CN103397749A - Simple rain gutter arrangement structure - Google Patents

Simple rain gutter arrangement structure Download PDF

Info

Publication number
CN103397749A
CN103397749A CN201310299614XA CN201310299614A CN103397749A CN 103397749 A CN103397749 A CN 103397749A CN 201310299614X A CN201310299614X A CN 201310299614XA CN 201310299614 A CN201310299614 A CN 201310299614A CN 103397749 A CN103397749 A CN 103397749A
Authority
CN
China
Prior art keywords
bracing frame
rain gutter
rain
roof drain
support frames
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310299614XA
Other languages
Chinese (zh)
Inventor
廖宝霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong L&s Science & Technology Group
Original Assignee
Guangdong L&s Science & Technology Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong L&s Science & Technology Group filed Critical Guangdong L&s Science & Technology Group
Priority to CN201310299614XA priority Critical patent/CN103397749A/en
Publication of CN103397749A publication Critical patent/CN103397749A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The invention relates to the technical field of rain gutter arrangement, in particular to a simple rain gutter arrangement structure which comprises support frames, rain strainers, rain gutters and support frame covers; the support frames are fixed to a wall, the rain strainers are arranged on the support frames, the rain gutters are arranged on the rain strainers, and the support frame covers are arranged on the rain gutters; the support frames are made of UPVC (unplasticized polyvinyl chloride) materials. The simple rain gutter arrangement structure has the advantages that the traditional fixing iron frames are omitted, a fixing effect is completely realized by the support frames made of UPVC plastics, the support frames are placed into grooves from top to bottom, and the support frame covers are finally sleeved into the grooves; the integral product cost is reduced as compared with the traditional fixing iron frames; the integral rain gutters are not easy to inwardly deform owing to the support frame covers which are sleeved into the grooves, and an integral arrangement procedure is simple and safe.

Description

A kind of simple and easy rain gutter arrangement
Technical field
The present invention relates to the technical field that rain gutter is arranged, more specifically, relate to a kind of simple and easy rain gutter arrangement.
Background technology
The Shelter in South China Cities amount of precipitation is large, rain gutter is adopted in the factory building draining more, the difficulty of design and construction has directly determined expensive, the low usefulness of rain gutter, the cement rainwater groove design of the overboard system of tradition is complicated, difficulty of construction is large, and is long in time limit, easily corrodes body of wall, will destroy the factory building exterior wall in a short time, affect attractive in appearance; The birth of plastic cement rain gutter brings hope to market, but when the wall connecting rain gutter of two roofings, often adopts brandreth to make pillar, both wasting space areas, also strengthening operating expenses, install and connect greatly, is relative pain in the neck feelings to designer, constructor, user.
Summary of the invention
The present invention is intended to solve the problems of the technologies described above at least to a certain extent.
The purpose of this invention is to provide a kind of simple and easy rain gutter arrangement, the brandreth of this structure abandoning tradition fixes, and all adopts UPVC plastic support frame to fix, and puts into from top to bottom groove, is inserted in finally the bracing frame lid.
For solving the problems of the technologies described above, the technical solution used in the present invention is: a kind of simple and easy rain gutter arrangement, wherein, comprise the bracing frame that is fixed in body of wall, be located at roof drain on bracing frame, be located at rain gutter on roof drain, be located at the bracing frame lid on rain gutter; Described bracing frame material is the UPVC material;
Described bracing frame both sides are provided with screw hole, and expansion bolt passes screw hole is fixed on body of wall bracing frame; Described bracing frame is provided with the bracing frame buckle, and bracing frame covers and is provided with hole clipping, bracing frame buckle and hole clipping clamping.The structure of employing clamping can reduce the cost of production of whole money product, alleviates customer's economy expenditure.The bracing frame lid is inserted in finally, and hole clipping and bracing frame buckle staple together, and unique arc and the rain gutter of bracing frame lid matches, and after fastening, whole product is difficult for to internal strain.During installation, can squeeze into expansion bolt and be fixed in body of wall under eaves and do the support of whole money product.
Described rain gutter is provided with the rain gutter position of bone, and roof drain is provided with the roof drain position of bone, and the rain gutter position of bone is connected with the roof drain position of bone.Can effectively be fixed together rain gutter and roof drain like this.
Described roof drain is provided with the roof drain buckle, roof drain buckle and hole clipping clamping.
Also be provided with reinforcing rib on described bracing frame.Reinforcing rib makes whole bracing frame more consolidate, stablize.Described bracing frame covers and is provided with perforation.Perforation can in time clear the rainwater that drops into the bracing frame lid.
Rain gutter can be put into bracing frame the inside very like a cork from top to bottom, makes that whole arrangement is simple, safety.The two ends of whole arrangement also are provided with end cap, and the junction between rain gutter also is provided with expansion coupling and straight joint.Whole money product all adopts the UPVC plastic production to form, and reduces the production cost.
Compared with prior art, beneficial effect is: the brandreth of abandoning tradition of the present invention fixes, and all adopts UPVC plastic support frame to fix, and puts into from top to bottom groove, is inserted in finally the bracing frame lid; Fixedly compare with traditional brandreth, reduced whole product cost; Being inserted in of bracing frame lid, be difficult for to internal strain whole rain gutter, and whole placement process is simple, safety.
Description of drawings
Fig. 1 is product arrangement schematic diagram of the present invention.
Fig. 2 is product cross-section structure the first schematic diagram of the present invention.
Fig. 3 is product cross-section structure the second schematic diagram of the present invention.
Fig. 4 is the generalized section of product layout of the present invention and body of wall.
The specific embodiment
Accompanying drawing only is used for exemplary illustration, can not be interpreted as the restriction to this patent; For better explanation the present embodiment, some parts of accompanying drawing have omission, zoom in or out, and do not represent the size of actual product; To those skilled in the art, in accompanying drawing some known configurations and explanation thereof may to omit be understandable.Describe position relationship in accompanying drawing and only be used for exemplary illustration, can not be interpreted as the restriction to this patent.
As Figure 1-4, a kind of simple and easy rain gutter arrangement, wherein, comprise the bracing frame 4 that is fixed in body of wall 9, be located at roof drain 2 on bracing frame 4, be located at rain gutter 1 on roof drain 2, be located at the bracing frame lid 3 on rain gutter 1; Bracing frame 4 materials are the UPVC material;
Bracing frame 4 both sides are provided with screw hole 42, and expansion bolt 8 passes screw hole 42 is fixed on body of wall 9 bracing frame 4; Bracing frame 4 is provided with bracing frame buckle 41, and bracing frame lid 3 is provided with hole clipping 32, bracing frame buckle 41 and hole clipping 32 clampings.The structure of employing clamping can reduce the cost of production of whole money product, alleviates customer's economy expenditure.Bracing frame lid 3 is inserted in finally, and hole clipping 32 staples together with bracing frame buckle 41, and arc and the rain gutter 1 of bracing frame lid 3 uniquenesses match, and after fastening, whole product is difficult for to internal strain.During installation, can squeeze into expansion bolt 8 and be fixed in body of wall 9 under eaves and do the support of whole money product.
Rain gutter 1 is provided with the rain gutter position of bone 11, and roof drain 2 is provided with the roof drain position of bone 22, and the rain gutter position of bone 11 is connected with the roof drain position of bone 22.Like this can both effectively be fixed together rain gutter 1 and roof drain 2.
In Fig. 3, roof drain 2 is provided with roof drain buckle 21, roof drain buckle 21 and hole clipping 32 clampings.
In Fig. 1,2, also be provided with reinforcing rib 43 on bracing frame 4.Reinforcing rib 43 makes whole bracing frame 4 more consolidate, stablize.Described bracing frame lid 3 is provided with perforation 31.Perforation 31 can in time clear the rainwater that drops into the bracing frame lid.
Rain gutter 1 can be put into bracing frame 4 the insides very like a cork from top to bottom, makes that whole arrangement is simple, safety.The two ends of whole arrangement also are provided with end cap 7, and the junction between rain gutter 1 also is provided with expansion coupling 5 and straight joint 6.Whole money product all adopts the UPVC plastic production to form, and reduces the production cost.
Before construction, at first should be according to the roofing shape, determine the position of standpipe, measure the distance of roof drain 2 both sides, determine the length of rain gutter 1 and the use amount of bracing frame 4, at 1 time uniform bracing frame 4 of rain gutter, its maximum spacing must not, greater than 400mm, calculate the cutting length of every section rain gutter 1 and service condition and the consumption of each accessory; Must guarantee that before construction each accessory is connected perfect with rain gutter 1 use glue in ground.
When arrangement is implemented, first determine the position of roof drain 2 and install; Hole on body of wall, bracing frame 4 is installed, squeeze into expansion bolt 8 and fix, bracing frame 4 use amounts are every four meters long interior uniform two bracing frames 4; Put into rain gutter 1 and each accessory product that has connected in the bracing frame 4 that fixes, slowly adjust; Being inserted in bracing frame lid 3 fixes; Install finally roof and criticize the water plate.
Obviously, the above embodiment of the present invention is only for example of the present invention clearly is described, and is not the restriction to embodiments of the present invention.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here need not also can't give all embodiments exhaustive.All any modifications of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., within all should being included in the protection domain of the claims in the present invention.

Claims (5)

1. simple and easy rain gutter arrangement, it is characterized in that, comprise the bracing frame (4) that is fixed in body of wall (9), be located at roof drain (2) on bracing frame (4), be located at rain gutter (1) on roof drain (2), be located at the bracing frame lid (3) on rain gutter (1); Described bracing frame (4) material is the UPVC material;
Described bracing frame (4) both sides are provided with screw hole (42), and expansion bolt (8) passes screw hole (42) is fixed on body of wall (9) bracing frame (4); Described bracing frame (4) is provided with bracing frame buckle (41), and bracing frame lid (3) is provided with hole clipping (32), bracing frame buckle (41) and hole clipping (32) clamping.
2. a kind of simple and easy rain gutter arrangement according to claim 1, it is characterized in that, described rain gutter (1) is provided with the rain gutter position of bone (11), and roof drain (2) is provided with the roof drain position of bone (22), and the rain gutter position of bone (11) is connected with the roof drain position of bone (22).
3. a kind of simple and easy rain gutter arrangement according to claim 2, is characterized in that, described roof drain (2) is provided with roof drain buckle (21), roof drain buckle (21) and hole clipping (32) clamping.
4. a kind of simple and easy rain gutter arrangement according to claim 3, is characterized in that, also is provided with reinforcing rib (43) on described bracing frame (4).
5. a kind of simple and easy rain gutter arrangement according to claim 4, is characterized in that, described bracing frame lid (3) is provided with perforation (31).
CN201310299614XA 2013-07-17 2013-07-17 Simple rain gutter arrangement structure Pending CN103397749A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310299614XA CN103397749A (en) 2013-07-17 2013-07-17 Simple rain gutter arrangement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310299614XA CN103397749A (en) 2013-07-17 2013-07-17 Simple rain gutter arrangement structure

Publications (1)

Publication Number Publication Date
CN103397749A true CN103397749A (en) 2013-11-20

Family

ID=49561444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310299614XA Pending CN103397749A (en) 2013-07-17 2013-07-17 Simple rain gutter arrangement structure

Country Status (1)

Country Link
CN (1) CN103397749A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839866A (en) * 2016-03-24 2016-08-10 安徽宝昱电子科技有限公司 Splashproof external edge module
JP2016216926A (en) * 2015-05-15 2016-12-22 鹿島建設株式会社 Restraint body and installation method of member

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001288860A (en) * 2000-04-05 2001-10-19 Mitsubishi Plastics Ind Ltd Rain gutter component
CN2634001Y (en) * 2003-07-17 2004-08-18 成都川路新型化学建材集团有限公司 Rain groove for abat-vent
US20070204521A1 (en) * 2006-02-03 2007-09-06 Emerald Innovations, Llc Gutter guard and decor support arrangement
CN200955230Y (en) * 2006-09-25 2007-10-03 李孟东 Holder of eaves gutter for water-drop
CN202324405U (en) * 2011-11-22 2012-07-11 浙江中财型材有限责任公司 Eaves gutter of finished PVC (Poly Vinyl Chloride) product
CN202467015U (en) * 2011-11-30 2012-10-03 广东联塑科技实业有限公司 Roof drainage system
CN202810016U (en) * 2012-07-28 2013-03-20 广东联塑科技实业有限公司 Downspout device of eaves gutter

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001288860A (en) * 2000-04-05 2001-10-19 Mitsubishi Plastics Ind Ltd Rain gutter component
CN2634001Y (en) * 2003-07-17 2004-08-18 成都川路新型化学建材集团有限公司 Rain groove for abat-vent
US20070204521A1 (en) * 2006-02-03 2007-09-06 Emerald Innovations, Llc Gutter guard and decor support arrangement
CN200955230Y (en) * 2006-09-25 2007-10-03 李孟东 Holder of eaves gutter for water-drop
CN202324405U (en) * 2011-11-22 2012-07-11 浙江中财型材有限责任公司 Eaves gutter of finished PVC (Poly Vinyl Chloride) product
CN202467015U (en) * 2011-11-30 2012-10-03 广东联塑科技实业有限公司 Roof drainage system
CN202810016U (en) * 2012-07-28 2013-03-20 广东联塑科技实业有限公司 Downspout device of eaves gutter

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016216926A (en) * 2015-05-15 2016-12-22 鹿島建設株式会社 Restraint body and installation method of member
CN105839866A (en) * 2016-03-24 2016-08-10 安徽宝昱电子科技有限公司 Splashproof external edge module

Similar Documents

Publication Publication Date Title
CN205116466U (en) Waterproof construction of node is hung futilely to assembly type structure outer wall
CN205077647U (en) Compound concrete outer wall board of prefabricated energy -saving insulation
CN205259477U (en) Factory building brick wall parapet and roofing eaves gutter waterproof construction
CN103397749A (en) Simple rain gutter arrangement structure
CN202810016U (en) Downspout device of eaves gutter
CN107190781B (en) Horizontal joint waterproofing construction method is added in large space basement roof post-cast strip
CN202866275U (en) Formwork system used for building
CN203834823U (en) Novel steel plate gutter
CN204001283U (en) A kind of grade beam of and the supporting Fast Installation of house wall
CN206233500U (en) Heat-preserving wall balustrade exterior panelling mounting structure
CN205918022U (en) Dismountable iron art railing
CN203145352U (en) Eave system
CN206145333U (en) Drainage pipe bend
CN205421752U (en) Adopt glass curtain wall building's hidden downspout
CN205689035U (en) Unit type door window auxiliary frame
CN208981671U (en) A kind of French building eave structure
CN202595959U (en) Novel curtain wall upright column
CN205780106U (en) The cross connecting piece of framework of glasshouse big shack
CN207499447U (en) For the heat insucation prefabricated plate connecting node construction of assembled passive type building
CN204960245U (en) Install flashing lath component between shingle nail and brick wall
CN206438927U (en) The window frame structure transformed available for old window
CN203960784U (en) Viaduct anti-collision wall template contral device
CN205077747U (en) Sideboard is received to dysmorphism gable and margin knot point is received to golden nation board gable
CN202157478U (en) Combined gutter eaves
CN206816072U (en) Plastic-steel window frame fixture

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131120