjacent crossbeams of the unit support bracket of described two unit bearing components are carried out connection by it.
Described pair of plate connects fastening anti-slip device and comprises upper cover plate and lower cover, wherein, upper cover plate is arranged at upper surface and the external margin of described two crossbeams, lower cover is arranged at soffit and the external margin of described two crossbeams, this two cover plate connects fastening by fastener, thus it is fastening that described two unit bearing components are carried out connection.
The two ends of described many cover unit bearing components arrange many plates pull bar respectively and connect anti-skidding fastener pressing plate, each many plates pull bar described connects on anti-skidding fastener pressing plate every a segment distance place, connect one end that the pull bar of plate more than connects anti-skidding fastening pull rod, the other end that this many plates pull bar connects anti-skidding fastening pull rod is movably connected on same bottom and fixes on anchorage bar, and the two ends that anchorage bar is fixed in described bottom are stuck in the lower end of the both sides water cooling tube of the apparatus of thermo-electric power boiler needing maintenance respectively.
Described many plates pull bar connects anti-skidding fastening pull rod and comprises two adjustment fastening length screw rods and be connected to the fastening length adjuster of adjustment between the fastening length screw rod of described two adjustment.
The two ends that anchorage bar is fixed in described bottom are provided with antiskid insulation rubber cushion.
A building method for boiler maintenance ash mouth support platform, it comprises the following steps:
One or more unit bearing component directly to be patrolled and examined on Hui Kou position that manhole door that stair portion arranges is put in stove by the boiler of 6-12 rice high (the manhole door height of 300,000,600,000,1,000,000 kilowatts of boiler controller system is respectively between 6-8-12 rice) and carries out layings installation, another, to stepping down in after two people are entered by described manhole door on the unit bearing component that lays, needs to carry out laying work according to carrying out length in boiler;
Patrol and examine at boiler the personnel that one or two people outside stair portion laid to the inside by described Boiler Ash mouth manhole door and transmit multiple unit bearing component, the inside laying personnel is linked in sequence and lays the plurality of unit bearing component.
Compared with prior art, the present invention possesses following advantage:
1, constitutionally stable gusseted girder steel overall structure is adopted, solid and reliable, safety is high, pass through bearing test, veneer (every square meter) load-bearing can reach 1500KG (weight capacity of veneer is original 4.3 times), and main equipment can freely carried out above and walk.
2, smooth, gap and the cavity of not jeopardizing personal safety and device security of overall structure: the connection gap between each unit block is less than 5 millimeters, drop between height is less than 5 millimeters, effectively ensure that the personal safety of operating personnel and avoid the generation of falling object from high altitude, also fluent when work plane mobile device and weight in addition.
3, assembly and disassembly are efficient and convenient, greatly save the time of building laying: when needing continuous operation 40-50 little than the assembly and disassembly time by original 20 scaffolders with the existing grey mouth support platform that scaffolds erecting, shorten to 4 skilled workers and lay 50-60 minute.
4, it is adjustable that the triangular support configurations in structure of the present invention is designed to carry out 0-30 degree, can adapt to the construction conditions of inside any angle ash mouth water-cooling wall of boiler.
5, all adopt Wear-resistant, high-temperature resistant rubber cushion with boiler water wall contact site, effectively avoid scratch water screen tube.
6, unit block surface adopts the design of anti-skidding aluminium sheet, effectively prevents staff from falling down injured.
7, all metal material all do anti-oxidant treatment, and ensure product application life, application life of the present invention can reach 10 years.
8, adopt the mode that is connected and fixed of unique design between unit block, after laying fast, an entirety can be linked to be, effectively enhance the stability of boiler maintenance ash mouth support platform, fastness and safety.
In addition, from the producible Economic and Efficiency Analysis of the present invention, it has the following advantages:
1, structure design of the present invention is simple, cheap for manufacturing cost and can repeatedly Reusability, thus effectively save the product purchasing cost of disposable input and build cost, and the cost in use procedure is substantially negligible, so can deserve to be called real inexpensive compared with existing method of building steel pipe scaffold work plane.
2, because the assembly and disassembly time of the present invention is short, efficiency is high, greatly saves the repair time of boiler unit, for client brings huge economic benefit.For 1,000,000 kilowatts of unit boilers: build and dismantle the time that existing scaffold ash mouth support platform needs about 3 days, as long as and the laying of new product and dismounting 60 minutes, which saves the repair time of similar 40-50 hour, 1000000 kilowatts of unit generated energy hourly are 1,000,000 kilowatt hours (i.e. 1,000,000 degree of electricity), the generated energy of 2,400 ten thousand degree within 24 hours, can be had, calculate with the profit often spending electricity 0.1 yuan, each maintenance can be just the direct economic benefit of the many creation of power plant 7,200,000 yuans.
Accompanying drawing explanation
Fig. 1 is the perspective view of the veneer gripper shoe of the embodiment of the present invention one and the released state of veneer support bracket;
Fig. 2 is the perspective view of the veneer gripper shoe of the embodiment of the present invention one and the bonding state of veneer support bracket;
Fig. 3 is the schematic side view of the unit supports assembly of the embodiment of the present invention one;
Fig. 4 is the phantom drawing of two unit bearing component assembled state of the embodiment of the present invention one;
Fig. 5 is the generalized section along A-A line in Fig. 4;
Fig. 6 is the top view of the boiler maintenance ash mouth support platform of the embodiment of the present invention two;
Fig. 7 is the lateral view of the boiler maintenance ash mouth support platform of the embodiment of the present invention two;
Fig. 8 is the boiler maintenance ash mouth support platform building method schematic diagram of the embodiment of the present invention three.
Detailed description of the invention
Embodiment one:
The present embodiment provides a kind of boiler maintenance ash mouth support platform, and as shown in Figure 1 to Figure 3, it connects to form by overlapping the arrangement of unit bearing component order more.Every suit unit bearing component is made up of unit support bracket 10, unit supports plate 20 and two unit gusseted shoes 30, described unit supports plate 20 is layed in the surface of described unit support bracket 10, and described two unit gusseted shoes 30 are arranged at the two ends, bottom of described unit support bracket 10 respectively; The two ends of described unit support bracket 10 and the bottom of described unit gusseted shoe 30 as leg, all for being connected to the grey mouth slope 1 of water-cooling wall of the described boiler needing maintenance.
Unit support bracket 10 described in each comprises as two of crossbeam 11 isometric parallel pipes and is welded in and is connected keel 12 with vertical many of this two crossbeam 11 between this two crossbeam 11, wherein, two connect keel 12 are welded in two ends of contiguous described two crossbeams 11 respectively position as limit connection keel; Be welded with one respectively at the both ends of described two crossbeams 11 for connecting the bearing tube of the end points of described two crossbeams 11, it is parallel and adjacent that this bearing tube and described limit are connected keel 12.This bearing tube is preferably pipe girder steel 13, and it is parallel and adjacent that itself and described limit are connected keel 12.And preferably, the external surface of this two pipes girder steel 13 is coated with skid resistant course.Concrete, described skid resistant course is antiskid insulation rubber skin, and itself and described two pipe girder steels 13 are fixed by rivet.
The length of described unit supports plate 20 is slightly less than the length of described unit support bracket 10, described unit supports plate 20 is layed in after on described unit support bracket 10, between each end of unit supports plate 20 and the corresponding end of unit support bracket 10, all leaves space.
Described unit gusseted shoe 30 comprises adjuster 31 and stressed adjustment eyelid retractor 32, described adjuster 31 comprises the gaily decorated basket 311 and is connected to the regulator body 312 at the described gaily decorated basket 311 two ends, wherein, an end of regulator body 312 is articulated with the point midway that a described limit connects keel 12; The regulator body 322 that described stressed adjustment eyelid retractor 32 comprises stressed support bar 321 and is connected with one end of this stressed support bar 321, the other end of described stressed support bar 321 is articulated with the point midway being connected the adjacent connection keel 12 of keel 12 with described limit, end winding support one skidproof supporting leg 323 of the regulator body 322 of described stressed adjustment eyelid retractor 32, is connected to as described leg on the grey mouth slope 1 of the water-cooling wall of the described boiler needing maintenance.
As shown in Figures 4 and 5, the adjacent of two often adjacent unit bearing components, be respectively equipped with two plate and connect fastening anti-slip device 40, it is fastening that the two adjacent crossbeams 11 of the unit support bracket 10 of described two unit bearing components are carried out connection by it.Described pair of plate connects fastening anti-slip device 40 and comprises upper cover plate 41 and lower cover 42, wherein, upper cover plate 41 is arranged at upper surface and the external margin of described two crossbeams 11, lower cover 42 is arranged at soffit and the external margin of described two crossbeams 11, this two cover plate 41,42 connects fastening by fastener, thus it is fastening that described two unit bearing components are carried out connection.
Described unit supports plate 20 is made up of panel and the anti-skidding aluminium sheet being coated on described panel surface.
To sum up, described unit bearing component utilizes described pipe girder steel 13 to make the strong point with the contact of boiler water wall ash mouth slope, recycle described unit gusseted shoe 30 and play fixed support effect, the angle of described unit gusseted shoe 30 can also be regulated according to the gradient of boiler water wall ash mouth slope 1, be provided with antiskid glue cushion between pipe girder steel 13 and boiler water wall ash mouth slope contact point, damage boiler water wall ash mouth slope 1 can be prevented.
Multiple described unit bearing component all connects fastening anti-slip device 40 by above-mentioned two plates between any two and connects fastening.
Embodiment two:
The present embodiment provides another kind of boiler maintenance ash mouth support platform, and it is similar with embodiment one, and difference is only: the boiler maintenance ash mouth support platform of the present embodiment also comprises the many plates pull bar connection fastening anti-slip device preventing it from turning on one's side.
In embodiment one, in the described space at the two ends of described many cover unit bearing components, plate pull bar more than is set respectively and connects anti-skidding fastener pressing plate 51, each many plates pull bar described connect anti-skidding fastener pressing plate 51 every a segment distance place, connect one end that the pull bar of plate more than connects anti-skidding fastening pull rod 52, the other end that this many plates pull bar connects anti-skidding fastening pull rod 52 is movably connected on same bottom and fixes on anchorage bar 53, and the two ends that anchorage bar 53 is fixed in described bottom are stuck in the lower end of the both sides water cooling tube of the apparatus of thermo-electric power boiler needing maintenance respectively.Described many plates pull bar connects anti-skidding fastening pull rod 52 and comprises two adjustments fastening length screw rod 521 and be connected to the fastening length adjuster 522 of adjustment between the fastening length screw rod 521 of described two adjustment.
The two ends that anchorage bar 53 is fixed in described bottom are provided with antiskid insulation rubber cushion.
Fastening length screw rod 521 is regulated to regulate described many plates pull bar to connect the length of anti-skidding fastening pull rod 52 by regulating described two, make described many plates pull bar connect anti-skidding fastener pressing plate 51 described multiple unit support bracket 10 to be pressed and scraped, both the connection of multiple unit bearing component can have been strengthened, and can effectively prevent in use, due to the rollover of the whole boiler maintenance ash mouth support platform caused uneven in the hand of two ends.
Embodiment three:
The present embodiment provides the building method of the boiler maintenance ash mouth support platform described in a kind of embodiment two.
The present embodiment comprises the following steps:
As shown in Figure 8, one or more unit bearing component directly to be patrolled and examined on Hui Kou position that manhole door 60 that stair portion arranges is put in stove by the boiler that 6-12 rice is high and carries out layings installation, another, to stepping down in after two people are entered by described manhole door 60 on the unit bearing component that lays, needs to carry out laying work according to carrying out length in boiler;
Patrol and examine at boiler the personnel that one or two people outside stair portion laid to the inside by described Boiler Ash mouth manhole door 60 and transmit multiple unit bearing component, the inside laying personnel is linked in sequence and lays the plurality of unit bearing component.
The advantage of the method is:
1, multiple unit load bearing support assembly to be directly directly put into by unit block on the Hui Kou position in stove, the grey mouth support scope of operation just can be completed smoothly without the need to building any support object again in the 6-12 rice of such bottom, this is the one action innovation in grey mouth support works face, and it will become a kind of development trend that following boiler maintenance supports scope of operation technological transformation;
2, the finished weight of every block platform unit bearing component is that 31.2KG is so 2 people carry fast very convenient;
3, Boiler Ash mouth support platform unit bearing component is placed in special Storage and transport case after assembling, can take out when needed and directly carry out by boiler manhole use of mating formation afterwards, the mating formation and carry out the connect hours probably for about half a minute with adjacent cells bearing component with " butterfly button " of every module unit bearing component, lay 30 meters of boiler maintenance work planes, 4 staff lay and probably need 1 hour time to complete.
The technical scheme of the present invention's protection is not limited to above-mentioned several embodiment, and all embodiments that the inventive concept basis of above-described embodiment extends are the scope of protection of the invention.Such as: in embodiment one, space can be there is no between the end of described unit supports plate and the corresponding end of unit support bracket yet, under such circumstances, the many plates pull bar in embodiment two connects anti-skidding fastener pressing plate and is arranged at above the end of unit supports plate.

Claims (7)

1. a boiler maintenance ash mouth support platform, it is characterized in that: it connects to form by overlapping the arrangement of unit bearing component order more, every suit unit bearing component is made up of unit support bracket, unit supports plate and two unit gusseted shoes, described unit supports plate is layed in the surface of described unit support bracket, and described two unit gusseted shoes are arranged at two ends, described unit support bracket bottom respectively; The two ends of described unit support bracket and the bottom of described unit gusseted shoe as leg, all for being connected to described boiler water wall ash mouth slope;
Described unit support bracket comprises as two of crossbeam isometric parallel pipes and is welded in and is connected keel with many of this two beam vertical between this two crossbeam, wherein, two connect keel are welded in two ends of contiguous described two crossbeams respectively position as limit connection keel; Be welded with one respectively at the both ends of described two crossbeams for connecting the bearing tube of the end points of described two crossbeams, it is parallel and adjacent that this bearing tube and described limit are connected keel;
Described gusseted shoe comprises adjuster and stressed adjustment eyelid retractor, and described adjuster comprises the gaily decorated basket and is connected to the regulator body at described gaily decorated basket two ends, and wherein, the end of a regulator body is articulated with the point midway of described limit connection keel; The regulator body that described stressed adjustment eyelid retractor comprises stressed support bar and is connected with one end of this stressed support bar, the other end of described stressed support bar is articulated with the point midway being connected the adjacent connection keel of keel with described limit, end winding support one skidproof supporting leg of the regulator body of described stressed adjustment eyelid retractor.
2. boiler maintenance ash mouth support platform according to claim 1, it is characterized in that: the adjacent of two often adjacent unit bearing components, be respectively equipped with two plate and connect fastening anti-slip device, it is fastening that the two adjacent crossbeams of the unit support bracket of described two unit bearing components are carried out connection by it.
3. boiler maintenance ash mouth support platform according to claim 2, it is characterized in that: described pair of plate connects fastening anti-slip device and comprise upper cover plate and lower cover, wherein, upper cover plate is arranged at upper surface and the external margin of described two crossbeams, lower cover is arranged at soffit and the external margin of described two crossbeams, this two cover plate connects fastening by fastener, thus it is fastening that described two unit bearing components are carried out connection.
4. boiler maintenance ash mouth support platform according to claim 3, it is characterized in that: the two ends of described many cover unit bearing components arrange many plates pull bar respectively and connect anti-skidding fastener pressing plate, each many plates pull bar described connects on anti-skidding fastener pressing plate every a segment distance place, connect one end that the pull bar of plate more than connects anti-skidding fastening pull rod, the other end that this many plates pull bar connects anti-skidding fastening pull rod is movably connected on same bottom and fixes on anchorage bar, and the two ends that anchorage bar is fixed in described bottom are stuck in the lower end of the both sides water cooling tube of the apparatus of thermo-electric power boiler needing maintenance respectively.
5. boiler maintenance ash mouth support platform according to claim 4, is characterized in that: described many plates pull bar connects anti-skidding fastening pull rod and comprises two adjustment fastening length screw rods and be connected to the fastening length adjuster of adjustment between the fastening length screw rod of described two adjustment.
6. the boiler maintenance ash mouth support platform according to claim 4 or 5, is characterized in that: the two ends that anchorage bar is fixed in described bottom are provided with antiskid insulation rubber cushion.
7. a building method for any one boiler maintenance ash mouth support platform of claim 1 to 6, is characterized in that: it comprises the following steps:
One or more unit bearing component directly to be patrolled and examined on Hui Kou position that manhole door that stair portion arranges is put in stove by the boiler that 6-12 rice is high and carries out layings installation, another, to stepping down in after two people are entered by described manhole door on the unit bearing component that lays, needs to carry out laying work according to carrying out length in boiler;
Patrol and examine at boiler the personnel that one or two people outside stair portion laid to the inside by described Boiler Ash mouth manhole door and transmit multiple unit bearing component, the inside laying personnel is linked in sequence and lays the plurality of unit bearing component.
CN201310369482.3A 2013-08-22 2013-08-22 Boiler maintenance ash mouth support platform and building method thereof Active CN103410305B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310369482.3A CN103410305B (en) 2013-08-22 2013-08-22 Boiler maintenance ash mouth support platform and building method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310369482.3A CN103410305B (en) 2013-08-22 2013-08-22 Boiler maintenance ash mouth support platform and building method thereof

Publications (2)

Publication Number Publication Date
CN103410305A CN103410305A (en) 2013-11-27
CN103410305B true CN103410305B (en) 2016-04-27

Family

ID=49603342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310369482.3A Active CN103410305B (en) 2013-08-22 2013-08-22 Boiler maintenance ash mouth support platform and building method thereof

Country Status (1)

Country Link
CN (1) CN103410305B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544948A (en) * 2016-01-15 2016-05-04 王本 Supporting device for wall tile fixing
CN105735628B (en) * 2016-03-11 2018-09-18 珠海市蓝海工业技术有限公司 Boiler maintenance ash mouth support platform and its building method
CN106185687B (en) * 2016-08-31 2020-01-03 江苏能建机电实业集团有限公司 Boiler furnace maintenance platform adopting M-shaped gangplank
CN108751061A (en) * 2018-06-26 2018-11-06 珠海市蓝海工业技术有限公司 A kind of maintenance craft of the coal-fired plant boiler burner based on inspection platform
CN109807839A (en) * 2019-02-20 2019-05-28 江苏能建机电实业集团有限公司 A kind of folded water cold stator inspection platform

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06322975A (en) * 1993-05-14 1994-11-22 Shikoku Electric Power Co Inc Method for horizontal installation of girder for scaffolding stage in furnace, and girder therefor
JPH07119914A (en) * 1993-10-20 1995-05-12 Shikoku Electric Power Co Inc Apparatus and method for hanging-up in furnace
JPH07305497A (en) * 1994-05-11 1995-11-21 Mitsubishi Heavy Ind Ltd In-furnace scaffolding
JPH0978827A (en) * 1995-09-13 1997-03-25 Mitsubishi Heavy Ind Ltd Work floor
CN201062430Y (en) * 2006-10-16 2008-05-21 中际联合工业技术(北京)有限公司 Bed board bracket with self-alignment support legs
CN203499228U (en) * 2013-08-22 2014-03-26 璩晶天 Ash opening supporting platform for overhauling boiler

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06322975A (en) * 1993-05-14 1994-11-22 Shikoku Electric Power Co Inc Method for horizontal installation of girder for scaffolding stage in furnace, and girder therefor
JPH07119914A (en) * 1993-10-20 1995-05-12 Shikoku Electric Power Co Inc Apparatus and method for hanging-up in furnace
JPH07305497A (en) * 1994-05-11 1995-11-21 Mitsubishi Heavy Ind Ltd In-furnace scaffolding
JPH0978827A (en) * 1995-09-13 1997-03-25 Mitsubishi Heavy Ind Ltd Work floor
CN201062430Y (en) * 2006-10-16 2008-05-21 中际联合工业技术(北京)有限公司 Bed board bracket with self-alignment support legs
CN203499228U (en) * 2013-08-22 2014-03-26 璩晶天 Ash opening supporting platform for overhauling boiler

Also Published As

Publication number Publication date
CN103410305A (en) 2013-11-27

Similar Documents

Publication Publication Date Title
CN103410305B (en) Boiler maintenance ash mouth support platform and building method thereof
CN106223595B (en) A kind of rack high altitude bulk sliding platform and high altitude bulk construction method
CN103711323B (en) Utilize the anti-ceiling board construction method of portable tubular truss stage+module roofing
CN110407097A (en) The construction method of the novel phase modifier of lifting based on portal frame and Lao Xinge device
CN103821376B (en) Single-layer latticed shell high-altitude oblique rail accumulation slippage construction
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN101126223A (en) Mobile integral construction platform, construction method thereof and special sling for the same
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN101372865A (en) Stay suspender multispan beam structure highly hollow-out formwork system and construction method
CN101871259B (en) Building method of integral slip type scaffold used for steel grid construction
CN104763109A (en) Quick construction method for pressed bottom tile of large-span steel structure factory building roof
CN104261232A (en) Lifting device attaching to special-shaped section and mounting method of lifting device
CN110259090A (en) A kind of construction method of novel pull-up builder's jack
CN203499228U (en) Ash opening supporting platform for overhauling boiler
CN205314590U (en) Special mechanism of main equipment dismouting in factory building and frame
CN202055502U (en) Basket-type operating platform for construction of high-rise building construction
US12012311B2 (en) Construction system
CN204059901U (en) A kind of high-altitude construction operation platform
CN206071041U (en) A kind of angle iron frame template
CN105735628B (en) Boiler maintenance ash mouth support platform and its building method
CN205476398U (en) Ash opening supporting platform for overhauling boiler
CN207672441U (en) A kind of integrated steel trusses bolt applies stubborn workbench
CN208266685U (en) A kind of safe work platform of beam bridge steel web coating
CN106836949A (en) Large scale equipment rotary construction method
CN207332281U (en) A kind of movable operation platform for being used to overhang I-steel dismounting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20160223

Address after: 519000, room 508, West Block 2121, Jiuzhou Road, Xiangzhou District, Guangdong, Zhuhai

Applicant after: ZHUHAI BLUE OCEAN TECHNOLOGIES LIMITED

Address before: Jinbi 50 times square, 519000 Guangdong province Zhuhai Jida Waterfront Road 1-1-701

Applicant before: Qu Jingtian

C14 Grant of patent or utility model